{{#Wiki_filter:Pe-C" Point Beach Nuelcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: | {{#Wiki_filter:Pe-C" Point Beach Nuelcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: | ||
NOTE: | April 15, 2004 Time: | ||
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/Tsrue = I through 4 REACTIVITY | 14O Preparer: | ||
: 1. | Andrea Lonigstoii U | ||
: 2. | I R | ||
: 3. | 28 NOTE: | ||
: 4. | Refer to base procedure NP 10.3.6 for safety asscssm eut checklist KSF definitions. | ||
Subtotal = | NOTE: | ||
: 1. | Wheneverffuel has been removedfroyn the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fielpool cooling. | ||
: 2. | KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/Tsrue = I through 4 REACTIVITY | ||
: 3. | : 1. | ||
: 4. | RCS Boron concentration = 2892 ppm a.) | ||
POWVER AVAILABILITY | For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppin b.) | ||
: 1. | For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C | ||
: 2. | : 2. | ||
: 3. | Number of boration paths | ||
: 1. | : 3. | ||
: 2. | No fuel motion | ||
: 3. | : 4. | ||
: 4. | SR instrumentation operable Subtotal Condition RED ORANGE | ||
_<ZD> | |||
(0-1) 1 (0-2) 2 (0-1) | |||
I (0-1) 1 0-I 2 | |||
34 5 | |||
Subtotal = | |||
S CORE COOLING Subtotal Condition | |||
: 1. | |||
Number of SG available for DHR (0-2) 0 0-1 RED | |||
: 2. | |||
Refueling cavity filled (0-1) 0 2 | |||
: 3. | |||
Number of trains RHR available (0-2) 2 3 | |||
: 4. | |||
RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TENMI | |||
= 96"F; 12 days shutdown; RCS 70% | |||
Subtotal = | |||
3 RCS Time to Boil 51 min (Applicable at Cold or Refueling Shutdown) | |||
POWVER AVAILABILITY Subtotal Condition | |||
: 1. | |||
Independent off-site power sources I | |||
RED available to A-05 and A-06 (totally 2 | |||
ORANGE independent at the 4160 V, 13.8 kV, 3 | |||
and 345 kV levels) | |||
(0-2) 2 4-5 | |||
: 2. | |||
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-061B-04 available (0-1) 1 | |||
: 3. | |||
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours. | |||
(0-1) 0 Subtotal = | |||
4 INVENTORY Subtotal Condition | |||
: 1. | |||
Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2 | |||
: 2. | |||
Refueling Cavity filled (see definition) | |||
(0-3) 0 3 | |||
: 3. | |||
RCS level above REDUCED INVENTORY (0-1) 1 4 | |||
: 4. | |||
Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal = | |||
3 Infrm^i,^*r.nl in accordance wi e Freedom of Inunrmate o | |||
ActMo nola~ | |||
PBF-1562 FOIA Revision 2 10/30/02 P | |||
0-44) | |||
==References:== | ==References:== | ||
NP 10.3.6 | NP 10.3.6 NP 10.2.1 | ||
,age I of 9 | |||
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT | Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT | ||
: 1. | : 1. | ||
: 2. | Containment integrity (TS 15.1.D) {Containment Operable) | ||
: 3. | ITS TS 3.6.1 ) set | ||
: 4. | : 2. | ||
Containment Closure CL-IE maintained and closure < time to boil | |||
: 3. | |||
No fuel motion | |||
: 4. | |||
NOTE: | DHR Capability: | ||
cavity flooded and intenals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) | |||
: 1. | I Subtotal 0 | ||
2-3 4-5-6 Condition RED ORANGE | |||
_C (0-1) | |||
: 2. | I Subtotal = | ||
4 SPE SPENI (ONLY APPLICABLE when NOTE: | |||
Take credit for only one P-12 independent | |||
: 3. | : 1. | ||
SE | "A" SFP cooling pump available with power available from: | ||
G-02 or G-01 via 2B-32 | |||
-(*) an independent off-site power source different than that for Train B below | |||
: 2. | |||
"B" SFP cooling pump available with power available from: | |||
G-03 or G-04 via IB-42 | |||
*(*) an independent off-site power source different than that for Train A above | |||
: 3. | |||
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil > 12 hours. | |||
SFP Temperatures: | |||
NW n/a OF SE n/a 0F SFP Average Temp n/a 0F SFP Time to Boil n/a | |||
'FUEL POOL COOLING starting AND during FULL CORE OFFLOADS) offsite power source during periods of single X-03 or X-04 availability (*). | |||
Subtotal Condition 0-I RED 2 | |||
ORANGE (0-1) n/a 3 | |||
YELLOW 4-5 GREEN (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a Subtotal = | |||
n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: | |||
No change from previous shift. | No change from previous shift. | ||
PBF-1562 | PBF-1562 Revision 2 10/30102 | ||
==References:== | ==References:== | ||
NP 10.3.6 | NP 10.3.6 NP 10.2.1 Page 2 of 9 | ||
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: | Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: | ||
REACTIVITY: | I DATE: | ||
April 15, 2004 TIME: | |||
140(0 KEY SAFETY FUNCTIONS: | |||
REACTIVITY: | |||
CORE COOLING: | |||
POWER AVAILABLE: | |||
INVENTORY: | |||
CONTAINMENT: | |||
SFP COOLING: | |||
GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EOUIPMENT: | |||
' COMMENTS: | ' COMMENTS: | ||
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency | Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency Ps>+ | ||
RCS Time to Boil is 51 minutes | RCS Time to Boil is 51 minutes | ||
RCS is at 70% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 | / | ||
RCS is at 70% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Revision 2 10/30/02 | |||
==References:== | ==References:== | ||
NP 10.3.6 | NP 10.3.6 NP1inn I Page 5 of 9}} | ||
Latest revision as of 18:29, 15 January 2025
| ML051920057 | |
| Person / Time | |
|---|---|
| Site: | Point Beach (DPR-024) |
| Issue date: | 04/15/2004 |
| From: | Longston A Nuclear Management Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0282 | |
| Download: ML051920057 (3) | |
Text
Pe-C" Point Beach Nuelcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
April 15, 2004 Time:
14O Preparer:
Andrea Lonigstoii U
I R
28 NOTE:
Refer to base procedure NP 10.3.6 for safety asscssm eut checklist KSF definitions.
NOTE:
Wheneverffuel has been removedfroyn the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fielpool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/Tsrue = I through 4 REACTIVITY
- 1.
RCS Boron concentration = 2892 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppin b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition RED ORANGE
_<ZD>
(0-1) 1 (0-2) 2 (0-1)
I (0-1) 1 0-I 2
34 5
Subtotal =
S CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
- 3.
Number of trains RHR available (0-2) 2 3
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TENMI
= 96"F; 12 days shutdown; RCS 70%
Subtotal =
3 RCS Time to Boil 51 min (Applicable at Cold or Refueling Shutdown)
POWVER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-061B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition
- 1.
Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
- 4.
Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =
3 Infrm^i,^*r.nl in accordance wi e Freedom of Inunrmate o
ActMo nola~
PBF-1562 FOIA Revision 2 10/30/02 P
0-44)
References:
NP 10.3.6 NP 10.2.1
,age I of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) {Containment Operable)
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and intenals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1)
I Subtotal 0
2-3 4-5-6 Condition RED ORANGE
_C (0-1)
I Subtotal =
4 SPE SPENI (ONLY APPLICABLE when NOTE:
Take credit for only one P-12 independent
- 1.
"A" SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32
-(*) an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
- (*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil > 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SFP Temperatures:
NW n/a OF SE n/a 0F SFP Average Temp n/a 0F SFP Time to Boil n/a
'FUEL POOL COOLING starting AND during FULL CORE OFFLOADS) offsite power source during periods of single X-03 or X-04 availability (*).
Subtotal Condition 0-I RED 2
ORANGE (0-1) n/a 3
YELLOW 4-5 GREEN (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a Subtotal =
n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
No change from previous shift.
PBF-1562 Revision 2 10/30102
References:
NP 10.3.6 NP 10.2.1 Page 2 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
I DATE:
April 15, 2004 TIME:
140(0 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EOUIPMENT:
' COMMENTS:
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency Ps>+
RCS Time to Boil is 51 minutes
/
RCS is at 70% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Revision 2 10/30/02
References:
NP 10.3.6 NP1inn I Page 5 of 9