. Thomas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 VioPresident ~ | |||
Engineering and Construction May 25, 1984 Dr. Thomas E. Murley, Administrator U.-S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 | Engineering and Construction May 25, 1984 Dr. Thomas E. Murley, Administrator U.-S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 | ||
==Dear Dr. Murley:== | ==Dear Dr. Murley:== | ||
NRC IE BULLETIN NO. 83-06, DATED JULY 22, 1983 MATERIALS SUPPLIED BY TUBE-LINE CORPORATION HOPE CREEK GENERATING STATION | NRC IE BULLETIN NO. 83-06, DATED JULY 22, 1983 MATERIALS SUPPLIED BY TUBE-LINE CORPORATION HOPE CREEK GENERATING STATION | ||
( | ( | ||
'The following final report is provided in response to the subject Bulletin. | |||
Responses have been received from all suppliers that furnished ASME Section III fittings-for the-Hope Creek Project. Based on this input and our on-site investigation, we have established that: | Responses have been received from all suppliers that furnished ASME Section III fittings-for the-Hope Creek Project. | ||
Based on this input and our on-site investigation, we have established that: | |||
- Twenty-four carbon steel flanges supplied by Tube-Line were installed on our Emergency Diesel Generatorsi by Colt Industries; | |||
- 578 fittings were received from two suppliers on four bulk purchase orders; and | |||
Nonconformance Reports have been issued to control and docu-ment the disposition of those materials received on the four bulk purchase . orders. These fittings have been identified as installed 11n non-safety related systems, removed-from inventory or determined to be missing. | - No Tube-Line fittings, beyond the twenty-four described above, have been identified as installed in safety related systems. | ||
O | Nonconformance Reports have been issued to control and docu-ment the disposition of those materials received on the four bulk purchase. orders. | ||
sc . a | These fittings have been identified as installed 11n non-safety related systems, removed-from inventory or determined to be missing. | ||
O A | |||
0 4 | |||
sc. a | |||
Dr. T. E. Murley | Dr. T. E. Murley 2 | ||
5/25/84 Th'e heat numbers of those items identifiedi as missing have been added to the checklist to be used during N-5 data package review. | |||
Colt Industries utilized twenty-four Tube-Line flanges in the manufacture of our Emergency Diesel Generators. The use of these flanges for their intended service is acceptable in accordance with ASME Code Case N-242 which is referenced in the applicable specification. | Items identified during package review as having these heat numbers shall be cut out and replaced with acceptable fittings. | ||
Very truly yours, C . Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C. 20555 NRC Resident Inspector - Hope Creek P. O. Box 241 Hancocks Bridge, NJ 08038 | This administrative control will | ||
-assure that the missing nonconforming fittings have not been installed in any ASME Section III system. | |||
k | Colt Industries utilized twenty-four Tube-Line flanges in the manufacture of our Emergency Diesel Generators. | ||
The use of these flanges for their intended service is acceptable in accordance with ASME Code Case N-242 which is referenced in the applicable specification. | |||
Very truly yours, C. Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C. | |||
20555 NRC Resident Inspector - Hope Creek P. O. Box 241 Hancocks Bridge, NJ 08038 hi i | |||
c | |||
.. < a i | |||
k | |||
_}} | |||
Latest revision as of 11:53, 13 December 2024
| ML20091N739 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 05/25/1984 |
| From: | Martin T Public Service Enterprise Group |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-83-06, IEB-83-6, NUDOCS 8406120443 | |
| Download: ML20091N739 (2) | |
Text
...... -.
.4 en
. Thomas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 VioPresident ~
Engineering and Construction May 25, 1984 Dr. Thomas E. Murley, Administrator U.-S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Dr. Murley:
NRC IE BULLETIN NO. 83-06, DATED JULY 22, 1983 MATERIALS SUPPLIED BY TUBE-LINE CORPORATION HOPE CREEK GENERATING STATION
(
'The following final report is provided in response to the subject Bulletin.
Responses have been received from all suppliers that furnished ASME Section III fittings-for the-Hope Creek Project.
Based on this input and our on-site investigation, we have established that:
- Twenty-four carbon steel flanges supplied by Tube-Line were installed on our Emergency Diesel Generatorsi by Colt Industries;
- 578 fittings were received from two suppliers on four bulk purchase orders; and
- No Tube-Line fittings, beyond the twenty-four described above, have been identified as installed in safety related systems.
Nonconformance Reports have been issued to control and docu-ment the disposition of those materials received on the four bulk purchase. orders.
These fittings have been identified as installed 11n non-safety related systems, removed-from inventory or determined to be missing.
O A
0 4
sc. a
Dr. T. E. Murley 2
5/25/84 Th'e heat numbers of those items identifiedi as missing have been added to the checklist to be used during N-5 data package review.
Items identified during package review as having these heat numbers shall be cut out and replaced with acceptable fittings.
This administrative control will
-assure that the missing nonconforming fittings have not been installed in any ASME Section III system.
Colt Industries utilized twenty-four Tube-Line flanges in the manufacture of our Emergency Diesel Generators.
The use of these flanges for their intended service is acceptable in accordance with ASME Code Case N-242 which is referenced in the applicable specification.
Very truly yours, C. Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.
20555 NRC Resident Inspector - Hope Creek P. O. Box 241 Hancocks Bridge, NJ 08038 hi i