10 CFR 50.12 PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.
WAYNE, PA 19087-5691 i
July 26, 1993 Docket No. 50-278 License Nos. DPR-56 STATION SUPPORT DEPARTMENT U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station, Unit 3 Request for Exemption from 10 CFR 50, Appendix J Type B and C Test Intervals
Dear Sir:
In our letter dated June 11, 1993, from G. A. Hunger, Jr. (PECo) to V.
S. Nuclear Regulatory Commission, Philadelphia Electric Company (PECo) requested exemption from the two year test interval for Type B and C leak rate tests required by 10 CFR 50, Appendix J, Sections III.D.2(a) and III.D.3. of that letter contained a discussion of the specific exemptions and the necessary justification in accordance with 10 CFR 50.12(a).
- contained the surveillance tests for which the exemption would apply.
PECo requests that the following surveillance test be added to the list of surveillance tests included in Table 2 of Attachment 2 in the June 11, 1993 letter:
DESCRIPTION ST. NO.
AND VALVE NUMBERS LAST PERFORMED EXPIRATION DATE PENETRATION 30.16.02
'B' Instrument N, 9/20/91 9/19/93 N-52F to D/W A0 3969B, CHK 332028, l
CHK 33312, and i
HV 33310 The justification contained in Attachment 1 of the June 11, 1993 letter would also apply to this surveillance test.
1 If you have any questions, please contact us.
Very truly yours,
%1. 0 UAu YW g
30(il [1 G. A. Hunger, Jr., Director j
Licensing Section cc:
T. T. Martin, Administrator, Region I, USNRC f
B. S. Norris, USNRC Senior Resident Inspector, PBAPS 01 9309020266 930726 t