THE TEXAS A&M UNIVERSITY SYSTEM TEXAS TRANSPORTATION INSTITUTE
THE TEXAS A&M UNIVERSITY SYSTEM TEXAS TRANSPORTATION INSTITUTE
                                                      ~
~
COLLEGE STATION TEXAS 77843-3135 TRANSPORT OPERATIONS PROC %M                                                         (713) g45.gs35 June 21, 1983 Perry D. Robinson                                                                               ,_ -
COLLEGE STATION TEXAS 77843-3135 TRANSPORT OPERATIONS PROC %M (713) g45.gs35 June 21, 1983 Perry D. Robinson Ed ~ / - O U.S. Nuclear Regulatory Commission Emergency Preparedness Branch Office of Inspection & Enforcement Washington, D.C.
U.S. Nuclear Regulatory Commission                                                   Ed ~ / - O Emergency Preparedness Branch Office of Inspection & Enforcement Washington, D.C. 20555
20555


==Dear Mr. Robinson:==
==Dear Mr. Robinson:==
 
A review of the Perry ETE dated July 1982 has been made using Appendix 4 of NUREG-0654, Revision 1.
A review of the Perry ETE dated July 1982 has been made using Appendix 4 of NUREG-0654, Revision 1. As indicated on the attached summary, two defi-ciencies were noted.
As indicated on the attached summary, two defi-ciencies were noted.
The Summer Sunday evacuation time estimate does not include an adverse weather estimate. Although a summer peak scenario with adverse weather is a remote possibility, wet roads due to a summer thunderstorm is nevertheless possible. It is, therefore, appropriate to have a Summer Sunday scenario con-sidering adverse weather (rain).
The Summer Sunday evacuation time estimate does not include an adverse weather estimate. Although a summer peak scenario with adverse weather is a remote possibility, wet roads due to a summer thunderstorm is nevertheless possible.
No reference in the report is made to having had the estimates reviewed by the appropriate state and local officials. A statement or reference to                                     ,
It is, therefore, appropriate to have a Summer Sunday scenario con-sidering adverse weather (rain).
state / local review is necessary to remove the deficiency regarding state and local review.
No reference in the report is made to having had the estimates reviewed by the appropriate state and local officials. A statement or reference to state / local review is necessary to remove the deficiency regarding state and local review.
If you have any questions, please call me at (409) 845-1535.
If you have any questions, please call me at (409) 845-1535.
Sincerely,
Sincerely,
                                                                                  ^Q.
^Q.
Thomas Urbanik II Assistant Research Engineer TV/kab I l 8308080657 830729 PDR ADOCK 05000128 F                   PDR TRANSPORTATION RESEARCH ANO DEVELOPMENT
Thomas Urbanik II Assistant Research Engineer TV/kab I
l 8308080657 830729 PDR ADOCK 05000128 F
PDR TRANSPORTATION RESEARCH ANO DEVELOPMENT


6   .
6 EVALUATION OF EVACUATION TIME ESTIMATE Perry Item Adequate Deficient Poor None
EVALUATION OF EVACUATION TIME ESTIMATE
=
      ,                                                Perry Item                             Adequate       Deficient         Poor None
I.
                                                                            =
General A. Maps X
I. General A. Maps                                     X B. Report Format                         1 II.     Demand Estimation A. Permanent Residents                       X B. Transient Populations                     X           _                              _
B. Report Format 1
C. Special Facility Population               X           _
II.
D. EPZ Sub-areas                             X III.       Traffic Capacity A. Evacuation Roadway Network               X B. Roadway Characteristics                   X C. Adverse Weather Considered                               X                           _
Demand Estimation A. Permanent Residents X
IV. Analysis A. Assumptions                               X                                           _
B. Transient Populations X
B. Methodology                               X           _,__
C. Special Facility Population X
C. Carless                                   X             _
D. EPZ Sub-areas X
V. Other Requirements A. Confirmation Time                         X B. State and Local Review                                 1 VI. Overall                                                       X Date of Report: July,       1982 i
III.
                                                                                                                                                )
Traffic Capacity A. Evacuation Roadway Network X
  !                                                                                                                                            l l
B. Roadway Characteristics X
C. Adverse Weather Considered X
IV.
Analysis A. Assumptions X
B. Methodology X
C. Carless X
V.
Other Requirements A. Confirmation Time X
B. State and Local Review 1
VI.
Overall X
Date of Report: July, 1982 i
)
l
l
                                                                                                                                                )}}
)}}

Latest revision as of 23:28, 20 December 2024

Forwards Public Version of Summary Evaluation of Evacuation Time Estimates.Adverse Weather Conditions (Rain) Should Be Considered for Summer Scenario
ML20024D977
Person / Time
Site: 05000128
Issue date: 06/21/1983
From: Urbanik T
TEXAS A&M UNIV., COLLEGE STATION, TX
To: Robinson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20024D973 List:
References
NUDOCS 8308080657
Download: ML20024D977 (2)


Text

$

THE TEXAS A&M UNIVERSITY SYSTEM TEXAS TRANSPORTATION INSTITUTE

~

COLLEGE STATION TEXAS 77843-3135 TRANSPORT OPERATIONS PROC %M (713) g45.gs35 June 21, 1983 Perry D. Robinson Ed ~ / - O U.S. Nuclear Regulatory Commission Emergency Preparedness Branch Office of Inspection & Enforcement Washington, D.C.

20555

Dear Mr. Robinson:

A review of the Perry ETE dated July 1982 has been made using Appendix 4 of NUREG-0654, Revision 1.

As indicated on the attached summary, two defi-ciencies were noted.

The Summer Sunday evacuation time estimate does not include an adverse weather estimate. Although a summer peak scenario with adverse weather is a remote possibility, wet roads due to a summer thunderstorm is nevertheless possible.

It is, therefore, appropriate to have a Summer Sunday scenario con-sidering adverse weather (rain).

No reference in the report is made to having had the estimates reviewed by the appropriate state and local officials. A statement or reference to state / local review is necessary to remove the deficiency regarding state and local review.

If you have any questions, please call me at (409) 845-1535.

Sincerely,

^Q.

Thomas Urbanik II Assistant Research Engineer TV/kab I

l 8308080657 830729 PDR ADOCK 05000128 F

PDR TRANSPORTATION RESEARCH ANO DEVELOPMENT

6 EVALUATION OF EVACUATION TIME ESTIMATE Perry Item Adequate Deficient Poor None

=

I.

General A. Maps X

B. Report Format 1

II.

Demand Estimation A. Permanent Residents X

B. Transient Populations X

C. Special Facility Population X

D. EPZ Sub-areas X

III.

Traffic Capacity A. Evacuation Roadway Network X

B. Roadway Characteristics X

C. Adverse Weather Considered X

IV.

Analysis A. Assumptions X

B. Methodology X

C. Carless X

V.

Other Requirements A. Confirmation Time X

B. State and Local Review 1

VI.

Overall X

Date of Report: July, 1982 i

)

l

)