| issue date = 01/05/1990
| issue date = 01/05/1990
| title = Responds to NRC 890616 Ltr Re Violations Noted in Insp Repts 50-317/89-12 & 50-318/89-12.Corrective Actions:Preventive Maint Procedures for Bulletin 85-003 Will Be Revised by 900115
| title = Responds to NRC Re Violations Noted in Insp Repts 50-317/89-12 & 50-318/89-12.Corrective Actions:Preventive Maint Procedures for Bulletin 85-003 Will Be Revised by 900115
| author name = Creel G
| author name = Creel G
| author affiliation = BALTIMORE GAS & ELECTRIC CO.
| author affiliation = BALTIMORE GAS & ELECTRIC CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = IEB-85-003, IEB-85-3, NUDOCS 9001160005
| document report number = IEB-85-003, IEB-85-3, NUDOCS 9001160005
| title reference date = 06-16-1989
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:w                                                                                                           ,
{{#Wiki_filter:w
(?f
:y _
:y _
(?f                                                                                                  ,
_F~
_F~                                                                                                   ,
o.
: o.                                                                                                           i BALTIMORE i                                                         GAS AND ELECTRIC CHARLES CENTER. P. O. BOX 1475 BALTIMORE, MARY 1.AND 21203 oc noc c. cace'                         JanuarE 5,1990                                           1
i BALTIMORE i
: i.                Vict PatsiDth?-                                                                               ;
GAS AND ELECTRIC CHARLES CENTER. P. O. BOX 1475 BALTIMORE, MARY 1.AND 21203 oc noc c. cace' i.
Nucatan cutmot                                                                                 I (400#SO*edSS R             U. S. Nuclear Regulatory Commission                                                               ,
JanuarE 5,1990 1
Washington, DC 20555 i
Vict PatsiDth?-
ATTENTION:         Document Control Desk                                                       ;
Nucatan cutmot I
1 I
(400#SO*edSS R
U. S. Nuclear Regulatory Commission Washington, DC 20555 i
ATTENTION:
Document Control Desk 1
I


==SUBJECT:==
==SUBJECT:==
Calvert Cliffs Nuclear Power Plant                                           >
Calvert Cliffs Nuclear Power Plant
[.                               Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318                                   l Reply to Notices of Violation (Inspection Report Nos. 50-317/89-12;         ,
[.
50-318/89-12)                                                               i
Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Reply to Notices of Violation (Inspection Report Nos. 50-317/89-12; 50-318/89-12) i


==REFERENCES:==
==REFERENCES:==
(n) Letter from Mr. J. P. Durr (NRC) to Mr. G. C. Creel (BG&E),
(n) Letter from Mr. J. P. Durr (NRC) to Mr. G. C. Creel (BG&E),
dated June 16, 1989, same subject                                       I (b) Letter from Mr. G. C. Creel (BG&E) to Document Control Desk               l (NRC), dated July 27, 1989, same subject                               j l
dated June 16, 1989, same subject (b) Letter from Mr. G. C. Creel (BG&E) to Document Control Desk (NRC), dated July 27, 1989, same subject j
(c) Teleconference between Mr. G. L. Bell (BGAE) and Mr. J. E. Beall (NRC) on January 2,1990, Corrective Action Extension Gentlemen:
l (c) Teleconference between Mr. G. L. Bell (BGAE) and Mr. J. E. Beall (NRC) on January 2,1990, Corrective Action Extension Gentlemen:
In response to a Notice of Violation issued June 16,1989 (Reference a), BG&E agreed to take several corrective actions with respect to our Motor Operated Valve (MOV)                   '
In response to a Notice of Violation issued June 16,1989 (Reference a), BG&E agreed to take several corrective actions with respect to our Motor Operated Valve (MOV) rnaintenance program. As part of the corrective actions, we agreed to revise our preventive maintenance procedures for Bulletin 85-03 MOVs by December 31, 1989 (Reference b). We did not meet this schedule because the MOV Project Manager did not effectively resolve impediments to the procedure revisions,
rnaintenance program. As part of the corrective actions, we agreed to revise our preventive maintenance procedures for Bulletin 85-03 MOVs by December 31, 1989 (Reference b). We did not meet this schedule because the MOV Project Manager did not effectively resolve impediments to the procedure revisions,
- Both Units have remained shutdown since the MOV inspection and have not entered into a mode where the identified MOVs are required to be OPERABLE. Also, preventive maintenance (PM) for these valves is not scheduled until the end of January. We will complete the maintenance procedure revisions by January 15, 1990. In addition, we will not perform any Bulletin MOV PM until the procedures are revised, i
!            - Both Units have remained shutdown since the MOV inspection and have not entered into
i l
!              a mode where the identified MOVs are required to be OPERABLE. Also, preventive                   ,
We informed Mr. J. E. Beall, our acting Senior Resident inspector, January 2,
maintenance (PM) for these valves is not scheduled until the end of January. We will complete the maintenance procedure revisions by January 15, 1990. In addition, we will i
: 1990, I
not perform any Bulletin MOV PM until the procedures are revised, i
that we would not meet our schedule for this corrective action (Reference c).
l             We informed Mr. J. E. Beall, our acting Senior Resident inspector, January 2,         1990, I             that we would not meet our schedule for this corrective action (Reference c).
PD$Ajf00K05000317 5 900105
Q 5 900105 PD$Ajf00K05000317                                                                 $0I r PDC                                                           I   t
$0I Q
r PDC I
t


a:
a:
Document Control Desk January 5,1990 Page 2 Should you have any further questions regarding this matter, we will be pleased to discuss them with you.
Document Control Desk January 5,1990 Page 2 Should you have any further questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours, i
Very truly yours, i
                                                      /-     -
/- -
GCC/GLB/db cc:   D. A. Brune Esquire J. E. Silberg, Esquire R: A.Capra, NRC S. A.McNeil,NRC W. T. Russell, NRC J. E. Beall, NRC T. Magette, DNR ~
GCC/GLB/db cc:
D. A. Brune Esquire J. E.
Silberg, Esquire R: A.Capra, NRC S. A.McNeil,NRC W. T. Russell, NRC J. E. Beall, NRC T. Magette, DNR ~
1 i
1 i
1 l}}
1 l}}

Latest revision as of 08:22, 23 December 2024

Responds to NRC Re Violations Noted in Insp Repts 50-317/89-12 & 50-318/89-12.Corrective Actions:Preventive Maint Procedures for Bulletin 85-003 Will Be Revised by 900115
ML20005F166
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/05/1990
From: Creel G
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-85-003, IEB-85-3, NUDOCS 9001160005
Download: ML20005F166 (2)


Text

w

(?f

y _

_F~

o.

i BALTIMORE i

GAS AND ELECTRIC CHARLES CENTER. P. O. BOX 1475 BALTIMORE, MARY 1.AND 21203 oc noc c. cace' i.

JanuarE 5,1990 1

Vict PatsiDth?-

Nucatan cutmot I

(400#SO*edSS R

U. S. Nuclear Regulatory Commission Washington, DC 20555 i

ATTENTION:

Document Control Desk 1

I

SUBJECT:

Calvert Cliffs Nuclear Power Plant

[.

Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Reply to Notices of Violation (Inspection Report Nos. 50-317/89-12; 50-318/89-12) i

REFERENCES:

(n) Letter from Mr. J. P. Durr (NRC) to Mr. G. C. Creel (BG&E),

dated June 16, 1989, same subject (b) Letter from Mr. G. C. Creel (BG&E) to Document Control Desk (NRC), dated July 27, 1989, same subject j

l (c) Teleconference between Mr. G. L. Bell (BGAE) and Mr. J. E. Beall (NRC) on January 2,1990, Corrective Action Extension Gentlemen:

In response to a Notice of Violation issued June 16,1989 (Reference a), BG&E agreed to take several corrective actions with respect to our Motor Operated Valve (MOV) rnaintenance program. As part of the corrective actions, we agreed to revise our preventive maintenance procedures for Bulletin 85-03 MOVs by December 31, 1989 (Reference b). We did not meet this schedule because the MOV Project Manager did not effectively resolve impediments to the procedure revisions,

- Both Units have remained shutdown since the MOV inspection and have not entered into a mode where the identified MOVs are required to be OPERABLE. Also, preventive maintenance (PM) for these valves is not scheduled until the end of January. We will complete the maintenance procedure revisions by January 15, 1990. In addition, we will not perform any Bulletin MOV PM until the procedures are revised, i

i l

We informed Mr. J. E. Beall, our acting Senior Resident inspector, January 2,

1990, I

that we would not meet our schedule for this corrective action (Reference c).

PD$Ajf00K05000317 5 900105

$0I Q

r PDC I

t

a:

Document Control Desk January 5,1990 Page 2 Should you have any further questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, i

/- -

GCC/GLB/db cc:

D. A. Brune Esquire J. E.

Silberg, Esquire R: A.Capra, NRC S. A.McNeil,NRC W. T. Russell, NRC J. E. Beall, NRC T. Magette, DNR ~

1 i

1 l