PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 JOSEPH W. G ALLAGHER atect ic r ,oou[do'u"one m r | / | ||
PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 JOSEPH W. G ALLAGHER atect ic r,oou[do'u"one m r (2151 e41-50o3 January 28, 1983 Re: Docket Nos. 50-277 50-278 Mr. J. F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 25: | Line 26: | ||
==Dear Mr. Stolz:== | ==Dear Mr. Stolz:== | ||
This letter transmits a revision to Figure 6.2-2 of the Peach Bottom Technical Specifications as requested in your letter of December 22, 1982 | |||
This letter transmits a revision to Figure 6.2-2 of the Peach Bottom Technical Specifications as requested in your letter of December 22, 1982 'J . F. Stolz to E. G. Bauer, Jr.). The revised figure shows the technical personnel' supporting the Senior Health Physicist. The figure reflects the re-organization of the health physics group into two subgroups, one designated | 'J. F. Stolz to E. G. Bauer, Jr.). | ||
The revised figure shows the technical personnel' supporting the Senior Health Physicist. | |||
The Applied Health Physicist is responsible for implementing the applied aspects of the Corporate Radiation Protection Program, such as field surveys, and the control of radiation work areas and personnel dosimetry. The Support Health Physicist provides technical support in the interest of improving the performance of the radiological monitoring and control programs at Peach Bottom. | The figure reflects the re-organization of the health physics group into two subgroups, one designated | ||
" Applied Health Physics", the other " Support Health Physics". | |||
The Applied Health Physicist is responsible for implementing the applied aspects of the Corporate Radiation Protection Program, such as field surveys, and the control of radiation work areas and personnel dosimetry. | |||
The Support Health Physicist provides technical support in the interest of improving the performance of the radiological monitoring and control programs at Peach Bottom. | |||
The individtals responsible for the activities of the health physics organization meet the qualifications of ANSI N18.1-1971. | The individtals responsible for the activities of the health physics organization meet the qualifications of ANSI N18.1-1971. | ||
fool 88:22888:ota8sil; P | fool 88:22888:ota8sil; P | ||
Mr. J. F. Stolz | Mr. J. F. Stolz Page 2 i | ||
Should you have any questions or require additional i | Should you have any questions or require additional i | ||
information regarding this matter, please do not hesitate to con.:act us. | information regarding this matter, please do not hesitate to con.:act us. | ||
Very truly yours, h! dL _- - | Very truly yours, h! dL _- - | ||
Attachment cc: | Attachment cc: | ||
Site Inspector Peach Bottom a | |||
e 1 | e 1 | ||
,4- | |||
,-v, w | |||
--. -- -,-- e | |||
-r- | |||
-,w--m m | |||
n | |||
- - - - -}} | |||
Latest revision as of 09:08, 16 December 2024
| ML20070S427 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 01/28/1983 |
| From: | Gallagher J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20070S431 | List: |
| References | |
| NUDOCS 8302040393 | |
| Download: ML20070S427 (2) | |
Text
.
e
/
PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 JOSEPH W. G ALLAGHER atect ic r,oou[do'u"one m r (2151 e41-50o3 January 28, 1983 Re: Docket Nos. 50-277 50-278 Mr. J. F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
Health Physics Organization for Peach Bottom Atomic Power Station
Dear Mr. Stolz:
This letter transmits a revision to Figure 6.2-2 of the Peach Bottom Technical Specifications as requested in your letter of December 22, 1982
'J. F. Stolz to E. G. Bauer, Jr.).
The revised figure shows the technical personnel' supporting the Senior Health Physicist.
The figure reflects the re-organization of the health physics group into two subgroups, one designated
" Applied Health Physics", the other " Support Health Physics".
The Applied Health Physicist is responsible for implementing the applied aspects of the Corporate Radiation Protection Program, such as field surveys, and the control of radiation work areas and personnel dosimetry.
The Support Health Physicist provides technical support in the interest of improving the performance of the radiological monitoring and control programs at Peach Bottom.
The individtals responsible for the activities of the health physics organization meet the qualifications of ANSI N18.1-1971.
fool 88:22888:ota8sil; P
Mr. J. F. Stolz Page 2 i
Should you have any questions or require additional i
information regarding this matter, please do not hesitate to con.:act us.
Very truly yours, h! dL _- -