Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: | Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: | ||
NOTE: | April 12, 2004 Time: | ||
NOTE: | 1430 Preparer: | ||
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/rrue = I through 4 REACTIVITY | Andrea Loneston U | ||
: 2. | 1 R | ||
28_ | |||
NOTE: | |||
Subtotal = | Refer to base procedure Nf ' 10.3.6 for safety assessment checklist KSF definitions. | ||
CORE COOLING | NOTE: | ||
: 2. | Wheneverfuel has been rcnovedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fiel pool cooling. | ||
: 3. | KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/rrue = I through 4 REACTIVITY I. | ||
: 4. | RCS Boron concentration = 2888 plrm a.) | ||
POWER AVAILABILITY | For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) b.) | ||
: 1. | For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C | ||
: 2. | : 2. | ||
G-03 or G-04/A-06/B-04 available | Number of boration paths Subtotal Conditinn RED ORANGE | ||
: 3. | <2 3. | ||
: 1. | 4. | ||
: 2. | (0-1) 1 (0-2) 2 (0-1) | ||
: 3. | I (0-1) 1 0-1 2 | ||
: 4. | 3-4 5 | ||
PBF-1 562 | No fuel motion SR instrumentation operable Subtotal = | ||
CORE COOLING Subtotal Condition I. | |||
Number of SG available for DHR (0-2) 0 0-1 RED | |||
: 2. | |||
Refueling cavity filled (0-1) 0 2 | |||
: 3. | |||
Number of trains RHR available (0-2) 2 3 | |||
Y | |||
: 4. | |||
RCS level above REDUCED INVENTORY (0-1) 1 4_5 RCS TE Nil' = 101.5`1; 9 daysshutdown; RCS 69% | |||
Subtotal = | |||
3 RCS Time to Boil 45 mil (Applicable at Cold or Refueling Shutdown) | |||
POWER AVAILABILITY Subtotal Condition | |||
: 1. | |||
Independent off-site power sources I | |||
RED available to A-05 and A-06 (totally 2 | |||
ORANGE independent at the 4160 V, 13.8 kV, 3 | |||
and 345 kV levels) | |||
(0-2) 2 4-5 | |||
: 2. | |||
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1 | |||
: 3. | |||
G-OS available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours. | |||
(0-1) 0 Subtotal = | |||
4 INVENTORY Subtotal Condition | |||
: 1. | |||
Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2 | |||
: 2. | |||
Refueling Cavity filled (see definition) | |||
(0-3) 0 3 | |||
YO1V | |||
: 3. | |||
RCS level above REDUCED INVENTORY (0-1) 1 4 | |||
: 4. | |||
Makeup from VCTIBLENDER and/or RWST available (0-2) 2 Subtotal = | |||
3 1nfnrmi#;nn ;- thit rocord Voe deleted in accordance with fhe Freedom of Infornation Act, exp r,qpin,; | |||
PBF-1 562 FqIlA-Revision 2 10130/02 Refeirences. | |||
NP 10.3.6 NP 10.2.1 Page 1 of 9 | |||
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT | Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT | ||
: 1. | : 1. | ||
: 2. | Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.11 set | ||
: 3. | : 2. | ||
: 4. | Containment Closure CL-IE maintained and closure < time to boil | ||
: 3. | |||
No fuel motion | |||
: 4. | |||
NOTE: | DHR Capability: | ||
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (Oor2) 2 (0-1) | |||
: 1. | I Subtotal 0 | ||
2-3 4-5-6 Condition RED ORANGE (0-1) | |||
: 2. | I Subtotal = | ||
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS) | |||
NOTE: | |||
: 3. | Take creditfor only one P-12 independent | ||
: 1. | |||
"A" SFP cooling pump available with power available from: | |||
G-02 or G-01 via 2B-32 an independent off-site power source different than that for Train B below | |||
: 2. | |||
"B" SFP cooling pump available with power available from: | |||
G-03 or G-04 via IB-42 | |||
.(*) an independent off-site power source different than that for Train A above | |||
: 3. | |||
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil > 12 hours. | |||
offsite power source during periods of single X-03 or X-04 availability (*). | |||
Subtotal Condition 0-1 RED 2 | |||
ORANGE (0- 1) n/a 3 | |||
YELLOW 4-5 GREEN (0-1) nra (0-1) nla (0-1) n/a (0- 1) n/a SFP Temperatures: | |||
N"' | |||
n/a OF SE n/a OF SFP Average Temp n/a SFP Time to Boil n/a Subtotal = | |||
n/a OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: | |||
No change from previous shift. | No change from previous shift. | ||
PBF 1562 | PBF 1562 Revision 2 1030/02 | ||
==References:== | ==References:== | ||
NE 10.3 6 | NE 10.3 6 NP 10.2.1 Page 2 of 9 | ||
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: | Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: | ||
REACTIVITY: | 1 DATE: | ||
/1" dENTS: | April 12, 2004 TIME: | ||
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 45 minutes | 1430 KEY SAFETY FUNCTIONS: | ||
RCS is at 69% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1362 | REACTIVITY: | ||
CORE COOLING: | |||
POWER AVAILABLE: | |||
GREEN V I'1.01,0W GREEN INVENTORY: | |||
CONTAINMENT: | |||
SFP COOLING: | |||
YELLOW GREEN NA PROTECTED EQUIPMENT: | |||
/1" dENTS: | |||
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency 0 RCS Time to Boil is 45 minutes RCS is at 69% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1362 Rteilon 2 10/301O2 | |||
==References:== | ==References:== | ||
NP 10.3 6 | NP 10.3 6 NP 10.2.1 Page 5 of 9}} | ||
Latest revision as of 18:30, 15 January 2025
| ML051920041 | |
| Person / Time | |
|---|---|
| Site: | Point Beach (DPR-024) |
| Issue date: | 04/12/2004 |
| From: | Longston A Nuclear Management Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0282 | |
| Download: ML051920041 (3) | |
Text
-
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
April 12, 2004 Time:
1430 Preparer:
Andrea Loneston U
1 R
28_
NOTE:
Refer to base procedure Nf ' 10.3.6 for safety assessment checklist KSF definitions.
NOTE:
Wheneverfuel has been rcnovedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fiel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/rrue = I through 4 REACTIVITY I.
RCS Boron concentration = 2888 plrm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths Subtotal Conditinn RED ORANGE
<2 3.
4.
(0-1) 1 (0-2) 2 (0-1)
I (0-1) 1 0-1 2
3-4 5
No fuel motion SR instrumentation operable Subtotal =
CORE COOLING Subtotal Condition I.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
- 3.
Number of trains RHR available (0-2) 2 3
Y
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4_5 RCS TE Nil' = 101.5`1; 9 daysshutdown; RCS 69%
Subtotal =
3 RCS Time to Boil 45 mil (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3.
G-OS available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition
- 1.
Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
YO1V
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
- 4.
Makeup from VCTIBLENDER and/or RWST available (0-2) 2 Subtotal =
3 1nfnrmi#;nn ;- thit rocord Voe deleted in accordance with fhe Freedom of Infornation Act, exp r,qpin,;
PBF-1 562 FqIlA-Revision 2 10130/02 Refeirences.
NP 10.3.6 NP 10.2.1 Page 1 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.11 set
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (Oor2) 2 (0-1)
I Subtotal 0
2-3 4-5-6 Condition RED ORANGE (0-1)
I Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take creditfor only one P-12 independent
- 1.
"A" SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32 an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
.(*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil > 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
offsite power source during periods of single X-03 or X-04 availability (*).
Subtotal Condition 0-1 RED 2
ORANGE (0- 1) n/a 3
YELLOW 4-5 GREEN (0-1) nra (0-1) nla (0-1) n/a (0- 1) n/a SFP Temperatures:
N"'
n/a OF SE n/a OF SFP Average Temp n/a SFP Time to Boil n/a Subtotal =
n/a OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
No change from previous shift.
PBF 1562 Revision 2 1030/02
References:
NE 10.3 6 NP 10.2.1 Page 2 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
April 12, 2004 TIME:
1430 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
GREEN V I'1.01,0W GREEN INVENTORY:
CONTAINMENT:
SFP COOLING:
YELLOW GREEN NA PROTECTED EQUIPMENT:
/1" dENTS:
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency 0 RCS Time to Boil is 45 minutes RCS is at 69% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1362 Rteilon 2 10/301O2
References:
NP 10.3 6 NP 10.2.1 Page 5 of 9