JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE  
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE  


Line 22: Line 22:
OF OPERATIONS OCTOBER There were no unit shutdowns or significant power reductions during the month of October.
OF OPERATIONS OCTOBER There were no unit shutdowns or significant power reductions during the month of October.
The following major safety-related maintenance was performed in the month of October:
The following major safety-related maintenance was performed in the month of October:
: 1. Performed miscellaneous corrective and preventive maintenance on diesel generators.
1.
: 2. Completed re-racking of Unit I spent fuel pool. High density storage racks have been installed to increase the capacity to 1407 fuel assemblies.
Performed miscellaneous corrective and preventive maintenance on diesel generators.
l 0                                                                           ck y
2.
Completed re-racking of Unit I spent fuel pool. High density storage racks have been installed to increase the capacity to 1407 fuel assemblies.
l 0
ck y
k
k


                                          ~
DOCKET NO.
            ,                                                                                                            DOCKET NO.     50-348 UNIT     1
50-348
      ^
~
November 6, 1984 DATE COMPLETED BY J. D. Woodard TELEPHONE (205) 899-5156 M0ffill     October. 1984 DAY       AVERAGE DA!LY POWER LEVEL '                               DAY
UNIT 1
* VERACE DAILY POWER LEVEL (MWe Net)                                                                           (MWe Net) 826                                                                                 806 g,                                                                 g7 2                     829                                           gg                                   708
November 6, 1984
              ~3                     829                                           19                                   nna 828                                                                                 811 4                                                                   20 5                     826                                           21                                   R09 821                                           g                                    809 6
^
819                                           23                                   810 7
DATE COMPLETED BY J. D. Woodard TELEPHONE (205) 899-5156 M0ffill October. 1984 DAY AVERAGE DA!LY POWER LEVEL '
8                    818                                           24                                   811 9                     770                                           ;$-                                  812 818                                                                                 814 10                                                                   26 819 11                                                                   27                                   814 0                                                                               807 12                                                                   3 i
DAY
13 820                                          ;9                                   gio 14                     819                                           30                                   811 687                                                                                 811
* VERACE DAILY POWER LEVEL (MWe Net)
:$                                                                  33 16 810 l
(MWe Net) 826 806 g,
l 2 G UCDONS On this form: . list the aversge daily unit puwer levelin MWe-Net for e:ch d:y in the reporting month. Compute to
g7 2
          , the neste:t whole rnepwast.
829 gg 708
~3 829 19 nna 828 811 4
20 5
826 21 R09 821 809 6
g 819 7
23 810 8
818 24 811 9
770 812 818 10 26 814 819 11 27 814 0
12 3
807 i
820 13
;9 gio 14 819 30 811 811 687 33 16 810 l
l 2 G UCDONS On this form:. list the aversge daily unit puwer levelin MWe-Net for e:ch d:y in the reporting month. Compute to
, the neste:t whole rnepwast.
(997) 1 l
(997) 1 l
l l
l l


          .                                                                                                                                I I
I I
l OPERATING DATA REPORT DOCKET NO.                 sn_1ag DATE 11 A RA                         l COMPLETED BY             J. D. Woodard TELEPHONE (?nsi R99-5156 OPERATING STATUS Joseph M. Farley - Unit 1                           Notes                                   -
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Nm.                                                               '
sn_1ag DATE 11 A RA l
: 2. Reporting Period: noenhar         1996                               . (1) Cumulative data since 2652                                  12-1-77, date of
COMPLETED BY J. D. Woodard TELEPHONE (?nsi R99-5156 OPERATING STATUS Joseph M. Farley - Unit 1 Notes
: 1. Unit Nm.
: 2. Reporting Period: noenhar 1996 (1) Cumulative data since
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):             860                                commercial  operation.
2652 12-1-77, date of 860 commercial operation.
: 4. Nameplate Rating (Gross MWe):
829
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
829
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):         Rat R
Rat R
: 7. Maximum Dependable Capacity (Net MWe):           797 1
: 7. Maximum Dependable Capacity (Net MWe):
797 1
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
N/A N/A
: 9. Power Level To which Restricted.If Any (Net MWe):         N/A
: 9. Power Level To which Restricted.If Any (Net MWe):
: 10. Reasons For Restrictions. If Any:     N/A i                                                                         -                    .                    ..
: 10. Reasons For Restrictions. If Any:
This Month           Yr..to-Date       Cumulative
N/A i
: 11. Hours In Reporting Period                                     745             7.320                         60,648
Cumulative This Month Yr..to-Date
: 12. Number Of Hours Reactor Was Critical                           745.0           5,541.8                       40,665.0 0.0                 nn                            3,650.0
: 11. Hours In Reporting Period 745 7.320 60,648
: 13. Reactor Reserve Shutdown Hours
: 12. Number Of Hours Reactor Was Critical 745.0 5,541.8 40,665.0 0.0 3,650.0
: 14. Hours Generator On-Line                                       745.0           5.457.0                         lo.560.4
: 13. Reactor Reserve Shutdown Hours nn
: 15. Unit Reserve Shutdown Hours                                     0.0                 0.0                                 0.0
: 14. Hours Generator On-Line 745.0 5.457.0 lo.560.4
: 16. Gross Thermal Energy Generated (MWH)                 1,949,788         14,001,907           100,103.433 632,706           4,514,896           31,857.906
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 17. Gross Electrical Energy Generated (MWH)
: 16. Gross Thermal Energy Generated (MWH) 1,949,788 14,001,907 100,103.433 632,706 4,514,896 31,857.906
: 18. Net Electrical Energy Generated (MWH)                  399'734           4.255.466 -         29,956,528.
: 17. Gross Electrical Energy Generated (MWH) 399'734 4.255.466 -
100.0               74.5                               65.2
29,956,528.
: 19. Unit Service Factor
: 18. Net Electrical Energy Generated (MWH)
: 20. Unit Availability Factor                                        100.0               74.5                               65.2
: 19. Unit Service Factor 100.0 74.5 65.2 100.0 74.5 65.2
: 21. Unit Capacity Factor (Using MDC Net)                          101.0               72,9                               62.0
: 20. Unit Availability Factor 101.0 72,9 62.0
: 22. Unit Capacity Factor (Using DER Net) 97*I               70.1                               59.6
: 21. Unit Capacity Factor (Using MDC Net) 97*I
: 23. Unit Forced Outage Rate                                           0.0                 1.4                               13.6
: 22. Unit Capacity Factor (Using DER Net) 70.1 59.6
: 23. Unit Forced Outage Rate 0.0 1.4 13.6
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration,.of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration,.of Each):
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status t Prior to Commercial Operation):                       Forecast           Achieved a
: 26. Units In Test Status t Prior to Commercial Operation):
INITIAL CRITICALITY                                      08-06-77               08-09-77 j
Forecast Achieved a
l INITIAL ELECTRICITY                                       nn-?n_77               08-18-77
08-06-77 08-09-77 INITIAL CRITICALITY j
.                              COMMERCIAL OPERATION                                       12-01-77               12-01-77 i
l INITIAL ELECTRICITY nn-?n_77 08-18-77 COMMERCIAL OPERATION 12-01-77 12-01-77 i
(4[77 ) )
(4[77 )
I i
)
i


s'    .
L
L                                                                )s                                                           J       .-
)s J
UNITSilU1 DOWNS AND POWER REIM)CilONS                     DOCKET NO. 5d-348-                '.[
s'
UNIT NAME .J,M. Farley - Unit.1 DATE 6-84           .
'.[
CU#*-*- * "' '' '     " D-'W" U #d
5d-348-UNITSilU1 DOWNS AND POWER REIM)CilONS DOCKET NO.
'                                                                  REPORT MON 111 October. 1984 TELErilONE _"G.Q5) 899-5156           ,
.J,M.
                                                              "r
Farley - Unit.1 UNIT NAME DATE 6-84 D-'W" U #d CU#*-*- * "' '' '
!                                        c      re    5 s4 'E                                       E i
REPORT MON 111 October. 1984 TELErilONE _"G.Q5) 899-5156 i
                              -.        .E E     g           5g       Licenser       Ev.           g4           Cause & Cussective N.e .        Date      g      Eg        g    7,gx           Event         u 'l           r]                   Acti.us to
"r 5 s4 'E E
* h3       5     ,C 2 i8 h         R*E'"' # -
c re i
o          p,gy,,,g,c,,,,,,,
.E E g
6 THERE     WERE     N0     la IT       SI UTDOW ;S       OR   SIGNIFICANT       PO.IE 1 REDUCTIC NS   DURING   THE         MONTH   OF OCTOBER, 4
5g Licenser Ev.
g4 Cause & Cussective 7,gx Event u 'l r]
Acti.us to N.e.
Date g
Eg g
h3 5
,C o
i8 h R*E'"' #
p,gy,,,g,c,,,,,,,
2 6
THERE WERE N0 la IT SI UTDOW ;S OR SIGNIFICANT PO.IE 1 REDUCTIC NS DURING THE MONTH OF OCTOBER, 4
t l
t l
l t   i                     3                                                   3                                 4 F: Forced           Reason:                                                 Method:                         Exhibit G -lasitucesons S: Stheduled         A Equipmens Failure (Explain)       -
l t
I Manual                       for Prepasasiam of Data
i 3
;                          u Maintenance e,iTest                                   2 Manual Scram.                 Enisy Sheets for Licensee -
3 4
C Refueling                                             3 Autuniatic Scram.             Event Rep w (i.ER) File INURI G-4 D.Regulasiuy Resisiction                               4 0 hcr (Emplaise)             0161)
F: Forced Reason:
E4)pesaius Tsaining A license Exandnasion F-Adminisisasive                                                                     5 G Opcaatiimal Essur (limplain)                                                         Exhibit I - Same Sousee 19/77)                   II Othe: (Emplain)
Method:
                                                                                                                          -    & m
Exhibit G -lasitucesons S: Stheduled A Equipmens Failure (Explain)
I Manual for Prepasasiam of Data u Maintenance e,iTest 2 Manual Scram.
Enisy Sheets for Licensee -
C Refueling 3 Autuniatic Scram.
Event Rep w (i.ER) File INURI G-D.Regulasiuy Resisiction 4 0 hcr (Emplaise) 0161) 4 E4)pesaius Tsaining A license Exandnasion F-Adminisisasive 5
G Opcaatiimal Essur (limplain)
Exhibit I - Same Sousee 19/77)
II Othe: (Emplain)
& m


f;   .        Malling Address f   *  .
f; Malling Address f
* Alabama Power Cornpany
* Alabama Power Cornpany
            ' 600 North 18th Strsot Post Office Box 2641 Btrmingham, Alabma 35291 f-            Telephone 205 783-6090 t
' 600 North 18th Strsot Post Office Box 2641 f-Btrmingham, Alabma 35291 Telephone 205 783-6090 tff(
ff(            R. P. Mcdonald
R. P. Mcdonald
[-             Senior Vice President
[-
[               Flintridge Building                                                                       AlabaritaPower ce s zwwe~ sa:. .
Senior Vice President
[
Flintridge Building AlabaritaPower ce s zwwe~ sa:..
November 9, 1984-Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission -
November 9, 1984-Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission -
Washington, D.C.                                 20555
Washington, D.C.
20555


==Dear Sir:==
==Dear Sir:==
 
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the October 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications.
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the October 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.                                             -
If you have any questions, please advise.
Yours very trul ,    ,
Yours very trul,
N     &.
N f
f R. P. Mcdonald f/
f/
RPM /KWM: sam Enclosures xc: Director, IE (10 copies)
R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)
Director, RII                           (1 copy)
Director, RII (1 copy)
                                                                                                                            +o}}
+o}}

Latest revision as of 06:29, 13 December 2024

Monthly Operating Rept for Oct 1984
ML20099H170
Person / Time
Site: Farley 
Issue date: 10/31/1984
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8411280050
Download: ML20099H170 (5)


Text

_

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS OCTOBER There were no unit shutdowns or significant power reductions during the month of October.

The following major safety-related maintenance was performed in the month of October:

1.

Performed miscellaneous corrective and preventive maintenance on diesel generators.

2.

Completed re-racking of Unit I spent fuel pool. High density storage racks have been installed to increase the capacity to 1407 fuel assemblies.

l 0

ck y

k

DOCKET NO.

50-348

~

UNIT 1

November 6, 1984

^

DATE COMPLETED BY J. D. Woodard TELEPHONE (205) 899-5156 M0ffill October. 1984 DAY AVERAGE DA!LY POWER LEVEL '

DAY

  • VERACE DAILY POWER LEVEL (MWe Net)

(MWe Net) 826 806 g,

g7 2

829 gg 708

~3 829 19 nna 828 811 4

20 5

826 21 R09 821 809 6

g 819 7

23 810 8

818 24 811 9

770 812 818 10 26 814 819 11 27 814 0

12 3

807 i

820 13

9 gio 14 819 30 811 811 687 33 16 810 l

l 2 G UCDONS On this form:. list the aversge daily unit puwer levelin MWe-Net for e:ch d:y in the reporting month. Compute to

, the neste:t whole rnepwast.

(997) 1 l

l l

I I

OPERATING DATA REPORT DOCKET NO.

sn_1ag DATE 11 A RA l

COMPLETED BY J. D. Woodard TELEPHONE (?nsi R99-5156 OPERATING STATUS Joseph M. Farley - Unit 1 Notes

1. Unit Nm.
2. Reporting Period: noenhar 1996 (1) Cumulative data since
3. Licensed Thermal Power (MWt):

2652 12-1-77, date of 860 commercial operation.

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

Rat R

7. Maximum Dependable Capacity (Net MWe):

797 1

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To which Restricted.If Any (Net MWe):
10. Reasons For Restrictions. If Any:

N/A i

Cumulative This Month Yr..to-Date

11. Hours In Reporting Period 745 7.320 60,648
12. Number Of Hours Reactor Was Critical 745.0 5,541.8 40,665.0 0.0 3,650.0
13. Reactor Reserve Shutdown Hours nn
14. Hours Generator On-Line 745.0 5.457.0 lo.560.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,949,788 14,001,907 100,103.433 632,706 4,514,896 31,857.906
17. Gross Electrical Energy Generated (MWH) 399'734 4.255.466 -

29,956,528.

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100.0 74.5 65.2 100.0 74.5 65.2
20. Unit Availability Factor 101.0 72,9 62.0
21. Unit Capacity Factor (Using MDC Net) 97*I
22. Unit Capacity Factor (Using DER Net) 70.1 59.6
23. Unit Forced Outage Rate 0.0 1.4 13.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration,.of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status t Prior to Commercial Operation):

Forecast Achieved a

08-06-77 08-09-77 INITIAL CRITICALITY j

l INITIAL ELECTRICITY nn-?n_77 08-18-77 COMMERCIAL OPERATION 12-01-77 12-01-77 i

(4[77 )

)

i

L

)s J

s'

'.[

5d-348-UNITSilU1 DOWNS AND POWER REIM)CilONS DOCKET NO.

.J,M.

Farley - Unit.1 UNIT NAME DATE 6-84 D-'W" U #d CU#*-*- * "' '

REPORT MON 111 October. 1984 TELErilONE _"G.Q5) 899-5156 i

"r 5 s4 'E E

c re i

.E E g

5g Licenser Ev.

g4 Cause & Cussective 7,gx Event u 'l r]

Acti.us to N.e.

Date g

Eg g

h3 5

,C o

i8 h R*E'"' #

p,gy,,,g,c,,,,,,,

2 6

THERE WERE N0 la IT SI UTDOW ;S OR SIGNIFICANT PO.IE 1 REDUCTIC NS DURING THE MONTH OF OCTOBER, 4

t l

l t

i 3

3 4

F: Forced Reason:

Method:

Exhibit G -lasitucesons S: Stheduled A Equipmens Failure (Explain)

I Manual for Prepasasiam of Data u Maintenance e,iTest 2 Manual Scram.

Enisy Sheets for Licensee -

C Refueling 3 Autuniatic Scram.

Event Rep w (i.ER) File INURI G-D.Regulasiuy Resisiction 4 0 hcr (Emplaise) 0161) 4 E4)pesaius Tsaining A license Exandnasion F-Adminisisasive 5

G Opcaatiimal Essur (limplain)

Exhibit I - Same Sousee 19/77)

II Othe: (Emplain)

& m

f; Malling Address f

' 600 North 18th Strsot Post Office Box 2641 f-Btrmingham, Alabma 35291 Telephone 205 783-6090 tff(

R. P. Mcdonald

[-

Senior Vice President

[

Flintridge Building AlabaritaPower ce s zwwe~ sa:..

November 9, 1984-Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission -

Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the October 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications.

As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very trul,

N f

f/

R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)