ML20004C084: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:r C - 2.* | {{#Wiki_filter:r C - 2.* Toteno b EDISON May 20, 1981 N | ||
AcHano P. CnouSE Vd 7 Serial No. 1-205 g,,,,33 3,,, | |||
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Offite of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Gian Ellyn, Illinois 60137 | |||
Offite of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Gian Ellyn, Illinois 60137 | |||
==Dear Mr. Keppler:== | ==Dear Mr. Keppler:== | ||
Enclosed are two copies of the supplement to the March 5, 1981 Startup Report for Davis-Besse Unit 1, Cycle 2, documenting 100% full power physics testing results. | Enclosed are two copies of the supplement to the March 5, 1981 Startup Report for Davis-Besse Unit 1, Cycle 2, documenting 100% full power physics testing results. | ||
This report, which covers the period from February 12-19, 1981, is being sub-mitted in accordance with Technical Specification 6.9.1 and Regulatory Guide 1.16, Section C.1.a. | This report, which covers the period from February 12-19, 1981, is being sub-mitted in accordance with Technical Specification 6.9.1 and Regulatory Guide 1.16, Section C.1.a. | ||
Very truly yours, l | Very truly yours, l | ||
RPC/CLB/ljk Enclosures cc: | RPC/CLB/ljk Enclosures cc: | ||
Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Enc 1: 25 copies I | |||
Mr. Norman Haller, Director Office of Management Program Analysis Enc 1: | |||
2 copies Mr. Luis Reyes NRC Resident Inspector Encl: | |||
1 copy 8106010 Y95 f | |||
THE TOLEOO EDISON COM,PANY EOISON PLAZA 300 MAO! SON / VENUE TOLEDO, OHIO 43552 | |||
.v- | |||
--m | |||
- -- -. ~,,,. -., | |||
-}} | |||
Latest revision as of 12:30, 23 December 2024
| ML20004C084 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 05/20/1981 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20004C085 | List: |
| References | |
| 1-205, NUDOCS 8106010495 | |
| Download: ML20004C084 (1) | |
Text
r C - 2.* Toteno b EDISON May 20, 1981 N
AcHano P. CnouSE Vd 7 Serial No. 1-205 g,,,,33 3,,,
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Offite of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Gian Ellyn, Illinois 60137
Dear Mr. Keppler:
Enclosed are two copies of the supplement to the March 5, 1981 Startup Report for Davis-Besse Unit 1, Cycle 2, documenting 100% full power physics testing results.
This report, which covers the period from February 12-19, 1981, is being sub-mitted in accordance with Technical Specification 6.9.1 and Regulatory Guide 1.16, Section C.1.a.
Very truly yours, l
RPC/CLB/ljk Enclosures cc:
Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Enc 1: 25 copies I
Mr. Norman Haller, Director Office of Management Program Analysis Enc 1:
2 copies Mr. Luis Reyes NRC Resident Inspector Encl:
1 copy 8106010 Y95 f
THE TOLEOO EDISON COM,PANY EOISON PLAZA 300 MAO! SON / VENUE TOLEDO, OHIO 43552
.v-
--m
- -- -. ~,,,. -.,
-