{{#Wiki_filter:LOUISIANA             f 342 OctAnO~Oc srneer POW E R & L1G H T/ P O BOX 6008
{{#Wiki_filter:LOUISIANA f 342 OctAnO~Oc srneer POW E R & L1G H T/ P O BOX 6008
* NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345
* NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345
      $uSN2ysNU July 15, 1983 W3I83-0238 Q-3-A35.07.42 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012
$uSN2ysNU July 15, 1983 W3I83-0238 Q-3-A35.07.42 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012


==SUBJECT:==
==SUBJECT:==
Waterford SES Unit No. 3                                 g             g           g Docket No. 50--382                                       l       _p   a         a l
Waterford SES Unit No. 3 g
Significant Construction Deficiency No. 42 R-1               ,,
g g
                "HMA Auxiliary Relays"                                       i g g lg
l Docket No. 50--382 l
_p a
a Significant Construction Deficiency No. 42 R-1 "HMA Auxiliary Relays" i
g g lg


==REFERENCE:==
==REFERENCE:==
LP&L letter W3I83-0238 dated May 26, 1983                 L                       d
LP&L letter W3I83-0238 dated May 26, 1983 L
d


==Dear Mr. Collins:==
==Dear Mr. Collins:==
The above referenced letter indicated submittal of a Final Report to the USNRC by July 17, 1983.
The above referenced letter indicated submittal of a Final Report to the USNRC by July 17, 1983.
At the present time, the completion of corrective action is being delayed due to testing. As a result, LP&L is waiting for an outage which will permit installation of the three (3) remaining coils.
At the present time, the completion of corrective action is being delayed due to testing. As a result, LP&L is waiting for an outage which will permit installation of the three (3) remaining coils.
A Final Report will therefore be submitted to the USNRC by September 23, 1983.
A Final Report will therefore be submitted to the USNRC by September 23, 1983.
Very truly yours, W ma N                 'f*
Very truly yours, W
F. J. Drumaand Project Support Manager - Nuclear cc: 1) Director                                         3)   Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
ma N
: 2) Director                                         4) Mr. W. M. Stevenson i             Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.     20555 r307260126 030715 PDR ADOCK 05000382 C                 PDR
'f*
[b              g 1}}
F. J. Drumaand Project Support Manager - Nuclear cc:
: 1) Director 3)
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
: 2) Director 4)
Mr. W. M. Stevenson i
Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 r307260126 030715
[b g
PDR ADOCK 05000382 C
PDR 1}}

Latest revision as of 02:55, 15 December 2024

Rept on Significant Const Deficiency 42 R-1 Re Hma Auxiliary Relays.Completion of Corrective Action Delayed Due to Testing.Three Remaining Coils Will Be Installed During Outage.Final Rept Will Be Provided by 830923
ML20077C499
Person / Time
Site: Waterford 
Issue date: 07/15/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0238, W3I83-238, NUDOCS 8307260126
Download: ML20077C499 (1)


Text

LOUISIANA f 342 OctAnO~Oc srneer POW E R & L1G H T/ P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345

$uSN2ysNU July 15, 1983 W3I83-0238 Q-3-A35.07.42 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 g

g g

l Docket No. 50--382 l

_p a

a Significant Construction Deficiency No. 42 R-1 "HMA Auxiliary Relays" i

g g lg

REFERENCE:

LP&L letter W3I83-0238 dated May 26, 1983 L

d

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC by July 17, 1983.

At the present time, the completion of corrective action is being delayed due to testing. As a result, LP&L is waiting for an outage which will permit installation of the three (3) remaining coils.

A Final Report will therefore be submitted to the USNRC by September 23, 1983.

Very truly yours, W

ma N

'f*

F. J. Drumaand Project Support Manager - Nuclear cc:

1) Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director 4)

Mr. W. M. Stevenson i

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.