=g28 (412) 923-1960 Nuclear Construction Division Telecow (412) 787-2629 Robinson Plaza, Building 2, Suite 210 Pittsbur9h, PA 15205 March 21, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: | |||
Mr. George W. Knighton, Chief Licensing Branch 3 Of fice of Nuclear Reactor Regulation | |||
==SUBJECT:== | ==SUBJECT:== | ||
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 S.E.R. Outstanding Issues Status Gentlemen: | Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 S.E.R. Outstanding Issues Status Gentlemen: | ||
Attached is a cur rent list, as of March 15 , 1985, which provides our understanding of the outstanding issues wh ich remain open. | Attached is a cur rent list, as of March 15, 1985, which provides our understanding of the outstanding issues wh ich remain open. | ||
and no confirmation of status has yet been received from the staff. | Items identified as "c omple t e" are those for which responses have been provided and no confirmation of status has yet been received from the staff. | ||
We i | |||
DUQUESNE LIGHT COMPANY By | consider these items catisfactorily closed unless notified otherwise. | ||
In order to permit timely resolution of items ident ified as " complete" which may not be resolved to the staf f's satisfaction, please provide a speci fic description of the issue which remains to be resolved. | |||
Vice resident GH0/wjs Attachment cc: | Items identified as | ||
" confirmatory" are based upon formal or informal communications or agree-ments with the staff. | |||
Please info rm us of any disagreement of status described on the attached list. | |||
DUQUESNE LIGHT COMPANY By J g. | |||
arey | |||
/ | |||
Vice resident GH0/wjs Attachment cc: | |||
Mr. H. R. Denton, Director NRR (w/ attachment) | |||
Mr. H Thompson, Director Division of Licensing (w/ attachment) | Mr. H Thompson, Director Division of Licensing (w/ attachment) | ||
Mr. B. K. Singh, Project Manager (w/ attachment) | Mr. B. K. Singh, Project Manager (w/ attachment) | ||
| Line 37: | Line 46: | ||
===RESPONSE=== | ===RESPONSE=== | ||
DIV. BRAM}l | DIV. | ||
* Qualification of RHR ptraps | BRAM}l REVIEWER ISSUE M7IE IWIE RDMS DSI RSB E. Lantz | ||
* Natural Circulation Test | * Qualification of RHR ptraps Closed 02/08/85 | ||
* Stean Generator level Control aid Pratection | * Natural Circulation Test IRC ICSB F. Burrows | ||
* Stean Generator level Control aid Pratection B | |||
05/30/84 ASB R. Anand | |||
* Internally Cemrated Missiles - | * Internally Cemrated Missiles - | ||
Outside containnent | Outside containnent Closed 01/08/85 | ||
* Internally Generated Missiles - | * Internally Generated Missiles - | ||
Inside containnent | Inside containnent Cloced 01/08/85 | ||
* Protection against postulated pipe breaks outside containnent | * Protection against postulated pipe breaks outside containnent Confinnatory 01/08/85 | ||
* Ebel Pool (boling and Cleanup systen | * Ebel Pool (boling and Cleanup systen Closed 01/08/85 | ||
* Overheal heavy load harxilirg systen | * Overheal heavy load harxilirg systen Mtc 02/13/85 | ||
* Standby service water system | * Standby service water system Closed 01/08/85 | ||
* Primary Conponent Cooling Water sy: ten | * Primary Conponent Cooling Water sy: ten A | ||
* Condensate and Feedwater System | M/30/85 | ||
* Eleccrical - 17 open Items | * Condensate and Feedwater System Closed 01/08/85 Auxiliary Feedwater Systen IRC 01/08/85 PSB J. Knox | ||
* lbchanical - 46 open itens | * Eleccrical - 17 open Items A | ||
* Icose part detection | R. Giardina | ||
* Inaiequate core cooling instrmentation A | * lbchanical - 46 open itens A | ||
* Analysis of combined ILCA ani seismic loads | CPB A. Gill | ||
* On-line detection method | * Icose part detection Cmplete 03/04/85 | ||
* Snow & Ice Ioal | * Inaiequate core cooling instrmentation A 04/30/85 M. Dunefeld | ||
* Rafiation consequences of ILCA | * Analysis of combined ILCA ani seismic loads A | ||
* Rod ejection a cidents | 03/28/85 | ||
* Primary vs. secondary loads | * On-line detection method Closed 09/07/84 PETB E. Markee x/q B | ||
* In service testing | 02/15/85 | ||
* Snow & Ice Ioal B | |||
01/16/85 AEB K. Desrpsey | |||
* Rafiation consequences of ILCA B | |||
11/08/84 | |||
* Rod ejection a cidents B | |||
11/08/84 PEB Y. Li | |||
* Primary vs. secondary loads Canplete 02/20/85 | |||
* In service testing A | |||
06/85 | |||
APPLICAhT RESPOEE DIV. | |||
* Asyurnetric IOCA loads | BRAN 01 REVINER ISSUE M7IE IBIE RMIES | ||
* P1V leak testing | * Asyurnetric IOCA loads tRC IE | ||
* Seismic Input | !EB' O. Rothberg | ||
* Seismic systen analysis | * P1V leak testing IRC SGEB K. Imu | ||
* Concrete containment | * Seismic Input Closed 02/01/85 - | ||
* Concrete and Structural steel internal structures | * Seismic systen analysis Closal 02/01/85 | ||
* Other Categpry I structures | * Concrete containment Closed 12/21/84 | ||
* Fomdations | * Concrete and Structural steel internal structures Closed 12/21/M | ||
* Other Categpry I structures Closed 12/17/84 | |||
* Fomdations Closed 12/17/84 | |||
* Soil Structure Interaction (SSI) | * Soil Structure Interaction (SSI) | ||
Analysis | Analysis | ||
* Seismology | $RC 02/01/85 GSB G. Giese-Koch | ||
* Environmental Qualification | * Seismology Complete 02/20/85 EQB H. Walker | ||
* Pmp & Valve | * Environmental Qualification Confirmatory 08/05/84 J. Inibardo | ||
* Seismic Qualification | * Pmp & Valve Confirmatory 08/05/84 A. Ime | ||
* Preservice Inspection Progran | * Seismic Qualification Confirmatory 08/05/84 MrEB M. Htun | ||
* Inservice inspection o' Class 2 & 3 components | * Preservice Inspection Progran A | ||
* Underclai cracking of forgings in R.V. Cicsed | 06/85 | ||
* Safe shutdown | * Inservice inspection o' Class 2 & 3 components A | ||
* Alternate shutdown | 06/85 D. Smith | ||
* Fire in Cable spreading room | * Underclai cracking of forgings in R.V. | ||
* Potential for flooding fmn local precipitation | Cicsed 08/10/84 OEB J. Stang | ||
* Flooding from Peggs Rm | * Safe shutdown A | ||
* Safety paraneter display systen aid control roon design review | 09/85 | ||
* Managenent & Organization | * Alternate shutdown A | ||
09/85 | |||
* Fire in Cable spreading room B | |||
05/30/84 WEB R. Gonzales | |||
* Potential for flooding fmn local precipitation B | |||
05/30/84 | |||
* Flooding from Peggs Rm B | |||
05/30/84 IHFS HFEB R. Eckenrode | |||
* Safety paraneter display systen aid control roon design review A | |||
03/28/85 IRB F. A11enspack | |||
* Managenent & Organization A | |||
APPLICANT RESP 0 FEE DIV. | |||
* Initici test progran | BRA!Of REV1BER ISSLE WIE IMIE R M IKS DHFS PSRB R. Becker | ||
* Bnergency operatirg procedure | * Initici test progran A | ||
* Emergency Preparedness Plan | S. Bryan | ||
* Cross-Training progran | * Bnergency operatirg procedure Closed I!E EPB J. Sianonds | ||
* Emergency Preparedness Plan A | |||
04/15/85 Reg.1 | |||
* Cross-Training progran A | |||
NUIE: These open issues include backfit itens A - Applica1t to provide information B - Backfit | |||
/?: | |||
a | a | ||
.. ~ | |||
..-. _~ | |||
,}} | |||
Latest revision as of 06:10, 13 December 2024
| ML20100A551 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/21/1985 |
| From: | Carey J DUQUESNE LIGHT CO. |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| 2NRC-5-048, 2NRC-5-48, NUDOCS 8503260087 | |
| Download: ML20100A551 (4) | |
Text
7-~
~
$VL
'Af Duquesne L@t
=g28 (412) 923-1960 Nuclear Construction Division Telecow (412) 787-2629 Robinson Plaza, Building 2, Suite 210 Pittsbur9h, PA 15205 March 21, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. George W. Knighton, Chief Licensing Branch 3 Of fice of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 S.E.R. Outstanding Issues Status Gentlemen:
Attached is a cur rent list, as of March 15, 1985, which provides our understanding of the outstanding issues wh ich remain open.
Items identified as "c omple t e" are those for which responses have been provided and no confirmation of status has yet been received from the staff.
We i
consider these items catisfactorily closed unless notified otherwise.
In order to permit timely resolution of items ident ified as " complete" which may not be resolved to the staf f's satisfaction, please provide a speci fic description of the issue which remains to be resolved.
Items identified as
" confirmatory" are based upon formal or informal communications or agree-ments with the staff.
Please info rm us of any disagreement of status described on the attached list.
DUQUESNE LIGHT COMPANY By J g.
arey
/
Vice resident GH0/wjs Attachment cc:
Mr. H. R. Denton, Director NRR (w/ attachment)
Mr. H Thompson, Director Division of Licensing (w/ attachment)
Mr. B. K. Singh, Project Manager (w/ attachment)
Mr. T. Novak, Assistant Director Division of Licensing (w/ attachment)
Mr. G. Walton, NRC Resident Inspector (w/ attachment)
BVPS-2 Outstanding Issue 2 Strtus APPLICANT
RESPONSE
DIV.
BRAM}l REVIEWER ISSUE M7IE IWIE RDMS DSI RSB E. Lantz
- Qualification of RHR ptraps Closed 02/08/85
- Natural Circulation Test IRC ICSB F. Burrows
- Stean Generator level Control aid Pratection B
05/30/84 ASB R. Anand
- Internally Cemrated Missiles -
Outside containnent Closed 01/08/85
- Internally Generated Missiles -
Inside containnent Cloced 01/08/85
- Protection against postulated pipe breaks outside containnent Confinnatory 01/08/85
- Ebel Pool (boling and Cleanup systen Closed 01/08/85
- Overheal heavy load harxilirg systen Mtc 02/13/85
- Standby service water system Closed 01/08/85
- Primary Conponent Cooling Water sy: ten A
M/30/85
- Condensate and Feedwater System Closed 01/08/85 Auxiliary Feedwater Systen IRC 01/08/85 PSB J. Knox
- Eleccrical - 17 open Items A
R. Giardina
- lbchanical - 46 open itens A
CPB A. Gill
- Icose part detection Cmplete 03/04/85
- Inaiequate core cooling instrmentation A 04/30/85 M. Dunefeld
- Analysis of combined ILCA ani seismic loads A
03/28/85
- On-line detection method Closed 09/07/84 PETB E. Markee x/q B
02/15/85
- Snow & Ice Ioal B
01/16/85 AEB K. Desrpsey
- Rafiation consequences of ILCA B
11/08/84
- Rod ejection a cidents B
11/08/84 PEB Y. Li
- Primary vs. secondary loads Canplete 02/20/85
- In service testing A
06/85
APPLICAhT RESPOEE DIV.
BRAN 01 REVINER ISSUE M7IE IBIE RMIES
- Asyurnetric IOCA loads tRC IE
!EB' O. Rothberg
- P1V leak testing IRC SGEB K. Imu
- Seismic Input Closed 02/01/85 -
- Seismic systen analysis Closal 02/01/85
- Concrete containment Closed 12/21/84
- Concrete and Structural steel internal structures Closed 12/21/M
- Other Categpry I structures Closed 12/17/84
- Fomdations Closed 12/17/84
- Soil Structure Interaction (SSI)
Analysis
$RC 02/01/85 GSB G. Giese-Koch
- Seismology Complete 02/20/85 EQB H. Walker
- Environmental Qualification Confirmatory 08/05/84 J. Inibardo
- Pmp & Valve Confirmatory 08/05/84 A. Ime
- Seismic Qualification Confirmatory 08/05/84 MrEB M. Htun
- Preservice Inspection Progran A
06/85
- Inservice inspection o' Class 2 & 3 components A
06/85 D. Smith
- Underclai cracking of forgings in R.V.
Cicsed 08/10/84 OEB J. Stang
09/85
- Alternate shutdown A
09/85
- Fire in Cable spreading room B
05/30/84 WEB R. Gonzales
- Potential for flooding fmn local precipitation B
05/30/84
- Flooding from Peggs Rm B
05/30/84 IHFS HFEB R. Eckenrode
- Safety paraneter display systen aid control roon design review A
03/28/85 IRB F. A11enspack
- Managenent & Organization A
APPLICANT RESP 0 FEE DIV.
BRA!Of REV1BER ISSLE WIE IMIE R M IKS DHFS PSRB R. Becker
- Initici test progran A
S. Bryan
- Bnergency operatirg procedure Closed I!E EPB J. Sianonds
- Emergency Preparedness Plan A
04/15/85 Reg.1
- Cross-Training progran A
NUIE: These open issues include backfit itens A - Applica1t to provide information B - Backfit
/?: