ML20091N739: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. . . . . . - .
{{#Wiki_filter:...... -.
  .4       en
.4 en
      . Thomas J. Martin                 Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 VioPresident ~
. Thomas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 VioPresident ~
Engineering and Construction May 25, 1984 Dr. Thomas E. Murley, Administrator U.-S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Engineering and Construction May 25, 1984 Dr. Thomas E. Murley, Administrator U.-S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406


==Dear Dr. Murley:==
==Dear Dr. Murley:==
NRC IE BULLETIN NO. 83-06, DATED JULY 22, 1983 MATERIALS SUPPLIED BY TUBE-LINE CORPORATION HOPE CREEK GENERATING STATION
NRC IE BULLETIN NO. 83-06, DATED JULY 22, 1983 MATERIALS SUPPLIED BY TUBE-LINE CORPORATION HOPE CREEK GENERATING STATION
(
(
                        'The following final report is provided in response to the subject Bulletin.
'The following final report is provided in response to the subject Bulletin.
Responses have been received from all suppliers that furnished ASME Section III fittings-for the-Hope Creek Project. Based on this input and our on-site investigation, we have established that:
Responses have been received from all suppliers that furnished ASME Section III fittings-for the-Hope Creek Project.
                                  - Twenty-four carbon steel flanges supplied by Tube-Line were installed on our Emergency Diesel Generatorsi by Colt Industries;
Based on this input and our on-site investigation, we have established that:
                                  - 578 fittings were received from two suppliers on four bulk purchase orders; and
- Twenty-four carbon steel flanges supplied by Tube-Line were installed on our Emergency Diesel Generatorsi by Colt Industries;
                                  - No Tube-Line fittings, beyond the twenty-four described above, have been identified as installed in safety related systems.
- 578 fittings were received from two suppliers on four bulk purchase orders; and
Nonconformance Reports have been issued to control and docu-ment the disposition of those materials received on the four bulk purchase . orders. These fittings have been identified as installed 11n non-safety related systems, removed-from inventory or determined to be missing.
- No Tube-Line fittings, beyond the twenty-four described above, have been identified as installed in safety related systems.
O A         0 4
Nonconformance Reports have been issued to control and docu-ment the disposition of those materials received on the four bulk purchase. orders.
sc . a
These fittings have been identified as installed 11n non-safety related systems, removed-from inventory or determined to be missing.
O A
0 4
sc. a


Dr. T. E. Murley                   2                       5/25/84 Th'e heat numbers of those items identifiedi as missing have been added to the checklist to be used during N-5 data package review.       Items identified during package review as having these heat numbers shall be cut out and replaced with acceptable fittings. This administrative control will
Dr. T. E. Murley 2
              -assure that the missing nonconforming fittings have not been installed in any ASME Section III system.
5/25/84 Th'e heat numbers of those items identifiedi as missing have been added to the checklist to be used during N-5 data package review.
Colt Industries utilized twenty-four Tube-Line flanges in the manufacture of our Emergency Diesel Generators. The use of these flanges for their intended service is acceptable in accordance with ASME Code Case N-242 which is referenced in the applicable specification.
Items identified during package review as having these heat numbers shall be cut out and replaced with acceptable fittings.
Very truly yours, C . Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C. 20555 NRC Resident Inspector - Hope Creek P. O. Box 241 Hancocks Bridge, NJ 08038
This administrative control will
                            .. < a   hi  . c  i i
-assure that the missing nonconforming fittings have not been installed in any ASME Section III system.
k                                                                                 _}}
Colt Industries utilized twenty-four Tube-Line flanges in the manufacture of our Emergency Diesel Generators.
The use of these flanges for their intended service is acceptable in accordance with ASME Code Case N-242 which is referenced in the applicable specification.
Very truly yours, C. Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.
20555 NRC Resident Inspector - Hope Creek P. O. Box 241 Hancocks Bridge, NJ 08038 hi i
c
.. < a i
k
_}}

Latest revision as of 11:53, 13 December 2024

Submits Final Response to IE Bulletin 83-06, Matls Supplied by Tube-Line Corp. Tube-Line Corp Supplied 24 Carbon Steel Flanges Installed on Emergency Diesel Generators & 578 Fittings Received in Bulk Purchase Orders
ML20091N739
Person / Time
Site: Hope Creek 
Issue date: 05/25/1984
From: Martin T
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-83-06, IEB-83-6, NUDOCS 8406120443
Download: ML20091N739 (2)


Text

...... -.

.4 en

. Thomas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 VioPresident ~

Engineering and Construction May 25, 1984 Dr. Thomas E. Murley, Administrator U.-S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Dr. Murley:

NRC IE BULLETIN NO. 83-06, DATED JULY 22, 1983 MATERIALS SUPPLIED BY TUBE-LINE CORPORATION HOPE CREEK GENERATING STATION

(

'The following final report is provided in response to the subject Bulletin.

Responses have been received from all suppliers that furnished ASME Section III fittings-for the-Hope Creek Project.

Based on this input and our on-site investigation, we have established that:

- Twenty-four carbon steel flanges supplied by Tube-Line were installed on our Emergency Diesel Generatorsi by Colt Industries;

- 578 fittings were received from two suppliers on four bulk purchase orders; and

- No Tube-Line fittings, beyond the twenty-four described above, have been identified as installed in safety related systems.

Nonconformance Reports have been issued to control and docu-ment the disposition of those materials received on the four bulk purchase. orders.

These fittings have been identified as installed 11n non-safety related systems, removed-from inventory or determined to be missing.

O A

0 4

sc. a

Dr. T. E. Murley 2

5/25/84 Th'e heat numbers of those items identifiedi as missing have been added to the checklist to be used during N-5 data package review.

Items identified during package review as having these heat numbers shall be cut out and replaced with acceptable fittings.

This administrative control will

-assure that the missing nonconforming fittings have not been installed in any ASME Section III system.

Colt Industries utilized twenty-four Tube-Line flanges in the manufacture of our Emergency Diesel Generators.

The use of these flanges for their intended service is acceptable in accordance with ASME Code Case N-242 which is referenced in the applicable specification.

Very truly yours, C. Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.

20555 NRC Resident Inspector - Hope Creek P. O. Box 241 Hancocks Bridge, NJ 08038 hi i