Submits Final Response to IE Bulletin 83-06, Matls Supplied by Tube-Line Corp. Tube-Line Corp Supplied 24 Carbon Steel Flanges Installed on Emergency Diesel Generators & 578 Fittings Received in Bulk Purchase Orders
ML20091N739
Person / Time
Site: Hope Creek 
Issue date: 05/25/1984
From: Martin T
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-83-06, IEB-83-6, NUDOCS 8406120443
Download: ML20091N739 (2)


Text

...... -.

.4 en

. Thomas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 VioPresident ~

Engineering and Construction May 25, 1984 Dr. Thomas E. Murley, Administrator U.-S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Dr. Murley:

NRC IE BULLETIN NO. 83-06, DATED JULY 22, 1983 MATERIALS SUPPLIED BY TUBE-LINE CORPORATION HOPE CREEK GENERATING STATION

(

'The following final report is provided in response to the subject Bulletin.

Responses have been received from all suppliers that furnished ASME Section III fittings-for the-Hope Creek Project.

Based on this input and our on-site investigation, we have established that:

- Twenty-four carbon steel flanges supplied by Tube-Line were installed on our Emergency Diesel Generatorsi by Colt Industries;

- 578 fittings were received from two suppliers on four bulk purchase orders; and

- No Tube-Line fittings, beyond the twenty-four described above, have been identified as installed in safety related systems.

Nonconformance Reports have been issued to control and docu-ment the disposition of those materials received on the four bulk purchase. orders.

These fittings have been identified as installed 11n non-safety related systems, removed-from inventory or determined to be missing.

O A

0 4

sc. a

Dr. T. E. Murley 2

5/25/84 Th'e heat numbers of those items identifiedi as missing have been added to the checklist to be used during N-5 data package review.

Items identified during package review as having these heat numbers shall be cut out and replaced with acceptable fittings.

This administrative control will

-assure that the missing nonconforming fittings have not been installed in any ASME Section III system.

Colt Industries utilized twenty-four Tube-Line flanges in the manufacture of our Emergency Diesel Generators.

The use of these flanges for their intended service is acceptable in accordance with ASME Code Case N-242 which is referenced in the applicable specification.

Very truly yours, C. Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.