ML20040F424: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:r-Norttiem States Power Company 414 Nicollet Mall MinneapoJs, Minnesota 55401 Telephone (612) 330-5500 February 4,   1982                                             ,
{{#Wiki_filter:r-Norttiem States Power Company 414 Nicollet Mall MinneapoJs, Minnesota 55401 Telephone (612) 330-5500 February 4, 1982 J}
J}       ' d('p, b
' d('p, b
I?QnM .1]gy Director
I?Qn.1]gy M
                                                                      ~
_'' f Ig Dj'g?
                                                                              '' f             Ig .
78Sg Director
Office of Nuclear Reactor Regulation Dj'g? 78Sg          "
~
U S Nuclear Regulatory Commission                                     47fllpn Washington, D.C. 20555                                       %            Ed"400     0 MONTICELLO NUCLEAR GENERATING PLANT                 N       _.    <>
Office of Nuclear Reactor Regulation U S Nuclear Regulatory Commission 47fllpn Washington, D.C.
Docket No. 50-263 License No. DPR-22 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282     License No. DPR-42 50-306                 DPR-60 Submission of Revision 2 to the Monticello and Prairie Island Nuclear Generating Plant Security Force Training and Qualification Plan In accordance with the provisions of 10CFR 50.54 (p), and Regulatory Guide 10.1 distribution guidance, enclosed are two copies of a re-vision to the Security Forte Training and Qualification Plan for the Monticello and Prairie Island Nuclear Generating Plants. This change is Revision 2 to the plan and is to be substituted in its entirety for previously submitted information.     It is anticipated that future revisions will be on a replacement page basis.
20555 Ed"400 0
MONTICELLO NUCLEAR GENERATING PLANT N
Docket No. 50-263 License No. DPR-22 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 License No. DPR-42 50-306 DPR-60 Submission of Revision 2 to the Monticello and Prairie Island Nuclear Generating Plant Security Force Training and Qualification Plan In accordance with the provisions of 10CFR 50.54 (p), and Regulatory Guide 10.1 distribution guidance, enclosed are two copies of a re-vision to the Security Forte Training and Qualification Plan for the Monticello and Prairie Island Nuclear Generating Plants.
This change is Revision 2 to the plan and is to be substituted in its entirety for previously submitted information.
It is anticipated that future revisions will be on a replacement page basis.
The revision is necessitated by further refinement of the security program by Northern States Power Company at both sites: specifi-cally, changes in operating procedures and changes to the security organizational structure.
The revision is necessitated by further refinement of the security program by Northern States Power Company at both sites: specifi-cally, changes in operating procedures and changes to the security organizational structure.
The plan has been reformatted, Task Identification Summary added, and the Task and Duty Summary has been revised and apdated. A summary of the changes to the plan and a cross reference from the old to the new plan is contained in Attachment A to this letter.
The plan has been reformatted, Task Identification Summary added, and the Task and Duty Summary has been revised and apdated.
ATTACHMENTS CONTAIN SAFEGUARDS INFORMATION           c0   0  \
A summary of the changes to the plan and a cross reference from the old to the new plan is contained in Attachment A to this letter.
7 6)\9' B202090100 820204 PDR ADOCK 05000263 F               PDR
ATTACHMENTS CONTAIN
\\
0 SAFEGUARDS INFORMATION c0 7
6)\\9' B202090100 820204 PDR ADOCK 05000263 F
PDR


NORTHERN CTATE'S POWER COMPANY Director, NRR February 4, 1982 Page       We conclude that this revision does not decrease the effective-ness of the Monticello and Prairie Island Nuclear Generating Plant Security Force Training and Qualification Plan.           Since the i     attachments are Safeguards Information per 10CFR 73.21 (b), they should not be made available for inspection and not be placed in the public document room.
NORTHERN CTATE'S POWER COMPANY Director, NRR February 4, 1982 Page We conclude that this revision does not decrease the effective-ness of the Monticello and Prairie Island Nuclear Generating Plant Security Force Training and Qualification Plan.
        . h.
Since the i
L O Mayer, Manager of Nuclear Support Services LOM/EGS/jmh cc Director MPA, NRC (1 copy w/ attachments)
attachments are Safeguards Information per 10CFR 73.21 (b), they should not be made available for inspection and not be placed in the public document room.
. h.
L O Mayer, Manager of Nuclear Support Services LOM/EGS/jmh cc Director MPA, NRC (1 copy w/ attachments)
Regional Administrator - III, NRC (w/o attachments)
Regional Administrator - III, NRC (w/o attachments)
Resident Inspectors, NRC, Monti & PI (w/o attachments)
Resident Inspectors, NRC, Monti & PI (w/o attachments)
G Charnoff (w/o attachments)
G Charnoff (w/o attachments)
ATTACHMENTS CONTAIN SAFEGUARDS INFORMATION
ATTACHMENTS CONTAIN SAFEGUARDS INFORMATION
          ,_                            .  . --___._ .- ._ . _.    .,    .}}
.}}

Latest revision as of 22:14, 19 December 2024

Fowards Revision 2 of Security Force Training & Qualification Plan for Facilities.Revision 2 Submits Changes in Operating Procedures & Security Organizational Structure. Plan Withheld (Ref 10CFR73.21(b))
ML20040F424
Person / Time
Site: Monticello, Prairie Island, 05000000
Issue date: 02/04/1982
From: Mayer L
NORTHERN STATES POWER CO.
To:
NRC
References
NUDOCS 8202090180
Download: ML20040F424 (2)


Text

r-Norttiem States Power Company 414 Nicollet Mall MinneapoJs, Minnesota 55401 Telephone (612) 330-5500 February 4, 1982 J}

' d('p, b

I?Qn.1]gy M

_ f Ig Dj'g?

78Sg Director

~

Office of Nuclear Reactor Regulation U S Nuclear Regulatory Commission 47fllpn Washington, D.C.

20555 Ed"400 0

MONTICELLO NUCLEAR GENERATING PLANT N

Docket No. 50-263 License No. DPR-22 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 License No. DPR-42 50-306 DPR-60 Submission of Revision 2 to the Monticello and Prairie Island Nuclear Generating Plant Security Force Training and Qualification Plan In accordance with the provisions of 10CFR 50.54 (p), and Regulatory Guide 10.1 distribution guidance, enclosed are two copies of a re-vision to the Security Forte Training and Qualification Plan for the Monticello and Prairie Island Nuclear Generating Plants.

This change is Revision 2 to the plan and is to be substituted in its entirety for previously submitted information.

It is anticipated that future revisions will be on a replacement page basis.

The revision is necessitated by further refinement of the security program by Northern States Power Company at both sites: specifi-cally, changes in operating procedures and changes to the security organizational structure.

The plan has been reformatted, Task Identification Summary added, and the Task and Duty Summary has been revised and apdated.

A summary of the changes to the plan and a cross reference from the old to the new plan is contained in Attachment A to this letter.

ATTACHMENTS CONTAIN

\\

0 SAFEGUARDS INFORMATION c0 7

6)\\9' B202090100 820204 PDR ADOCK 05000263 F

PDR

NORTHERN CTATE'S POWER COMPANY Director, NRR February 4, 1982 Page We conclude that this revision does not decrease the effective-ness of the Monticello and Prairie Island Nuclear Generating Plant Security Force Training and Qualification Plan.

Since the i

attachments are Safeguards Information per 10CFR 73.21 (b), they should not be made available for inspection and not be placed in the public document room.

. h.

L O Mayer, Manager of Nuclear Support Services LOM/EGS/jmh cc Director MPA, NRC (1 copy w/ attachments)

Regional Administrator - III, NRC (w/o attachments)

Resident Inspectors, NRC, Monti & PI (w/o attachments)

G Charnoff (w/o attachments)

ATTACHMENTS CONTAIN SAFEGUARDS INFORMATION

.