ML20056D054: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 2: Line 2:
| number = ML20056D054
| number = ML20056D054
| issue date = 07/26/1993
| issue date = 07/26/1993
| title = Requests That Listed Surveillance Test Be Added to List of Surveillance Tests Included in Table 2 of Attachment 2 in Util 930611 Ltr Requesting Exemption from Two Yr Test Interval for Type B & C Leak Rate Tests,Per 10CFR50,App J
| title = Requests That Listed Surveillance Test Be Added to List of Surveillance Tests Included in Table 2 of Attachment 2 in Util Requesting Exemption from Two Yr Test Interval for Type B & C Leak Rate Tests,Per 10CFR50,App J
| author name = Hunger G
| author name = Hunger G
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9308020266
| document report number = NUDOCS 9308020266
| title reference date = 06-11-1993
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 1
| page count = 1
Line 28: Line 29:


==Dear Sir:==
==Dear Sir:==
In our letter dated June 11, 1993, from G. A. Hunger, Jr. (PECo) to V.          ,
In our {{letter dated|date=June 11, 1993|text=letter dated June 11, 1993}}, from G. A. Hunger, Jr. (PECo) to V.          ,
S. Nuclear Regulatory Commission, Philadelphia Electric Company (PECo) requested exemption from the two year test interval for Type B and C leak rate          .
S. Nuclear Regulatory Commission, Philadelphia Electric Company (PECo) requested exemption from the two year test interval for Type B and C leak rate          .
tests required by 10 CFR 50, Appendix J, Sections III.D.2(a) and III.D.3.
tests required by 10 CFR 50, Appendix J, Sections III.D.2(a) and III.D.3.
Line 35: Line 36:
Attachment 2 contained the surveillance tests for which the exemption would              ,
Attachment 2 contained the surveillance tests for which the exemption would              ,
apply.                                                                                  ;
apply.                                                                                  ;
PECo requests that the following surveillance test be added to the list of surveillance tests included in Table 2 of Attachment 2 in the June 11, 1993 letter:
PECo requests that the following surveillance test be added to the list of surveillance tests included in Table 2 of Attachment 2 in the {{letter dated|date=June 11, 1993|text=June 11, 1993 letter}}:
DESCRIPTION ST. NO.        AND VALVE NUMBERS      LAST PERFORMED EXPIRATION DATE PENETRATION        !
DESCRIPTION ST. NO.        AND VALVE NUMBERS      LAST PERFORMED EXPIRATION DATE PENETRATION        !
30.16.02      'B' Instrument N,        9/20/91          9/19/93          N-52F to D/W A0 3969B, CHK 332028,                                                    l CHK 33312, and                                                            i HV 33310 The justification contained in Attachment 1 of the June 11, 1993 letter              !
30.16.02      'B' Instrument N,        9/20/91          9/19/93          N-52F to D/W A0 3969B, CHK 332028,                                                    l CHK 33312, and                                                            i HV 33310 The justification contained in Attachment 1 of the {{letter dated|date=June 11, 1993|text=June 11, 1993 letter}}               !
would also apply to this surveillance test.                                              1 If you have any questions, please contact us.
would also apply to this surveillance test.                                              1 If you have any questions, please contact us.
Very truly yours,
Very truly yours,
                                                       %1. 0      UAug      YW 30(il [1 j                            G. A. Hunger, Jr., Director Licensing Section cc:    T. T. Martin, Administrator, Region I, USNRC                                  f B. S. Norris, USNRC Senior Resident Inspector, PBAPS 01 '
                                                       %1. 0      UAug      YW 30(il [1 j                            G. A. Hunger, Jr., Director Licensing Section cc:    T. T. Martin, Administrator, Region I, USNRC                                  f B. S. Norris, USNRC Senior Resident Inspector, PBAPS 01 '
l 9309020266 930726 8        @                                                t ADDCK 0500                                                                k0 gDR}}
l 9309020266 930726 8        @                                                t ADDCK 0500                                                                k0 gDR}}

Revision as of 07:04, 13 November 2023

Requests That Listed Surveillance Test Be Added to List of Surveillance Tests Included in Table 2 of Attachment 2 in Util Requesting Exemption from Two Yr Test Interval for Type B & C Leak Rate Tests,Per 10CFR50,App J
ML20056D054
Person / Time
Site: Peach Bottom 
Issue date: 07/26/1993
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9308020266
Download: ML20056D054 (1)


Text

  • - - 10 CFR 50.12 PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS ,

955-65 CHESTERBROOK BLVD. '

WAYNE, PA 19087-5691 July 26, 1993 i Docket No. 50-278 License Nos. DPR-56 STATION SUPPORT DEPARTMENT U.S. Nuclear Regulatory Commission .

Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Unit 3 ,

Request for Exemption from 10 CFR 50, Appendix J Type B and C Test Intervals

Dear Sir:

In our letter dated June 11, 1993, from G. A. Hunger, Jr. (PECo) to V. ,

S. Nuclear Regulatory Commission, Philadelphia Electric Company (PECo) requested exemption from the two year test interval for Type B and C leak rate .

tests required by 10 CFR 50, Appendix J, Sections III.D.2(a) and III.D.3.

Attachment 1 of that letter contained a discussion of the specific exemptions  ;

and the necessary justification in accordance with 10 CFR 50.12(a).  :

Attachment 2 contained the surveillance tests for which the exemption would ,

apply.  ;

PECo requests that the following surveillance test be added to the list of surveillance tests included in Table 2 of Attachment 2 in the June 11, 1993 letter:

DESCRIPTION ST. NO. AND VALVE NUMBERS LAST PERFORMED EXPIRATION DATE PENETRATION  !

30.16.02 'B' Instrument N, 9/20/91 9/19/93 N-52F to D/W A0 3969B, CHK 332028, l CHK 33312, and i HV 33310 The justification contained in Attachment 1 of the June 11, 1993 letter  !

would also apply to this surveillance test. 1 If you have any questions, please contact us.

Very truly yours,

%1. 0 UAug YW 30(il [1 j G. A. Hunger, Jr., Director Licensing Section cc: T. T. Martin, Administrator, Region I, USNRC f B. S. Norris, USNRC Senior Resident Inspector, PBAPS 01 '

l 9309020266 930726 8 @ t ADDCK 0500 k0 gDR