ML20039G832: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- .- | {{#Wiki_filter:-.- | ||
Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 Docket Numbers 50-508 and 50-509 5 | Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 Docket Numbers 50-508 and 50-509 5 | ||
s January 12, 19o2 | s January 12, 19o2 RfCf.hVED G03-82-031 s | ||
g *JAN.131982b EEhT?Em* ;0 D:c Document Control Desk o | |||
V. S. Nuclear Regulatory Commission | |||
/ | |||
0 Washington D. C. | |||
20555 4 | |||
==Subject:== | ==Subject:== | ||
| Line 27: | Line 31: | ||
Attached is a copy of the final report provided to. Region V concern-ing a potential 10CFR50.55(e) associated with an undersized structural steel column. | Attached is a copy of the final report provided to. Region V concern-ing a potential 10CFR50.55(e) associated with an undersized structural steel column. | ||
Should you have any questions or desire further information, please contact me directly, s | Should you have any questions or desire further information, please contact me directly, s | ||
.N | |||
/ | |||
C R. S. Leddick (1000) | C R. S. Leddick (1000) | ||
Program Director, WNP-3/5 DRC/tt Attachment cc: | Program Director, WNP-3/5 DRC/tt Attachment cc: | ||
J. Adams - NESCO-WO/A D. Smithpeter - BPA-WO/A Ebascc - New York-WO/A WNP-3/5 Files - Richland-WO/A g6Y Col/ | |||
[ | [ | ||
DR ADOCK 05000}} | 0201190195 820112 DR ADOCK 05000 | ||
..}} | |||
Latest revision as of 22:49, 19 December 2024
| ML20039G832 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 01/12/1982 |
| From: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC |
| Shared Package | |
| ML20039G833 | List: |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, GO3-82-031, GO3-82-31, NUDOCS 8201190195 | |
| Download: ML20039G832 (1) | |
Text
-.-
Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 Docket Numbers 50-508 and 50-509 5
s January 12, 19o2 RfCf.hVED G03-82-031 s
g *JAN.131982b EEhT?Em* ;0 D:c Document Control Desk o
V. S. Nuclear Regulatory Commission
/
0 Washington D. C.
20555 4
Subject:
PROJECT NOS. 3 AND 5 FINAL REPORT OF P0TENTIAL 10CFR50.55(e)
UNDERSIZED RAB COLUMN (D/N :-036)
Attached is a copy of the final report provided to. Region V concern-ing a potential 10CFR50.55(e) associated with an undersized structural steel column.
Should you have any questions or desire further information, please contact me directly, s
.N
/
C R. S. Leddick (1000)
Program Director, WNP-3/5 DRC/tt Attachment cc:
J. Adams - NESCO-WO/A D. Smithpeter - BPA-WO/A Ebascc - New York-WO/A WNP-3/5 Files - Richland-WO/A g6Y Col/
[
0201190195 820112 DR ADOCK 05000
..