MONTHLY NARRATIVE REPORT
MONTHLY NARRATIVE REPORT 0F 0PERATION
    ~   '
~
0F 0PERATION AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of June,1984. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the Plant Technical Specifications.
AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of June,1984. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the Plant Technical Specifications.
There is no significant operating experience or major safety-related maintenance to report.
There is no significant operating experience or major safety-related maintenance to report.
No challenges to the PORV's or safety valves have been made.
No challenges to the PORV's or safety valves have been made.
No changes have been made in the Offsite Dose Calculation Procedure, the Environmental ' Radiological . Monitoring Procedure, or any radioactive waste
No changes have been made in the Offsite Dose Calculation Procedure, the Environmental ' Radiological. Monitoring Procedure, or any radioactive waste
                  --treatment systems.
--treatment systems.
4 i
4 i
a s
a s
ill D     o     y PDR.   -
ill D
1
o y
  +                      0C0044 3       ,
PDR.
+
0C0044 3


l
l
    '* i;         =                                           '
'* i;
=
O KRATING DATA REPORT J
O KRATING DATA REPORT J
~
~
DOCKET NO.               50-275 DATE         07/06/84 COMPLETED BY               W.J. Kelly
DOCKET NO.
(                                                                                                       TELEPHONE               (805)595-7351 OPERATING STATUS
50-275 DATE 07/06/84 COMPLETED BY W.J. Kelly
            '1. Unit Name:             Diablo Canyon Unit 1
(
: 2. Reporting Period:                 June 1984                                         Notes: Startup Testing is
TELEPHONE (805)595-7351 OPERATING STATUS
: 3. Licensed Thermal Power (MWt):                     166.9                             completed. Awaiting grant i=       -4.     Nameplate Rating-(Gross MWe):                     1170                               of the full power license
'1.
: 5. Design Electrical Rating (Net MWe):                                   1084               from the NRC.
Unit Name:
: 6. Maximum Dependable Capacity (Gross MWe):                                   1134
Diablo Canyon Unit 1 2.
: 7. . Maximum Dependable Capacity (Net MWe):                                 1084
Reporting Period:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
June 1984 Notes: Startup Testing is 3.
I
Licensed Thermal Power (MWt):
: 9. Power Level To Which Restricted, If Any (Net MWe):                               58.50
166.9 completed. Awaiting grant i =
: 10.     Reasons For Restrictions, If Any:                         Low power test permit granted by the Nuclear Regulatory Commission on April 13, 1984, effective April 19, 1984 at 1200 hours.
-4.
This Month             Yr-to-Date             Cumulative
Nameplate Rating-(Gross MWe):
,          11. Hours In Reporting. Period                                                     720                   4914                 4914
1170 of the full power license 5.
: 12. -Number Of Hours Reactor Was Critical                                           0                     239                   239
Design Electrical Rating (Net MWe):
: 13.     Reactor Reserve Shutdown Hours                                             0                       0                     0
1084 from the NRC.
: 14. Hours Generator On-Line                                                         0                       0                     0
6.
: 15.     Unit Reserve Shutdown Hours                                                 0                       0                     0
Maximum Dependable Capacity (Gross MWe):
: 16. Gross Thermal Energy Generated (MWH)                                             0-                     615                   615
1134
: 17. Gross Electrical Energy Generated (MWH)-                                         0               "-
: 7.. Maximum Dependable Capacity (Net MWe):
1084 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
I 9.
Power Level To Which Restricted, If Any (Net MWe):
58.50 10.
Reasons For Restrictions, If Any:
Low power test permit granted by the Nuclear Regulatory Commission on April 13, 1984, effective April 19, 1984 at 1200 hours.
This Month Yr-to-Date Cumulative
: 11. Hours In Reporting. Period 720 4914 4914
: 12. -Number Of Hours Reactor Was Critical 0
239 239 13.
Reactor Reserve Shutdown Hours 0
0 0
: 14. Hours Generator On-Line 0
0 0
15.
Unit Reserve Shutdown Hours 0
0 0
: 16. Gross Thermal Energy Generated (MWH) 0-615 615
: 17. Gross Electrical Energy Generated (MWH)-
0
: 18. Net Electrical Energy Generated (MWH) 0
"- 0 0
0
0
: 18. Net Electrical Energy Generated (MWH)                                            0              " " '
: 19.. Unit Service Factor N/A
0                    0
: 20. Unit Availability Factor N/A
: 19. . Unit Service Factor                                                           N/A
: 21. Unit Capacity Factor (Using MDC Net)
: 20. Unit Availability Factor                                                       N/A
N/A
: 21. Unit Capacity Factor (Using MDC Net)                                           N/A
: 22.. Unit Capacity Factor (Using DER Net)
: 22. . Unit Capacity Factor (Using DER Net)                                         N/A
N/A
  +        23. Unit Forced Outage Rate                                                         N/A
: 23. Unit Forced Outage Rate N/A
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
+
                                                                                                                                                    -- r 1
24.
                                                                                ~
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 25.     If Shut Down At End Of Report Period, Est. Date of Startup:                                             JULY 1984-
-- r
~
25.
If Shut Down At End Of Report Period, Est. Date of Startup:
JULY 1984-
: 26. _ Units In Test Status (Prior to Commercial Operation):
: 26. _ Units In Test Status (Prior to Commercial Operation):
Forecast         Achieved
Forecast Achieved
                            ' INITIAL CRITICALITY                                                 April             1984         April 1984             4 INITIAL ELECTRICITY.                                               July               1984                                 I COMMERCLil 0PERATION                                                 September 1984-                                         !
' INITIAL CRITICALITY April 1984 April 1984 4
DC0044.' 4
INITIAL ELECTRICITY.
_ , . -    -      y          .yn.c       = y e           9   --y. - ,-
July 1984 COMMERCLil 0PERATION September 1984-DC0044.' 4 y
9   _97p   --=a       g- q   -w
.yn.c
=
y e 9
--y.
9
_97p
--=a g-q
-w


  ~*
~*
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0. 50-275 UNIT   Diablo Canyon Unit 1 DATE   07/06/84 COMPLETED BY   W.J. Kelly TELEPHONE   (805)595-7351 MONTH       June 1984 DAY       AVERAGE D?:iY POWER LEVEL           DAY     AVERAGE DAILY POWER LEVEL (Pht NET)                                     (Ph'E-NET) 1                   0                       17                 0 2                   0                       18                 0 3                   0                       19                 0 4                   0                     20                   0 5                   0                       21                   0 6                   0                       22                   0 7                   0                       23                   0 8                   0                       24                   0 9                   0                       25                   0
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.
                .10                   0                       26                   0 11                   0                       27                   0 12-                   0                       28                   0 13                   0                       29                   0 14                   0                       30                   0 15                   0                                                                   1
50-275 UNIT Diablo Canyon Unit 1 DATE 07/06/84 COMPLETED BY W.J. Kelly TELEPHONE (805)595-7351 MONTH June 1984 DAY AVERAGE D?:iY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Pht NET)
(                 a                     0 1
(Ph'E-NET) 1 0
1 INSTRUCTIONS On this format, list the average daily unit nower level in MWe-Net for each day in the r porting month. Compute to the nearest whole megawatt.
17 0
DC0044                                                                           l
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
.10 0
26 0
11 0
27 0
12-0 28 0
13 0
29 0
14 0
30 0
15 0
1 0
(
a INSTRUCTIONS On this format, list the average daily unit nower level in MWe-Net for each day in the r porting month. Compute to the nearest whole megawatt.
DC0044.


UNIT SHUTDOWNS AND POWER EDUCTIONS                                                   *'
UNIT SHUTDOWNS AND POWER EDUCTIONS DOCKET NO.
DOCKET NO.       50-275 UNIT NAE       UlABLO CANYON UNii 1 DATE       07/05/84 COPPLETED BY       W.J. TELLY TELEPHONE       (805 w a-/351 Method of   Licensee                                       Cause & Corrective Duration               Shutting     Event       System Component                     Action-to No.           Date   Type'l   (Hours)   Reason 2 Down Reactor 3 Report #     Code'+     Code 5             ' Prevent Recurrence                 f NONE J
50-275 UNIT NAE UlABLO CANYON UNii 1 DATE 07/05/84 COPPLETED BY W.J. TELLY TELEPHONE (805 w a-/351 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action-to No.
Date Type'l (Hours)
Reason 2 Down Reactor 3 Report #
Code'+
Code 5
' Prevent Recurrence f
NONE J
9
9
(
(
1                           2                                                   3                         4 F: Forced           Reason:                                             Method:                   Exhibit G - Instructions S: Scheduled       :A-Equipment Failure-(Explain)                       1-Manual                 for Preparation of Data B-Maintenance or Test                               2-Manual Scram.         -Entry Sheets for Licensee C-Refueling-                                       3-Automatic Scram.       Event Report (LER) File D-Regulatory Festriction                           4-Other (Explain)       -(NUREG-0161)
1 2
-                                                      E-Operator Training & License Examination F-Administrative             .                                              5 G-Operational Error (Explain)''                                               Exhibit I - Same Source H-Other (Explain)
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled
:A-Equipment Failure-(Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
-Entry Sheets for Licensee C-Refueling-3-Automatic Scram.
Event Report (LER) File D-Regulatory Festriction 4-Other (Explain)
-(NUREG-0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)''
Exhibit I - Same Source H-Other (Explain)
DC0044 '6
DC0044 '6


7 PACIFIC GAS AND E LE C T RIC C O M PAN'I pgg                i      DIABLO CANYON POWER PLANT i       PO. Box 56 Avila Beach, Califomia 93424 - (805) 595-7351 R.C. THORNBERRY PLANT MANAGER r
7 PACIFIC GAS AND E LE C T RIC C O M PAN'I DIABLO CANYON POWER PLANT pgg i
July 6, 1984 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 RE:     Docket No. 50-275 License No. DPR-76 Monthly Operating Report for June, 1984 Gentlemen:
i PO. Box 56 Avila Beach, Califomia 93424 - (805) 595-7351 R.C. THORNBERRY PLANT MANAGER r
Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for June 1984. For this report, the number of hours the reactor was critical and the gross thermal energy generated have been changed to reflect more cccurate information. This report is submitted in accordance with
July 6, 1984 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 RE:
            'Section 6.9.1.10 of our Technical Specifications.
Docket No. 50-275 License No. DPR-76 Monthly Operating Report for June, 1984 Gentlemen:
Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for June 1984.
For this report, the number of hours the reactor was critical and the gross thermal energy generated have been changed to reflect more cccurate information. This report is submitted in accordance with
'Section 6.9.1.10 of our Technical Specifications.
Sincerely,
Sincerely,
                                                              @dY R. C. THORNBERRY RCT:jhr Enclosures cc Mr. John B. Martin, Regional Administrator Region V - USNRC 4=$
@dY R. C. THORNBERRY RCT:jhr Enclosures cc Mr. John B. Martin, Regional Administrator Region V - USNRC 4=$
DC0044' 1 k  '
k DC0044' 1
_ _ _ _ _ _ _        _ - _ _ - _ _ _ - - - _ _ _    _ - _ _ _ - _ _ _ _ _ _ -}}
_ - _ _ _ - _ _ _ _ _ _ -}}

Latest revision as of 13:08, 13 December 2024

Monthly Operating Rept for June 1984
ML20090J016
Person / Time
Site: Diablo Canyon 
Issue date: 06/30/1984
From: Kelly W, Thornberry R
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8407270361
Download: ML20090J016 (5)


Text

..

MONTHLY NARRATIVE REPORT 0F 0PERATION

~

AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of June,1984. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the Plant Technical Specifications.

There is no significant operating experience or major safety-related maintenance to report.

No challenges to the PORV's or safety valves have been made.

No changes have been made in the Offsite Dose Calculation Procedure, the Environmental ' Radiological. Monitoring Procedure, or any radioactive waste

--treatment systems.

4 i

a s

ill D

o y

PDR.

+

0C0044 3

l

'* i;

=

O KRATING DATA REPORT J

~

DOCKET NO.

50-275 DATE 07/06/84 COMPLETED BY W.J. Kelly

(

TELEPHONE (805)595-7351 OPERATING STATUS

'1.

Unit Name:

Diablo Canyon Unit 1 2.

Reporting Period:

June 1984 Notes: Startup Testing is 3.

Licensed Thermal Power (MWt):

166.9 completed. Awaiting grant i =

-4.

Nameplate Rating-(Gross MWe):

1170 of the full power license 5.

Design Electrical Rating (Net MWe):

1084 from the NRC.

6.

Maximum Dependable Capacity (Gross MWe):

1134

7.. Maximum Dependable Capacity (Net MWe):

1084 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

I 9.

Power Level To Which Restricted, If Any (Net MWe):

58.50 10.

Reasons For Restrictions, If Any:

Low power test permit granted by the Nuclear Regulatory Commission on April 13, 1984, effective April 19, 1984 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />.

This Month Yr-to-Date Cumulative

11. Hours In Reporting. Period 720 4914 4914
12. -Number Of Hours Reactor Was Critical 0

239 239 13.

Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 0

0 0

15.

Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0-615 615
17. Gross Electrical Energy Generated (MWH)-

0

18. Net Electrical Energy Generated (MWH) 0

"- 0 0

0

19.. Unit Service Factor N/A
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net)

N/A

22.. Unit Capacity Factor (Using DER Net)

N/A

23. Unit Forced Outage Rate N/A

+

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

-- r

~

25.

If Shut Down At End Of Report Period, Est. Date of Startup:

JULY 1984-

26. _ Units In Test Status (Prior to Commercial Operation):

Forecast Achieved

' INITIAL CRITICALITY April 1984 April 1984 4

INITIAL ELECTRICITY.

July 1984 COMMERCLil 0PERATION September 1984-DC0044.' 4 y

.yn.c

=

y e 9

--y.

9

_97p

--=a g-q

-w

~*

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.

50-275 UNIT Diablo Canyon Unit 1 DATE 07/06/84 COMPLETED BY W.J. Kelly TELEPHONE (805)595-7351 MONTH June 1984 DAY AVERAGE D?:iY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Pht NET)

(Ph'E-NET) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

.10 0

26 0

11 0

27 0

12-0 28 0

13 0

29 0

14 0

30 0

15 0

1 0

(

a INSTRUCTIONS On this format, list the average daily unit nower level in MWe-Net for each day in the r porting month. Compute to the nearest whole megawatt.

DC0044.

UNIT SHUTDOWNS AND POWER EDUCTIONS DOCKET NO.

50-275 UNIT NAE UlABLO CANYON UNii 1 DATE 07/05/84 COPPLETED BY W.J. TELLY TELEPHONE (805 w a-/351 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action-to No.

Date Type'l (Hours)

Reason 2 Down Reactor 3 Report #

Code'+

Code 5

' Prevent Recurrence f

NONE J

9

(

1 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled

A-Equipment Failure-(Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

-Entry Sheets for Licensee C-Refueling-3-Automatic Scram.

Event Report (LER) File D-Regulatory Festriction 4-Other (Explain)

-(NUREG-0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain)

DC0044 '6

7 PACIFIC GAS AND E LE C T RIC C O M PAN'I DIABLO CANYON POWER PLANT pgg i

i PO. Box 56 Avila Beach, Califomia 93424 - (805) 595-7351 R.C. THORNBERRY PLANT MANAGER r

July 6, 1984 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 RE:

Docket No. 50-275 License No. DPR-76 Monthly Operating Report for June, 1984 Gentlemen:

Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for June 1984.

For this report, the number of hours the reactor was critical and the gross thermal energy generated have been changed to reflect more cccurate information. This report is submitted in accordance with

'Section 6.9.1.10 of our Technical Specifications.

Sincerely,

@dY R. C. THORNBERRY RCT:jhr Enclosures cc Mr. John B. Martin, Regional Administrator Region V - USNRC 4=$