        'Af Duquesne L@t                                                                       =g28 Nuclear Construction Division                                                 (412) 923-1960 Robinson Plaza, Building 2, Suite 210                                 Telecow (412) 787-2629 Pittsbur9h, PA 15205                                                   March 21, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:         Mr. George W. Knighton, Chief Licensing Branch 3 Of fice of Nuclear Reactor Regulation
'Af Duquesne L@t
=g28 (412) 923-1960 Nuclear Construction Division Telecow (412) 787-2629 Robinson Plaza, Building 2, Suite 210 Pittsbur9h, PA 15205 March 21, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. George W. Knighton, Chief Licensing Branch 3 Of fice of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 S.E.R. Outstanding Issues Status Gentlemen:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 S.E.R. Outstanding Issues Status Gentlemen:
Attached is a cur rent list, as of March 15 , 1985, which provides our understanding of the outstanding issues wh ich remain open.                             Items identified as "c omple t e" are those for which responses have been provided i
Attached is a cur rent list, as of March 15, 1985, which provides our understanding of the outstanding issues wh ich remain open.
and no confirmation of status has yet been received from the staff.                             We consider these items catisfactorily closed unless notified otherwise. In order to permit timely resolution of items ident ified as " complete" which may not be resolved to the staf f's satisfaction, please provide a speci fic description of the issue which remains to be resolved.                 Items identified as
Items identified as "c omple t e" are those for which responses have been provided and no confirmation of status has yet been received from the staff.
          " confirmatory" are based upon formal or informal communications or agree-ments with the staff.                   Please info rm us of any disagreement of status described on the attached list.
We i
DUQUESNE LIGHT COMPANY By       ,
consider these items catisfactorily closed unless notified otherwise.
Jg. arey       /
In order to permit timely resolution of items ident ified as " complete" which may not be resolved to the staf f's satisfaction, please provide a speci fic description of the issue which remains to be resolved.
Vice resident GH0/wjs Attachment cc:     Mr. H. R. Denton, Director NRR (w/ attachment)
Items identified as
" confirmatory" are based upon formal or informal communications or agree-ments with the staff.
Please info rm us of any disagreement of status described on the attached list.
DUQUESNE LIGHT COMPANY By J g.
arey
/
Vice resident GH0/wjs Attachment cc:
Mr. H. R. Denton, Director NRR (w/ attachment)
Mr. H Thompson, Director Division of Licensing (w/ attachment)
Mr. H Thompson, Director Division of Licensing (w/ attachment)
Mr. B. K. Singh, Project Manager (w/ attachment)
Mr. B. K. Singh, Project Manager (w/ attachment)
Line 37: Line 46:


===RESPONSE===
===RESPONSE===
DIV. BRAM}l   REVIEWER                     ISSUE                     M7IE       IWIE   RDMS DSI   RSB   E. Lantz
DIV.
* Qualification of RHR ptraps             Closed       02/08/85
BRAM}l REVIEWER ISSUE M7IE IWIE RDMS DSI RSB E. Lantz
* Natural Circulation Test                 IRC ICSB   F. Burrows
* Qualification of RHR ptraps Closed 02/08/85
* Stean Generator level Control aid Pratection                           B             05/30/84 ASB   R. Anand
* Natural Circulation Test IRC ICSB F. Burrows
* Stean Generator level Control aid Pratection B
05/30/84 ASB R. Anand
* Internally Cemrated Missiles -
* Internally Cemrated Missiles -
Outside containnent                   Closed       01/08/85
Outside containnent Closed 01/08/85
* Internally Generated Missiles -
* Internally Generated Missiles -
Inside containnent                   Cloced       01/08/85
Inside containnent Cloced 01/08/85
* Protection against postulated pipe breaks outside containnent           Confinnatory 01/08/85
* Protection against postulated pipe breaks outside containnent Confinnatory 01/08/85
* Ebel Pool (boling and Cleanup systen     Closed       01/08/85
* Ebel Pool (boling and Cleanup systen Closed 01/08/85
* Overheal heavy load harxilirg systen     Mtc           02/13/85
* Overheal heavy load harxilirg systen Mtc 02/13/85
* Standby service water system             Closed       01/08/85
* Standby service water system Closed 01/08/85
* Primary Conponent Cooling Water sy: ten A             M/30/85
* Primary Conponent Cooling Water sy: ten A
* Condensate and Feedwater System         Closed       01/08/85 Auxiliary Feedwater Systen             IRC           01/08/85 PSB   J. Knox
M/30/85
* Eleccrical - 17 open Items               A R. Giardina
* Condensate and Feedwater System Closed 01/08/85 Auxiliary Feedwater Systen IRC 01/08/85 PSB J. Knox
* lbchanical - 46 open itens               A CPB   A. Gill
* Eleccrical - 17 open Items A
* Icose part detection                     Cmplete       03/04/85
R. Giardina
* Inaiequate core cooling instrmentation A               04/30/85 M. Dunefeld
* lbchanical - 46 open itens A
* Analysis of combined ILCA ani seismic loads                               A             03/28/85
CPB A. Gill
* On-line detection method                 Closed       09/07/84 PETB   E. Markee x/q                                     B           02/15/85
* Icose part detection Cmplete 03/04/85
* Snow & Ice Ioal                           B           01/16/85 AEB   K. Desrpsey
* Inaiequate core cooling instrmentation A 04/30/85 M. Dunefeld
* Rafiation consequences of ILCA           B             11/08/84
* Analysis of combined ILCA ani seismic loads A
* Rod ejection a cidents                   B             11/08/84 PEB   Y. Li
03/28/85
* Primary vs. secondary loads             Canplete     02/20/85
* On-line detection method Closed 09/07/84 PETB E. Markee x/q B
* In service testing                       A             06/85
02/15/85
* Snow & Ice Ioal B
01/16/85 AEB K. Desrpsey
* Rafiation consequences of ILCA B
11/08/84
* Rod ejection a cidents B
11/08/84 PEB Y. Li
* Primary vs. secondary loads Canplete 02/20/85
* In service testing A
06/85


.                                                                                                                                              APPLICAhT RESPOEE DIV. BRAN 01   REVINER                           ISSUE                   M7IE       IBIE     RMIES
APPLICAhT RESPOEE DIV.
* Asyurnetric IOCA loads                 tRC IE     !EB'   O. Rothberg
BRAN 01 REVINER ISSUE M7IE IBIE RMIES
* P1V leak testing                       IRC SGEB   K. Imu
* Asyurnetric IOCA loads tRC IE
* Seismic Input                           Closed       02/01/85 -
!EB' O. Rothberg
* Seismic systen analysis                 Closal       02/01/85
* P1V leak testing IRC SGEB K. Imu
* Concrete containment                   Closed       12/21/84
* Seismic Input Closed 02/01/85 -
* Concrete and Structural steel internal structures                         Closed       12/21/M
* Seismic systen analysis Closal 02/01/85
* Other Categpry I structures             Closed       12/17/84
* Concrete containment Closed 12/21/84
* Fomdations                             Closed       12/17/84
* Concrete and Structural steel internal structures Closed 12/21/M
* Other Categpry I structures Closed 12/17/84
* Fomdations Closed 12/17/84
* Soil Structure Interaction (SSI)
* Soil Structure Interaction (SSI)
Analysis                           $RC           02/01/85 GSB     G. Giese-Koch
Analysis
* Seismology                             Complete     02/20/85 EQB     H. Walker
$RC 02/01/85 GSB G. Giese-Koch
* Environmental Qualification             Confirmatory 08/05/84 J. Inibardo
* Seismology Complete 02/20/85 EQB H. Walker
* Pmp & Valve                             Confirmatory 08/05/84 A. Ime
* Environmental Qualification Confirmatory 08/05/84 J. Inibardo
* Seismic Qualification                   Confirmatory 08/05/84 MrEB   M. Htun
* Pmp & Valve Confirmatory 08/05/84 A. Ime
* Preservice Inspection Progran           A             06/85
* Seismic Qualification Confirmatory 08/05/84 MrEB M. Htun
* Inservice inspection o' Class 2 & 3 components                         A             06/85 D. Smith
* Preservice Inspection Progran A
* Underclai cracking of forgings in R.V. Cicsed       08/10/84 OEB     J. Stang
06/85
* Safe shutdown                         A             09/85
* Inservice inspection o' Class 2 & 3 components A
* Alternate shutdown                     A             09/85
06/85 D. Smith
* Fire in Cable spreading room           B           05/30/84 WEB   R. Gonzales
* Underclai cracking of forgings in R.V.
* Potential for flooding fmn local precipitation                       B           05/30/84
Cicsed 08/10/84 OEB J. Stang
* Flooding from Peggs Rm                 B           05/30/84 IHFS HFEB     R. Eckenrode
* Safe shutdown A
* Safety paraneter display systen aid control roon design review         A             03/28/85 IRB   F. A11enspack
09/85
* Managenent & Organization               A
* Alternate shutdown A
09/85
* Fire in Cable spreading room B
05/30/84 WEB R. Gonzales
* Potential for flooding fmn local precipitation B
05/30/84
* Flooding from Peggs Rm B
05/30/84 IHFS HFEB R. Eckenrode
* Safety paraneter display systen aid control roon design review A
03/28/85 IRB F. A11enspack
* Managenent & Organization A


  ,                                                                                                                                                                                          APPLICANT RESP 0 FEE DIV. BRA!Of                 REV1BER                         ISSLE                           WIE               IMIE             R M IKS DHFS PSRB                   R. Becker
APPLICANT RESP 0 FEE DIV.
* Initici test progran                           A S. Bryan
BRA!Of REV1BER ISSLE WIE IMIE R M IKS DHFS PSRB R. Becker
* Bnergency operatirg procedure                 Closed I!E     EPB                 J. Sianonds
* Initici test progran A
* Emergency Preparedness Plan                   A                   04/15/85 Reg.1
S. Bryan
* Cross-Training progran                         A NUIE: These open issues include backfit itens A - Applica1t to provide information B - Backfit
* Bnergency operatirg procedure Closed I!E EPB J. Sianonds
          /?:
* Emergency Preparedness Plan A
04/15/85 Reg.1
* Cross-Training progran A
NUIE: These open issues include backfit itens A - Applica1t to provide information B - Backfit
/?:
a
a
            - _ - . - - - _ . . ~             ,,      _ ,, _      _        ..-. _~ _ . _ _ - _ .        - _ . . . . .          . . _ . . .    . _ . . ,}}
.. ~
..-. _~
,}}

Latest revision as of 06:10, 13 December 2024

Forwards Current Listing of SER Outstanding Issues.Specific Description of Unresolved Issues Requested
ML20100A551
Person / Time
Site: Beaver Valley
Issue date: 03/21/1985
From: Carey J
DUQUESNE LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
2NRC-5-048, 2NRC-5-48, NUDOCS 8503260087
Download: ML20100A551 (4)


Text

7-~

~

$VL

'Af Duquesne L@t

=g28 (412) 923-1960 Nuclear Construction Division Telecow (412) 787-2629 Robinson Plaza, Building 2, Suite 210 Pittsbur9h, PA 15205 March 21, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. George W. Knighton, Chief Licensing Branch 3 Of fice of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 S.E.R. Outstanding Issues Status Gentlemen:

Attached is a cur rent list, as of March 15, 1985, which provides our understanding of the outstanding issues wh ich remain open.

Items identified as "c omple t e" are those for which responses have been provided and no confirmation of status has yet been received from the staff.

We i

consider these items catisfactorily closed unless notified otherwise.

In order to permit timely resolution of items ident ified as " complete" which may not be resolved to the staf f's satisfaction, please provide a speci fic description of the issue which remains to be resolved.

Items identified as

" confirmatory" are based upon formal or informal communications or agree-ments with the staff.

Please info rm us of any disagreement of status described on the attached list.

DUQUESNE LIGHT COMPANY By J g.

arey

/

Vice resident GH0/wjs Attachment cc:

Mr. H. R. Denton, Director NRR (w/ attachment)

Mr. H Thompson, Director Division of Licensing (w/ attachment)

Mr. B. K. Singh, Project Manager (w/ attachment)

Mr. T. Novak, Assistant Director Division of Licensing (w/ attachment)

Mr. G. Walton, NRC Resident Inspector (w/ attachment)

BVPS-2 Outstanding Issue 2 Strtus APPLICANT

RESPONSE

DIV.

BRAM}l REVIEWER ISSUE M7IE IWIE RDMS DSI RSB E. Lantz

  • Qualification of RHR ptraps Closed 02/08/85
  • Natural Circulation Test IRC ICSB F. Burrows
  • Stean Generator level Control aid Pratection B

05/30/84 ASB R. Anand

  • Internally Cemrated Missiles -

Outside containnent Closed 01/08/85

  • Internally Generated Missiles -

Inside containnent Cloced 01/08/85

  • Protection against postulated pipe breaks outside containnent Confinnatory 01/08/85
  • Ebel Pool (boling and Cleanup systen Closed 01/08/85
  • Overheal heavy load harxilirg systen Mtc 02/13/85
  • Primary Conponent Cooling Water sy: ten A

M/30/85

  • Eleccrical - 17 open Items A

R. Giardina

  • lbchanical - 46 open itens A

CPB A. Gill

  • Icose part detection Cmplete 03/04/85
  • Inaiequate core cooling instrmentation A 04/30/85 M. Dunefeld
  • Analysis of combined ILCA ani seismic loads A

03/28/85

  • On-line detection method Closed 09/07/84 PETB E. Markee x/q B

02/15/85

  • Snow & Ice Ioal B

01/16/85 AEB K. Desrpsey

  • Rafiation consequences of ILCA B

11/08/84

  • Rod ejection a cidents B

11/08/84 PEB Y. Li

  • Primary vs. secondary loads Canplete 02/20/85
  • In service testing A

06/85

APPLICAhT RESPOEE DIV.

BRAN 01 REVINER ISSUE M7IE IBIE RMIES

  • Asyurnetric IOCA loads tRC IE

!EB' O. Rothberg

  • P1V leak testing IRC SGEB K. Imu
  • Seismic Input Closed 02/01/85 -
  • Seismic systen analysis Closal 02/01/85
  • Concrete containment Closed 12/21/84
  • Concrete and Structural steel internal structures Closed 12/21/M
  • Other Categpry I structures Closed 12/17/84
  • Fomdations Closed 12/17/84
  • Soil Structure Interaction (SSI)

Analysis

$RC 02/01/85 GSB G. Giese-Koch

  • Seismology Complete 02/20/85 EQB H. Walker
  • Environmental Qualification Confirmatory 08/05/84 J. Inibardo
  • Pmp & Valve Confirmatory 08/05/84 A. Ime
  • Seismic Qualification Confirmatory 08/05/84 MrEB M. Htun
  • Preservice Inspection Progran A

06/85

  • Inservice inspection o' Class 2 & 3 components A

06/85 D. Smith

  • Underclai cracking of forgings in R.V.

Cicsed 08/10/84 OEB J. Stang

09/85

  • Alternate shutdown A

09/85

  • Fire in Cable spreading room B

05/30/84 WEB R. Gonzales

  • Potential for flooding fmn local precipitation B

05/30/84

  • Flooding from Peggs Rm B

05/30/84 IHFS HFEB R. Eckenrode

  • Safety paraneter display systen aid control roon design review A

03/28/85 IRB F. A11enspack

  • Managenent & Organization A

APPLICANT RESP 0 FEE DIV.

BRA!Of REV1BER ISSLE WIE IMIE R M IKS DHFS PSRB R. Becker

  • Initici test progran A

S. Bryan

  • Bnergency operatirg procedure Closed I!E EPB J. Sianonds

04/15/85 Reg.1

  • Cross-Training progran A

NUIE: These open issues include backfit itens A - Applica1t to provide information B - Backfit

/?: