ML20115B269: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:/ | {{#Wiki_filter:/ | ||
O | O AEROTEST OPERATIONS, INC. | ||
O 3455 FOSTORIA WAY SAN RAMON. CA 94583 = (SW 8661212 | |||
O | * FAX (510) 866-1716 g | ||
* FAX (510) 866-1716 4A1 | 4A1 | ||
_ _ ._ g 6/12[96 I Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-228 | _ _._ g 6/12[96 I Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-228 | ||
==Dear Sir:== | ==Dear Sir:== | ||
In our letter dated 8 Aug.1994 we stated that as part of our program to meet the requirements of 10CFR 20.1301 - Radiation Dose Limits for Individual Members of the Public, we would perform periodic surveillance at approximately one hour intervals of our fence area whenever our reactor was operational. | In our letter dated 8 Aug.1994 we stated that as part of our program to meet the requirements of 10CFR 20.1301 - Radiation Dose Limits for Individual Members of the Public, we would perform periodic surveillance at approximately one hour intervals of our fence area whenever our reactor was operational. | ||
i in the 2-year period since we instituted this surveillance we have rarely observed | i in the 2-year period since we instituted this surveillance we have rarely observed anyone come close to our fenceline. During our recent NRC inspection in April, Blaine Murray (Region IV Chief of Reactor Inspection Branch) characterized our hourly surveillance as "probably overkill" In view of the above observations and to reduce the burden on our employees we have decided, with the approval of our Reactor Safeguards Committee, to reduce the fence area surveillance to wice in the morning and twice in the afternoon with the reactor shutdown during lunch. | ||
anyone come close to our fenceline. During our recent NRC inspection in April, Blaine | l This action will take effect on 1 July 1996. Ifyou have any questions or comments on this matter please call us at your convenience. | ||
Murray (Region IV Chief of Reactor Inspection Branch) characterized our hourly surveillance as "probably overkill" In view of the above observations and to reduce the burden on our employees we have decided, with the approval of our Reactor Safeguards Committee, to reduce the | Sincerely, 9607100041 960612 PDR ADOCK 05000228 P | ||
fence area surveillance to wice in the morning and twice in the afternoon with the reactor shutdown during lunch. | PDR Al redo W. Meren Reactor Supervisor cc: Marvin Mendonca, USNRC Samuel Collins, USNRC, Region IV A SUBSIDIARY OF OEA AEROSPACE,INC. | ||
Sincerely, 9607100041 960612 PDR | D t | ||
-}} | |||
t | |||
Latest revision as of 23:31, 12 December 2024
| ML20115B269 | |
| Person / Time | |
|---|---|
| Site: | Aerotest |
| Issue date: | 06/12/1996 |
| From: | Meren A AEROTEST OPERATIONS, INC. |
| To: | NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| NUDOCS 9607100041 | |
| Download: ML20115B269 (1) | |
Text
/
O AEROTEST OPERATIONS, INC.
O 3455 FOSTORIA WAY SAN RAMON. CA 94583 = (SW 8661212
- FAX (510) 866-1716 g
4A1
_ _._ g 6/12[96 I Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-228
Dear Sir:
In our letter dated 8 Aug.1994 we stated that as part of our program to meet the requirements of 10CFR 20.1301 - Radiation Dose Limits for Individual Members of the Public, we would perform periodic surveillance at approximately one hour intervals of our fence area whenever our reactor was operational.
i in the 2-year period since we instituted this surveillance we have rarely observed anyone come close to our fenceline. During our recent NRC inspection in April, Blaine Murray (Region IV Chief of Reactor Inspection Branch) characterized our hourly surveillance as "probably overkill" In view of the above observations and to reduce the burden on our employees we have decided, with the approval of our Reactor Safeguards Committee, to reduce the fence area surveillance to wice in the morning and twice in the afternoon with the reactor shutdown during lunch.
l This action will take effect on 1 July 1996. Ifyou have any questions or comments on this matter please call us at your convenience.
Sincerely, 9607100041 960612 PDR ADOCK 05000228 P
PDR Al redo W. Meren Reactor Supervisor cc: Marvin Mendonca, USNRC Samuel Collins, USNRC, Region IV A SUBSIDIARY OF OEA AEROSPACE,INC.
D t
-