ML20082H851: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:i l
l i
l "s
"s               ;                                                        l
' DukeIbwerCompany J W.HA wros OconeeNuclearSite Dce President PD. Box H39 (803)&SS3499 Office Senece SC29679 (803)8853564 Fax DUKEPOWER l
            ' DukeIbwerCompany                                             J W.HA wros
March 16, 1995 I
!  ,          OconeeNuclearSite                                           Dce President PD. Box H39                                                 (803)&SS3499 Office Senece SC29679                                 -
(803)8853564 Fax DUKEPOWER l         March 16, 1995 I
l l
l l
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.           20555 i
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.
C.
20555 i


==Subject:==
==Subject:==
Oconee Nuclear Station                                                 '
Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Emergency Plan Implementing Procedures Manual l
Docket Nos. 50-269, -270, -287 Emergency Plan Implementing Procedures Manual l                           Volume B, Revision 95-02                                               i l                                                                                                 :
Volume B, Revision 95-02 i
Please find attached for your use and review copies of the revision to the Oconee Nuclear Station Emergency Plan:
l Please find attached for your use and review copies of the revision to the Oconee Nuclear Station Emergency Plan:
Volume B     Revision 95-02 March 16, 1995 This revision is being submitted in accordance with 10 CFR 50-54 (q) and does not decrease the effectiveness of the Emergency Plan or                         j the Emergency Plan Implementing Procedures.
Volume B Revision 95-02 March 16, 1995 This revision is being submitted in accordance with 10 CFR 50-54 (q) and does not decrease the effectiveness of the Emergency Plan or j
the Emergency Plan Implementing Procedures.
Please delete privacy material in the form of personal telephone numbers prior to placing in the Public Document Room.
Please delete privacy material in the form of personal telephone numbers prior to placing in the Public Document Room.
By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia.
By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia.
Ver     truly yo rs,
Ver truly yo rs,
            . W. Ha pton VP, Oconee Nuclear Site xc:       (w/2 copies of attachments)
. W. Ha pton VP, Oconee Nuclear Site xc:
(w/2 copies of attachments)
Mr. Stewart D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 At.lanta, Georgia 30323 (w/o Attachments, Occnee Nuclear Station)
Mr. Stewart D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 At.lanta, Georgia 30323 (w/o Attachments, Occnee Nuclear Station)
NRC Resident Inspector C. C. Jennings, Manager, Emergency Planning" 9504170386 950326 a-      hDR ADDCK 05000269                                               f I
NRC Resident Inspector C. C. Jennings, Manager, Emergency Planning" 9504170386 950326 hDR ADDCK 05000269 f
PDR                                     '
I a-PDR w on wwmoaw l
w on wwmoaw                                                   l                 \}}
\\}}

Latest revision as of 07:02, 14 December 2024

Forwards Public Version of Revised Epips,Including Rev 95-02 to Cover Sheet & Table of Contents,Change 0 to RP/0/B/1000/25,Chemistry Manual 5.1 & Chemistry Manual 5.2
ML20082H851
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/16/1995
From: Hampton J
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082H855 List:
References
NUDOCS 9504170386
Download: ML20082H851 (1)


Text

i l

l "s

' DukeIbwerCompany J W.HA wros OconeeNuclearSite Dce President PD. Box H39 (803)&SS3499 Office Senece SC29679 (803)8853564 Fax DUKEPOWER l

March 16, 1995 I

l l

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.

C.

20555 i

Subject:

Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Emergency Plan Implementing Procedures Manual l

Volume B, Revision 95-02 i

l Please find attached for your use and review copies of the revision to the Oconee Nuclear Station Emergency Plan:

Volume B Revision 95-02 March 16, 1995 This revision is being submitted in accordance with 10 CFR 50-54 (q) and does not decrease the effectiveness of the Emergency Plan or j

the Emergency Plan Implementing Procedures.

Please delete privacy material in the form of personal telephone numbers prior to placing in the Public Document Room.

By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia.

Ver truly yo rs,

. W. Ha pton VP, Oconee Nuclear Site xc:

(w/2 copies of attachments)

Mr. Stewart D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 At.lanta, Georgia 30323 (w/o Attachments, Occnee Nuclear Station)

NRC Resident Inspector C. C. Jennings, Manager, Emergency Planning" 9504170386 950326 hDR ADDCK 05000269 f

I a-PDR w on wwmoaw l

\\