ML19030A797: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 2: Line 2:
| number = ML19030A797
| number = ML19030A797
| issue date = 09/08/1978
| issue date = 09/08/1978
| title = 09/08/1978 Letter Submittal of Requested Appendix I Technical Specifications for Both Units
| title = Letter Submittal of Requested Appendix I Technical Specifications for Both Units
| author name = Mittl R
| author name = Mittl R
| author affiliation = Public Service Electric & Gas Co
| author affiliation = Public Service Electric & Gas Co
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:. --~         PS~G                 e   REGULATORY DOCKET f!l£90?Y Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201/430-7000
{{#Wiki_filter:.  
                                                                                          ,._)
--~
                                                                                          -*.I t.J      C.:..i September 8, 1978
PS~G e REGULATORY DOCKET f!l£90?Y Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201/430-7000 t.J September 8, 1978
                                                                                              .::-.:.. -::..:. ~;~~
,._)  
                                                                                                      -,(._
-*.I C.:..i  
                                                                                                              --~
-::..:. ~;~~  
C-)
-,(._
U. s. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. D. B. Vassallo, Assistant Director For Light Water Reactors Division of Project Management Gentlemen:
APPENDIX I TECHNICAL SPECIFICATIONS SALEM NUCLEAR GENERATING STATION DOCKET NOS. 50-272 AND 50-311 C-)
Pl
Pl
(/"*
(/"*
U. s. Nuclear Regulatory Commission Washington, D.C.                20555 Attention:          Mr. D. B. Vassallo, Assistant Director For Light Water Reactors Division of Project Management Gentlemen:
On August 1, 1978, you wrote to PSE&G requesting that we submit the proposed Appendix I Technical Specifications for Salem Unit No. 2 utilizing guidance enclosed in your letter within sixty days.
APPENDIX I TECHNICAL SPECIFICATIONS SALEM NUCLEAR GENERATING STATION DOCKET NOS. 50-272 AND 50-311 On August 1, 1978, you wrote to PSE&G requesting that we submit the proposed Appendix I Technical Specifications for Salem Unit No. 2 utilizing guidance enclosed in your letter within sixty days.
Previously, on July 11, 1978, the Assistapt Director for Engineering and Projects of the Division of Operating Reactors wrote a similar letter requesting that we submit proposed Appendix I Technical Specifications for Salem Unit No. 1.
Previously, on July 11, 1978, the Assistapt Director for Engineering and Projects of the Division of Operating Reactors wrote a similar letter requesting that we submit proposed Appendix I Technical Specifications for Salem Unit No. 1.
We were requested to respond within 180 days of the July 11, 1978 date.
We were requested to respond within 180 days of the July 11, 1978 date.
In as much as Salem 1 and Salem 2 are located on the same site and are essentially duplicates of each other, we propose that a common submittal be made by PSE&G to comply with both requests from NRC. We propose that the 180 day schedule established for Salem Unit No. 1 should be the basis of our combined submittal.
In as much as Salem 1 and Salem 2 are located on the same site and are essentially duplicates of each other, we propose that a common submittal be made by PSE&G to comply with both requests from NRC.
The Energy People
We propose that the 180 day schedule established for Salem Unit No. 1 should be the basis of our combined submittal.
* 9/8/78 We would be pleased to meet with you and your staff to discuss our submittal schedule if there are any questions. Please contact Mr. E. A. Liden, the Project Licensing Manager for Salem, if you have any additional questions on this matter.
The Energy People  
--~
* 9/8/78 We would be pleased to meet with you and your staff to discuss our submittal schedule if there are any questions.
Please contact Mr. E. A. Liden, the Project Licensing Manager for Salem, if you have any additional questions on this matter.
Very truly yours, R1¥:~
Very truly yours, R1¥:~
R. L. Mittl General Manager -
R. L. Mittl General Manager -
Licensing and Environment Engineering and Construction CC: Brian K. Grimes, Assistant Director for Engineering Projects - NRC 7Rl 02/03}}
Licensing and Environment Engineering and Construction CC:
Brian K. Grimes, Assistant Director for Engineering Projects -
NRC 7Rl 02/03}}

Latest revision as of 05:39, 5 January 2025

Letter Submittal of Requested Appendix I Technical Specifications for Both Units
ML19030A797
Person / Time
Site: Salem  
Issue date: 09/08/1978
From: Mittl R
Public Service Electric & Gas Co
To: Vassallo D
Office of Nuclear Reactor Regulation
References
Download: ML19030A797 (2)


Text

.

--~

PS~G e REGULATORY DOCKET f!l£90?Y Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201/430-7000 t.J September 8, 1978

,._)

-*.I C.:..i

-::..:. ~;~~

-,(._

U. s. Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. D. B. Vassallo, Assistant Director For Light Water Reactors Division of Project Management Gentlemen:

APPENDIX I TECHNICAL SPECIFICATIONS SALEM NUCLEAR GENERATING STATION DOCKET NOS. 50-272 AND 50-311 C-)

Pl

(/"*

On August 1, 1978, you wrote to PSE&G requesting that we submit the proposed Appendix I Technical Specifications for Salem Unit No. 2 utilizing guidance enclosed in your letter within sixty days.

Previously, on July 11, 1978, the Assistapt Director for Engineering and Projects of the Division of Operating Reactors wrote a similar letter requesting that we submit proposed Appendix I Technical Specifications for Salem Unit No. 1.

We were requested to respond within 180 days of the July 11, 1978 date.

In as much as Salem 1 and Salem 2 are located on the same site and are essentially duplicates of each other, we propose that a common submittal be made by PSE&G to comply with both requests from NRC.

We propose that the 180 day schedule established for Salem Unit No. 1 should be the basis of our combined submittal.

The Energy People

--~

  • 9/8/78 We would be pleased to meet with you and your staff to discuss our submittal schedule if there are any questions.

Please contact Mr. E. A. Liden, the Project Licensing Manager for Salem, if you have any additional questions on this matter.

Very truly yours, R1¥:~

R. L. Mittl General Manager -

Licensing and Environment Engineering and Construction CC:

Brian K. Grimes, Assistant Director for Engineering Projects -

NRC 7Rl 02/03