{{#Wiki_filter:Pe-C" Point Beach Nuelcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:       April 15, 2004           Time:     14O         Preparer:           Andrea Lonigstoii         U   I         R       28 NOTE:         Refer to base procedure NP 10.3.6for safety asscssm eut checklist KSF definitions.
{{#Wiki_filter:Pe-C" Point Beach Nuelcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
NOTE:         Wheneverffuel has been removedfroyn the reactorvessel and refueling cavity, all key safety functions are GREEN except spentfielpool cooling.
April 15, 2004 Time:
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/Tsrue = I through 4 REACTIVITY                                                                         Subtotal      Condition
14O Preparer:
: 1.       RCS Boron concentration = 2892 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppin b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C       (0-1)    1          0-I          RED
Andrea Lonigstoii U
: 2.       Number of boration paths                                       (0-2)    2          2            ORANGE
I R
: 3.       No fuel motion                                                 (0-1)    I          34
28 NOTE:
: 4.       SR instrumentation operable                                   (0-1)   1         5         _<ZD>
Refer to base procedure NP 10.3.6 for safety asscssm eut checklist KSF definitions.
Subtotal =       S CORE COOLING                                                                     Subtotal     Condition
NOTE:
: 1.       Number of SG available for DHR                               (0-2)   0         0-1           RED
Wheneverffuel has been removedfroyn the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fielpool cooling.
: 2.       Refueling cavity filled                                       (0-1)   0           2
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/Tsrue = I through 4 REACTIVITY
: 3.       Number of trains RHR available                               (0-2)   2           3
: 1.
: 4.       RCS level above REDUCED INVENTORY                             (0-1)   1         4-5 RCS TENMI = 96"F; 12 days shutdown; RCS 70%                   Subtotal =     3 RCS Time to Boil           51 min     (Applicable at Cold or Refueling Shutdown)
RCS Boron concentration = 2892 ppm a.)
POWVER AVAILABILITY                                                               Subtotal     Condition
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppin b.)
: 1.       Independent off-site power sources                                                 I             RED available to A-05 and A-06 (totally                                               2             ORANGE independent at the 4160 V, 13.8 kV,                                               3 and 345 kV levels)                                             (0-2)   2           4-5
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
: 2.       G-01 or G-02/A-05/B-03 available                               (0-1)   1 G-03 or G-04/A-061B-04 available                               (0-1)   1
: 2.
: 3.       G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours.           (0-1)   0 Subtotal =     4 INVENTORY                                                                         Subtotal     Condition
Number of boration paths
: 1.       Pressurizer level 220 percent w/head on                                           0-1         RED (0-1)   0           2
: 3.
: 2.       Refueling Cavity filled (see definition)                     (0-3)   0           3
No fuel motion
: 3.       RCS level above REDUCED INVENTORY                             (0-1)   1           4
: 4.
: 4.       Makeup from VCT/BLENDER and/or RWST available                                         (0-2)   2 Subtotal =       3 Infrm^i,^*r.nl in accordance wi ActMo e Freedom of Inunrmate nola~
SR instrumentation operable Subtotal Condition RED ORANGE
o 0-44)
_<ZD>
PBF-1562          FOIA                                                                                           
(0-1) 1 (0-2) 2 (0-1)
I (0-1) 1 0-I 2
34 5
Subtotal =
S CORE COOLING Subtotal Condition
: 1.
Number of SG available for DHR (0-2) 0 0-1 RED
: 2.
Refueling cavity filled (0-1) 0 2
: 3.
Number of trains RHR available (0-2) 2 3
: 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TENMI  
= 96"F; 12 days shutdown; RCS 70%
Subtotal =
3 RCS Time to Boil 51 min (Applicable at Cold or Refueling Shutdown)
POWVER AVAILABILITY Subtotal Condition
: 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
: 2.
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-061B-04 available (0-1) 1
: 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition
: 1.
Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2
: 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
: 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
: 4.
Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =
3 Infrm^i,^*r.nl in accordance wi e Freedom of Inunrmate o
ActMo nola~
PBF-1562 FOIA Revision 2 10/30/02 P
0-44)


==References:==
==References:==
NP 10.3.6 Revision 2 10/30/02                                                P,age I of 9                                               NP 10.2.1
NP 10.3.6 NP 10.2.1
,age I of 9


Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT                                                                 Subtotal          Condition
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
: 1.       Containment integrity (TS 15.1.D) {Containment                               0                RED Operable) ITS TS 3.6.1 ) set                           (O or 4)  0                            ORANGE
: 1.
: 2.       Containment Closure CL-IE maintained                                         2-3 and closure < time to boil                             (O or 2)  2          4-5-6          _C
Containment integrity (TS 15.1.D) {Containment Operable)
: 3.       No fuel motion                                             (0-1)  I
ITS TS 3.6.1 ) set
: 4.       DHR Capability:
: 2.
          -    cavity flooded and intenals out OR
Containment Closure CL-IE maintained and closure < time to boil
          -    at least one SG available OR
: 3.
          -    one fan cooler with Equip hatch installed and personnel hatches capable of being shut                               (0-1) I Subtotal =   4 SPE                                                                   .
No fuel motion
* SPENI 'FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
: 4.
NOTE:           Take creditfor only one P-12 independent offsite power source duringperiods of single X-03 or X-04 availability (*).
DHR Capability:
Subtotal          Condition
cavity flooded and intenals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1)
: 1.       "A" SFP cooling pump available                                             0-I                RED with power available from:                                                   2                ORANGE
I Subtotal 0
          -    G-02 or G-01 via 2B-32                               (0-1) n/a        3                YELLOW
2-3 4-5-6 Condition RED ORANGE
          -(*) an independent off-site power                                         4-5                GREEN source different than that for Train B below                                       (0-1) n/a
_C (0-1)
: 2.       "B" SFP cooling pump available with power available from:
I Subtotal =
          -    G-03 or G-04 via IB-42                               (0-1) n/a
4 SPE SPENI (ONLY APPLICABLE when NOTE:
          *(*) an independent off-site power source different than that for Train A above                                       (0-1) n/a
Take credit for only one P-12 independent
: 3.       Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil > 12 hours.                                                   (0-1) n/a SFP Temperatures:                                           Subtotal =    n/a NW         n/a       OF 0
: 1.  
SE         n/a         F SFP Average Temp         . n/a       0F SFP Time to Boil             n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
"A" SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32
-(*) an independent off-site power source different than that for Train B below
: 2.  
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
*(*) an independent off-site power source different than that for Train A above
: 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil > 12 hours.
SFP Temperatures:
NW n/a OF SE n/a 0F SFP Average Temp n/a 0F SFP Time to Boil n/a
'FUEL POOL COOLING starting AND during FULL CORE OFFLOADS) offsite power source during periods of single X-03 or X-04 availability (*).
Subtotal Condition 0-I RED 2
ORANGE (0-1) n/a 3
YELLOW 4-5 GREEN (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a Subtotal =
n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
No change from previous shift.
No change from previous shift.
PBF-1562                                                                                                        
PBF-1562 Revision 2 10/30102


==References:==
==References:==
NP 10.3.6 Revision 2 10/30102                                            Page 2 of 9                                                  NP 10.2.1
NP 10.3.6 NP 10.2.1 Page 2 of 9


Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:       I             DATE:       April 15, 2004             TIME:       140(0 KEY SAFETY FUNCTIONS:
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
REACTIVITY:                   GREEN CORE COOLING:               YELLOW POWER AVAILABLE:             GREEN INVENTORY:                   YELLOW CONTAINMENT:                 GREEN SFP COOLING:                 NA PROTECTED EOUIPMENT:
I DATE:
April 15, 2004 TIME:
140(0 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EOUIPMENT:
' COMMENTS:
' COMMENTS:
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency         Ps>+
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency Ps>+
RCS Time to Boil is 51 minutes                                                                       /
RCS Time to Boil is 51 minutes  
RCS is at 70% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562                                                                                      
/
RCS is at 70% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Revision 2 10/30/02


==References:==
==References:==
NP 10.3.6 Revision 2 10/30/02                                  Page 5 of 9                                           NP1inn I}}
NP 10.3.6 NP1inn I Page 5 of 9}}

Latest revision as of 18:29, 15 January 2025

Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051920057
Person / Time
Site: Point Beach 
(DPR-024)
Issue date: 04/15/2004
From: Longston A
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920057 (3)


Text

Pe-C" Point Beach Nuelcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 15, 2004 Time:

14O Preparer:

Andrea Lonigstoii U

I R

28 NOTE:

Refer to base procedure NP 10.3.6 for safety asscssm eut checklist KSF definitions.

NOTE:

Wheneverffuel has been removedfroyn the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fielpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/Tsrue = I through 4 REACTIVITY

1.

RCS Boron concentration = 2892 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppin b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE

_<ZD>

(0-1) 1 (0-2) 2 (0-1)

I (0-1) 1 0-I 2

34 5

Subtotal =

S CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TENMI

= 96"F; 12 days shutdown; RCS 70%

Subtotal =

3 RCS Time to Boil 51 min (Applicable at Cold or Refueling Shutdown)

POWVER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-061B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =

3 Infrm^i,^*r.nl in accordance wi e Freedom of Inunrmate o

ActMo nola~

PBF-1562 FOIA Revision 2 10/30/02 P

0-44)

References:

NP 10.3.6 NP 10.2.1

,age I of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) {Containment Operable)

ITS TS 3.6.1 ) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and intenals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1)

I Subtotal 0

2-3 4-5-6 Condition RED ORANGE

_C (0-1)

I Subtotal =

4 SPE SPENI (ONLY APPLICABLE when NOTE:

Take credit for only one P-12 independent

1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

  • (*) an independent off-site power source different than that for Train A above
3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil > 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SFP Temperatures:

NW n/a OF SE n/a 0F SFP Average Temp n/a 0F SFP Time to Boil n/a

'FUEL POOL COOLING starting AND during FULL CORE OFFLOADS) offsite power source during periods of single X-03 or X-04 availability (*).

Subtotal Condition 0-I RED 2

ORANGE (0-1) n/a 3

YELLOW 4-5 GREEN (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a Subtotal =

n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

No change from previous shift.

PBF-1562 Revision 2 10/30102

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 15, 2004 TIME:

140(0 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EOUIPMENT:

' COMMENTS:

Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency Ps>+

RCS Time to Boil is 51 minutes

/

RCS is at 70% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Revision 2 10/30/02