QUALITY ASSURANCE PROGRAM 1
TOPICAL REPORT GIBSAR A l
l GIBBS & HILL INC.
ENGINEERS, DESIGNERS, CONSTRUCTORS NEW YORK, NEW YORK i                                                                                                                                          Amendment 7 August 1983 l
1 09070389 830831 A R ADOCK 05000584 PDR
 
MANAGEMENT POLICY STATEMENT This    Quality    Assurance    Program Topical Report establis'hes the Gibbs & Hill corporate policies, goals, objectives and references procedures      to be    followed      by    all G&H offices during the the design and engineering, procurement, fabrication and construction activities      related  to nuclear power projects.            This program has been developed over many years of company experience                in  nuclear power    and    related work to provide confidence that the completed facility will perform in accordance with prescribed                requirements in a safe and reliable manner.
The  Quality    Assurance    Program Topical Report is applicable to Gibbs & Hill activities involving nuclear safety-related systems, structures      and    components      as    defined      in Gibbs & Hill's contractual scope.      It is intended that this program comply with the    requirements    of  Appendix B      to    10 CFR    Part 50  " Quality Assurance Criteria      for  Nuclear      Power    Facilities,"    and  other regulatory      criteria    and applicable national codes and standards as specified elsewhere in this document.
Gibbs & Hill      management    recognizes        Quality    As'surance to be an interdisciplinary function requiring the              full    participation    of all  personnel    involved  in    a  nuclear      project    in order to be meaningful      and  effective.      The    authority    to  establish    and implement    this  G&H  Quality    Assurance      Program is delegated by company management,,to the Quality Assurance Manager                and  covers i
 
all quality assurance and quality-related activities performed by, and for Gibbs & Hill in all G&H offices.
Procedures to satisfy the program set forth in this document have been incorporated into the G&H Quality        Assurance    Manual      which delineates    the  methods    to  be  followed  in complying with the requirements of this QA Program.        All employees  associated with G&H  nuclear  projects  are  required to become familiar with the procedures of the Quality Assurance        Manual  and    to    conform      to those    procedures  that    are    applicable  to  their      respective assignments.
This program is subject to periodic revision and all holders will be furnished revisions and additions as they are issued.                It    is the  responsibility  of    each program holder      to    maintain his document current.
l                                                                      1      ,      N l                                                                      J            .)
                                                        'Yr
* CG ~
                                                                                ~
d P.P DeRienzo Vice President, Consulting Engineering, Quality Assurance-and New Technology l
49
                                          -ii-l L
 
INTRODUCTION This          topical report describes the Gibbs & Hill Quality Assurance Program and sets forth the methods to be followed in                                  controlling quality-related                  activities  performed by              Gibbs & Hill          and its contractors.                This program has been developed over many years                        of company experience in nuclear power and related work, and defines a system found effective                  in providing      independent            control      of quality-related functions and documentation.
The        scope          of  this  report  covers activities involving nuclear safety-related structures, systems,                      and  components            covered by Gibbs & Hill's                  contractual  obligation      to the Utility owner for each project.
It      is            intended  that  this  topical    repart          will  be        reviewed periodically, at least annually, to assess adequacy of compliance with quality                  assurance  objectives, and that amendments will be submitted as necessary to keep current with                              changing          regulatory requirements.                  The  program    described herein is now in effect, except for specific projects too far                      along          to  incorporate        new requirements.                    Activities    on    affected      nuclear projects              are following the procedures outlined in this report.                                Modifications established                in  future amendments to this report will be applied to active projects at the time of cubmittal of the amendment, but will            not be        automatically backfitted        to previously performed activities.
iii
 
CHAPTER 17-QUALITY ASSURANCE TABLE OF CONTENTS Section                              Title                                            Page 17.1        QUALITY ASSURANCE DURING DESIGN                                                    1 AND CONSTRUCTION 17.1.1      ORGANIZATION                                                                        1 17.1.1.1    General                                                                              1 17.1.1.2    Corporate Management Organization                                                  2 17.1.1.3    Project Organization                                                                6 17.1.1.4    QA Department                                                                      7 17.1.1.5    Project Operation                                                              13 17.1.2      QUALITY ASSURANCE PROGRAM                                                      18 17.1.3      DESIGN CONTROL                                                                26 17.1.3.1    General                                                                        26 17.1.3.2    Performance of Work                                                            28 17.1.3.3    Control of Engineering and Design                                              30 17.1.3.3.1  Preparation of Q-List                                                          31 17.1.3.3.2  Preparation of Technical Descriptions and Structural Design Criteria                                                      32 17.1.3.3.3  Preparation of Analyses and Calculations                                        33 17.1.3.3.4  Preparation of Specifications                                                  36 17.1.3.3.5  Preparation of Design Drawings                                                  39 iv
 
CHAPTER 17 QUALITY ASSURANCE TABLE OF CONTENTS (Cont'd.)
Section                Title                            Page 17.1.3.3.6 Vendor Drawings, Specifications, and Procedures                                    44 17.1.3.3.7 Interface Control                              45 17.1.3.3.8 Independent Design Verification                46 17.1.3.3.9 QA Reviews of Engineering and Design Documents                                      48 17.1.4    PROCUREMENT DOCUMENT CONTROL                  51 17.1.5    INSTRUCTIONS, PROCEDURES AND DRAWINGS          53 17.1.6    DOCUMENT CONTROL                              55 17.1.7    CONTROL OF PURCHASED MATERIAL, EQUIPMENT AND SERVICES                                      58 17.1.7.1  Evaluation and Selection of Suppliers and Constructors                                  58 17.1.7.2  Surveillance and Audits of Supplier Operations                                    '60 17.1.7.3  Surveillance and Audits of Construction Site Operations                                62 17.1.8    IDENTIFICATION AND CONTROL OF MATERIALS, PARTS AND COMPONENTS                          64 17.1.9    CONTROL OF SPECIAL PROCESSES                  66 17.1.10    INSPECTION                                    68 v
 
CHAPTER 17 QUALITY ASSURANCE TABLE OF CONTENTS (Cont'd.)
Section            Title                      Page 17.1.11 TEST CONTROL                            72 17.1.12 CONTROL OF MEASURING AND TEST EQUIPMENT  74 17.1.13 HANDLING, STORAGE AND SHIPPING          76 17.1.14 INSPECTION, TEST AND OPERATING STATUS    78 17.1.15 NONCONEORMING MATERIALS, PARTS AND COMPONENTS                              80 17.1.16 CORRECTIVE ACTION                        82 17.1.17 QUALITY ASSURANCE RECORDS                86 17.1.18 AUDITS                                  89 Appendix A                              92 l
{
l l
vi L
 
CHAPTER.17 QUALITY ASSURANCE LIST OF FIGURES Figure                                                                      Title 17.1-1                              Gibbs & Hill, Inc. Organization Chart 17.1-2                              Deleted 17.1-3                              Nuclear Project Organization Chart 17.1-4                              Quality Assurance Department Organization Chart 17.1-5                              Criteria Implementation Matrix f
I l
l vii
 
  . - , .        -        . ..                .. .. . ~.
t CHAPTER 17 QUALITY ASSURANCE LIST OF TABLES Table                        Title 17.1-1  Gibbs & Hill Procedures for Establishing Project Quality 1
I l
l l
l I
J d
;                                    viii I
 
17.1          QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.1.1        ORGANIZATION 17.1.1.1      General Gibbs & Hill, Inc. (G&H)        provides    an    integrated    project organization and program    to  administer,  engineer,  design  and construct,  or manage the construction of, as applicable, nuclear power plants. Quality Assurance (QA) personnel are      assigned to each project    to  determine  that  the QA Program is effectively implemented and executed. The    program  establishes  conformance with applicable regulatory requirements and with the design bases specified    in    the  license    application. Job    functional descriptions    are written for each project-level position related to quality functions, and included in the G&H Quality          Assurance l Manual. The  descriptions    delineate  the  reporting functions, internal  and    external    interfaces,    and    the  duties    and responsibilities assigned to each position.
l l
l l
l
_1 l
L
 
17.1.1.2            Corporate Management Organization The  G&H      Corporate        Management            Organization    is  shown- on Figure 17.1-1.          The    Vice    President,        Consulting    Engineering, Quality Assurance          and New Technology,.who is accountable to a Senior Vice President, is            the    G&H      corporate  officer directly responsible        for    the      QA      program        for    all  G&H    offices.
    . Correspondingly, the QA Manager, who reports directly to the Vice President,      is responsible for the QA Department and is delegated the authority to implement and administer the QA Program                        at    all G&H offices, facilities and construction sites.
New York Office project management activities are headed by the Vice President, Power Projects who in turn reports                      to  a  Senior Vice  President.          Each project is assigned a project manager, who reports to the Vice President,                Power Projects        normally via      a Manager of Projects.
New York Office          engineering and design activities are headed by l
the Vice President, Power Engineering who                      reports  to  a  Senior Vice  President.          The    Manager, Mechanical Engineering; Manager, Structural, Civil and Hydro Engineering; Manager, Electrical                          and Control      Engineering;        Manager,        Advanced    Technology;    and    the 7 Manager, CADAE and Graphics report to the Vice                      President,    Power Engineering.        Each      of  their departments            supply the technical personnel assigned to staff a particular project and                      work    as  a Amendment 7 August 1983
 
team    under    the          administrative          responsibility                          of        a  project manager.
The Vice President, Consulting Engineering, Quality Assurance and New Technology; the Vice President, Power Projects; and the                                                                  Vice President,    Power            Engineering all report to the same Senior Vice President who in turn reports to the President.
The  regional      office          is  headed by                              a Vice President, Regional Office who reports              to  the  President.                              For  quality              assurance related matters,              however,  the    Vice                          President of the regional                          7 office reports to              the  Senior Vice                          President        responsible                        for quality assurance.
All  nuclear      safety-related engineering and design activities at the regic nal office are headed by                      the                    Manager,    Operations                        who I reports  to  the          Vice    President, Regional Office.                                          The Manager, 7
Engineering    and Manager,              Projects                        report      to          the        Manager, Operation .        Technical            personnel                        are      assigned              to  staff            a
                                                          ~
l particular project and work as a team under                                          the        administrative responsibility      of          a  project manager.                              QA personnel assigned to staff a particular project are responsible to the G&H QA Manager.
1 New York Office procurement activities are headed by the Manager, Purchasing, who reports to the Manager, Project Support                                                      Services l
l who  in turn reports to the Senior Vice President responsible for                                                                  7 1
procurement activities.              The Manager, Purchasing                                is          responsible Amendment 7 August 1983 l
l l
 
for  the  establishment    and maintenance      of a corporate list of approved bidders for nuclear safety-related items          and  services; coordinates  preparation    of'the Instruction to Bidders and Terms and  Conditions    sections    of  the  procurement    document;    and administers  all  purchasing    and  expediting    aspects related to procurement functions.
Procurement    activities  in    the regional office are handled by a procurement group who is responsible to        the  Manager,  Projects. 7 The  Manager,    Projects  is responsible for coordinating with the Manager, Purchasing, New York Office to        maintain    the  corporate list  of  approved bidders for nuclear safety related items.          The procurement group in    the    regional    office  is  responsible  for  7 preparation of commercial bid documents; review and evaluation of
:)id proposals;    preparation    of  contract  and  purchase    order documents  and  coordination of the expediting aspects related to procurement.
Construction    activities, performed as part of a G&H project, are l
coordinated by the Manager,      Construction    Liaison,  who  reports directly    to  the  President.      For  quality    assurance  related matters, however, this manager is accountable to the Sea.ior          Vice l
President responsible for quality assurance.
The  G&H  QA Manager is also responsible for Quality Control (QC)
I    activities such as vendor shop surveillance and construction site QC functions.
Amendment 7 l
August 1983 1
l . .                                                                            _
 
The Vice President, Consulting Engineering, Quality Assurance and New Technology and the.other Vice Presidents engaged  in  nuclear safety  related activities are responsible for reviewing the G&H Quality Assurance Manual in accordance with  corporate    policies, goals and objectives. These Vice Presidents are also responsible for performing an annual management review  of  their  respective departments to confirm the implementation and adequacy of the G&H corporate QA Program and procedures.
4 l_
 
17.1.1.3      Project Organization An  example  of  the  organization      of basic      administrative and technical staffs for a project, responsible for carrying out                all project    activities      to  successful      completion    is  shown    on Figure 17.1-3. The  interconnecting        lines    show  the  flow    of responsibility    and    accountability        for    administration      and technical direction, and for QA functions.            At  the    start  of  a definitive' project,      a project manager is appointed to establish and maintain project relations with the Utility Owner,              principal suppliers  -and    con'structors,    and  to ~ direct    and  guide    the engineering, design, procurement, and site construction functions to  the  extent  of G&H    contractual      obligations to the Utility Owner, including the      incorporation      of  the    desired degree      of quality    in    the    engineering      and design,      procurement,      and construction phases,, as applicable.
                                                          /
The project, manager's functions, with regard to quality-related activities, are in    accordance      with  the    duties    prescribed    in l
j  detailed written procedure.s in the G&H Quality Assurance Manual.
l l
t l
l i
L
 
4 s
4
:s n'                  '
(,
17.1.1.4      '
QA Department
                                          .x
                                            \
The    QA Department        performs the 'funhtions_necessary to provide 5
                  . confidence      that      all    safety-related I structures,                      systems,          and components of a nuclear power plant project conform to the design
                    *Nbases and the technical specifications                    set      forth            in  a    Safety s    ?
s Analysis      Report (SAR),              Nuclear      Regulatory              Commission (NRC)
J                    Regulatory criteria, and applicable national codes and standards.
m.
$\s                    This    department        is    headed by the QA Manager who is responsible
&.,                                    s    y for developing and maintaining QA procedures, and                                for      verifying                          7 that    they    are      being properly        implemented,                thus establishing confidence that the desired level of qualit*/ is                              being      achieved.
The      QA Department            is    completely      separate                and      functions independently of those persons or groups having specific project, engineering            and    .s    design,      scheduling,                  or        budgetary responsibilities.            Independence      is    maintained by having                            the QA Manager      report      directly      to  the    Vice President, Consulting Engineering, Quality Assurance and New Technology,                                  as    discussed in' subsection 17.'1.1'. 2.              G&H requires that the QA Manager, as a (minimum: a. be a degreed engineer; b. have 10 or                                more        years            of engineering ^ experience;              c'. have  five or more years of combined
                    . experience in nuclear power and quality assurance activities; and
: d. preferably          have had responsible control of the QA program for essentially the          entire      engineering,    design,              procurement,              and construction          phases      of    at  least one nuclear power plant.                            The s
organization of the QA Department is shown on Figure 17.1-4.
s I      (
Amendment 7 August 1983
 
The  QA Department has      four  main    functional responsibilities:
: a. to establish and approve QA and QC requirements and            criteria;
: b. to review engineering and design documents for procurement and construction to verify that all nuclear safety requirements              have been    incorporated;      c. to    provide    surveillance    of  all      QA activities in all G&H offices during the engineering and design, procurement,    and  construction phases        to  determine    that  all on-line and specified independent design verification procedures and  quality control procedures have, in fact been applied to all processes-engineering,        design,      procurement,      manufacture, fabrication,    assembly, construction, erection, installation, and preparation for    startup;  and    that  all    activities  have    been properly    documented,    whether at G&H facilities or at facilities of supoliers, constructors,      and    their  subcontractors    (to  the extent    of G&H contractual obligations to the Utility owner); and
: d. to audit at regular intervals, by examination and          evaluation, the  objective  evidence    provided by documentation accumulated internally and externally in the normal course of          the    processes involved    and during    surveillance activities at G&H offices, at the supplier's facilities, and at the nuclear plant site.            Audits are performed by the G&H QA Department in accordance with written procedures and checklists to verify compliance with            all  aspects of    the  G&H QA Program    and    to  recommend,    where  indicated, improvements or modifications,      with  management    followup    where required,  including    reaudit of the deficient areas.        The review
 
and audit functions of the QA Department are described in written procedures contained in the G&H Quality Assurance Manual.
The G&H QA Manager, assisted by the Assistant QA Manager, assigns a project QA        supervisor,          a  project QA            engineer,' vendor QA supervisor    and      a    site QA supervisor for the project.                          They are responsible for reviews and audits of                    engineering,          design,        and procurement    activities,            and      auditing        site construction and QC activities,    respectively.                The    project            QA    supervisor          is responsible    to      supervise the daily activities of the project QA engineer. Further, the project QA engineer is                            assisted        in his work by additional engineers on the QA Department staff assigned by the QA Manager, as necessary.                  The  vendor          QA  supervisor        is similarly assisted by additional QA representatives.                              The site QA supervisor    is      assisted by            site  QA    engineers          and        site    QC engineers. Audits          include      the  review of conceptual documents involving  nuclear            safety-related          structures,            systems,          and components,    as      necessary          to    demonstrate          compliance        with the QA Program for the particular project.
The . project    QA engineer is further responsible for surveillance to determine that independent design verification of documents pertaining    to      nuclear      safety-related items has been adequately
; performed by the assigned design review engineers.                              The        project l
QA engineer is authorized to require revision to design documents as necessary to satisfy compliance with                        the    established design bases and regulatory requirements.
_g_
l
 
Engineers          representing        the  major disciplines, and qualified by training and experience in engineering                    and  design  of  similar structures,          systems,      and components,        are    assigned by      their respective chief engineers to perform independent design                        review and verification.                Design review engineers review the conceptual documents related to nuclear safety-related structures,                      systems, or  components as necessary to determine whether they comply with the requirements of the safety-related design bases                      established in the project Preliminary Safety Analysis Report (PSAR).
Design verification                covers G&H originated work including proper          7 use of those portions              of  documents      prepared by    others    which relate          to    interfaces        with    G&H    systems,    structures,    and components.          The implementation of design            verification    comments is  subjscted          to      periodic    surveilla.nce    and  audit by    the QA Department.
Surveillance          activities        in vendor      shops are carried out by QA personnel          experienced      in    surveillance    of    manufacturing      and fabricating          QC        procedures,    tests,    material    certifications, nondestructive          examination,        welding,    and    other    specialized functions          and qualified        in  accordance      with American National Standards Institute (ANSI) N45.2.6 or SNTC-1A as appropriate                        for the    activities being performed.              When continuous surveillance is needed, a resident vendor QA representative will be stationed                        at Amendment 7 August 1983
 
the    vendor's          facility. Vendor              surveillance  is    performed in accordance with checklists prepared by QA personnel. and ~ subject to approval by the. vendor QA supervisor.
A    site        QA supervisor assigned to the nuclear plant construction site reports to the G&H QA Manager.                          He  establishes    an onsite staff          of technical personnel experienced in construction methods-and    techniques          and  is  knowledgeable              in QA procedures        and requirements.
C&H    site        QA personnel      prepare              QA procedures and checklists, subject to approval by the G&H QA Manager,                            related    to  the  QA auditing          of  construction,      erection,              and  installation of all structures and equipment important to nuclear                          safety    throughout the. area of the facility.              Based on these procedures, they audit the site QC and construction activities                          of  the  constructor    to determine          if    compliance with the project QC and QA requirements is being achieved.
This          is  accomplished by      random witnessing of construction and inspection activities, as well as by reviewing the                            constructor's QC    documentation            for    accuracy              and    completeness.      Where nonconformances are found to exist, the G&H                          site  QA    supervisor reports his findings to the constructor's site superintendent and requests that work be stopped or                      corrections      made,    subject  to rejection of the work.              When such a request is made, the G&H site l
1
 
{1 QA supervisor notifies the Utility Owner's  site  representative, the .G&H project manager and the G&H QA Manager, of the situation and advises them of his recommendation for work. stoppage.
l 9
4 9
17.1.1.5-      Project Operation The  G&H project' manager- is            appointed to direct and guide all activities (except those delegated                    to  the  QA Manager)            of  the various  phases    of the project under the contractual obligations of G&H to the Utility owner.          As          such,  he  is    responsible          for overseeing  the    direct    implementation              of  those    QA procedures applicable to    the    work of      the          project    staff. He          receives technical    support        from      specific            engineering,    design          and construction staffs which        are    assigned          to  the    project.          The project  manager    is    in direct communication with the project QA supervisor, and with pertinent-QA personnel                      on his    project          as described    in      subsection        17.1.1.3            and    as    depicted            in Figure 17.1-3.
The  project managet        deals      directly with              the  Utility owner, j suppliers and constructors, and has the authority to stop work on engineering    and design        activities              performed by G&H as well as authority  to    reject    delivery          of      nonconforming        structures, I systems,    or      components        as        identified by          QA  surveillance activities. Surveillance        is    conducted by QA personnel                          in accordance  with    the    G&H Quality Assurance Manual, using vendor surveillance    checklists      to    ascertain            that    the          supplier's manufacturing,      inspection,      testing and documentation activities are effectively implemented.            In addition, a QA Release                      Form  is l used to record the final surveillance and review of documentation to  verify  that    the    equipment              is  in  conformance            with    the l
l                                        l l
l 1                  --      -        -      . - - - -                        ______ _          .
 
I i
procurement      document    and    that    there  are  no  unresolved    l l
l nonconformances or deviations.        No equipment can be shipped by      a  )
supplier until a GGH QA Release Form is complete and signed by a G&H QA representative.                                                          I l
The      engineering    staffs    receive  their  authority    from  the discipline job engineers who are, in          turn,  responsible    to  the  l discipline      chief  engineers    and  to  the  project manager.      The design staffs receive their authority from the        discipline      squad  I leaders who are, in turn, responsible to the job engineers of the            7 pertinent    disciplines.      The  engineering  and    design    staffs identify      quality    requirements      applicable      to    nuclear safety-related structures, systems, and components, from          sources such as the Regulatory Guides and applicable codes and standards, and  incorportte    them  in    the    project  design      documents.
Furthermore,    they  take adequate measures to ascertain that both internal and external interfaces are properly identified, so that all parties affected are duly notified to enable them to properly coordinate their work. The assigned job engineers also        consider quality requirements when they review the work of their staffs to preclude nonconformances, or to identify them when they occur and institute  corrective    action, with a further review to ascertain that the corrective action has been taken.
The  site  construction  staff is functionally responsible to the Amendment 7 August 1983
 
project manager    for project      related  activities    and  to  the Manager,  Construction  Liaison    for technical and administrative.
control.  (See Figure 17.1-3)
The  project,QA    supervisor maintains      close  contact with the project manager to coordinate QA activities with the progress          of the  project. The project-QA supervisor oversees the project QA engineer and the site QA supervisor assigned to the project.          The project    QA  engineer    identifies    quality-related problems, initiates or recommends solutions, and verifien implementation of corrective measures. Corrective action is requested as a result of QA audits or reviews. During the course of an audit or review all    nonconformances    found    are    identified    to    applicable instructions, procedures, regulatory criteria, codes or standards and  tre recorded on an audit report or QA Document Review Record Sheet. A copy of the audit report or QA Document        Review- Record Sheet  is  issued  to  the  project manager      and  the applicable discipline / department, with instructions to provide a        corrective action  reply  to  the  audit    report  or  revise    the applicable document to incorporate the comments noted      on  the    Q,  Document Review  Record  Sheet and return it to the QA Department within a specified time limit. Where corrective action is      not    campleted or is inadequate, the QA Manager has the authority to require the project manager to exercise his stop work or reject authority          as previously described. Where disagreement as to corrective action cannot be resolved between    QA  and  other department      personnel
 
within    a    project,  the QA Manager will        consult with- the appropriate    discipline  chief    engineer / department manager      to establish appropriate corrective action.
Should    resolution not    occur at this level, the QA Manager will bring the matter      to  the    attention  of  the  responsible    Vice President    for  action. If  resolution    acceptable to QA is not reached at this level of management, the problem is taken to            the Vice  President,    Consulting    Engineering, QA, and New Technology who interfaces with the responsible Vice President and ultimately to  the  Senior Vice    President responsible for QA who makes the final decision for the corporation.
The  G&H    site QA supervisor performs surveillances and audits of quality-related    activities    of  the  construction manager,      the constructors,    and  their subcontractors at the site, to identify problem areas, recommend solutions, and verify corrective action.
Stop  work    authority at the construction site would be exercised through the appropriate Utility Owner's          representative    who  has the  authority    to  require    work  stoppage  on  a  timely basis.
Additional follow-up surveillance will        be  performed  to  verify that  the nonconforming activity has been halted.        This authority could be delegated to the G&H site QA        supervisor  in  accordance with project contractual scope.
The project QA engineer's and the site QA supervisor's duties and responsibilities are described in subsection 17.1.1.4.            Detailed
          .- l job- function descriptions  are  provided  in  the  G&H Quality Assurance Manual.  (They are guided in the performance    of  their functions .by  written  procedures  contained - in the G&H Quality Assurance Manual.)
e w 17.1.2              QA PROGRAM G&H has      an    established QA Program                to    be followed by all G&H offices for the management, engineering and design,                                  procurement and. construction phases                of    its    work    on nuclear power plant projects, based          on  extensive          experience        in    the -engineering, design,    procurement,            and construction of                similar nuclear and conventional        power-generating              facilities.            This          program delineates      the    organization,          functions,        responsibilities, and procedures in effect for nuclear power plant projects within G&H, as    defined by contractual obligations to the Utility Owner, and is intended to comply with the criteria specified                          in Appendix B to    10 CFR Part 50.              The  program is further designed to comply with the supplementary              requirements        of    the    American National Standards      Institute (ANSI) N45.2 series standards as well as the NRC Regulatory          Guides      applicable        to    quality      requirements            as t
L      referenced      in Appendix A of this document subject to contractual obligations with the Utility Owner.                        This program covers              all l
those    nuclear safety-related structures, systems, and components included in      the    PSAR      submitted      for      a    specific          project  and identified      as    Seismic      Category I,        in    accordance          with USNRC Regulatory Guide 1.29, or Class 1, 2 or                        3,    in  accordance with i
ANSI N18.2      corresponding          to    quality      groups A, B or C of USNRC l      Regulatory Guide 1.26.
l The    procedures        established          to meet the requirements of the G&H
!      QA Program and the NRC Regulatory Guide 1.70.6 are set                                forth      in l
l                                                  l
 
the  G&H    Quality    Assurance        Manual.                      For    the            control  of quality-related project        activities                  the            Management              Policy Statement which prefaces the Manual mandates the application of the  approved Manual      procedures          to          all            nuclear              projects.
Figure 17.1-5    is  a matrix        showing            the            interrelations of the QA Manual  procedures    with      the  18 criteria                        of  Appendix B            to 10 CFR Part 50.      The  arrangement of this manual and its various sections, with a listing of individual procedures, is outlined in Table 17.1-1.        Procedure        for      Control                  of    Distribution            and Revisions of the Quality Assurance                    Manual,              QAI-D1            of  the  G&H Quality Assurance      Manual  establishes                    those management persons responsible for generating and reviewing changes for updating and improving    the  QA  Program procedures.                        Requests                    for proposed a
changes to the G&H Quality Assurance Manual must be                                            approved by the    chief    engineer / department                manager              of    the            involved discipline / department and the        QA Manager.                          When        the      proposed draft text of the change is completed it must then be approved by the following management personnel:
: a. QA Manager
: b. Manager,      Project    Support      Services                        (procurement            related 7 procedures)
: c. Vice President, Power Projects
: d. Vice President, Power Engineering Amendment 7 August 1983
: e. Vice President of the. regional office-
: f. Vice President, Consulting Engineering, QA and New Technology
: g. Manager,              Construction          Liaison            (construction-related procedures)
: h. Senior Vice President responsible for QA The  QA Department              is  responsible              for  the        distribution      and accountability          of    the  Quality Assurance                      Manual.        The    QA Department      prepares,          issues      and      maintains a Quality Assurance Manual Holder's List that identifies                          by  name        and    book number those  personnel,            both  internal and external, who have received copies of the manual.                Initial        issuance        of        Quality Assurance Manuals,      as  well        as  additions        or revisions to the manual are accomplished by use of a cover me.no which requires the                                    recipient to  sign the acknowledgement section of the cover memo and return it to the QA Department to document their receipt of                                    the    manual or revisions.
The  G&H QA Program is available prior to the initiation of any nuclear safety-related              activity which                the        Utility    Owner    may require    for  submittal          of      his    application              for a construction permit.      The QA procedures of this program have been reviewed and accepted by responsible management personnel which assures their timely    implementation with                the  commencement              of    any  nuclear safety-related              activity,      by  properly          trained          and  qualified Amendment 7 August 1983
 
engineering, design, and administrative            personnel.          To  further satisfy  this requirement the G&H QA Manager assigns a project QA supervisor and a project QA engineer at the start of a project to ascertain  that the Quality Assurance Manual procedures are being implemented from the onset of any work            on  activities        involving nuclear safety-related structures, systems, and components.
The  written procedures specified in the Quality Assurance Manual are designed to demonstrate that the            requirements        stated          in  a project  SAR  are    fully  complied with        and      integrated      in the engineering and design,      procurement,      and  construction phases.
The  personnel      engaged  in    the QA functions of surveillance and auditing the implementation and documentation of these procedures are  appropriately      trained,    and experienced in performing their functions. Furthermore, the progran is reviewed periodically by G&H Management in accordance with the requirements of the Quality Assurance Manual to ascertain the effectiveness in complying with the  criteria    of Appendix B        to  10 CFR Part 50, and applicable Regulatory Guides.
Engineering    and design      activities      affecting      the    quality of nuclear safety-related structures, systems,              and    components,            as identified in the Q-List of the Utility Owner's PSAR, are subject to independent design verification as detailed in the G&H Quality Assurance Manual.
Also those Regulatory Guides applicable to a nuclear project will l
l
 
1 be referenced in the Utility Owner's PSAR.            These, and Regulatory Guides    issued  subsequently during        the  design phase _of      the project, which have been reviewed in accordance with the              written procedures    of  the  G&H    Quality Assurance      Manual    and- judged applicable    to  the  project,    will    be    incorporated      in    the engineering and design activities.          Control of the implementation of    these    Regulatory      Guide    requirements,      or    acceptable alternatives,      will    be    subject    to  engineering    and design verification and QA        surveillance      activities    as    described  in subsection 17.1.3 of this Chapter.
G&H also has a continuing program to maintain an awareness of the capability of potential suppliers of nuclear safety-related items to meet the requirements of Appendix B to 10 CFR Part 50.                A list of potentially qualified bidders          is  established    in  accordance with    the  requirements      of  the G&H Quality Assurance Manual and established procedures of the G&H Purchasing Department.
This    qualification    of    potential suppliers is subject to review and acceptance by QA Department personnel in accordance with                the procedures    of. the  GGH Quality Assurance Manual.            G&H requires that suppliers and constructors have established QA Programs              and procedures    which  set    forth  their    organization and program in accordance with Appendix B to 10 CFR Part 50, and            establish    the adequacy  of  their    identification measures,        their testing and inspection    activities      with    suitable      instrumentation      and equipment, and their documentation.
G&H  requires for its work,-and will require from contractors and subcontractors, the development and maintenance of documents                              and records    in        accordance            with      the    guidelines    prescribed    in ANSI N45.2.9, and delineated in the G&H Quality Assurance                            Manual procedures.      ,Further            requirements        will be imposed on suppliers and constructors to develop and implement adequate procedures for tagging  and        identifying structures, systems, and components, as discussed in subsequent subsections of this chapter.                            Transfer of such  records        under          the jurisdiction of G&H will conform to the procedures established by the Utility Owner                          in his    QA Program.
Such    records          will          include,        as    a    minimum:  a. material certification          and    test data              for    traceability      and    quality verification;          b. reports          of  inspection, examinations, and test results    for        verification            of        conformance;      c. drawings, specifications,          procedures,          and instructions for use in control j              of  configuration;          and        d. records        of    deviations    and    their resolutions.
I Personnel      engaged      in QA activities are indoctrinated or trained as necessary to responsibly perform functions as required by                              the procedures      of    the      G&H Quality            Assurance Manual.      QA Seminars initiated by the QA Manager are designed to                          provide  instruction in    the      understanding              of  the      QA Program      requirements    and implementing the Quality Assurance Manual                          procedures. Seminars are  presented        as    necessitated by                the    number of new hires or transfers      into      the        area  of      nuclear      responsibility    and  are l
 
mandatory    for  all    designers,    engineers  and project personnel having responsible input to a nuclear power plant.          In  addition, when  major  changes    to the Quality Assurance Manual are issued, new QA Seminars are scheduled to indoctrinate          personnel    engaged in QA    activities    as  to  the  new  requirements    of the manual procedures. Specialized indoctrination courses in specific areas of  nuclear  and  structural    engineering    and design    are    also provided to    familiarize      new personnel    with  the  requirements peculiar  to the development of a nuclear power plant and related quality requirements.      Responsibility    for  the  development    and implementation    of these specialized indoctrination courses rests with the appropriate divisional management.          These  programs    are documented    as to general course content, length, and schedule of
; the course and records of attendance are maintained          for    the  QA indoctrination    sessions. The QA Depart.nent has the independence and authority necessary to determine the          effectiveness    of    this indoctrination    and  training program.        The  indoctrination and training program is implemented by G&H management personnel                in accordance    with  the    written procedures      in  the  G&H Quality Assurance Manual.      QA Department      personnel    indoctrination    and training  program    is organized and implemented by the QA Manager for all new QA personnel, to establish an        understanding    of  the duties  and responsibilities of the G&H Quality Assurance Program and Manual. This indoctrination and training program establishes familiarity with Appendix B          to 10 CFR Part 50, appropriate NRC criteria, ANSI Standards, industry codes and          standards    and  the methods  for    performing        audits    and    reviews      of  design  and engineering,  procurement,        project    administration,            site    and supplier  shop  activities.        The  program        is    also  designed to develop understanding, knowledge and implementation ~of                    the  G&H Quality Assurance    Program        and  Manual      aims and objectives; to l
establish that all QA personnel          are  at    an      adequate    level. of proficiency    for  performing          their      assigned        duties    and responsibilities;  and    that      this    level        of    proficiency    is  i 1
l maintained by retraining as required.
1 The  G&H QA Program    is      subject  to    review        and    audit for the    )
adequacy of implementation by the Utility owner, for whom                    it  is l
l being applied, in-accordance with the requirements of the Utility                      1 Owner's QA Program defined in his PSAR submittal.                                      j l
 
17.1.3          DESIGN CONTROL 17.1.3.1        General G&H has    formulated      control  procedures for the engineering and design of all nuclear projects.        These procedures are intended to attain high levels of quality commensurate with the importance of the safety functions to be performed by the structures,                  systems, and components.        The  engineering and design control procedures are applied to    activities    such  as:    reactor        physics,    stress, thermal,      hydraulic,      radiation,      and        accident      analyses; determination      of    materials    compatibility;            provision      of accessibility    for  inservice    inspection, operation, maintenance and  repair;  and    delineation    of    acceptance          criteria    for inspections    and    tests. These    procedures        are  used  in  the preparation    of    technical    descriptions;          structural    design criteria;  analysis and calculations; specification and drawings; engineering check of      vendor  equipment        drawings;    and  for  the independent    design      verification    of      engineering    and design documents. Design documents that are changed or              corrected,    for I          whatever  reason,    are  subject  to    the      same  procedures as the I
original issue.
j            Interface  requirements    of  the  foregoing,        among participating l
groups, are also controlled by the pertinent                procedures    of  the G&H Quality    Assurance    Manual. Control for the distribution of G&H  engineering      and    design    documents          is    described    in l
f
 
subsection 17.1.6.                                                        ,
i i
f f
 
17.1.3.2          Performs.nce of Work
* The work      performed by G&H          is,  where applicable, governed or guided by      established        and  recognized    codes,  standards,    and criteria.      Regulatory        requirements    defining    the  mandatory criteria and other conditions for            acceptance    of  a  project  or parts      thereof    set      forth    by    public    authorities    having jurisdictions in the area of such facilities will              be  referenced or  stated    in  other  chapters      of the pertinent Utility owner's PSAR. In addition to these          statutory documents,      other  widely accepted industry standards are used as guidelines for performing engineering and design for nuclear power generating stations.
The determination of applicable NBC Regulatory Guides, codes, and standards is the responsibility of the discipline chief engineers in accordance with the Quality Assurance Manual procedures.                  The Chief    Nuclear    Engineer      is  delegated    the  responsibility    of obtaining    copies    of  the      pertinent  documents    and  for  their distribution within G&H.
l At  the    start  of  a project, the Project Manager undertakes the l
compilation, editing and issuance of a Project Guide for which he is  responsible.      The      Project    Guide  is prepared primarily for in-house    use  and  contains      in  a  single  document,    both  the administrative guidelines and reporting instructions required for the execution of G&H work.            It gives all    personnel    assigned  to the  project    an overall understanding of the total project, the
 
e Utility Owner, and the detailed  scope  of work. It may  also include  brief  descriptions  of salient technical feature and QA requirements,.although the  applicable  PSAR  is  referenced  for definitive technical details.
The G&H engineering and design activities are subject to periodic audits by the QA Department in accordance with    the  G&H Quality Assurance Manual.
f l
l
 
17.1.3.3        Control of Engineering and Design The  Quality Assurance Manual outlines the control of activities followed to develop the high quality of            engineering    and design required  for    nuclear projects.        Any  deviations or changes to these procedures are subject to review            and  control  of  the  QA Department.    ' Job    engineers,  and design squad leaders have the      7 responsibility        for  implementation    of    the    requirements    of applicable    NRC      documents    and  ANSI  Codes  and  Standards  in activitites under their jurisdiction.            Design Review Engineers are further responsible, during performance of independent design verification      to      determine    that    applicable      information, guidelines,    or directives        have been in fact, incorporated into engineering and design documents as required.
l l
Amendment 7 August 1983
 
17.1.3.3.1                              Preparation of Q-List A- Q-List                          is  prepared                  to    identify    and  classify            structures, systems, and components of the nuclear power plant                                                        required              to                    ,
perform                          safety-related                    functions.      This  list identifies those items which require consideration by                                                the  G&H QA        Program with regard                    to        design,- procurement,                      fabrication, and installation.
Criteria for the selection of                                              items  that  shall      be            considered safety-related,                            and  the                  safety class to be used are defined in Section 50.55a, Codes and Standards                                                of  10 CFR Part 50,                  in  NRC Regulatory                            Guide 1.26,                    Quality      Group    Classifications                    and Standards                          for  Water,                Steam,      and  Radioactive-waste-containing Components                          of  Nuclear                  Plants and in NRC Regr.latory Guide 1.29, Seismic Design Classification.                                              These documents are          supplemented by        ANSI N18.2,                      Nuclear                  Safety    Criteria  for      the              Design  of Stationary Pressurized Water                                              Reactor    Plants;      and  ANS-22N-212, Nu: lear                          Safety  Criteria                  for    the  Design of Stationary Boiling Water Reactor Plants.                                  Q-Lists are prepared, and are                              subject      to i
independent                            design verification, in accordance with the written l
procedures of the G&H Quality Assurance Manual.
l l
 
17.1.3.3.2        Preparation                      of            Technical                Descriptions      and Structural Design Criteria Technical    descriptions                        and    structural                    design criteria. are prepared to provide-relevant technical information                                                required    for the  preparation of                      G&H    engineering                      and design documents for nuclear  safety-related                        systems          and              components,    and    Seismic Category I  structures.                        These      documents                  are prepared, and are subject to independent design verification,                                              in  accordance with the written procedures of the G&H Quality Assurance Manual.
The  original                technical          descriptions                      and    structural    design criteria are developed based on the scope of G&H responsibilities as  delineated            in          the Project Guide and commitments made in the Utility Owner's                        PSAR.      Periodic                        revisions    to    technical descriptions          and              structural      design                    criteria    are    made  when necessitated      by              engineering        design                      changes    or    subsequent development    of more                    detailed information.                          These revisions are I
subject to the same reviews                        as      the                original      document.      These documents  are            therefore,            available                      to  engineering and design personnel to      assist                them    in    performing                    their    activities    in accordance with the Utility Owner's PSAR.
 
                                                                                                                .r-U q      ,        u.
                                                                                                              ; ,. x
                                                                                                                  ~,.                  - - -
17.1.3.3.3        Preparation of Analyses _and Calculations                                      a                                      .
Analyses      and calculations are required.for establishing detailed engineering      and design    features,    results              of            which 'will                be incorporated      in  specifications, ~ drawings' and other documents.                                              4 The analyses and calculations are made- by engineers' under                                                the p-direction of        the discipline job engineers (nuclear, nochanical,                  -
                                                                                                      - >,              f                          .
                                                                                                                  ~              '
r    electrical) of a specific project.          In    the        case                  o f. structural                                  r discipline,      calculations    are  made  by an engineer, directed by                                                              's
: j. either the design squad leader or, in special' cases, byg the                                              job engineer.      The engineers-are experienced in this work and in the
  . use of modern techniques and tools (such as                    computer programs).
They    are  familiar    with applicable Regulatory Guides, codes and standards,      and    recognized  acceptable      practices;                            have    direct access    to higher levels of their own, or other disciplines up to i    the chief discipline engineer for consultation and guidance;                                              and follow    the  procedures    set    forth  in the G&H Quality Assurance                                          ,
p Manual.      These procedures are briefly outlined below:                                                                                    /
j    a. Analysis      and  calculation work      is  identified by subject,                                                                  I i
sequentially      numbered,  and    entered      in            a            master          index                                  -.
maintained by the job engineer.            Standard calculation sheets ~'                                            '
are    used  and  the  engineer      assigned                  to                perform          the computations identifies each sheet, dates it, and initials it sus  the    originator. Basic    conditions,                    parameters,                      and l
l        assumptions        are  stated    and  the    sources                          identified              as applicable.        References    to  pertinent            studies,                      formulas,
 
                                                                                                  -          ~ -
t'                                      ,
                                                                                                            .l, -
t            m      s                .                                  .
w                          --';                                                        x 7                      .
\                                                          ~                                                            x;*
s w
and previous                            calculations, .
* cedes ~~and                        ;
standards,                            other information relatsd to thelwork Ire listed.            i When a                computer p                                                                                              -
1                                            is            used                to perform computations, this. fact is noted and all.
sheets are properlyJidentified.- When diagrams,                                                                              curves,                        or other_ such                            inputs are prepared on different forms, they are similarly identified and added to the' calculation                                                                                  file                and maintained in apprcipriate binders in an orderly manner by the
:                                                                                                                ~
discipline job engineer.
I              J          b.      Calculations                              for  the        nuclear,                        mechanical,                  analytical and electrical work are checked by the                                                                  corresponding discipline job          enginner                    or    an        engineer,                        other                than the originator,
            ,'                              . assigned by the job engineer who indicates his acceptance                                                                                                  by
, :t
[                              ,
                                            , initialing                            the      first                    page            of              the      particular                      set      of
                                      ,      .ca'i cdlations.                          For the structural work, all calculations                                                                    are checked as,part of the design drawing checking process.                                                                                                Each sheet                is            ini tiale,d by                    the              individual                    performing                        the computation anb by the                                            '' individual                                who  checks          it.              The i
structural job engineer reviews and approves the                                                                            result                      and
[                                              indidates h'is                              acceptance also by initialing the cover sheet l
of the' calculation set when the associated design drawing                                                                                                    is
                                                              ?
['
L                              <              op' proved.                          For    all      disciplines, when a computer program is l
s used, the computer input and final data are checked by either the-job en,qineer or an engineer assigned by the job engineer.
f Approval is by the job engineer who indicates                                                                          acceptance                          by 34-
                ,  ,y-,.--.m                    . , -
                                                                                                              .w9._      _e . . . ,,-      +9----,7---                    , , . , , - - ,+ mis      , - - .
 
3 initialing        the    first- pages of the particular set.                      'For the structural work,.this approval-is made                        when      the' associated-design drawing is approved.                                              .
Engineering        analyses and calculations are subject to independent design verification by              a  design        review.          engineer      in    the e  s                        -    !
appropriate          discipline        (nucijar,            mechanical,-          electrical,.
                                                                          .        .)
structural),      qualified by        training          and    experie'nce        in    the
_perfcrmance      of    similar calculations                in    accordance . with        the procedures of          the. G&H Quality fAssurance Manual.      Review    of calculations' is' performed in accordance with a written checklist s
s                s                                              ,
and considers        accuracy;    completeness;              addquacy :o'f        input  and assumptions;          appropriateness          of    methods;          re4sonableness      of results; and conformance with codes,                      standards,          and  regulatory criteria and guides.          The calculations are initialed and dated by" the reviewer when he concurs with the results.                              The    calculation s            t x        sheets ,are      maintained      and filed in accordance with the written x      's procedures. of the G&H Quality Assurance Manual.
When    calculations        are  modified          to    reflect        changes in design bases, thi s . . f act  is    recorded    on      the      calculation        sheet  with
              ''                          the changas,        New calculations are performed and the details      of s
                        ' sheets attached to the original work, or entire new work                                sheets i
                      - are    prepared      and placed      in  theLfiles.            New work is reviewed, 3          checked, and approved in the same manner as                            the    original    work.
The superseded work is so identified or destroyed as requirements i
may dictate.
s
      ~
h y
 
17.1.3.3.4        Preparation of Specifications Specifications      are prepared by G&H for the procurement of items (such as equipment, materials,_ systems) and services                within  the contract    scope. It is the purpose of QA to determine that items and services meet the functional requirements and the high                  level of  quality which        are essential and mandatory for the items and 4
r.ervices involved in nuclear safety-related functions, as defined in  10 CFR Part 50          ac.d    the  Regulatory Guides.      This applies whether    the    items      for    nuclear    safety-related    functions    of struc ture s.,  systems, and components are specialJy engineered and manufactured for a specific plant,                or  are  standard  commercial types, preengineered or previously approved and successfully used items for the      given        application. The  G&H Quality Assurance Manual    cove: s  the      steps to be followed from the origination of the specification to its issue as an official document,                  tailored to each particular project.
Specifications      are prepared by assigned cognizant engineers with knowledge      and  experience        of  the    functional    and  material requirements        of    the        item  covered,    commensurate  with  the importance of the given item, and familiar                with  applicable    NRC regulatory      requirements;          special safety requirements, codes and standards; as well as the level of quality                desired  for  design, materials, workmanship, and appropriate acceptance criteria.
The    cognizant      engineer        prepares,    initials,  and dates    the
 
Specification    Review-Record      Form  and  submits  it    with  the specification to the responsible discipline job engineer, as well 7
as the discipline chief engineer, or-group supervisor, who review the  specification      for    technical      accuracy,    completeness, conformance    with    applicable        regulations      and      overall acceptability. These reviewers also initial and date the record sheet to indicate their review.
Epecifications    are  also    reviewed by      engineers    of applicable associated disciplines,      and QA      for  interfacing with      related systems  and    design  requirements,      as well as by a construction services engineer, for any feature bearing on the installation of the equipment or other construction aspects.          All these reviewers initial the    record  sheet    as    supporting  discipline.      The  QA engin<er  review of specifications is performed to check that all the requirements for achieving the desired level of            quality  are defined as outlined in subsection 17.1.3.3.9.
(
Specifications    are  subject    to  a  mandatory independent design verification by      a  design    review    engineer  qualified    in  the appropriate    discipline    through training and experience on other nuclear projects in accordance with the          procedures    of  the  G&H Quality Assurance      Manual.      Verification    of  specifications is performed in accordance with written checklists for completeness; adequacy    of    inputs;    incorporation of      the  requirements    of applicable codes, standards      and    regulatory    criteria;    material Amendment 7 l                                                          August 1983 l
l l
1
 
compatibility; inclusion of appropriate quality requirements; and suitability of the equipment for the application.                        The  reviewer prepares        and  initials      a record sheet to document his comments, acceptance, or both.          The design            review  records  are  filed  in accordance with the G&H Quality Assurance Manual procedures.
The    specifications        are then reviewed by the project manager for compliance with the          overall              project  requirements    and  special conditionc.        He    also    reviews the Specification Review - Record Form to check that all appropriate signatures have been                        affixed.
When he        is  satisfied      that          it  complies, he also initials the record form te indicate his spproval and its                      readiness    for  the client's approval and for procurement as required.                                      7 When specifications are revised to reflect changes in design, the identical procecs is followed                      as  for  the  preparation    of  the original specification.
Amendment 7 August 1983 l
l 1
  -  .~,- --            _.
 
17.1.3.3.5      Preparation of Design Drawings Power  plant design drawings are required for the procurement of equipment and materials, and for the construction of        the  plant.
These  drawings are an important means for giving instructions to fabricators for assembling materials and parts        into  components, and  to the field for building the structures, and for installing and erecting the equipment and accessory items.        The drawings are required  to be cor.plete and accurate and are, therefore, subject to review and checks. The G&H Quality Assurance Manual      contains procedures    for  the  production    and control of design drawings, briefly ru.nmarized below.
: a. Power  plant design drawings are prepared by design personnel under the direction and supervision of an      experienced    squad leader  of  the  applicable  discipline. The    squad leader, assigned to the project by the discipline      group    supervisor,  7 has  the full responsibility for producing documents that are i
complete    and  accurate,  that    incorporate    the    concepts developed and approved during the engineering of the project,
!    and that conform to NRC regulatory requirements        for  nuclear safety-related structures, systems, and components.
: b. The  job  engineer    guides the design activities by supplying the squad leader with the necessary design base          documents,
;      such  as    technical    descriptions  and  structural    design l                                              .
criteria, the PSAR/FSAR, specifications,      and  other    related 7 Amendment 7 l                                                        August'1983 t
 
design  information.      The  squad    leader    then instructs the designers who perform the work to familiarize them with              the engineering    intent,    the types of equipment to be installed, the applicable codes      and  standards,    NRC  regulations,    the selection  of materials, the modes of control and operation, and the design philosophy to be followed.
: c. When preliminary      design .is      completed a print is routed to associated discipline squad lenders        and    job    engineera  for their  review with regard to the extent that the design shown thereen may affect their      own work,      This    is  intended  to eliminate  interferences and.inconsistencios, and achieve the intradiscipline interfecing er:.sential to system design.            If a revision  is    required  to accommodate their own design, they consult the originating squad leader          and  job    engineer  and work out changes acceptable to each party.          If the drawing is
!    satisfactory,      or    when    agreed-to        modifications      are incorporated,    the  drawing    is  completed    and    the preparer initials it.
: d. Following the preceding step, a drawing check is performed by checkers. In  some  disciplines    a  group    of    specialized checkers  has been set up to perform this function, and they 1
operate  independently    of    the  basic  design    squad. The drawings are checked generally for:
s
: 1)  Completeness
: 2)  Accuracy of dimensioning
: 3)  Correctness of information and design data
: 4)  Adherence    to design concepts established in the several
:        design documents
: 5)  Correctness    of layout, adequate headroom and passageway clearances, freedor. from interferencea
: e. Following  his    review  for incorporation of any ccmments the checker signifies his acceptancs by initialing        the  drawing.
The  drawing  is  then  submitted    to  the job engineer to be revieweu for  compliance    with  design  criteria,    supporting
(    calculations,    specification,    codes    and  standards,  NRC l
Regulatory Guides, and overall      accuracy  and  acceptability.
The  job  engineer when satisfied also initials the drawing.
Similarly, the job engineers of      the  associated disciplines review pertinent    drawings    with emphasis on consistency and compatibility with related systems and design        requirements.
1 On acceptance, they also initial the drawings.
l  f. The  original  issue of detail design drawings to be released for use outside G&H is reviewed, approved, and        initialed by the  responsible discipline job engineer.      Furthermore, these  7 1
1                                                  Amendment 7 l
August 1983
 
drawings are reviewed and initialed by the job                engineers      of other disciplines whenever they include information affecting the  work being performed by                these  other    disciplines.
Subsequent issues only require the review and approval of the responsible job engineer, and the applicable                discipline      job engineer whose work is affected by the revisions.                              .
On    completion    and      prior    to    issuance  for  construction      or fabricacion,    drawings        are  subjected      to  independent      design verificaticn by      a design review engineer in accordance with the procedures  of    the        G&H    Quality      Assurance    Manucl<      This verification    is  performed in accordance with written checklists and  emphasizes    the      following:        completeness;    acc uracy    of dimensioning    end        detail;      conformance    Mo  design concepts; regu:.atory requirement-including quality requirements; applicable codes  and  standards; accessiblity of maintenance; and inservice inspection and repair.          The  reviewer      prepares  and  initials    a record  sheet to document his comments, acceptance, or both.                  The design verification records are filed in accordance with written l
procedures of the G&H Quality Assurance Manual.
When drawings are modified to reflect changes in the design it is the responsibility of the designer or engineer making the changes to  review referenced drawings and specifications to determine if
!  they are affected by the changes.
I l
l The preceding procedures are applicable to the original issue, as i
l l
 
well as to all subsequent revised issues of each document            which incorporate all design changes originating in the G&H engineering office. Similarly, within the G&H scope, all major field changes are  reviewed,      documented,  and are reflected in record drawings which are subject to the same drawing        controls  and  reviews  as previous'y outlined.
When  a drawing is ready to be released for use outside G&H as an original iseue, and has been fully and correctly        signed by    all rer,ponsible    engineering    and design personnel,      the drawing is passed  to    the    project  manager,    The  project    mana'ger  is responsible for reviewing the drawing for conpliance with overall          :
project requirements and        special  conditions. If  the  project manager    is satisfied that the drawing may be issued, he initials the drawing.      Fa drawings are released from    the  company    unless initialed by        the  project manager. All subsequent revisions of the drawing will also requira the approval and        initials    of  the project manager.
l l
l
 
17.1.3.3.6            Vendor Drawings, Specifications, and Procedures Review      of        vendor drawings,      specifications,    and procedures received    from        a    supplier    are    recorded    with    pertinent identification,          data, and date of receipt.      Documents are routed through the cognizant engineering and design discipline personnel (nuclear,    mechanical, electrical, structural) in accordance with procedures of the GEH Quality            Assurance    Manual,  to  check  for compliance      with G&h des $gn          drawings and specifications.      Each squad leader and job engineer, as .2ppl; cable, initials and              dates the  appropriate          action  required    (e.g., approved, returneu for correction) on the office copy routing form.              The project manager reviews  the        documents  to  ascertain the action required and to determine whether comments from engineering and design                (if  any) are  pertinent        and  in compliance vith contractual requirements.
Documents are          then  returned  to  the  vendor with    appropriate instructions for required action.
 
17.1.3.3.7    Interface Control-Internal and external interface requirements are defined prior to the start of  detail  engineering  and design          of          a  system            or structure  based on contractual obligations to the Utility Owner.
Discipline job engineers prepare a list of required internal                            and external  interface inputs to complete the engineering and design effort in  accordance  with  the  G&H Quality Assurance                  Manual procedures. Interf1ce    inputs    received are                identified            and examined for completeness and applicability.    (Is data                certified for  final  design or is it preliminary information?)                  Discipline job engineers record internal and external interface requirements on Design Data Input Forms and maintain these forms active until all the required interfact    information    is received                for  final design of the appropriate structure or syster.
 
17.1.3.3.8        Independent Design Verification Independent design verification                                              activities              concerning nuclear safety-related structures, systems, and components are                                                                            performed by designated design                      review- engineers                                  in accordance with the procedures of the                    G&H  Quality                    Assurance                  Manual.                  Independent design verification is performed by use of the following methods:
a Design    Reviews-to                    verify            that              all      nuclear                safety-related engineering  and design docu. Tents are in accordance with safety documents, codes, standards or other requiresuents of the project.
The  results      of design reviews are documented and measures taken to denonstrate that the findings are                                              implemented;                    b.            Alternate Calculations-by                    use    of      simplified                          alternate                          methods      of calculation or analysis                      to    ascertain                        the            correctness                    of  the original  calculation.                      The        results are documented and measures taken to demonstrate that the findings are                                                          implemented;                    and  c.
Qualification Testing-is                        not              normally used                          as a verification method by G&H for its own design activities, although this method l
may be    imposed on                      equipment                          suppliers for verification of seismic analysis as specified by the                                              G&H procurement document.
Surveillance        is performed by QA Personnel in accordance with the G&H Quality Assurance                        Manual                    to      verify              that        the              item has satisfactorily met                      the    seismic                        criteria.                  This verification process is applied to technical descriptions,                                                            structural                  design criteria,  analyses                    and    calculations, specifications, drawings, Q-List, technical SAR text, and                                        amendments                  in    accordance                  with l
[
l
  - - - _ . . . - - . - _    -        . _ , , . . . - . - _              . , - . . . , - . . , . , ,    ,    - - . _ . - ,    . z---  ...,,.--,-,,m.y        ._y , _ - - -
3 -..
 
written' checklists      to  determine compliance with safety-related design bases, QA requirements, applicable codes,        standards,. and NRC regulatory criteria.
Design  review    engineers    are  appointed by  and  are undar the direction of and responsibility of the pertinent discipline chief engineers subject to approval by the QA Manager.        These engineers are  responsible    for    the  independent design    verification    of nuclear      safety-related    documents    developed    within    their discipline for specific      projects. Thece  individuals    are  not involved    in  the  original    design being verified nor is their design verification function subject to        budgetary  or  schedular prescures.
l
* I
 
17.1.3.3.9      QA Reviews of Engineering and Design Documents Review  activities  are  carried  out by    QA engineers under the direction and responsibility of the QA Manager and the project QA supervisor  in  accordance with the procedures of the G&H Quality Assurance  Manual  to  ascertain  that  engineering    and    design activities  of  nuclear plant safety-related structures, systems, and components are    performed  in  accordance    with  the    NRC QA regulatory    requirements.      Calculations      and    drawings    are selectively reviewed during audits to check compliance          with  the QA requirements established for the project.        The project manager and the applicable    engineering    discipline    chief,  as  well  as appropriate  higher management personnel, are notified by the QA Department  of  any  apparent design      deficiencies,      so    that corrective  measures    can be  undertaken    and necessary followup instituted to determine if proper action has been accomplished.
On  acceptance. of    a  document  (drawing or calculation), the QA engineer signifies his approval by preparing a QA Document Review Record Sheet. Should corrections be required, comments are noted on the record sheet and    transmitted    to  the  job  engineer    for action. QA engineers maintain documented evidence of the results          ,
of these reviews and responses in accordance with the          procedures of the G&H Quality Assurance Manual.
All  technical specification sections of the procurement document concerning      nuclear    safety-related    items  are    reviewed by QA engineer to determine that they contain as appropriate:
: a. Applicable      design bases, technical requirements, regulatory F
requirements,          component      and  material      identification, drawings,        referenced      specificaticns,  codes    and  industry standards, tests and inspections            requirements,    and  special process      instructions      for  such  activities    as fabrication, cleaning, erection, packaging, handling,              shipping,    storage, and inspection
: b. Requirements        that identify the documentation to be prepared, maintained, submitted, and made available              to  the  purchaser for  review        and    comment,    such as drawings, specifications, procedures, inspection and fabrication plans, inspection                and test  records,        personnel      and procedure qualifications, and chemical and physical test results on materials
: c. Requirements        for    the retention, control, and maintenance of l        documents and quality assurance activities records which                are to be delivered to the purchaser prior to use or installation l
of the item.
On  acceptance      of    a  document    (including procurement technical specifications      and      referenced    drawings),    the    QA    engineer signifies his approval by signing the Specification Review Record Form. The original Specification Review Record Form documenting
 
i the  results  of  these reviews are maintained in accordance with written procedures of the G&H Quality Assurance Manual.
i' I
I a
l l
 
17.1.4          PROCUREMENT DOCUMENT CONTROL The  specifications and' referenced drawings produced by G&H for a project, supplemented by referenced        codes,  and  standards,  and applicable  NRC  Regulatory Guides,      are  the  basic  sources of technical requirements contained in        the  nuclear  safety-related procurement    documents prepared by G&H for the purchase of items or services. The G&H Procurement Document is composed        of  three sections: a. Instructions to Sidder; b. Terms and Conditions; and
: c. Technical  Specifications    and  referenced    drawings. These specifications    and    drawings    are  subject    to  technical  and administrative    reviews    and    controls    as    described    in subsection 17.1.3.      The  control measures to be applied to these specifications    and  drawings,    which  require    that  applicable regulatory    requirements,    design bases,      inspaction,    testing, acceptance criteria, and appropriate documentation be          addressed, are  contained in written procedures 'of the G&H Quality Assurance Manual.
The  specification section (including referenced drawings) of the procurement document is subject to review by a QA engineer, prior to    its  release,    as  described  in    subsection 17.1.3.3.9,    to determine that all quality requirements are correctly stated          and that  necessary  inspection,    testing,    and control requirements, l
including acceptance and rejection criteria, are called out.          The documentation is available for audit.
i I
l l
!                                    l l
 
Procurement    documents  involving  items and services for nuclear safety-related    structures,  systems,      or        components                      require suppliers  or  constructors  to  establish QA/QC                              Programs which satisfy the requirements of    Appendix B      to        10 CFR                    Part 50    and appropriate ANSI N45.2 series standards.
The  procurement    documents further require that the purchaser or his  designated    representative    have  access                  to            tha  suppliers facilities  and  defines the QA documentation to be generated and submitted to the purchaser in accordance with the                                  procedures        of the G&H Quality Assurance Manual.
Changes or revisions to technical requirements of the procurement documents are subject to the same review and                    control                procedures as the original procurement documents.
 
17.1.5              INSTRUCTIONS, PROCEDURES-AND DRAWINGS Instructions,        procedures, drawings, and specifications are used, as applicable, by        technical    and    administrative          personnel        for various      phases  of  the    design    and procurement              activities of nuclear plants and are          consistent with      the    level          of  quality required to produce a safe and reliable operating plant.                        Written procedures      for  preparation      and  control  of    these            technical documents      are  contained    in  the  G&H Quality Assurance Manual, referenced in Table 17.1-1, and are            intended    to          establish      the activities necessary to conform to tne requirements of Appendix B to 10 CFR Part 50.        It  is  the    responsibility      of        the  project manager        and his    staff    to  determine    that    instructions              and procedures are being implemented and adhered to.                The QA Manager and his staff will perform reviews and audits to determine if the Project is in compliance with the QA            requirements            and  initiate corrective action when nonconformances are discovered.
; Quantitative acceptance criteria (such as dimensions, tolerances, i
and operating limits) and qualitative acceptance                criteria              (such as      workmanship    samples, welding and radiographic standards) for activities      affecting    quality    are  included    in G&H drawings, specifications,          and  in  the  applicable    codes            and  standards referenced in the specifications.            To confirm proper inclusion of these      requirements,    the drawings and specifications are subject to        independent    design    verification      as      described                in subsection 17.1.3, and performed in accordance with procedures of
 
the C&H Quality Assurance  Manual. The  specifications  require that  a  supplier  or  constructor submit detail procedures which include acceptance criteria of specified fabrication, inspection, and  testing  activities. These procedures are subject to review and acceptance by  the  G&H  engineering    group  requesting  such procedures. For  submittals  concerning inspection plans; test, calibration  and  special  process    procedures;    drawings    and specifications;    and  changes    thereto,  these  documents  are submitted as appropriste to QA for    review  and  ccoment. These comments  are  incorpot-ated by  the  cognizant    engineer  in his response to the supplier or conctructor.
{
1 l
l l
4 17.1.6                    DOCUMENT CONTROL All  G&H  record design documents                    (such  as specifications and drawings) for use outside CAH are issued by the                    project    manager with his        approval          noted    thereon,  and only    after    all other required approvals are also noted in the                    appropriate    locations, in  accordance              with    the procedures of the G&H Quality Assurance Manual.
A  record      copy of all original and revised issues of such design documents        is        retained    in the    appropriate  record    files,    as delineated by                the G&H Quality Assurance Manual.        Before revised design documents are issued, they are reviewed                    and    approved    in i
the  same      manner        as    the original issue, in accordance with the procedures cited in subsection 17.1.3.
Provisions            for proper and timely distribution of these documents and their revisions are set forth in the procedures                      of  the    G&H l
l              Quality Assurance                Manual. The  documents  controlled by these l
!              procedures are specifications and drawings (which constitute                        the technical        portion          of    procurement  documents),    PSAR,  FSAR and  7 related    design                criteria      documents,      test      procedures, l              Design / Engineering Change / Deviation                Requests and Nonconformance Reports and Corrective Action Requests as well                    as  analyses    and I              calculations,              other    technical  documents,  and    the G&H Quality Assurance Manual and its procedures.                    Implementation and      control l                                                                              Amendment 7 August 1983 l
 
of distribution are verified through periodic audits performed by QA engineers.
External distribution of engineering and design documents is made by            the      project    manager.                    Such            distribution            includes              an acknowledgment                  form  to be completed by the recipient to confirm his receipt of the latest issue.                                          Further to determine                that          all project participants                            are  cognizant                of the latest revisions of documents, the status of each document is periodically summarized and published.                  These status repcrts indicate the latest approved revision and date of each document.                                            The engineering department,                                    7 the            project      department, and the field forces use these lists to update                their    files    and          remova                  obsolete          information                  when necessary.                  The QA staff performs periodic audits to verify that status reports are current and properly distributed.                                                          Field          and shop                surveillance is performed by QA/QC personnel to verify that the latest document issues are in use.
Engineering                  and  design            changes,                whether        field      or    supplier originated                    are    documented                          on            a    Design / Engineering Change / Deviation                Request Form and subject to the same review and approval procedures as the original document in                                                    accordance                with the G&H Quality Assurance Manual.                                        Copies of the completed change form, whether dispositioned as                                        approved            or not    approved,              are distributed                  to  the project QA engineer, the involved discipline engineers,                the    project            manager,                the        Utility    owner    and          the Amendment 7 August 1983
 
'(
organization who initiated.the request.
No work    can proceed until the change has been approved and'that documentation attesting to this has been received by the supplier Or Cons *ructor.
5 1
t i
l l
t
 
                                . 17.1.7                    CONTROL:              OF        PURCHASED _ MATERIAL,        EQUIPMFJJT AND SERVICES
+
17.1.7.1                ' Evaluation                    and      Selection    of. Suppliers'  and Constructors A    list            of potential bidders for nuclear safety-related items or services is established, based on a. the                                    current    capability  of.
the  supplier              or -constructor to comply with the requirements of Appendix B to 10 CFR Part 50 that are applicable to the types                                        of items or services being procured; and b. previous experience with suppliers or constructors supplying similar                                    items    or  services.
'1
~
When  this            is' not              available,          or for adding new bidders to the list, G&H requires a written                                    response  to  a  pre-Qualification supplier questionnaire                          to        determine a bidder's capability as a possible              procurement              source          and  to  evaluate      their    QA/QC performance capabilities.
QA Department                  review          of procurement documents, as discussed in subsection 17.1.3 establishes the                                  adequacy  of    QA  requirements imposed              on suppliers and constructors.                      Further, these documents require all bidders to submit their QA/QC Programs for review by
!                                  the  G&H            QA Department                  to    establish    that they conform to the requirements of Appendix B to 10 CFR Part 50.
Prior to actual award of contract, preaward surveys are performed on those suppliers or                          constructors          for  whom  adequate    current experience              data              is not available at G&H.            Such preaward surveys l
    , . _ . - - - - . . , - - . . .        - - - - - -.        --,,,,,m-.--        _,,,,r.
 
are performed by the QA Department, with    the  aid  of  qualified engineering personnel as may be required, to ascertain compliance with previously  reviewed  supplier's  or  constructor's    QA/QC manuals. Results of these surveys are documented, distributed to the Utility Owner, supplier  or  constructor    surveyed,  and  the original. maintained by G&H. The  foregoing    activities  are performed in accordance with the written procedures    of  the  G&H Quality Assurance Manual.
17.1.7.2        Surveillance and Audits of Supplier Operations Surveillance    of ' suppliers  during manufacture, fabrication, and assembly is performed by QA personnel        in  accordance    with  the procedures of the G&H Quality Assurance Manual.        The surveillance activities follow    the  requirements    of    a vendor    surveillance checklist, which sets forth the quality documents to be reviewed, check the revision status of the design and engineering documents in use and the operations, inspections, or tests to be witnessed or verified    in  accordance    with  the  acceptance    criteria  of procurement    document  technical specification.      These checklists are prepared by QA personnel subject to approval by          the  project QA  supervisor. G&H  does  not rely on supplier certificates of conformance for acceptance    of  equipment.      Surveillance    by QA personnel  is  performed to verify conformance to the procurement document    technical    specification      and    referenced    drawing requirements    and  to  review the suppliers quality documentation package which is to be available      with  the  equipment    prior  to l
release  for  shipment. Equipment    cannot be      released  from a l
supplier's facility until a G&H QA Release Form is completed          and signed by    a  G&H  QA Representative.        Written reports of such  .
activities are issued to the      supplier,    Utility    Owner,  G&H QA Manager, and the G&H project manager.
Further,  periodic audits of supplier operations are performed by the QA Department in accordance with the        written  procedures  of i
the  G&H Quality Assurance        Manual to:    a. provide an objective m
m a              ,
determination    of    compliance      with          established                ~ requirements, methods-    and procedures;        b.      determine' the                  adequacy- of          the3 supplier's_QA/QC program; c. verify implementation of                                      correctivi'r "
action;    and  d. confirm    the          completion            and maintenance, of appropriate documentation.          These            audits            follow      a      preplanned audit  checklist which establishes                    the criteria to be audited.
The completed checklist is reviewed and approved by                                  the      project QA  supervisor    and      a report is issued to the supplier, Utility Owner, G&H QA Manager, and the G&H project manager.
Recommendations        resulting      from            surveillance                or      audits    as applicable for improvement, adjustment, or corrective                                      action    to be    taken    will    be  made    to          the    supplier, -and                    additional i
surveillance or      audits  will    be        performed              to    ascertain        that measures have seen taken to implement the recommendations.
t l
l l
l l
l t
i 1
l
 
3  .
                                        .-          3 s
                                                      .t
                                      .                          ;a S.                      s 17.1.7.3                                Surveillance                            and        Audits                        of ' Construction- Site operations
                                                                                      \
Receipt ' inspection                                    of- supplier-furnished items is performed-by the constructor                                at        the: construction                                          site,    and  appropriately documented- in accordance with approved written procedures of the constructor's QA Program in accordance with the                                                                                  requirements                      of the        G&H Quality Assurance Manual.                                                      Construction procedures shall include the, requirement that items be properly                                                                                identified,                    that required QA                              document'ation package has been received, that items be        inspected                        for          shipping                  damage,                      that        all    criteria                      for acceptance                            be        natinfied,                      and      that                        nonconforming                    items    be appropriately identified and segregated as applicable.
G&H          site                  QA and QC personnel audit and survey the constructors' operatior. s ,                          including            receiving,                              fabrication,                  installation, inspection, testing, and documentation activities.
Surveillance                              activities                          are      performed                        in  accordance                    with preplanned documents                                      to:              a.      perform                          periodic    checks                  of    the constructors'                              quality          system                    to      determine continued effective implementation                              of that                        system;                b.                  witness    constructor's performance                                during                fabrication,                                        installation,                      assembly, inspection, and testing to verify                                                          conformance                        with        the              design criteria;                        sc.      check          the              revision                status                of  the        design                and a
engineering documents in use;                                                        d.        review                    contractors'                    quality k
1
                                                                                                              - 6 2 -'
  .~ ,                                          ,
f -
        - . - . - -,    ,,      , . .h - . , - .          _y            --          -
                                                                                          ..-----,._-,_,c..              _,-,...-_,,...._.----.,.c-              - , - _ - _ . , - .      -,  .,...r . , . - . - _ . , , ,
 
1 m                                                            l l
1
                                                                                                    -o  j
                                                                                              .          1
        >                                  ~
s                    1 I
documentation for traceability, completeness, and retrievability.                                s Surveillance reports are prepared and maintained at the site              and
    'become part of the overall project QA documentation.
Auditing  activities  are performed in accordance with checklists prepared by site QA personnel under the authority of the site              QA supervisor  and  in  accordance  with the requirements of the G&H Quality Assurance Manual. Audit Reports.are prepared and            issued to  the audited organization,    the    Utility        Owner,  the G&H QA Manager and the G&H project manager.
Recommendations    resulting    from    surveillance          or audits  as applicable, for improvement, adjustment or. corrective- action            to be taken will be made to the constructor and further surveillance or audits will be performed to ascertain that measures have              been taken to implement the recomn endations.
l I
l r
l l
l l
I i
 
17.1.8          IDENTIFICATION AND CONTROL OF MATERIALS, PARTS AND COMPONENTS G&H  prepares    specifications,        subject    to review and control as described in subsection 17.1.3, which require the                      contractor            to have    established procedures          for identification and control of materials, parts,    and    components      which will          not      impair          the function or quality -of the item.          These procedures              are          required so  that any    segment of the manufacture, fabrication,                        assembly, or  construction    activity      can  be readily verified              or          checked for compliance with the QC procedures in the previously                                approved supplier's    or  constructor's        (or    their    subcontractors) QA/QC manuals. QC records are carefully          reviewed    to          ascertain            that whatever type of identification mark              (such as            heat              number, part model      number,          component          serial                number,            as applicable)    is  applied, it will accompany the segment, part, or component through      manufacture,        fabrication,              or          assembly, to    its  ultimate      installation      and    onsite        testing, and be t retained  as    required        by    codes    or    Regulatory                      Guides.
l These  procedures    are    applied    to    subcontractors            so          that G&H surveillance personnel can trace any identified item in the chain of  documentation from origin to final installation.                      Each of the i contributors to    the    progression      of  the  item,          including            the l
l Utility Owner      at the site, is required to obtain and retain the I
; records up to    and  including      those    of  its  own contribution.
Surveillance    personnel      have the responsibility to ascertain, in i
I 4
i
'                                                              . . , _ _        _ . . - _          _ _m.
 
accordance with procedures outlined in the G&H Quality Assurance Manual,        that  the    proper traceability        procedures    are used'by suppliers and constructors (and their subcontractors),                    and  that these  identifications can be traced to such associated documents as  drawings,        specifications,    purchase        orders,  physical    and chemical mill test reports; manufacturing, fabrication, assembly, inspection, and test reports;            deviation        reports;    installation; and  onsite        test    reports to  the  extent        of  G&H  contractual obligations.
 
17.1.9          CONTROL OF SPECIAL PROCESSES When  special  processes-are used for the production, fabrication and  services    involved    in purchased      items    or  services,  G&H specifies  the    codes    and standards, Regulatory Guides and QA/QC requirements in the procurement documents.            Bidders are required, as  outlined  in  subsection 17.1.7 to provide documentation with their propo als, indicating their          capability    to  implement  the special  process    requirements      including written procedures and evidence of verification of adherence to such procedures as              well as  evidence  of  availability      of  qualification records for the procedures    and  for    personnel    performing      such    activitites.
Special  processes      include,  but are not necessarily limited to:      1 welding,    plating,      nondestructive      testing,      heat-treating, electrochemical      machining,      and  cleaning,    and will    require certification by      a    proper    authority,      of    procedures  and personnel where appropriate or required by code or NRC Regulatory Guides. Prior    to    award  of  a  contract,    the    supplier    or constructor will      be  required    to submit to G&H, for review and approval, the procedures it will use to          accomplish    the  special processes  specified by        the  procurement documents,        including references to the appropriate codes and standards, and Regulatory l  Guides. The pertinent engineering department responsible for the special  process    requirements      described    in    the  procurement 1
L documents,      will      review    and    approve    these    procedures.
l Surveillance personnel observe supplier or constructor (and their
 
subcontractor's as applicable) operations to ascertain compliance                          . g.
with the approved procedures, and to review the                          special  process records    to    determine                whether;      a. proper  documentation  of purchased items or services is being maintained; b. materials and parts  are    being appropriately identified and controlled; and c.
qualifications and certifications are                        being  properly  developed and    maintained      current.                Revisions      to  any  special  process procedures and requirements require approval by                          the  appropriate G&H  engineering      department.                G&H QA/QC        personnel monitor the supplier or constructor to determine compliance with the accepted revisions and maintenance of proper documentation.
 
17.1.10        INSPECTION G&H prepares a general specification, as part of the procurement documents  for    nuclear- safety-related      structures,    system,  or components,    which    requires    that    suppliers    or  constructors establish and put into operation a quality program to satisfy the requirements    of Appendix B      to  10 CFR    Part 50, with regard to manufacture, fabrication, assembly, installation, inspection, and testing of materials, equipment, or structures.            Each supplier or constructor is required to      submit    to  G&H  its  existing    QA/QC Manual    and    any  other    specific    procedures    detailing  the organization and methods for      satisfying    the    requirements    that inspection procedures      are  in effect for the purchased items or services, and that inspection personnel are          independent    of  the group performing the work.
These procedures will be required to address the following:
I a. Identification    of the individuals or organization (and their qualifications    and    authority)    performing    the    inspection activities
: b. Identification    and    control  of    items  or  work  subject to inspection,    such  as  materials,      parts,    components,    or construction      services,      includi ng    partially    complete assemblies or work, to prevent use of incorrect or            defective items or work l
: c.        Identification of quality characteristics to be inspected
: d.        Acceptance and rejection criteria
: e.        Measures established to control special processes
: f.        Description          of  the  methods            of  inspection                or tects to be performed as necessary to verify quality (including                                          indirect control      of processing methods, equipment and personnel where direct inspection is not possible)
: g.        Methods to be followed for calibration of inspection and test equipment
: h.        Documentary          evidence    of          completion      and  certification                  of inspection activities
: i.        Documentation          of  nonconformances,              and  implementation                  of l
corrective action l
: j.        That      inspections      and      tests      are  performed with specified equipment and under suitable                    environmental      conditions,,                  and prerequisites have been met.
In      addition, the supplier or constructor is required to submit a manufacturing                schedule  or          sequence    of    oper.stions,                  including witness            and      hold points critical to the quality of the item or service being performed.                  G&H          will    review    this                  schedule  and indicate          the witness and hold points it wishes to observe in the l
!  contractor's              facility. Work          shall    not proceed                        beyond  an l
l
 
established hold point- without prior. approval by G&H.                    The QA Department reviews the supplier's or~ constructor's                QA/QC  Manual to    determine    its    adequacy    in    meeting ~the requirements of the specification and applicable criteria, codes and                standards,  and Regulatory Guides.            An  initial    audit    is performed by G&H QA personnel      at    the    supplier's    or  constructor's      facility    in accordance    with      the G&H Quality Assurance Manual, to review the procedures detailed in            their QA/QC Manual;        to  ascertain  the qualifications      of the supplier's or constructor's personnel; and to review the records and procedures required for documenting all critical    aspects      of  their procedures        for performing process activities, including inspection.            Furthermore, G&H      reviews  the requirements      for    supplier's    or constructor's senior management involvement in their quality program.
The    supplier or constructor is required to notify G&H prior to a required witness          or hold point,        so    that    the    appropriate surveillance      personnel      will  be available to observe the event.
Surveillance personnel are responsible for periodically observing the    supplier's    or    constructor's implementation of his approved quality procedures in the areas previously listed.
Inspection      of modified or repaired items or work is required to be performed by the supplier or constructor                in  accordance  with the same procedures which applied to the original work.
Surveillance      reports    for  each    visit    are prepared and include
 
recommendations for corrective action when necessary.
These  reports            and corrective action requests are distributed to the contractor, Utility Owner, the G&H project manager,                                              and G&H QA Manager,        whose            department                                maintains a complete file of QA reports, and keeps senior management appraised of such activities in accordance with G&H established procedures.
l I
 
17.1.11        TEST CONTROL G&H  establishes  the- necessary      test programs    for structures, systems, and components in the appropriate procurement documents which    include,    as  required,    proof  tests  during or          after fabrication,  assembly,    construction      or    installation,          and preoperating tests prior to startup.        The supplier or constructor is required to establish a detailed written procedure for.each of 2    the tests that are neccessary to demonstrate that the structures,.
systems, or components will perform satisfactorily in service, in accordance  with  their design      requirements    and within          their acceptance limits. The test procedures will      include        provisions for assurance that:
: a. The prerequisites for conducting the test have been met
: b. Adequate test information is available and will be used
: c. Properly    identified      and    calibrated    up  to        date  test instrumentation and equipment are available
: d. The  test  is conducted by trained or appropriately qualified personnel
: e. Adequate acceptance and rejection criteria are included
: f. Proper  environmental    conditions for the test are maintained during its performance.
 
e The  supplier  or  constructor  is  responsible  for  adequately documenting the test and its  results,  and  for  submitting  the documentation  to  G&H  for review and acceptance. G&H personnel will witness  the  test where    appropriate,  at  specified hold points, and will ascertain that the requirements specified in the procurement documents have been satisfactorily met.      To ascertain compliance with the contractors approved procedures, surveillance personnel  monitor  the  manufacturing,  fabrication,    assembly, inspection,  and test procedures in the supplier's shops, and the installation, inspection, and test procedures at the construction site in accordance with the G&H Quality Assurance Manual.
l t
 
17.1.12          CONTROL OF MEASURING AND TEST EQUIPMENT G&H prepares      procurement documents which require that suppliers and constructors establish control procedures to assure that                        all items      of measuring      and        test  equipment        used  in  activities affecting quality are        properly        identified        and  calibrated,    at scheduled      intervals,      against          certified        standards-    having documented relationship to nationally recognized                      standards. If no national standard exists, the certification of the calibration used will require verification                in  accordance        with  applicable industry      standards  and documentation              of    acceptability.      The supplier or constructor is              required  to    maintain      records    that identify the measuring and test equipment and show the latest and next due calibration dates.              The calibration        interval    for  each item      is to be based on the type of equipment, required accuracy, stability characteristics, use, and                other      conditions      affecting measuring      control. Items that have not been properly maintained or calibrated in accordance with                specified        schedules,    or  that have      been damaged    in service will be required to be identified and removed from service.
l    The  supplier    or  constructor may perform his own calibration, using duly qualified personnel.              As an alternate, the constructor may  use    the services of an approved standardization laboratory.
Standards are to be maintained, and measuring and test equipment
;    calibrated      in  an environment            having      controlled      temperature, l
humidity, and radiation or contamination limits                      compatible    with
 
the  required    accuracy      and measuring objective of the required test. The error in certified calibration standards shall be less than  1/4  of  the      tolerance  of the equipment being calibrated, unless limited by the state of the art.                  When discrepancies        in measuring    and  test      equipment are found at the next calibration date, the supplier or constructor will be required                    to  determine the  corrective    action required.          Where equipment is shown to be out of calibration, all items inspected or tested since the                      last acceptable    calibration        are  considered unacceptable            until the supplier or constructor demonstrates that the                  applicable      design requirements of those items have been satisfactorily met.
The  supplier    or constructor is required to maintain the records which indicate the calibration status                of  all    items    under  the calibraticn    system      in effect, and which identify the measuring and test equipment.          G&H surveillance personnel          are    responsible for  verifying    records      of  the  measuring        and  test    equipment calibration;    and      the  reports  thereof        issued by      them    will recommend corrective action when required.
 
17.1.13        HANDLING, STORAGE AND SHIPPING G&H prepares    procurement documents containing basic guidelines for  the  proper handling,      cleaning,    preservation,        storage, packaging    and    shipping    of    nuclear  safety-related      items.
Suppliers  and  constructors will      be  required by procurement documents to develop written procedures or instructions detailing protective  measures,    including    the  establishment      of  special environments    as    may    be    required    to prevent damage          or deterioration to items or structures        during handling,        storage, and  shipping at the suppliers' facilities, in transit, or at the construction site. G&H will review and comment on the procedures developed by the suppliers or constructors.
G&H  surveillance    personnel at the shop or construction site are responsible for ascertaining if        the  suppliers    or  constructors actually implen. ant the protective measures in compliance with the previously submitted and accepted procedures.          This    surveillance activity    is  performed    in  accordance    with    the  G&H    Quality Assurance  Manual    procedures    and will    encompass    visual      and nondestructive      examinations;      witnessing    of    the    level  of workmanship    and  care    being  exercised;    and    reviewing      the documentation      that  is  required. Reports  of    G&H    findings, together with    recommendations      for  improvements    or  corrective action  to  be    taken,    where  required are prepared, issued, and distributed as appropriate to the contractor, Utility Owner,              the G&H    project    manager    and    the  G&H  QA Manager.        Followup surveillance                        or  audits              will                    be        instituted as        required    to establish                        that  improvements                              and . corrective        action have been-effective where indicated.
I l
i
(
 
17.1.14            INSPECTION, TEST AND OPERATING STATUS G&H prepares        procurement documents which require that suppliers and constructors be responsible for establishing procedures                        for identifying      the        status    of inspection, test, and readiness for operation of      nuclear        safety-related      structures,    systems,      and components      throughout manufacturing,              fabrication, installation and testing.      G&H also-requires that suppliers              and  constructors prepare    written procedures to establish that the inspection and test    status    of        individual  items    be  indicated      by      readily identifiable      means        such as stamps, tags, labels, routing cards, shop travelers, or other suitable indicators.                    These    procedures will also establish the authority for the application and removal of identification and status markings and that this is                    performed by      personnel      not      s2bject  to    cost  or  schedule    pressures.
Indicators are        required        to identify    those    items  which have satisfactorily passed required inspections and tests, to preclude bypassing required inspections and                tests,    and  to  prevent      the inadvertent      use        of  unsatisfactory items.      Where inspection and welding stamps are in use, procedures are required to incorporate controls      to    prevent        deterioration    of materials or components.
The suppliers' and constructors' procedures                  shall    also      include provisions      to  control        the bypassing    of required inspections,
, tests, or other critical operations subject to approval                    by    each of their quality organization.
 
G&H will be responsible for reviewing and commenting on suppliers and  constructors      procedures,        including      requirements      for documentation. This . documentation will be required to indicate the types of inspections and tests, and the authority under whom the  tests    were  performed        and witnessed.          Review    of  such documentation at the suppliers' shop or the construction site                  is performed by G&H surveillance personnel to determine correlation with the inspection, test, and operating status of the materials, components,  and  structures,        and  to      determine    conformance to accepted contractors' procedures.
As applicable, procedures will be established by G&H for transfer of equipment or systems    from      the  constructor      to  the  Utility Owner's    pperating    staff.        These        procedures    will  include preparation  of  suitable        records  indicating      the    status    of equipment    or  systems.          During  construction        site  testing, l adjustment, trial operation and any other times                when hydraulic, I
l mechanical,  or electrical systems are energized, the G&H tagging procedure is put into effect to promote              equipment,    systems  and personnel  safety,  and  to      prevent inadvertent use.          Under this procedure the Utility Owner will have the sole responsibility for operation    and    maintenance        of  equipment      and    systems  thus l
transferred to their control.
l
 
17.1.15        NONCONFORMING MATERIALS, PARTS AND COMPONENTS G&H prepares procurement documents which require that suppliers-and constructors establish, implement,        and maintain procedures for  the identification, control, and documentation of materials, parts, components, systems, structures, or-processes which do not conform to requirements of the procurement documents, in order to l
prevent their inadvertent use or installation.          These  procedures l
, are  to  provide for identification, quality review, segregation, I
{ disposition, verification, and documentation of the nonconforming l
item, structure, system, or process, and notification to affected organizations.
l The  supplier  or  constructor will        be required to identify all nonconforming items, structures, or systems by tagging          or  other l suitable  means,    and    to  segregate    or  isolate    them where l practicable, to prevent their unauthorized shipment, installation or use. The  identification system is to be established in the written procedures.      Special    areas  for  segregation    and    for storage of nonconforming items will be provided as' required.          The contractors' procedures    are  to  include    the  requirements    for maintaining records of all nonconformances and their disposition.
Repairs or  rework  of  nonconforming    items    will  require  that j reinspection  and retesting be accomplished by methods equivalent to those of the original inspection or        test. Acceptance    of  a nonconformance  will    require  that    a  written    deviation report
(
containing verification      of    disposition      and    a  technical i
;                                                                                                                  l l
 
justification  establishing that neither safety nor function will be adversely affected shall be submitted to G&H        for  review  and approval. Such. deviation    reports for nonconforming items will require review and approval by the      responsible  G&H  engineering department,  and  a  subsequent QA review in accordance with the procedures of the G&H Quality Assurance Manual.
Implementation by contractors of their procedures for handling of nonconformances will be subject to periodic surveillance        by  G&H personnel.
All  deviation    or    nonconformance    reports  (including    those dispositioned accept as is or repair) generated by suppliers will be  required to be forwarded to the construction site, along with those reports generated by constructors which will become part of the  QA documentation      to  be    filed  at  the    plant  site  and transferred to    the  Utility Owner.      Copies  of  deviation  and nonconformance    reports  are    required to be submitted to the G&H project manager and G&H QA Department for review and analysis          of quality  trends  and maintenance      of  documentation. Situations where supplier's and constructor's quality appears to be trending away from the desired levels, will be reported to the supplier or constructor, the    appropriate    senior  G&H management,    and  the i
! Utility Owner.
l
 
17.1.16          CORRECTIVE ACTION G&H has    established      nonconformance          reporting      and  corrective action procedures to identify            conditions        that    are  adverse            to quality as discussed in subsection 17.1.15.                  These procedures are concerned with.the engineering and design activities of G&H,                                  as-well  as  activities      of    its    suppliers        and    constructors.              The corrective action to be          instituted        by G&H,      its  suppliers            or constructors    will    be determined by the source and nature of the nonconformance,      and  follow-up        action      as  necessary will                  be performed    to    verify  implementation of the required corrective action.
QA    Department      personnel      perform          periodic      audits              of G&H engineering and design, project administration, procurement,                                and site  QC activities to substantiate that applicable QA procedures and  contractual      obligations      are      adhered    to,      and          properly administered    by    the cognizant organizations.                During the course of these audits      all  nonconformances          found    are    identified            to applicable      criteria,        instructions,          procedures,      codes,            and standards and recorded on an audit report.                  This audit report                is then  issued    to the project manager and the audited organization to  complete    the  corrective      action      reply    eection within                  a specified    time limit.      These actions are performed in accordance with  the procedures        of    the    G&H      Quality Assurance                    Manual.
Auditors    will    assess    the    corrective action reply to determine that    the    respondent        has    included          in    his    reply              as
 
applicable: a. the            cause of deficiency or nonconformance; b. the action to be taken to correct the deficiency                                or  nonconformance;
: c. the action taken to prevent recurrence; d. the action taken to establish that other areas or previous work completed have                                      not been effected;      e.      projected date of corrective action completion; and  f. identification          of      cognizant          personnel            assigned      to implement    the    corrective action.                  Auditors will also review the corrective action reply to check that the corrective action to be taken    is      in        accordance              with    the            applicable    criteria, instructions, codes, standards, contractual requirements, and the procedures      of the G&H Quality Assurance Manual.                              Ecllowup action will be scheduled after the corrective action completion date                                    to confirm    that          the    corrective              action            indicated has      been satisfactorily implemented.                    Copies of the completed audit report i  with the corrective ac ion input are distributed to the cognizant j  organization audited, the G&H project                        manager,            and  appropriate G&H management personnel                  in        accordance            with  the G&H Quality l
l Assurance Manual.            The original of the audit report is maintained l  in the QA files.
I Corrective      action is also requested as a result of QA reviews of i
engineering      and        design            documents      (including            procurement specifications).              During            the      course            of    the  review    all l
nonconformances found are identified to applicable                                  instructions, procedures,      codes,        standards            or  regulatory            criteria  and are
 
recorded on a QA Document Review Record Sheet or for procurement technical    specifications      comments  are noted on the document as described in subsections 17.1.3.3.4 and 17.1.3.3.9.
A  copy  of  this    form    is issued to the project manager and the applicable discipline / department with instructions to revise            the applicable    document    to  incorporate the comments noted within a specified    time    limit    and  resubmit    the  docume'nt    to  the        QA Department    to  verify    that all comments have been incorporated.
Where corrective action is not complete          or  is  inadequate,    the QA Manager has      the  authority to require the project manager to exercise his stop work authority and consult with appropriate G&H Management personnel to resolve the condition.
G&H prepares      procurement documents which require that suppliers anc    constructc rs      establish,    implement,      and    maintain        a nonconformance      reporting    and corrective      action    system  that l identifies conditions adverse to quality,          and  that    appropriate l
action  is taken to preclude repetition.          Audits and surveillance l
of suppliers and constructors are performed by G&H QA personnel l in  accordance    with    the procedures of the G&H Quality Assurance l
l Manual. During    the  course  of  the  audit    or    surveillance activities,      all    nonconformances    or  deficiencies      found  are identified    to    applicable    criteria,      instructions,      codes, l
l standards, and procedures, and are recorded on an audit report or vendor shop surveillance report.        In  addition    a    Nonconformance l
Report  and Corrective Action Request Form or a Deficiency Report l
 
and Corrective Action Request Form will be issued to the supplier or  constructor    respectively,    with  instruction to complete the applicable form and return it to G&H for review.            The project QA engineer    will  assess    the  response  in    the    same  manner  as previously discussed. Copies of the completed nonconformance          or deficiency    report    and  corrective    action      request  form  are distributed to the supplier or constructor,            the  Utility  Owner, the  G&H QA Manager, the G&H project manager, and appropriate G&H management personnel in accordance with the procedures of the G&H Quality Assurance Manual.
Any  significant    conditions    adverse  to  quality which are not observed by      audits    or    surveillance      nor    documented    on Nonconformance    Report  and Corrective      Action    Request  Form or Deficiency Report and Corrective Action Request Form,            which  are discovered by    suppliers    or  constructors will be recorded on a Design / Engineering Change / Deviation    Request      Form. Corrective action  for these conditions will be individually documented on a memorandum by the project QA engineer and distributed to            the QA l
Manager, the project manager and appropriate levels of management in the cognizant areas of the nonconformance            or deficiency,    to review,  make  assessment of and institute appropriate corrective action to prevent recurrence.
i
!                                    l                                                    _-.        ..      __  _ _ - .
 
17.1.17        QUALITY AS.cURANCE. RECORDS G&H maintains- QA      records          for  all  its work involving nuclear safety-related structures, systems, and components in                          accordance with procedures      of  the      G&H Quality Assurance Manual.                    These procedures are designed to meet the requirements of Appendix B to 10 CER Part 50,      Criteria XVII,            Quality Assurance              Records and establish the requirements for those              records    to  be maintained including duration, location, and assigned responsibility, using as a guide ANSI N45.2.9, Requirements                for  Collection,            Storage, and Maintenance      of Quality Assurance Records for Nuclear Power Plants,    as  applicable    in          accordance  with G&H              contractural obligations to the Utility Owner.
Recognizing    the  obligation of the Utility Owner as the ultimate repository for all required lifetime              and  nonpermanent            records, G&H maintains      a complete in-house file of all the documents and records it generates during its phase of the work, and                          transmits them when    completed    to      the Utility Owner as required with the exception of calculations.              Calculations are retained by the                      job engineer and a copy as applicable furnished to the G&H Print File Department to be maintained until completion of                  the          G&H design activity. These  documents are then transferred to the QA files at the site for retention by the Utility Owner for                        the    life          of the plant.
C&H prepares    procurement documents which require that suppliers 1
 
and  constructors    have    established    procedures    detailing    the generation, maintenance, and retrievability of records to furnish evidence of activities affecting quality,            and provide    adequate identification    for    relating a record to the item or activity to which it applies,    as well    as  to  the  persons    involved;  the results,  the acceptability, and also recommendations and actions taken in connection with any deviations          or    deficiencies  noted.
Furthermore,    G&H    requires    that  suppliers    and  constructors transmit to the Utility Owner, in due cours(, those lifetime              and nonpermanent    records    which the NRC Regulatory Guides require to be kept at the site.
These    records    are    to  include    as    a  minimum: a. material certification    and  test data      for  traceability      and  quality verification,    b. reports    of inspections, exaninations, and test results    for    verification      of    conformance;        c. drawings, specifications,    procedures,    and instructions for use in control of  configurations;    and    d. records      of    nonconformances    or deviations    and    their    corrective      action    (including    those dispositioned accept as is or repair).
Surveillance    of  suppliers    and constructors during manufacture, fabrication, assembly, installation and testing is            performed by f QA personnel    to  verify that the suppliers and constructors are l
l maintaining inspection      and  test    records    as  required by    the i procurement document.        QA personnel will review the supplier's and constructor's inspection and test records to verify that they i
l 1
 
contain  as        applicable:                      a. a  description of -the                                        type  of observation;  b. evidence                          of      completing                                      and    verifying. a manufacturing        inspection,                    or    test              operation;                          c. the date.and results of the inspection                          or    test;              d. information                            related  to conditions    adverse                        to  quality;    e.            inspector                          or data recorder identification; and f. evidence as to the                                                                acceptability of      the results.
l l
I l
l
 
V 4
: a. !        ,
r                                              s
                                                                                  ~
                                                                                      +a.
17.1.18        AUDITS                                                    -
s
                                                                          "\                          ,
G&H QA    Department  personnel      perform periodic      audits i of' G&H .
engineering and design, project administration, procurement,                      and site QC operations to substantiate that, applicable QA, procedures, criteria, and contractual obligations are adhered to and properly administered    by  the  cognizant    organizations.        These        audits
                                                ,              1 include the objective evaluation of work        areas, activities            and items, and the review of documents and records, and are performed using written checklists in accordance with the procedure's of"the G&H Quality    Assurance    Manual and are scheduled on the~ basis of the status and safety importance of the activity beir.g performed.4 Reports  documenting the results of these audits are prepared and-                            -    _
issued to the project manager;        the  audited  organizaUion~;              the '      -
Vice President    Consulting Engineering,        QA, and New Technolo.qy and other appropriate G&H management personnel in accordance.with the  G&H Quality Assurance Manual.        These audit reports' serve as an indication of the quality trends within our own              organization.
All  nonconformances    found  are recorded on the audit report and the audited organization is instructed to        provide      a  corrective action  reply within    a  specified    time  limit    as descri$ed in
( subsections 17.1.15 and 17.1.16.        Follewup  action      is  scheduied after  the  corrective action completion date to confirm that the corrective action indicated has been satisfactorily              implemented.
i The completed audit report is maintained in the QA files.
s I
 
                                                                                ':        1; t'
p i        & .
                                                                                      . f.
4      )
J 4
Additionally,                  the Vice                Presidents--of Power. Engineering; Power t            ,                    .
                                                                          -                                  v Projects; Consulting-Engineering,                                        QA  and New ' Technology;      the Manager,-                Project                Support        Services        who- is    responsible -for    7
                                  -procurement,                  the LManager                Construction            Liaison  and  the  Vice President,                  Regional              Office          involved- in- performing          nuclear safety-related activities,; institute annual management reviews of
;                                  .the            areas      under          theirs' cognizance                to ' assess the adequacy and 1
Program              accordance  .w ith  the l
effectiveness of the                            G&H . QA                        in criteria .of                Appendix B ~ to                  10CFR Part 50.            Management Review-Reports are issued to the appropriate Senior Vice                                            President    or Vice              President ,and                submitted- to              the    President for approval.
Where              Reports          identify          the      need        for    specific    changes      or improvements,                  follow-up action is monitored by the QA Department to verify that implementation is accomplished within a                                            specified time              frame.        Procedures              for performing management reviews are
                                                              ~
(,                                  established in the G&H Quality Assurance Manual.
I The            G&H QA Department also performs periodic audits of suppliers and constructors , as contractually required, to                                            determine    that i
they              are complying with and implementing the requirements of the procurement documents, their previously approved QA/QC Manual and
!                                    procedures,                and        the      criteria          of Appendix B to 10 CFR Part 50.
          -        ~
These              audits      include            objective            evaluation    of    work    areas, activities,                processes, and items and the review of documents and records, and are performed using preplanned written                                            checklists l
                                    . based on the status and safety importance of the activities being Amendment 7 August 1983
 
                                                                                                                      \
performed in accordance with the procedures of                                                      the  G&H Quality Assurance Manual.                  Reports  documenting the results of. supplier-or constructor audits are prepared and issued to the                                                      contractor, the  Utility Owner,                the G&H project manager and appropriate G&H management personnel.                  Nonconformances                                    or      deficiencies      are handled  as                described    in  subsections 17.1.15                                      and      17.1.16.
Followup  action will                  be  scheduled                          to              confirm  satisfactory implementation of the required corrective action, and the results are distributed in the same manner as the original report.
f i
 
GIBBS & HILL QA PROGRAM TOPICAL REPORT APPENDIX A
: 1. 10        CFR Part                50  Appindix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants.
: 2. NRC        Regulatory Guide                        1.28      (Revision  2 - February      1979),
Quality            Assurance            Program                Requirements        (Design    and Construction), endorses ANSI N45.2.
: 3. NRC Regulatory Guide 1.30 (Revision 0 - August 1972), Quality Assurance            Requirements                  for      Installation,      Inspection,  and Testing          of      Instrumentation and Electric Equipment, endorses ANSI N45.2.4.
: 4. NRC        Regulatory Guide 1.37 (Revision 0 - March 1973), Quality Assurance Requirements for Cleaning                                  of  Fluid      Systems  and i          Associated            Components                  of Water-Cooled Nuclear Power Plants, endorses ANSI N45.2.1.
: 5. NRC        Regulatory Guide                        1.38 (Revision 2 - May 1977), Quality Assurance Requirements for                                Packaging,    Shipping,      Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants, endorses ANSI 45.2.2.
: 6. NRC  Regulatory  Guide 1.39      (Revision 2  -
September 1977),
Housekeeping    Requirements      for  Water-Cooled          Nuclear            Power Plants, endorsos ANSI N45.2.3.
: 7. NRC  Regulatory Guide 1.58 (Revision 1 - September 1980), as required for the work being done,        Qualification of Nuclear Power  Plant  Inspection, Examination, and Testing Personnel, endorses ANSI N45.2.6.
: 8. NRC  Regulatory Guide 1.64 (Revision 2 - June 1976), Quality Assurance Requirements for Design of Nuclear                  Power Plants, endorses ANSI N45.2.11.
: 9. NRC  Regulatory Guide    1.70      (Revision 2 - September                    1975),
Standard Format and Content of Snfety        Analysis          Reports            for Nuclear Power Plants.
: 10. NRC  Regulatory Guide    1.74      (Revision 0  -
February 1974),
;    Quality    Assurance    Terms      and    Definitions,                  endorses l
ANSI 45.2.10.
l
: 11. NRC  Regulatory  Guide  1.88      (Revision 2  -
October, 1976),
Collection, Storage, and Maintenance of Nuclear                Power            Plant Quality Assurance Records, endorses ANSI N45.2.9.
l
: 12. NRC  Regulatory Guide 1.94 (Revision 1 - April 1976), Quality Assurance  Requirements    for      Installation,    Inspection,                  and l
Testing of    Structural  Concrete and Structural Steel During l
l l
l
 
the Construction Phase                  of  Nuclear      Power  Plants,                endorses ANSI 45.2.5.
: 13. NRC          Regulatory Guide 1.116 (Revision 0 - June 1976) Quality Assurance          Requirements            for    Installation,      Inspection,                and Testing          of            Mechanical  Equipment      and  Systems,                endorses ANSI N45.2.8.
: 14. NRC          Regulatory Guide 1.123 (Revision 1 - July 1977) Quality Assurance Requirements for Control of                        Procurement                  of  Items and          Services            for    Nuclear    Power      Plants,                  endorses ANSI N45.2.13.
: 15. NRC          Regulatory Guide              1.144    (Revision      1 - September 1980)
Auditing of Quality                  Assurance    Programs      for Nuclear                  Power Plants, endorses ANSI N45.2.12
: 16. NRC          Regulatory              Guide  1.146    (Revision      0 - August                1980)
Qualifications of Quality Assurance Program                        Audit                Personnel for Nuclear Power Plants, endorses ANSI N45.2.23
 
pi                                                                                      -                                                                                                          _ _ _ . _                        _-
00RRO OF Cl CMAIFDW1 g
l                                                                                                                                                                                                                                (1 NAfit l
(                                                                                                                                                                                                                                Ppf St 0E1 eau I OllEF EEEC4 SFFICEI i
R.n. CORN I
pagACFO                                                                SE 4109 Cont r avC f l0m                                                    VICE PAC 51DEul 48C152]      . .- g 8.0. STAsu15                                                        E.L. SCwf
* PELT l                                                            8 bm    e-.          -        ==                        ..        - .-. - -.-                  - - - m                  - - - -                  . - . -
TLCf PRC310Cuf      .                    93Cf PRE 5!DEtT                                                                    b--  . - . .
WN#
PonEA PROECTS                          F:.!4 Eh;InEER!n=
{                                                                                                        AECIfm        0F FICE M.R. AOCR                              8.a. vivl4170                                                                                      P. CARTW4ICMt l
erw. cts                                                                                        manAGen                                                                              pahat,Em 0F                                                                                                                                                                              0FLAA T10h5 PROJECf 3                                                                                      mova=cto
                                                                                                                                    ,f f,CM40LDEF 1.N. GALLO                                                                                      0.C. PuM37                                                                            J.n. Divf 3 NGL A i                                          magasLR S T RUCitP*aL /
PRO CM                                                                                      Civl L/wLAO l                                      t hclhEE R1hG C.R. LGESE                                                                                  J.L. tiCMif R I
PkwGE R                                            R                                            nHMEIR CP                                            5 PAGJECf$                                            g                                        pggpeq[get a                                      tuGI4EEnl43 C.F. kIIenth                                                                                    J,g, gypygg l
                                        -u a                                              l                                          .., A2 R
                                        ,n%.                                                l                                        MCm g g,                                                                                    EkClhEEhl43 hlRifl83 tS                                          l                                      E.F.CHELCTf!
paGr R                                                                                        nuagt e DF                                                                                                  6 P AQJt CTS                                                                                        Carnt ChAPMICS R.f.
h(R5540f A                                            (                                      L. A. C OLOTZ!
I
                                        ~ pen                                              y______.                                    P -e .
PROJE Cl
                                                                                                                                                                                                                              .~a n PECIchAL PR3JE CTS                                          -
SvPPGR1                                                                                ggtg3 I                                          SERV!CES I"      I'O'l h5''
l C. A.3f MAU33                                                                          J.R. ActtMIC NNA G E R O
l                >R4AGER                                          PA%ACER PLMCMa$lh3                                      15fIrp flhG                                                        pgg.gg.a raf 415N11>
9.CL%N14G413                                                          T .P.YOU4C                                      F.M. CL E S l
A.B. CUATIS MN%1 M                                            l                P A%CE R                                        P A%A GE R O'                                            E              PL94%Ih3 &                                      T E C a* h 0 L C G f P40JE CT S                                        B              3
* et t ;JL i h G                                f um5F E4                                      RAhCEA J. J. J!h[h{ f                                                            (C Pg h)                                    P J 34970                                $CIE'hCE S- CtERh 0.8. mikson 0 !*t C T09                  ("
n ;. ! Fai31 f 4T ACM/ va e 44 CE%ELC' Olvil104                          ::sf;Lf!h" E404                                                                                            Pawg R
: i. S. A hL d 1tCM.                                                                                    E %;t w IR! bG
                                                                                                                                                                                            ~
J. J. C AS$ 10Y                        '.P. CfR!teID                                                                                        . Crnven A.R. FCREE3 an:Stagr                                                                                        6*m u u
                                                                                                                                  'E d          *MG '
t tattf 04                                                                                          #"A* A M A L RF h /;t u tL OP ClaillC4                                                                                        F SFIC I"L PROJE C T S 1.W. L C055 R 2C R                                                                              5. 5. h 80', A 10 c TICE FME51DE41                                                                M A%%ER Ppf 9lCf m1                                                                00altfy
                                                              &ltilN                                                                R55u*p%CE
                                                              $.R. EC3                                                        i W. W. KE DDIS m:s%t9                                                                                          C*ItF
* CON 1VL T I%$
( 4G l % E ( P 14G f at tat                                                                                  E *Gl*Ef 8 t.J. pawsrs                                                                                  v.P. 9'JSCEu p4g4g[R Cf                                                                                      80%M A Pwa t i 140 I
>f                                      m.g ing qg ig                                                                                  ECG%CRIC5 i(
P. E. M3                                                                              ' .M.P# Estam I                                                                                    _
* P al S 10i t ?
084v] $44 i                                                                                esL1[h
                                                                            *, J. C OL Lt *B s
 
e.
7 l i E
_                                                              _ _ _ _ _ .                                  . _ _ _ _            ._                    _        ~                  - - - - -
SE 410R                                                                                    TICE PhESIDENT                                                  3Entc9 WICE PREllDENT                                                                                      FlemCE gjC        gar F.O. PUTCplu50m                                                                                  N.G. FORNCLLA                                                P. SRERCN VICE PRE 510L41                                    TICE PRE 5ISEh!
CORPCRATE STRFF COMEST!          !T* .
i                                                  N.S. SL AIR                                      f.R. CllDIi2J l
RA4AGER                                                          OIRECTOR                                                    Ci*Ltl69 t C*
00Mt31 tC                                                        F l"**C I%                                                  r'g 5Y[et t s
                                                                                                                                        ~            U                                            ~
5fLES                                                      aan 8 8 '" E f "f "'
E.P. REENT                                                        .fa1"l'T'R T'Ish G E. MRGNER                                                h            f"
' ram *LE4                                                                      pa                                                              01    TOR                                                  PEsS0ER PSG JECTS                                                                        SALE S                                              -
F{*]!g                                          -      etu t3TR ATI .
: 6. MSO%                                                                        IDFE N)                                                  l  S.I. EHRMAN                                                T. 4 PILLEn na                      **'                                                                                                    PA%a En 1.nh (.La                                                                                                                                    CONTROLLER f
JEl#!.'?i.
sdn!is                                                  -
), ggtLErr                                                                      0. CDR6v                                                      .4.R. FR54aCHT                                                0. 03YhCW P$$ $
* gO%)R I iR4pE 4                                                                                                                                                                  tER Gha YSI p, pggy                                                                                                                                                        D.W. SHIPLEY RS$151Ruf
( b'' E F                                                                                                                                                        CEhE L
[tc]tEER$                                                                                                                                                            GCCCUhf lhG F.M. hESLET
                                              ' ICE PRES'"
Also Available On
                                      -      t Ran  sP.',no"%sn.
Di.i R.P. EN;EL Aperture Card CIPE C TOR                                                                      -
PfCJE C15 i\ U o.R. Enres0, f
0 .e E .. . ., E R , ..                                      r.A3 T
                                                                            .0.._,
OIREC TCA
                                                                                                                                        !                  CAR) .
Or sRtts                                          J                                      Figure 17.1-1
: 2. C. ,ut ,T.R, s                          LEGEl4D                                            Amendment 7 flCE Ff E5 tCf.41 CORP. RESPONSIBILITY
(;;CHESA;g;n  /
: a. sartEn                                                                    _____-                          0.A.        RESPONSIBILITY 6304MlZ4T10M CMAMT l
                                                                                                                            .Olb_bo a Mill,                  ,,,.
Inc,.
8309070389-o\
l
 
Figure 17.1-2 DELETED as of Amendment 6 l
1 l
l l
6 l
l
 
LEGEND 9055o a Hill, Unc.
                                            .                ..    . , . . . - . . . . -                              INOICRTES OFFSITE DIRECT PROJECT                    NUCLERR PR0 JECT                                                        PERSONNEL RESPONSIBILITY OR RUDIT 0RGRNIZATION CHRRT                                              -
INDICRTES RESPONSIBILITY                                                                                                ONSITE TECHNICRL                                                                                                  PERSONNEL RESPONSIBILITY              UTILITY l
OWNER                                                        .
MANRGER                                          .
MRNRGERS OF          MRNRGER                  PROJECT ENGINEERING        OF PROJECTS                SUPPORT l    SERVICES DISCIPLINE                                                                                          CONST PROJECT              PURCHRS]NG                      OR
:                  CHIEF ENGRS.          MANRGER                  MRNRGER                  MRNRGER LlRISON MANRGER l                              -              's                                                          3
    ,_______s                                    , _ _ _ . .__a                                                                    i 8
                                  )              3 3
{                                                                          l
:                  INDEPENDENT    8 l
i
    '              DES. REVIEW                I      I                                  RSST.OR l
8 ENGINEERS                  :                                        MRNRGER                                  I
!    I                                          i                                                                                  g
                                                          ~
i                                        l i l                                        I7                                      I i
4 i
I I-l      b          h- I i                                          i                                                                        l          1 f,  i      P DISCIPLINE          PROJECT            PROJECT                PROJECT OR              VENDOR OR                              p JOB ENGRS.        SCHEDULING        PURCHRSING        l      SUPERVISOR              SUPERVISOR
                                                                                                        )
                                                                                                                        -    NMEg g
[--i                                                l r --
4      N  S                                                    OR ENGR.
I                          FIGURE 17.1-3 i                          Amendment 7                                                          ,
j                                                                                                                              _. _
 
GIf2ba a Hill, Inc.
l QUALITY RSSURANCE DEPARTMENT ORGANIZATION CHART OR MANRGER RSSISTANT OR MANAGER PROJECT              VENDOR              SITE OR                  OR                  OR SUPERVISORS          SUPERVISORS          SUPERVISORS I
I                I 0
.                    PROJECT QR ENGINEERS VENDOR OR ENGINEERS bh l                                                    ENGINEERS        ENGINEERS QUALITY RSSURANCE ENGINEERS FIGURE 17.1 tl
 
l CRITERIA IMPLEMENTATION MATRIX G 8H QUALITY  APPENDIX 8 OF 10 CFR 50- QUALITY ASSURANCE ASSURANCE      CRITERIA FOR NUCLEAR POWER PLANTS MANUAL PROCEDURES I II 11I E Y 3ZI 3ZII 3El![ 3X I II Ill = xiv' xv 'v0xv= ="=
QAI - A          'O Q AI-BI        G Q AI- 82      9 QAI-C            9 QAI-DI            $
l                          QAI- D2          9 l                          Q AI- E                                                      G G QAI- F                                                                G GAI-G                  i  l                                            9 I
QAH-A                G      l QAI- BI          G        l QAI-82                        9 Q A X - 8 3.1                9 QAX - 8 32                    Gl Q AH - 8 4.1        $          l Q AH - B 4.2        9 Q AH -8 5            9              9 9 9 9 9 9 9 9 9 QAH - 8 6            9 QAH - 87            9 Q AE- 8 8                    9            9    9 9      9 Q AIE - C        $ G QAH -D              G l                          Q AH - E                          G QAH-F                G QAM- A                    $
Q AM - BI                          $
Q AM- 82                            9 QAM - c                  9        9 QAM - D                  G                                          G Q AM- E                            G                            G G QAM- F                              G G G G G G G G G G G QA IE-A                      G    G G G G G G G G G G G Figure 17.1-3
 
I TABLE 17.1-1 Sheet 1 of 8 GIBBS & HILL PROCEDURES FOR ESTABLISHING PROJECT QUALITY PROCEDURE NUMBER        TITLE                              PURPOSE Quality Assurance Manual To set forth the G&H Corporate procedures developed to document and control the QA activities concerned with nuclear safety-related structures, systems, and components.
PART I        GENERAL QAI-A          Glossary of Terms and              To define terms important to Definitions                        the uniform understanding of the Quality Assurance Manual Procedures.
QAI-B1        Quality Assurance                  To describe the G&H Project and Organizations                      QA organization and functions established to effectively administer, design and construct nuclear power plants.
QAI-B2        Project Staff Personnel            To establish the duties and and their Responsi-                responsabilities of G&H l
bilities                          personnel performing quality related activities during the engineering and design, procu-rement and construction phases of a nuclear project.
QAI-C          Quality Assurance                  To describe the measures by Program Description                which the G&H QA Program meets the criteria of Appendix B to 10 CFR Part 50 and to establish G&H Management involvement in the Program.
QAI-D1          Procedure for Control            To establish the methods to of Distribution and              control distribution and l
Revisions of Quality              revisions of the Quality l                      Assurance Manual                  Assurance Manual and its procedures.
l l
l
 
TABLE 17.1-1 Sheet 2 of 8 PROCEDURE NUMBER    TITLE                                  PURPOSE QAI-D2    Procedure for Indoctri-                To establish the requirements nation and Training                      for indoctrination and training of personnel performing quality-related activities and to define the methods to be followed for such indoctri-nation and training.
QAI-E    Procedure for Control                  To establish methods for of Nonconformances and                  documentation and reporting of Corrective Action                        nonconformances and to control the implementation of corrective action.
QAI-F    Procedure for Control                  To sat forth the requirements fo of QA Documents                          collection, filing, and reten-tion of QA records generated during the engineering and design, procurement and con-struction phases of a nuclear project.
QAI-G    Procedure for Perform-                  To establish a system of audits ance of Audits                          to confirm implementation of the internal G&H QA Program as well as external contractor QA l                                                    programs.
PART II  QUALITY ASSURANCE DURING ENGINEERING AND DESIGN QAII-A    Procedure for                            To define the methods for Dissemination of                        distribution and maintenance Regulatory Guides and                    of publications related to other Publications                      nuclear projects and for i                                                    confirming that they are being l                                                    received by cognizant engi-neering and design personnel responsible for there imple-mentation.
j l
l
 
TABLE 17.1-1 Sheet 3 of 8 PROCEDURE NUMBER    TITLE                    PURPOSE QAII-BI  Procedure for Prepara-    To set forth instructions'for tion of Q-List            preparation and control of the list of nuclear safety-related structures, systems and major components and to establish responsibility for originating and maintaining this list.
QAII-B2  Technical Data Input      To set forth the methods for Procedure                indentification, accumulation, documentation and maintenance of all technical inputs required for engineering and design of nuclear safety-related items generated by G&H personnel and supplied to G&H by other organizations.
QAII-B3.1 Procedure for Prepara-    To establish the procedures to tion of Technical        be followed for the control of Descriptions              preparation, review, distri-bution and maintenance to technical descriptions setting forth design bases to be followed in the design of nuclear safety-related systems and components.
1 QAII-B3.2 Procedure for Prepara-    To establish the procedures to tion of Structural        be followed for the control of Design Criteria          preparation, review, distri-bution and maintenance of structural design criteria setting forth design bases to be followed in the design of nuclear safety-related struc-tures.
 
TABLE 17.1-1 Sheet 4 of 8 PROCEDURE NUMBER            TITLE                    PURPOSE QAII-B4.1        Analyses and Calcu-      To set forth the procedures for lation Procedure - Power the control of preparation, and Energy Division      review, documentation and re-(Other than Structural tention of analyses and calcu-and Special Analysis    lations concerned with nuclear Departments              safety-related power plant
        .                                  structures, systems, and com-ponents generated by the Power Division.
QAII-B4.2        -Analyses and Calcu-      To set forth the procedures for lations Procedure -      the control of preparation, Structural and          review, documentation and Special Analysis        retention of analyses and Departments              calculations concerned with nuclear safety-related' power plant structures, systems, and components generated by the Structural Department.
QAII-B5          Specificaticn Procedure  To establish the methods to be followed for the control of.
preparation review documenta-tion and maintenance activities associated with specifications for nuclear safety-related items and services.
QAII-B6          Design Drawing          To describe the procedures for Procedure                the control of preparation, checking, review, documentation and maintenance activities l
applied to design drawings for j                                            nuclear safety-related j
structures, systems, or compo-
'                                            nents.
l l QAII-B7          Safety Analysis Report  To set forth the requirements Procedure                for control of preparation, l
l                                            review and documentation of material for inclusion in Safety Analysis Reports and amendments thereto.
l
 
TABLE 17.1                          Sheet 5 of 8 PROCEDURE NUMBER    TITLE                    PURPOSE QAII-B8  Installation and other    To establish the instructions Special Design            for the control of preparation, Documents Procedure      review, documentation and maintenance activities concerned with installation and special design requirements for nuclear safety-related items or services.
QAII-C    Interface Control        To set forth the methods to be Procedure                followed for the identification and control of engineering and design interface infor-mation and to establish the requirements for coordination among G&H engineering disci-plines and between G&H and external participating organ-izations.
QAII-D    Engineering and Design    To establish the procedures Verification Procedure    for performing and documenting independent design verification of those engineering and design documents concerned with nuclear safety-related power plant structures, systems, and components.
QAII-E    Engineering and Design    To set forth the instructions Document Control          to control the distribution Procedure                  and retention of engineering and design documents prepared by G&H.
QAII-F    Design Change Procedure  To establish the procedures for the control and documen-tation of changes to engineer-ing and design documents concerned with nuclear safety-related items.
 
TABLE 17.1-1 Sheet 6 of 8 PROCEDURE NUMBER      TITLE                                                                      PURPOSE PART III    QUALITY ASSURANCE DURING PROCUREMENT QAIII-A    Procedure for Control                                                      To set forth the requirements of Reveiw and                                                                for control of the review and Compilation of                                                              issuance to be exercised during Procurement Documents                                                        the assembly of procurement documents prior to their release.
QAIII-B1    Procedure for Prepara-                                                      To establish the procedure for tion of Qualified                                                            control of the selection and Bidders List                                                                evaluation of acceptable procurement sources for their inclusion in the Qualified Bidders List for nuclear safety-related items or services. This list is limited to those suppliers showing potential for meeting the project QA requirements.
                ~
QAIII-B2    Procedure for                                                              To define the procedures for Performance of Preaward                                                      in depth evaluation of techni-Surveys                                                                      cally acceptable suppliers or constructors QA programs, and implementation in accordance with project requirements.
QAIII-C    Bid Proposal Evaluation To define the methods to be Procedure                                                                    followed during processing of proposals received in reply to invitation to bid requests, including QA review of the contractor's QA/QC programs, and any exceptions taken to specified requirements.
1 I
i l
f l
t
 
TABLE 17.1-1.
Sheet 7 of 8 PROCEDURE NUMBER      TITLE                      PURPOSE QAIII-D    Procedure for Control      To set forth the procedures by of Vendor Submitted        which G&H controls the receipt, Documents                  internal distribution, review, documentation, filing and return to vendor of specifica-tions, drawings procedures, test reports and other perti-nent data submitted for infor-mation or comment by contrac-tors in accordance with the requirements of the procurement document.
QAIII-E    Procedure for Control      To establish the requirements and Evaluation of          for audit control and evalu-Supplier Performance      ation of supplier performance to determine adherence to his QA program, Appendix B to 10 CFR Part 50, and the procurement document during his
          -                                design, fabriation and pro-curement activities.
QAIII-F      Procedure for Sur-        Tc describe the performance of veillance of Supplier      G&H supplier shop surveillance j                Operations                activities designed to l
establish confidence that materials, components and equipment conform to the spe-cified requirements and that appropriate quality related documentation has been gener-ated.
PART IV      QUALITY ASSURANCE DURING CONSTRUCTION QAIV-A        Site Quality Assurance    To set forth the procedure for i                  Procedure                a system of site QA activities to monitor site constructors, l                                            subcontractors and suppliers i
engaged in field fabrication,
!                                            installation, erection,
!                                            inspection, testing and i                                            documentation for a nuclear I                                            power plant.
l t
l I
p-  -      - - e-  =  w
 
TABLE 17.1-1 Sheet 8 of 8 PROCEDURE NUMBER    TITLE                      PURPOSE PART V    AUTHORIZED INSPECTOR QAV-A    Interrelation with        This procedure establishes Authorized Inspector      the areas of involvement and describes the relationship between the Authorized Nuclear Inspector and G&H.
4 Ad}}

Latest revision as of 01:21, 16 February 2020

Amend 7 to QA Program.
ML20024E934
Person / Time
Site: 05000584
Issue date: 08/31/1983
From: Derienzo P
GIBBS & HILL, INC. (SUBS. OF DRAVO CORP.)
To:
Shared Package
ML20024E933 List:
References
GIBSAR-17-A, GIBSAR-17-A-A07-DRFT, GIBSAR-17-A-A7-DRFT, NUDOCS 8309070389
Download: ML20024E934 (117)


Text

.

QUALITY ASSURANCE PROGRAM 1

TOPICAL REPORT GIBSAR A l

l GIBBS & HILL INC.

ENGINEERS, DESIGNERS, CONSTRUCTORS NEW YORK, NEW YORK i Amendment 7 August 1983 l

1 09070389 830831 A R ADOCK 05000584 PDR

MANAGEMENT POLICY STATEMENT This Quality Assurance Program Topical Report establis'hes the Gibbs & Hill corporate policies, goals, objectives and references procedures to be followed by all G&H offices during the the design and engineering, procurement, fabrication and construction activities related to nuclear power projects. This program has been developed over many years of company experience in nuclear power and related work to provide confidence that the completed facility will perform in accordance with prescribed requirements in a safe and reliable manner.

The Quality Assurance Program Topical Report is applicable to Gibbs & Hill activities involving nuclear safety-related systems, structures and components as defined in Gibbs & Hill's contractual scope. It is intended that this program comply with the requirements of Appendix B to 10 CFR Part 50 " Quality Assurance Criteria for Nuclear Power Facilities," and other regulatory criteria and applicable national codes and standards as specified elsewhere in this document.

Gibbs & Hill management recognizes Quality As'surance to be an interdisciplinary function requiring the full participation of all personnel involved in a nuclear project in order to be meaningful and effective. The authority to establish and implement this G&H Quality Assurance Program is delegated by company management,,to the Quality Assurance Manager and covers i

all quality assurance and quality-related activities performed by, and for Gibbs & Hill in all G&H offices.

Procedures to satisfy the program set forth in this document have been incorporated into the G&H Quality Assurance Manual which delineates the methods to be followed in complying with the requirements of this QA Program. All employees associated with G&H nuclear projects are required to become familiar with the procedures of the Quality Assurance Manual and to conform to those procedures that are applicable to their respective assignments.

This program is subject to periodic revision and all holders will be furnished revisions and additions as they are issued. It is the responsibility of each program holder to maintain his document current.

l 1 , N l J .)

'Yr

  • CG ~

~

d P.P DeRienzo Vice President, Consulting Engineering, Quality Assurance-and New Technology l

49

-ii-l L

INTRODUCTION This topical report describes the Gibbs & Hill Quality Assurance Program and sets forth the methods to be followed in controlling quality-related activities performed by Gibbs & Hill and its contractors. This program has been developed over many years of company experience in nuclear power and related work, and defines a system found effective in providing independent control of quality-related functions and documentation.

The scope of this report covers activities involving nuclear safety-related structures, systems, and components covered by Gibbs & Hill's contractual obligation to the Utility owner for each project.

It is intended that this topical repart will be reviewed periodically, at least annually, to assess adequacy of compliance with quality assurance objectives, and that amendments will be submitted as necessary to keep current with changing regulatory requirements. The program described herein is now in effect, except for specific projects too far along to incorporate new requirements. Activities on affected nuclear projects are following the procedures outlined in this report. Modifications established in future amendments to this report will be applied to active projects at the time of cubmittal of the amendment, but will not be automatically backfitted to previously performed activities.

iii

CHAPTER 17-QUALITY ASSURANCE TABLE OF CONTENTS Section Title Page 17.1 QUALITY ASSURANCE DURING DESIGN 1 AND CONSTRUCTION 17.1.1 ORGANIZATION 1 17.1.1.1 General 1 17.1.1.2 Corporate Management Organization 2 17.1.1.3 Project Organization 6 17.1.1.4 QA Department 7 17.1.1.5 Project Operation 13 17.1.2 QUALITY ASSURANCE PROGRAM 18 17.1.3 DESIGN CONTROL 26 17.1.3.1 General 26 17.1.3.2 Performance of Work 28 17.1.3.3 Control of Engineering and Design 30 17.1.3.3.1 Preparation of Q-List 31 17.1.3.3.2 Preparation of Technical Descriptions and Structural Design Criteria 32 17.1.3.3.3 Preparation of Analyses and Calculations 33 17.1.3.3.4 Preparation of Specifications 36 17.1.3.3.5 Preparation of Design Drawings 39 iv

CHAPTER 17 QUALITY ASSURANCE TABLE OF CONTENTS (Cont'd.)

Section Title Page 17.1.3.3.6 Vendor Drawings, Specifications, and Procedures 44 17.1.3.3.7 Interface Control 45 17.1.3.3.8 Independent Design Verification 46 17.1.3.3.9 QA Reviews of Engineering and Design Documents 48 17.1.4 PROCUREMENT DOCUMENT CONTROL 51 17.1.5 INSTRUCTIONS, PROCEDURES AND DRAWINGS 53 17.1.6 DOCUMENT CONTROL 55 17.1.7 CONTROL OF PURCHASED MATERIAL, EQUIPMENT AND SERVICES 58 17.1.7.1 Evaluation and Selection of Suppliers and Constructors 58 17.1.7.2 Surveillance and Audits of Supplier Operations '60 17.1.7.3 Surveillance and Audits of Construction Site Operations 62 17.1.8 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS AND COMPONENTS 64 17.1.9 CONTROL OF SPECIAL PROCESSES 66 17.1.10 INSPECTION 68 v

CHAPTER 17 QUALITY ASSURANCE TABLE OF CONTENTS (Cont'd.)

Section Title Page 17.1.11 TEST CONTROL 72 17.1.12 CONTROL OF MEASURING AND TEST EQUIPMENT 74 17.1.13 HANDLING, STORAGE AND SHIPPING 76 17.1.14 INSPECTION, TEST AND OPERATING STATUS 78 17.1.15 NONCONEORMING MATERIALS, PARTS AND COMPONENTS 80 17.1.16 CORRECTIVE ACTION 82 17.1.17 QUALITY ASSURANCE RECORDS 86 17.1.18 AUDITS 89 Appendix A 92 l

{

l l

vi L

CHAPTER.17 QUALITY ASSURANCE LIST OF FIGURES Figure Title 17.1-1 Gibbs & Hill, Inc. Organization Chart 17.1-2 Deleted 17.1-3 Nuclear Project Organization Chart 17.1-4 Quality Assurance Department Organization Chart 17.1-5 Criteria Implementation Matrix f

I l

l vii

. - , . - . .. .. .. . ~.

t CHAPTER 17 QUALITY ASSURANCE LIST OF TABLES Table Title 17.1-1 Gibbs & Hill Procedures for Establishing Project Quality 1

I l

l l

l I

J d

viii I

17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.1.1 ORGANIZATION 17.1.1.1 General Gibbs & Hill, Inc. (G&H) provides an integrated project organization and program to administer, engineer, design and construct, or manage the construction of, as applicable, nuclear power plants. Quality Assurance (QA) personnel are assigned to each project to determine that the QA Program is effectively implemented and executed. The program establishes conformance with applicable regulatory requirements and with the design bases specified in the license application. Job functional descriptions are written for each project-level position related to quality functions, and included in the G&H Quality Assurance l Manual. The descriptions delineate the reporting functions, internal and external interfaces, and the duties and responsibilities assigned to each position.

l l

l l

l

_1 l

L

17.1.1.2 Corporate Management Organization The G&H Corporate Management Organization is shown- on Figure 17.1-1. The Vice President, Consulting Engineering, Quality Assurance and New Technology,.who is accountable to a Senior Vice President, is the G&H corporate officer directly responsible for the QA program for all G&H offices.

. Correspondingly, the QA Manager, who reports directly to the Vice President, is responsible for the QA Department and is delegated the authority to implement and administer the QA Program at all G&H offices, facilities and construction sites.

New York Office project management activities are headed by the Vice President, Power Projects who in turn reports to a Senior Vice President. Each project is assigned a project manager, who reports to the Vice President, Power Projects normally via a Manager of Projects.

New York Office engineering and design activities are headed by l

the Vice President, Power Engineering who reports to a Senior Vice President. The Manager, Mechanical Engineering; Manager, Structural, Civil and Hydro Engineering; Manager, Electrical and Control Engineering; Manager, Advanced Technology; and the 7 Manager, CADAE and Graphics report to the Vice President, Power Engineering. Each of their departments supply the technical personnel assigned to staff a particular project and work as a Amendment 7 August 1983

team under the administrative responsibility of a project manager.

The Vice President, Consulting Engineering, Quality Assurance and New Technology; the Vice President, Power Projects; and the Vice President, Power Engineering all report to the same Senior Vice President who in turn reports to the President.

The regional office is headed by a Vice President, Regional Office who reports to the President. For quality assurance related matters, however, the Vice President of the regional 7 office reports to the Senior Vice President responsible for quality assurance.

All nuclear safety-related engineering and design activities at the regic nal office are headed by the Manager, Operations who I reports to the Vice President, Regional Office. The Manager, 7

Engineering and Manager, Projects report to the Manager, Operation . Technical personnel are assigned to staff a

~

l particular project and work as a team under the administrative responsibility of a project manager. QA personnel assigned to staff a particular project are responsible to the G&H QA Manager.

1 New York Office procurement activities are headed by the Manager, Purchasing, who reports to the Manager, Project Support Services l

l who in turn reports to the Senior Vice President responsible for 7 1

procurement activities. The Manager, Purchasing is responsible Amendment 7 August 1983 l

l l

for the establishment and maintenance of a corporate list of approved bidders for nuclear safety-related items and services; coordinates preparation of'the Instruction to Bidders and Terms and Conditions sections of the procurement document; and administers all purchasing and expediting aspects related to procurement functions.

Procurement activities in the regional office are handled by a procurement group who is responsible to the Manager, Projects. 7 The Manager, Projects is responsible for coordinating with the Manager, Purchasing, New York Office to maintain the corporate list of approved bidders for nuclear safety related items. The procurement group in the regional office is responsible for 7 preparation of commercial bid documents; review and evaluation of

)id proposals; preparation of contract and purchase order documents and coordination of the expediting aspects related to procurement.

Construction activities, performed as part of a G&H project, are l

coordinated by the Manager, Construction Liaison, who reports directly to the President. For quality assurance related matters, however, this manager is accountable to the Sea.ior Vice l

President responsible for quality assurance.

The G&H QA Manager is also responsible for Quality Control (QC)

I activities such as vendor shop surveillance and construction site QC functions.

Amendment 7 l

August 1983 1

l . . _

The Vice President, Consulting Engineering, Quality Assurance and New Technology and the.other Vice Presidents engaged in nuclear safety related activities are responsible for reviewing the G&H Quality Assurance Manual in accordance with corporate policies, goals and objectives. These Vice Presidents are also responsible for performing an annual management review of their respective departments to confirm the implementation and adequacy of the G&H corporate QA Program and procedures.

4 l_

17.1.1.3 Project Organization An example of the organization of basic administrative and technical staffs for a project, responsible for carrying out all project activities to successful completion is shown on Figure 17.1-3. The interconnecting lines show the flow of responsibility and accountability for administration and technical direction, and for QA functions. At the start of a definitive' project, a project manager is appointed to establish and maintain project relations with the Utility Owner, principal suppliers -and con'structors, and to ~ direct and guide the engineering, design, procurement, and site construction functions to the extent of G&H contractual obligations to the Utility Owner, including the incorporation of the desired degree of quality in the engineering and design, procurement, and construction phases,, as applicable.

/

The project, manager's functions, with regard to quality-related activities, are in accordance with the duties prescribed in l

j detailed written procedure.s in the G&H Quality Assurance Manual.

l l

t l

l i

L

4 s

4

s n' '

(,

17.1.1.4 '

QA Department

.x

\

The QA Department performs the 'funhtions_necessary to provide 5

. confidence that all safety-related I structures, systems, and components of a nuclear power plant project conform to the design

  • Nbases and the technical specifications set forth in a Safety s  ?

s Analysis Report (SAR), Nuclear Regulatory Commission (NRC)

J Regulatory criteria, and applicable national codes and standards.

m.

$\s This department is headed by the QA Manager who is responsible

&., s y for developing and maintaining QA procedures, and for verifying 7 that they are being properly implemented, thus establishing confidence that the desired level of qualit*/ is being achieved.

The QA Department is completely separate and functions independently of those persons or groups having specific project, engineering and .s design, scheduling, or budgetary responsibilities. Independence is maintained by having the QA Manager report directly to the Vice President, Consulting Engineering, Quality Assurance and New Technology, as discussed in' subsection 17.'1.1'. 2. G&H requires that the QA Manager, as a (minimum: a. be a degreed engineer; b. have 10 or more years of engineering ^ experience; c'. have five or more years of combined

. experience in nuclear power and quality assurance activities; and

d. preferably have had responsible control of the QA program for essentially the entire engineering, design, procurement, and construction phases of at least one nuclear power plant. The s

organization of the QA Department is shown on Figure 17.1-4.

s I (

Amendment 7 August 1983

The QA Department has four main functional responsibilities:

a. to establish and approve QA and QC requirements and criteria;
b. to review engineering and design documents for procurement and construction to verify that all nuclear safety requirements have been incorporated; c. to provide surveillance of all QA activities in all G&H offices during the engineering and design, procurement, and construction phases to determine that all on-line and specified independent design verification procedures and quality control procedures have, in fact been applied to all processes-engineering, design, procurement, manufacture, fabrication, assembly, construction, erection, installation, and preparation for startup; and that all activities have been properly documented, whether at G&H facilities or at facilities of supoliers, constructors, and their subcontractors (to the extent of G&H contractual obligations to the Utility owner); and
d. to audit at regular intervals, by examination and evaluation, the objective evidence provided by documentation accumulated internally and externally in the normal course of the processes involved and during surveillance activities at G&H offices, at the supplier's facilities, and at the nuclear plant site. Audits are performed by the G&H QA Department in accordance with written procedures and checklists to verify compliance with all aspects of the G&H QA Program and to recommend, where indicated, improvements or modifications, with management followup where required, including reaudit of the deficient areas. The review

and audit functions of the QA Department are described in written procedures contained in the G&H Quality Assurance Manual.

The G&H QA Manager, assisted by the Assistant QA Manager, assigns a project QA supervisor, a project QA engineer,' vendor QA supervisor and a site QA supervisor for the project. They are responsible for reviews and audits of engineering, design, and procurement activities, and auditing site construction and QC activities, respectively. The project QA supervisor is responsible to supervise the daily activities of the project QA engineer. Further, the project QA engineer is assisted in his work by additional engineers on the QA Department staff assigned by the QA Manager, as necessary. The vendor QA supervisor is similarly assisted by additional QA representatives. The site QA supervisor is assisted by site QA engineers and site QC engineers. Audits include the review of conceptual documents involving nuclear safety-related structures, systems, and components, as necessary to demonstrate compliance with the QA Program for the particular project.

The . project QA engineer is further responsible for surveillance to determine that independent design verification of documents pertaining to nuclear safety-related items has been adequately

performed by the assigned design review engineers. The project l

QA engineer is authorized to require revision to design documents as necessary to satisfy compliance with the established design bases and regulatory requirements.

_g_

l

Engineers representing the major disciplines, and qualified by training and experience in engineering and design of similar structures, systems, and components, are assigned by their respective chief engineers to perform independent design review and verification. Design review engineers review the conceptual documents related to nuclear safety-related structures, systems, or components as necessary to determine whether they comply with the requirements of the safety-related design bases established in the project Preliminary Safety Analysis Report (PSAR).

Design verification covers G&H originated work including proper 7 use of those portions of documents prepared by others which relate to interfaces with G&H systems, structures, and components. The implementation of design verification comments is subjscted to periodic surveilla.nce and audit by the QA Department.

Surveillance activities in vendor shops are carried out by QA personnel experienced in surveillance of manufacturing and fabricating QC procedures, tests, material certifications, nondestructive examination, welding, and other specialized functions and qualified in accordance with American National Standards Institute (ANSI) N45.2.6 or SNTC-1A as appropriate for the activities being performed. When continuous surveillance is needed, a resident vendor QA representative will be stationed at Amendment 7 August 1983

the vendor's facility. Vendor surveillance is performed in accordance with checklists prepared by QA personnel. and ~ subject to approval by the. vendor QA supervisor.

A site QA supervisor assigned to the nuclear plant construction site reports to the G&H QA Manager. He establishes an onsite staff of technical personnel experienced in construction methods-and techniques and is knowledgeable in QA procedures and requirements.

C&H site QA personnel prepare QA procedures and checklists, subject to approval by the G&H QA Manager, related to the QA auditing of construction, erection, and installation of all structures and equipment important to nuclear safety throughout the. area of the facility. Based on these procedures, they audit the site QC and construction activities of the constructor to determine if compliance with the project QC and QA requirements is being achieved.

This is accomplished by random witnessing of construction and inspection activities, as well as by reviewing the constructor's QC documentation for accuracy and completeness. Where nonconformances are found to exist, the G&H site QA supervisor reports his findings to the constructor's site superintendent and requests that work be stopped or corrections made, subject to rejection of the work. When such a request is made, the G&H site l

1

{1 QA supervisor notifies the Utility Owner's site representative, the .G&H project manager and the G&H QA Manager, of the situation and advises them of his recommendation for work. stoppage.

l 9

4 9

17.1.1.5- Project Operation The G&H project' manager- is appointed to direct and guide all activities (except those delegated to the QA Manager) of the various phases of the project under the contractual obligations of G&H to the Utility owner. As such, he is responsible for overseeing the direct implementation of those QA procedures applicable to the work of the project staff. He receives technical support from specific engineering, design and construction staffs which are assigned to the project. The project manager is in direct communication with the project QA supervisor, and with pertinent-QA personnel on his project as described in subsection 17.1.1.3 and as depicted in Figure 17.1-3.

The project managet deals directly with the Utility owner, j suppliers and constructors, and has the authority to stop work on engineering and design activities performed by G&H as well as authority to reject delivery of nonconforming structures, I systems, or components as identified by QA surveillance activities. Surveillance is conducted by QA personnel in accordance with the G&H Quality Assurance Manual, using vendor surveillance checklists to ascertain that the supplier's manufacturing, inspection, testing and documentation activities are effectively implemented. In addition, a QA Release Form is l used to record the final surveillance and review of documentation to verify that the equipment is in conformance with the l

l l l

l 1 -- - - . - - - - ______ _ .

I i

procurement document and that there are no unresolved l l

l nonconformances or deviations. No equipment can be shipped by a )

supplier until a GGH QA Release Form is complete and signed by a G&H QA representative. I l

The engineering staffs receive their authority from the discipline job engineers who are, in turn, responsible to the l discipline chief engineers and to the project manager. The design staffs receive their authority from the discipline squad I leaders who are, in turn, responsible to the job engineers of the 7 pertinent disciplines. The engineering and design staffs identify quality requirements applicable to nuclear safety-related structures, systems, and components, from sources such as the Regulatory Guides and applicable codes and standards, and incorportte them in the project design documents.

Furthermore, they take adequate measures to ascertain that both internal and external interfaces are properly identified, so that all parties affected are duly notified to enable them to properly coordinate their work. The assigned job engineers also consider quality requirements when they review the work of their staffs to preclude nonconformances, or to identify them when they occur and institute corrective action, with a further review to ascertain that the corrective action has been taken.

The site construction staff is functionally responsible to the Amendment 7 August 1983

project manager for project related activities and to the Manager, Construction Liaison for technical and administrative.

control. (See Figure 17.1-3)

The project,QA supervisor maintains close contact with the project manager to coordinate QA activities with the progress of the project. The project-QA supervisor oversees the project QA engineer and the site QA supervisor assigned to the project. The project QA engineer identifies quality-related problems, initiates or recommends solutions, and verifien implementation of corrective measures. Corrective action is requested as a result of QA audits or reviews. During the course of an audit or review all nonconformances found are identified to applicable instructions, procedures, regulatory criteria, codes or standards and tre recorded on an audit report or QA Document Review Record Sheet. A copy of the audit report or QA Document Review- Record Sheet is issued to the project manager and the applicable discipline / department, with instructions to provide a corrective action reply to the audit report or revise the applicable document to incorporate the comments noted on the Q, Document Review Record Sheet and return it to the QA Department within a specified time limit. Where corrective action is not campleted or is inadequate, the QA Manager has the authority to require the project manager to exercise his stop work or reject authority as previously described. Where disagreement as to corrective action cannot be resolved between QA and other department personnel

within a project, the QA Manager will consult with- the appropriate discipline chief engineer / department manager to establish appropriate corrective action.

Should resolution not occur at this level, the QA Manager will bring the matter to the attention of the responsible Vice President for action. If resolution acceptable to QA is not reached at this level of management, the problem is taken to the Vice President, Consulting Engineering, QA, and New Technology who interfaces with the responsible Vice President and ultimately to the Senior Vice President responsible for QA who makes the final decision for the corporation.

The G&H site QA supervisor performs surveillances and audits of quality-related activities of the construction manager, the constructors, and their subcontractors at the site, to identify problem areas, recommend solutions, and verify corrective action.

Stop work authority at the construction site would be exercised through the appropriate Utility Owner's representative who has the authority to require work stoppage on a timely basis.

Additional follow-up surveillance will be performed to verify that the nonconforming activity has been halted. This authority could be delegated to the G&H site QA supervisor in accordance with project contractual scope.

The project QA engineer's and the site QA supervisor's duties and responsibilities are described in subsection 17.1.1.4. Detailed

.- l job- function descriptions are provided in the G&H Quality Assurance Manual. (They are guided in the performance of their functions .by written procedures contained - in the G&H Quality Assurance Manual.)

e w 17.1.2 QA PROGRAM G&H has an established QA Program to be followed by all G&H offices for the management, engineering and design, procurement and. construction phases of its work on nuclear power plant projects, based on extensive experience in the -engineering, design, procurement, and construction of similar nuclear and conventional power-generating facilities. This program delineates the organization, functions, responsibilities, and procedures in effect for nuclear power plant projects within G&H, as defined by contractual obligations to the Utility Owner, and is intended to comply with the criteria specified in Appendix B to 10 CFR Part 50. The program is further designed to comply with the supplementary requirements of the American National Standards Institute (ANSI) N45.2 series standards as well as the NRC Regulatory Guides applicable to quality requirements as t

L referenced in Appendix A of this document subject to contractual obligations with the Utility Owner. This program covers all l

those nuclear safety-related structures, systems, and components included in the PSAR submitted for a specific project and identified as Seismic Category I, in accordance with USNRC Regulatory Guide 1.29, or Class 1, 2 or 3, in accordance with i

ANSI N18.2 corresponding to quality groups A, B or C of USNRC l Regulatory Guide 1.26.

l The procedures established to meet the requirements of the G&H

! QA Program and the NRC Regulatory Guide 1.70.6 are set forth in l

l l

the G&H Quality Assurance Manual. For the control of quality-related project activities the Management Policy Statement which prefaces the Manual mandates the application of the approved Manual procedures to all nuclear projects.

Figure 17.1-5 is a matrix showing the interrelations of the QA Manual procedures with the 18 criteria of Appendix B to 10 CFR Part 50. The arrangement of this manual and its various sections, with a listing of individual procedures, is outlined in Table 17.1-1. Procedure for Control of Distribution and Revisions of the Quality Assurance Manual, QAI-D1 of the G&H Quality Assurance Manual establishes those management persons responsible for generating and reviewing changes for updating and improving the QA Program procedures. Requests for proposed a

changes to the G&H Quality Assurance Manual must be approved by the chief engineer / department manager of the involved discipline / department and the QA Manager. When the proposed draft text of the change is completed it must then be approved by the following management personnel:

a. QA Manager
b. Manager, Project Support Services (procurement related 7 procedures)
c. Vice President, Power Projects
d. Vice President, Power Engineering Amendment 7 August 1983
e. Vice President of the. regional office-
f. Vice President, Consulting Engineering, QA and New Technology
g. Manager, Construction Liaison (construction-related procedures)
h. Senior Vice President responsible for QA The QA Department is responsible for the distribution and accountability of the Quality Assurance Manual. The QA Department prepares, issues and maintains a Quality Assurance Manual Holder's List that identifies by name and book number those personnel, both internal and external, who have received copies of the manual. Initial issuance of Quality Assurance Manuals, as well as additions or revisions to the manual are accomplished by use of a cover me.no which requires the recipient to sign the acknowledgement section of the cover memo and return it to the QA Department to document their receipt of the manual or revisions.

The G&H QA Program is available prior to the initiation of any nuclear safety-related activity which the Utility Owner may require for submittal of his application for a construction permit. The QA procedures of this program have been reviewed and accepted by responsible management personnel which assures their timely implementation with the commencement of any nuclear safety-related activity, by properly trained and qualified Amendment 7 August 1983

engineering, design, and administrative personnel. To further satisfy this requirement the G&H QA Manager assigns a project QA supervisor and a project QA engineer at the start of a project to ascertain that the Quality Assurance Manual procedures are being implemented from the onset of any work on activities involving nuclear safety-related structures, systems, and components.

The written procedures specified in the Quality Assurance Manual are designed to demonstrate that the requirements stated in a project SAR are fully complied with and integrated in the engineering and design, procurement, and construction phases.

The personnel engaged in the QA functions of surveillance and auditing the implementation and documentation of these procedures are appropriately trained, and experienced in performing their functions. Furthermore, the progran is reviewed periodically by G&H Management in accordance with the requirements of the Quality Assurance Manual to ascertain the effectiveness in complying with the criteria of Appendix B to 10 CFR Part 50, and applicable Regulatory Guides.

Engineering and design activities affecting the quality of nuclear safety-related structures, systems, and components, as identified in the Q-List of the Utility Owner's PSAR, are subject to independent design verification as detailed in the G&H Quality Assurance Manual.

Also those Regulatory Guides applicable to a nuclear project will l

l

1 be referenced in the Utility Owner's PSAR. These, and Regulatory Guides issued subsequently during the design phase _of the project, which have been reviewed in accordance with the written procedures of the G&H Quality Assurance Manual and- judged applicable to the project, will be incorporated in the engineering and design activities. Control of the implementation of these Regulatory Guide requirements, or acceptable alternatives, will be subject to engineering and design verification and QA surveillance activities as described in subsection 17.1.3 of this Chapter.

G&H also has a continuing program to maintain an awareness of the capability of potential suppliers of nuclear safety-related items to meet the requirements of Appendix B to 10 CFR Part 50. A list of potentially qualified bidders is established in accordance with the requirements of the G&H Quality Assurance Manual and established procedures of the G&H Purchasing Department.

This qualification of potential suppliers is subject to review and acceptance by QA Department personnel in accordance with the procedures of. the GGH Quality Assurance Manual. G&H requires that suppliers and constructors have established QA Programs and procedures which set forth their organization and program in accordance with Appendix B to 10 CFR Part 50, and establish the adequacy of their identification measures, their testing and inspection activities with suitable instrumentation and equipment, and their documentation.

G&H requires for its work,-and will require from contractors and subcontractors, the development and maintenance of documents and records in accordance with the guidelines prescribed in ANSI N45.2.9, and delineated in the G&H Quality Assurance Manual procedures. ,Further requirements will be imposed on suppliers and constructors to develop and implement adequate procedures for tagging and identifying structures, systems, and components, as discussed in subsequent subsections of this chapter. Transfer of such records under the jurisdiction of G&H will conform to the procedures established by the Utility Owner in his QA Program.

Such records will include, as a minimum: a. material certification and test data for traceability and quality verification; b. reports of inspection, examinations, and test results for verification of conformance; c. drawings, specifications, procedures, and instructions for use in control j of configuration; and d. records of deviations and their resolutions.

I Personnel engaged in QA activities are indoctrinated or trained as necessary to responsibly perform functions as required by the procedures of the G&H Quality Assurance Manual. QA Seminars initiated by the QA Manager are designed to provide instruction in the understanding of the QA Program requirements and implementing the Quality Assurance Manual procedures. Seminars are presented as necessitated by the number of new hires or transfers into the area of nuclear responsibility and are l

mandatory for all designers, engineers and project personnel having responsible input to a nuclear power plant. In addition, when major changes to the Quality Assurance Manual are issued, new QA Seminars are scheduled to indoctrinate personnel engaged in QA activities as to the new requirements of the manual procedures. Specialized indoctrination courses in specific areas of nuclear and structural engineering and design are also provided to familiarize new personnel with the requirements peculiar to the development of a nuclear power plant and related quality requirements. Responsibility for the development and implementation of these specialized indoctrination courses rests with the appropriate divisional management. These programs are documented as to general course content, length, and schedule of

the course and records of attendance are maintained for the QA indoctrination sessions. The QA Depart.nent has the independence and authority necessary to determine the effectiveness of this indoctrination and training program. The indoctrination and training program is implemented by G&H management personnel in accordance with the written procedures in the G&H Quality Assurance Manual. QA Department personnel indoctrination and training program is organized and implemented by the QA Manager for all new QA personnel, to establish an understanding of the duties and responsibilities of the G&H Quality Assurance Program and Manual. This indoctrination and training program establishes familiarity with Appendix B to 10 CFR Part 50, appropriate NRC criteria, ANSI Standards, industry codes and standards and the methods for performing audits and reviews of design and engineering, procurement, project administration, site and supplier shop activities. The program is also designed to develop understanding, knowledge and implementation ~of the G&H Quality Assurance Program and Manual aims and objectives; to l

establish that all QA personnel are at an adequate level. of proficiency for performing their assigned duties and responsibilities; and that this level of proficiency is i 1

l maintained by retraining as required.

1 The G&H QA Program is subject to review and audit for the )

adequacy of implementation by the Utility owner, for whom it is l

l being applied, in-accordance with the requirements of the Utility 1 Owner's QA Program defined in his PSAR submittal. j l

17.1.3 DESIGN CONTROL 17.1.3.1 General G&H has formulated control procedures for the engineering and design of all nuclear projects. These procedures are intended to attain high levels of quality commensurate with the importance of the safety functions to be performed by the structures, systems, and components. The engineering and design control procedures are applied to activities such as: reactor physics, stress, thermal, hydraulic, radiation, and accident analyses; determination of materials compatibility; provision of accessibility for inservice inspection, operation, maintenance and repair; and delineation of acceptance criteria for inspections and tests. These procedures are used in the preparation of technical descriptions; structural design criteria; analysis and calculations; specification and drawings; engineering check of vendor equipment drawings; and for the independent design verification of engineering and design documents. Design documents that are changed or corrected, for I whatever reason, are subject to the same procedures as the I

original issue.

j Interface requirements of the foregoing, among participating l

groups, are also controlled by the pertinent procedures of the G&H Quality Assurance Manual. Control for the distribution of G&H engineering and design documents is described in l

f

subsection 17.1.6. ,

i i

f f

17.1.3.2 Performs.nce of Work

  • The work performed by G&H is, where applicable, governed or guided by established and recognized codes, standards, and criteria. Regulatory requirements defining the mandatory criteria and other conditions for acceptance of a project or parts thereof set forth by public authorities having jurisdictions in the area of such facilities will be referenced or stated in other chapters of the pertinent Utility owner's PSAR. In addition to these statutory documents, other widely accepted industry standards are used as guidelines for performing engineering and design for nuclear power generating stations.

The determination of applicable NBC Regulatory Guides, codes, and standards is the responsibility of the discipline chief engineers in accordance with the Quality Assurance Manual procedures. The Chief Nuclear Engineer is delegated the responsibility of obtaining copies of the pertinent documents and for their distribution within G&H.

l At the start of a project, the Project Manager undertakes the l

compilation, editing and issuance of a Project Guide for which he is responsible. The Project Guide is prepared primarily for in-house use and contains in a single document, both the administrative guidelines and reporting instructions required for the execution of G&H work. It gives all personnel assigned to the project an overall understanding of the total project, the

e Utility Owner, and the detailed scope of work. It may also include brief descriptions of salient technical feature and QA requirements,.although the applicable PSAR is referenced for definitive technical details.

The G&H engineering and design activities are subject to periodic audits by the QA Department in accordance with the G&H Quality Assurance Manual.

f l

l

17.1.3.3 Control of Engineering and Design The Quality Assurance Manual outlines the control of activities followed to develop the high quality of engineering and design required for nuclear projects. Any deviations or changes to these procedures are subject to review and control of the QA Department. ' Job engineers, and design squad leaders have the 7 responsibility for implementation of the requirements of applicable NRC documents and ANSI Codes and Standards in activitites under their jurisdiction. Design Review Engineers are further responsible, during performance of independent design verification to determine that applicable information, guidelines, or directives have been in fact, incorporated into engineering and design documents as required.

l l

Amendment 7 August 1983

17.1.3.3.1 Preparation of Q-List A- Q-List is prepared to identify and classify structures, systems, and components of the nuclear power plant required to ,

perform safety-related functions. This list identifies those items which require consideration by the G&H QA Program with regard to design,- procurement, fabrication, and installation.

Criteria for the selection of items that shall be considered safety-related, and the safety class to be used are defined in Section 50.55a, Codes and Standards of 10 CFR Part 50, in NRC Regulatory Guide 1.26, Quality Group Classifications and Standards for Water, Steam, and Radioactive-waste-containing Components of Nuclear Plants and in NRC Regr.latory Guide 1.29, Seismic Design Classification. These documents are supplemented by ANSI N18.2, Nuclear Safety Criteria for the Design of Stationary Pressurized Water Reactor Plants; and ANS-22N-212, Nu: lear Safety Criteria for the Design of Stationary Boiling Water Reactor Plants. Q-Lists are prepared, and are subject to i

independent design verification, in accordance with the written l

procedures of the G&H Quality Assurance Manual.

l l

17.1.3.3.2 Preparation of Technical Descriptions and Structural Design Criteria Technical descriptions and structural design criteria. are prepared to provide-relevant technical information required for the preparation of G&H engineering and design documents for nuclear safety-related systems and components, and Seismic Category I structures. These documents are prepared, and are subject to independent design verification, in accordance with the written procedures of the G&H Quality Assurance Manual.

The original technical descriptions and structural design criteria are developed based on the scope of G&H responsibilities as delineated in the Project Guide and commitments made in the Utility Owner's PSAR. Periodic revisions to technical descriptions and structural design criteria are made when necessitated by engineering design changes or subsequent development of more detailed information. These revisions are I

subject to the same reviews as the original document. These documents are therefore, available to engineering and design personnel to assist them in performing their activities in accordance with the Utility Owner's PSAR.

.r-U q , u.

,. x

~,. - - -

17.1.3.3.3 Preparation of Analyses _and Calculations a .

Analyses and calculations are required.for establishing detailed engineering and design features, results of which 'will be incorporated in specifications, ~ drawings' and other documents. 4 The analyses and calculations are made- by engineers' under the p-direction of the discipline job engineers (nuclear, nochanical, -

- >, f .

~ '

r electrical) of a specific project. In the case o f. structural r discipline, calculations are made by an engineer, directed by 's

j. either the design squad leader or, in special' cases, byg the job engineer. The engineers-are experienced in this work and in the

. use of modern techniques and tools (such as computer programs).

They are familiar with applicable Regulatory Guides, codes and standards, and recognized acceptable practices; have direct access to higher levels of their own, or other disciplines up to i the chief discipline engineer for consultation and guidance; and follow the procedures set forth in the G&H Quality Assurance ,

p Manual. These procedures are briefly outlined below: /

j a. Analysis and calculation work is identified by subject, I i

sequentially numbered, and entered in a master index -.

maintained by the job engineer. Standard calculation sheets ~' '

are used and the engineer assigned to perform the computations identifies each sheet, dates it, and initials it sus the originator. Basic conditions, parameters, and l

l assumptions are stated and the sources identified as applicable. References to pertinent studies, formulas,

- ~ -

t' ,

.l, -

t m s . .

w --'; x 7 .

\ ~ x;*

s w

and previous calculations, .

  • cedes ~~and  ;

standards, other information relatsd to thelwork Ire listed. i When a computer p -

1 is used to perform computations, this. fact is noted and all.

sheets are properlyJidentified.- When diagrams, curves, or other_ such inputs are prepared on different forms, they are similarly identified and added to the' calculation file and maintained in apprcipriate binders in an orderly manner by the

~

discipline job engineer.

I J b. Calculations for the nuclear, mechanical, analytical and electrical work are checked by the corresponding discipline job enginner or an engineer, other than the originator,

,' . assigned by the job engineer who indicates his acceptance by

, :t

[ ,

, initialing the first page of the particular set of

, .ca'i cdlations. For the structural work, all calculations are checked as,part of the design drawing checking process. Each sheet is ini tiale,d by the individual performing the computation anb by the individual who checks it. The i

structural job engineer reviews and approves the result and

[ indidates h'is acceptance also by initialing the cover sheet l

of the' calculation set when the associated design drawing is

?

['

L < op' proved. For all disciplines, when a computer program is l

s used, the computer input and final data are checked by either the-job en,qineer or an engineer assigned by the job engineer.

f Approval is by the job engineer who indicates acceptance by 34-

, ,y-,.--.m . , -

.w9._ _e . . . ,,- +9----,7--- , , . , , - - ,+ mis , - - .

3 initialing the first- pages of the particular set. 'For the structural work,.this approval-is made when the' associated-design drawing is approved. .

Engineering analyses and calculations are subject to independent design verification by a design review. engineer in the e s -  !

appropriate discipline (nucijar, mechanical,- electrical,.

. .)

structural), qualified by training and experie'nce in the

_perfcrmance of similar calculations in accordance . with the procedures of the. G&H Quality fAssurance Manual. Review of calculations' is' performed in accordance with a written checklist s

s s ,

and considers accuracy; completeness; addquacy :o'f input and assumptions; appropriateness of methods; re4sonableness of results; and conformance with codes, standards, and regulatory criteria and guides. The calculations are initialed and dated by" the reviewer when he concurs with the results. The calculation s t x sheets ,are maintained and filed in accordance with the written x 's procedures. of the G&H Quality Assurance Manual.

When calculations are modified to reflect changes in design bases, thi s . . f act is recorded on the calculation sheet with

the changas, New calculations are performed and the details of s

' sheets attached to the original work, or entire new work sheets i

- are prepared and placed in theLfiles. New work is reviewed, 3 checked, and approved in the same manner as the original work.

The superseded work is so identified or destroyed as requirements i

may dictate.

s

~

h y

17.1.3.3.4 Preparation of Specifications Specifications are prepared by G&H for the procurement of items (such as equipment, materials,_ systems) and services within the contract scope. It is the purpose of QA to determine that items and services meet the functional requirements and the high level of quality which are essential and mandatory for the items and 4

r.ervices involved in nuclear safety-related functions, as defined in 10 CFR Part 50 ac.d the Regulatory Guides. This applies whether the items for nuclear safety-related functions of struc ture s., systems, and components are specialJy engineered and manufactured for a specific plant, or are standard commercial types, preengineered or previously approved and successfully used items for the given application. The G&H Quality Assurance Manual cove: s the steps to be followed from the origination of the specification to its issue as an official document, tailored to each particular project.

Specifications are prepared by assigned cognizant engineers with knowledge and experience of the functional and material requirements of the item covered, commensurate with the importance of the given item, and familiar with applicable NRC regulatory requirements; special safety requirements, codes and standards; as well as the level of quality desired for design, materials, workmanship, and appropriate acceptance criteria.

The cognizant engineer prepares, initials, and dates the

Specification Review-Record Form and submits it with the specification to the responsible discipline job engineer, as well 7

as the discipline chief engineer, or-group supervisor, who review the specification for technical accuracy, completeness, conformance with applicable regulations and overall acceptability. These reviewers also initial and date the record sheet to indicate their review.

Epecifications are also reviewed by engineers of applicable associated disciplines, and QA for interfacing with related systems and design requirements, as well as by a construction services engineer, for any feature bearing on the installation of the equipment or other construction aspects. All these reviewers initial the record sheet as supporting discipline. The QA engin<er review of specifications is performed to check that all the requirements for achieving the desired level of quality are defined as outlined in subsection 17.1.3.3.9.

(

Specifications are subject to a mandatory independent design verification by a design review engineer qualified in the appropriate discipline through training and experience on other nuclear projects in accordance with the procedures of the G&H Quality Assurance Manual. Verification of specifications is performed in accordance with written checklists for completeness; adequacy of inputs; incorporation of the requirements of applicable codes, standards and regulatory criteria; material Amendment 7 l August 1983 l

l l

1

compatibility; inclusion of appropriate quality requirements; and suitability of the equipment for the application. The reviewer prepares and initials a record sheet to document his comments, acceptance, or both. The design review records are filed in accordance with the G&H Quality Assurance Manual procedures.

The specifications are then reviewed by the project manager for compliance with the overall project requirements and special conditionc. He also reviews the Specification Review - Record Form to check that all appropriate signatures have been affixed.

When he is satisfied that it complies, he also initials the record form te indicate his spproval and its readiness for the client's approval and for procurement as required. 7 When specifications are revised to reflect changes in design, the identical procecs is followed as for the preparation of the original specification.

Amendment 7 August 1983 l

l 1

- .~,- -- _.

17.1.3.3.5 Preparation of Design Drawings Power plant design drawings are required for the procurement of equipment and materials, and for the construction of the plant.

These drawings are an important means for giving instructions to fabricators for assembling materials and parts into components, and to the field for building the structures, and for installing and erecting the equipment and accessory items. The drawings are required to be cor.plete and accurate and are, therefore, subject to review and checks. The G&H Quality Assurance Manual contains procedures for the production and control of design drawings, briefly ru.nmarized below.

a. Power plant design drawings are prepared by design personnel under the direction and supervision of an experienced squad leader of the applicable discipline. The squad leader, assigned to the project by the discipline group supervisor, 7 has the full responsibility for producing documents that are i

complete and accurate, that incorporate the concepts developed and approved during the engineering of the project,

! and that conform to NRC regulatory requirements for nuclear safety-related structures, systems, and components.

b. The job engineer guides the design activities by supplying the squad leader with the necessary design base documents,
such as technical descriptions and structural design l .

criteria, the PSAR/FSAR, specifications, and other related 7 Amendment 7 l August'1983 t

design information. The squad leader then instructs the designers who perform the work to familiarize them with the engineering intent, the types of equipment to be installed, the applicable codes and standards, NRC regulations, the selection of materials, the modes of control and operation, and the design philosophy to be followed.

c. When preliminary design .is completed a print is routed to associated discipline squad lenders and job engineera for their review with regard to the extent that the design shown thereen may affect their own work, This is intended to eliminate interferences and.inconsistencios, and achieve the intradiscipline interfecing er:.sential to system design. If a revision is required to accommodate their own design, they consult the originating squad leader and job engineer and work out changes acceptable to each party. If the drawing is

! satisfactory, or when agreed-to modifications are incorporated, the drawing is completed and the preparer initials it.

d. Following the preceding step, a drawing check is performed by checkers. In some disciplines a group of specialized checkers has been set up to perform this function, and they 1

operate independently of the basic design squad. The drawings are checked generally for:

s

1) Completeness
2) Accuracy of dimensioning
3) Correctness of information and design data
4) Adherence to design concepts established in the several
design documents
5) Correctness of layout, adequate headroom and passageway clearances, freedor. from interferencea
e. Following his review for incorporation of any ccmments the checker signifies his acceptancs by initialing the drawing.

The drawing is then submitted to the job engineer to be revieweu for compliance with design criteria, supporting

( calculations, specification, codes and standards, NRC l

Regulatory Guides, and overall accuracy and acceptability.

The job engineer when satisfied also initials the drawing.

Similarly, the job engineers of the associated disciplines review pertinent drawings with emphasis on consistency and compatibility with related systems and design requirements.

1 On acceptance, they also initial the drawings.

l f. The original issue of detail design drawings to be released for use outside G&H is reviewed, approved, and initialed by the responsible discipline job engineer. Furthermore, these 7 1

1 Amendment 7 l

August 1983

drawings are reviewed and initialed by the job engineers of other disciplines whenever they include information affecting the work being performed by these other disciplines.

Subsequent issues only require the review and approval of the responsible job engineer, and the applicable discipline job engineer whose work is affected by the revisions. .

On completion and prior to issuance for construction or fabricacion, drawings are subjected to independent design verificaticn by a design review engineer in accordance with the procedures of the G&H Quality Assurance Manucl< This verification is performed in accordance with written checklists and emphasizes the following: completeness; acc uracy of dimensioning end detail; conformance Mo design concepts; regu:.atory requirement-including quality requirements; applicable codes and standards; accessiblity of maintenance; and inservice inspection and repair. The reviewer prepares and initials a record sheet to document his comments, acceptance, or both. The design verification records are filed in accordance with written l

procedures of the G&H Quality Assurance Manual.

When drawings are modified to reflect changes in the design it is the responsibility of the designer or engineer making the changes to review referenced drawings and specifications to determine if

! they are affected by the changes.

I l

l The preceding procedures are applicable to the original issue, as i

l l

well as to all subsequent revised issues of each document which incorporate all design changes originating in the G&H engineering office. Similarly, within the G&H scope, all major field changes are reviewed, documented, and are reflected in record drawings which are subject to the same drawing controls and reviews as previous'y outlined.

When a drawing is ready to be released for use outside G&H as an original iseue, and has been fully and correctly signed by all rer,ponsible engineering and design personnel, the drawing is passed to the project manager, The project mana'ger is responsible for reviewing the drawing for conpliance with overall  :

project requirements and special conditions. If the project manager is satisfied that the drawing may be issued, he initials the drawing. Fa drawings are released from the company unless initialed by the project manager. All subsequent revisions of the drawing will also requira the approval and initials of the project manager.

l l

l

17.1.3.3.6 Vendor Drawings, Specifications, and Procedures Review of vendor drawings, specifications, and procedures received from a supplier are recorded with pertinent identification, data, and date of receipt. Documents are routed through the cognizant engineering and design discipline personnel (nuclear, mechanical, electrical, structural) in accordance with procedures of the GEH Quality Assurance Manual, to check for compliance with G&h des $gn drawings and specifications. Each squad leader and job engineer, as .2ppl; cable, initials and dates the appropriate action required (e.g., approved, returneu for correction) on the office copy routing form. The project manager reviews the documents to ascertain the action required and to determine whether comments from engineering and design (if any) are pertinent and in compliance vith contractual requirements.

Documents are then returned to the vendor with appropriate instructions for required action.

17.1.3.3.7 Interface Control-Internal and external interface requirements are defined prior to the start of detail engineering and design of a system or structure based on contractual obligations to the Utility Owner.

Discipline job engineers prepare a list of required internal and external interface inputs to complete the engineering and design effort in accordance with the G&H Quality Assurance Manual procedures. Interf1ce inputs received are identified and examined for completeness and applicability. (Is data certified for final design or is it preliminary information?) Discipline job engineers record internal and external interface requirements on Design Data Input Forms and maintain these forms active until all the required interfact information is received for final design of the appropriate structure or syster.

17.1.3.3.8 Independent Design Verification Independent design verification activities concerning nuclear safety-related structures, systems, and components are performed by designated design review- engineers in accordance with the procedures of the G&H Quality Assurance Manual. Independent design verification is performed by use of the following methods:

a Design Reviews-to verify that all nuclear safety-related engineering and design docu. Tents are in accordance with safety documents, codes, standards or other requiresuents of the project.

The results of design reviews are documented and measures taken to denonstrate that the findings are implemented; b. Alternate Calculations-by use of simplified alternate methods of calculation or analysis to ascertain the correctness of the original calculation. The results are documented and measures taken to demonstrate that the findings are implemented; and c.

Qualification Testing-is not normally used as a verification method by G&H for its own design activities, although this method l

may be imposed on equipment suppliers for verification of seismic analysis as specified by the G&H procurement document.

Surveillance is performed by QA Personnel in accordance with the G&H Quality Assurance Manual to verify that the item has satisfactorily met the seismic criteria. This verification process is applied to technical descriptions, structural design criteria, analyses and calculations, specifications, drawings, Q-List, technical SAR text, and amendments in accordance with l

[

l

- - - _ . . . - - . - _ - . _ , , . . . - . - _ . , - . . . , - . . , . , , , - - . _ . - , . z--- ...,,.--,-,,m.y ._y , _ - - -

3 -..

written' checklists to determine compliance with safety-related design bases, QA requirements, applicable codes, standards,. and NRC regulatory criteria.

Design review engineers are appointed by and are undar the direction of and responsibility of the pertinent discipline chief engineers subject to approval by the QA Manager. These engineers are responsible for the independent design verification of nuclear safety-related documents developed within their discipline for specific projects. Thece individuals are not involved in the original design being verified nor is their design verification function subject to budgetary or schedular prescures.

l

  • I

17.1.3.3.9 QA Reviews of Engineering and Design Documents Review activities are carried out by QA engineers under the direction and responsibility of the QA Manager and the project QA supervisor in accordance with the procedures of the G&H Quality Assurance Manual to ascertain that engineering and design activities of nuclear plant safety-related structures, systems, and components are performed in accordance with the NRC QA regulatory requirements. Calculations and drawings are selectively reviewed during audits to check compliance with the QA requirements established for the project. The project manager and the applicable engineering discipline chief, as well as appropriate higher management personnel, are notified by the QA Department of any apparent design deficiencies, so that corrective measures can be undertaken and necessary followup instituted to determine if proper action has been accomplished.

On acceptance. of a document (drawing or calculation), the QA engineer signifies his approval by preparing a QA Document Review Record Sheet. Should corrections be required, comments are noted on the record sheet and transmitted to the job engineer for action. QA engineers maintain documented evidence of the results ,

of these reviews and responses in accordance with the procedures of the G&H Quality Assurance Manual.

All technical specification sections of the procurement document concerning nuclear safety-related items are reviewed by QA engineer to determine that they contain as appropriate:

a. Applicable design bases, technical requirements, regulatory F

requirements, component and material identification, drawings, referenced specificaticns, codes and industry standards, tests and inspections requirements, and special process instructions for such activities as fabrication, cleaning, erection, packaging, handling, shipping, storage, and inspection

b. Requirements that identify the documentation to be prepared, maintained, submitted, and made available to the purchaser for review and comment, such as drawings, specifications, procedures, inspection and fabrication plans, inspection and test records, personnel and procedure qualifications, and chemical and physical test results on materials
c. Requirements for the retention, control, and maintenance of l documents and quality assurance activities records which are to be delivered to the purchaser prior to use or installation l

of the item.

On acceptance of a document (including procurement technical specifications and referenced drawings), the QA engineer signifies his approval by signing the Specification Review Record Form. The original Specification Review Record Form documenting

i the results of these reviews are maintained in accordance with written procedures of the G&H Quality Assurance Manual.

i' I

I a

l l

17.1.4 PROCUREMENT DOCUMENT CONTROL The specifications and' referenced drawings produced by G&H for a project, supplemented by referenced codes, and standards, and applicable NRC Regulatory Guides, are the basic sources of technical requirements contained in the nuclear safety-related procurement documents prepared by G&H for the purchase of items or services. The G&H Procurement Document is composed of three sections: a. Instructions to Sidder; b. Terms and Conditions; and

c. Technical Specifications and referenced drawings. These specifications and drawings are subject to technical and administrative reviews and controls as described in subsection 17.1.3. The control measures to be applied to these specifications and drawings, which require that applicable regulatory requirements, design bases, inspaction, testing, acceptance criteria, and appropriate documentation be addressed, are contained in written procedures 'of the G&H Quality Assurance Manual.

The specification section (including referenced drawings) of the procurement document is subject to review by a QA engineer, prior to its release, as described in subsection 17.1.3.3.9, to determine that all quality requirements are correctly stated and that necessary inspection, testing, and control requirements, l

including acceptance and rejection criteria, are called out. The documentation is available for audit.

i I

l l

! l l

Procurement documents involving items and services for nuclear safety-related structures, systems, or components require suppliers or constructors to establish QA/QC Programs which satisfy the requirements of Appendix B to 10 CFR Part 50 and appropriate ANSI N45.2 series standards.

The procurement documents further require that the purchaser or his designated representative have access to tha suppliers facilities and defines the QA documentation to be generated and submitted to the purchaser in accordance with the procedures of the G&H Quality Assurance Manual.

Changes or revisions to technical requirements of the procurement documents are subject to the same review and control procedures as the original procurement documents.

17.1.5 INSTRUCTIONS, PROCEDURES-AND DRAWINGS Instructions, procedures, drawings, and specifications are used, as applicable, by technical and administrative personnel for various phases of the design and procurement activities of nuclear plants and are consistent with the level of quality required to produce a safe and reliable operating plant. Written procedures for preparation and control of these technical documents are contained in the G&H Quality Assurance Manual, referenced in Table 17.1-1, and are intended to establish the activities necessary to conform to tne requirements of Appendix B to 10 CFR Part 50. It is the responsibility of the project manager and his staff to determine that instructions and procedures are being implemented and adhered to. The QA Manager and his staff will perform reviews and audits to determine if the Project is in compliance with the QA requirements and initiate corrective action when nonconformances are discovered.

Quantitative acceptance criteria (such as dimensions, tolerances, i

and operating limits) and qualitative acceptance criteria (such as workmanship samples, welding and radiographic standards) for activities affecting quality are included in G&H drawings, specifications, and in the applicable codes and standards referenced in the specifications. To confirm proper inclusion of these requirements, the drawings and specifications are subject to independent design verification as described in subsection 17.1.3, and performed in accordance with procedures of

the C&H Quality Assurance Manual. The specifications require that a supplier or constructor submit detail procedures which include acceptance criteria of specified fabrication, inspection, and testing activities. These procedures are subject to review and acceptance by the G&H engineering group requesting such procedures. For submittals concerning inspection plans; test, calibration and special process procedures; drawings and specifications; and changes thereto, these documents are submitted as appropriste to QA for review and ccoment. These comments are incorpot-ated by the cognizant engineer in his response to the supplier or conctructor.

{

1 l

l l

4 17.1.6 DOCUMENT CONTROL All G&H record design documents (such as specifications and drawings) for use outside CAH are issued by the project manager with his approval noted thereon, and only after all other required approvals are also noted in the appropriate locations, in accordance with the procedures of the G&H Quality Assurance Manual.

A record copy of all original and revised issues of such design documents is retained in the appropriate record files, as delineated by the G&H Quality Assurance Manual. Before revised design documents are issued, they are reviewed and approved in i

the same manner as the original issue, in accordance with the procedures cited in subsection 17.1.3.

Provisions for proper and timely distribution of these documents and their revisions are set forth in the procedures of the G&H l

l Quality Assurance Manual. The documents controlled by these l

! procedures are specifications and drawings (which constitute the technical portion of procurement documents), PSAR, FSAR and 7 related design criteria documents, test procedures, l Design / Engineering Change / Deviation Requests and Nonconformance Reports and Corrective Action Requests as well as analyses and I calculations, other technical documents, and the G&H Quality Assurance Manual and its procedures. Implementation and control l Amendment 7 August 1983 l

of distribution are verified through periodic audits performed by QA engineers.

External distribution of engineering and design documents is made by the project manager. Such distribution includes an acknowledgment form to be completed by the recipient to confirm his receipt of the latest issue. Further to determine that all project participants are cognizant of the latest revisions of documents, the status of each document is periodically summarized and published. These status repcrts indicate the latest approved revision and date of each document. The engineering department, 7 the project department, and the field forces use these lists to update their files and remova obsolete information when necessary. The QA staff performs periodic audits to verify that status reports are current and properly distributed. Field and shop surveillance is performed by QA/QC personnel to verify that the latest document issues are in use.

Engineering and design changes, whether field or supplier originated are documented on a Design / Engineering Change / Deviation Request Form and subject to the same review and approval procedures as the original document in accordance with the G&H Quality Assurance Manual. Copies of the completed change form, whether dispositioned as approved or not approved, are distributed to the project QA engineer, the involved discipline engineers, the project manager, the Utility owner and the Amendment 7 August 1983

'(

organization who initiated.the request.

No work can proceed until the change has been approved and'that documentation attesting to this has been received by the supplier Or Cons *ructor.

5 1

t i

l l

t

. 17.1.7 CONTROL: OF PURCHASED _ MATERIAL, EQUIPMFJJT AND SERVICES

+

17.1.7.1 ' Evaluation and Selection of. Suppliers' and Constructors A list of potential bidders for nuclear safety-related items or services is established, based on a. the current capability of.

the supplier or -constructor to comply with the requirements of Appendix B to 10 CFR Part 50 that are applicable to the types of items or services being procured; and b. previous experience with suppliers or constructors supplying similar items or services.

'1

~

When this is' not available, or for adding new bidders to the list, G&H requires a written response to a pre-Qualification supplier questionnaire to determine a bidder's capability as a possible procurement source and to evaluate their QA/QC performance capabilities.

QA Department review of procurement documents, as discussed in subsection 17.1.3 establishes the adequacy of QA requirements imposed on suppliers and constructors. Further, these documents require all bidders to submit their QA/QC Programs for review by

! the G&H QA Department to establish that they conform to the requirements of Appendix B to 10 CFR Part 50.

Prior to actual award of contract, preaward surveys are performed on those suppliers or constructors for whom adequate current experience data is not available at G&H. Such preaward surveys l

, . _ . - - - - . . , - - . . . - - - - - -. --,,,,,m-.-- _,,,,r.

are performed by the QA Department, with the aid of qualified engineering personnel as may be required, to ascertain compliance with previously reviewed supplier's or constructor's QA/QC manuals. Results of these surveys are documented, distributed to the Utility Owner, supplier or constructor surveyed, and the original. maintained by G&H. The foregoing activities are performed in accordance with the written procedures of the G&H Quality Assurance Manual.

17.1.7.2 Surveillance and Audits of Supplier Operations Surveillance of ' suppliers during manufacture, fabrication, and assembly is performed by QA personnel in accordance with the procedures of the G&H Quality Assurance Manual. The surveillance activities follow the requirements of a vendor surveillance checklist, which sets forth the quality documents to be reviewed, check the revision status of the design and engineering documents in use and the operations, inspections, or tests to be witnessed or verified in accordance with the acceptance criteria of procurement document technical specification. These checklists are prepared by QA personnel subject to approval by the project QA supervisor. G&H does not rely on supplier certificates of conformance for acceptance of equipment. Surveillance by QA personnel is performed to verify conformance to the procurement document technical specification and referenced drawing requirements and to review the suppliers quality documentation package which is to be available with the equipment prior to l

release for shipment. Equipment cannot be released from a l

supplier's facility until a G&H QA Release Form is completed and signed by a G&H QA Representative. Written reports of such .

activities are issued to the supplier, Utility Owner, G&H QA Manager, and the G&H project manager.

Further, periodic audits of supplier operations are performed by the QA Department in accordance with the written procedures of i

the G&H Quality Assurance Manual to: a. provide an objective m

m a ,

determination of compliance with established ~ requirements, methods- and procedures; b. determine' the adequacy- of the3 supplier's_QA/QC program; c. verify implementation of correctivi'r "

action; and d. confirm the completion and maintenance, of appropriate documentation. These audits follow a preplanned audit checklist which establishes the criteria to be audited.

The completed checklist is reviewed and approved by the project QA supervisor and a report is issued to the supplier, Utility Owner, G&H QA Manager, and the G&H project manager.

Recommendations resulting from surveillance or audits as applicable for improvement, adjustment, or corrective action to be taken will be made to the supplier, -and additional i

surveillance or audits will be performed to ascertain that measures have seen taken to implement the recommendations.

t l

l l

l l

l t

i 1

l

3 .

.- 3 s

.t

. ;a S. s 17.1.7.3 Surveillance and Audits of ' Construction- Site operations

\

Receipt ' inspection of- supplier-furnished items is performed-by the constructor at the: construction site, and appropriately documented- in accordance with approved written procedures of the constructor's QA Program in accordance with the requirements of the G&H Quality Assurance Manual. Construction procedures shall include the, requirement that items be properly identified, that required QA document'ation package has been received, that items be inspected for shipping damage, that all criteria for acceptance be natinfied, and that nonconforming items be appropriately identified and segregated as applicable.

G&H site QA and QC personnel audit and survey the constructors' operatior. s , including receiving, fabrication, installation, inspection, testing, and documentation activities.

Surveillance activities are performed in accordance with preplanned documents to: a. perform periodic checks of the constructors' quality system to determine continued effective implementation of that system; b. witness constructor's performance during fabrication, installation, assembly, inspection, and testing to verify conformance with the design criteria; sc. check the revision status of the design and a

engineering documents in use; d. review contractors' quality k

1

- 6 2 -'

.~ , ,

f -

- . - . - -, ,, , . .h - . , - . _y -- -

..-----,._-,_,c.. _,-,...-_,,...._.----.,.c- - , - _ - _ . , - . -, .,...r . , . - . - _ . , , ,

1 m l l

1

-o j

. 1

> ~

s 1 I

documentation for traceability, completeness, and retrievability. s Surveillance reports are prepared and maintained at the site and

'become part of the overall project QA documentation.

Auditing activities are performed in accordance with checklists prepared by site QA personnel under the authority of the site QA supervisor and in accordance with the requirements of the G&H Quality Assurance Manual. Audit Reports.are prepared and issued to the audited organization, the Utility Owner, the G&H QA Manager and the G&H project manager.

Recommendations resulting from surveillance or audits as applicable, for improvement, adjustment or. corrective- action to be taken will be made to the constructor and further surveillance or audits will be performed to ascertain that measures have been taken to implement the recomn endations.

l I

l r

l l

l l

I i

17.1.8 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS AND COMPONENTS G&H prepares specifications, subject to review and control as described in subsection 17.1.3, which require the contractor to have established procedures for identification and control of materials, parts, and components which will not impair the function or quality -of the item. These procedures are required so that any segment of the manufacture, fabrication, assembly, or construction activity can be readily verified or checked for compliance with the QC procedures in the previously approved supplier's or constructor's (or their subcontractors) QA/QC manuals. QC records are carefully reviewed to ascertain that whatever type of identification mark (such as heat number, part model number, component serial number, as applicable) is applied, it will accompany the segment, part, or component through manufacture, fabrication, or assembly, to its ultimate installation and onsite testing, and be t retained as required by codes or Regulatory Guides.

l These procedures are applied to subcontractors so that G&H surveillance personnel can trace any identified item in the chain of documentation from origin to final installation. Each of the i contributors to the progression of the item, including the l

l Utility Owner at the site, is required to obtain and retain the I

records up to and including those of its own contribution.

Surveillance personnel have the responsibility to ascertain, in i

I 4

i

' . . , _ _ _ . . - _ _ _m.

accordance with procedures outlined in the G&H Quality Assurance Manual, that the proper traceability procedures are used'by suppliers and constructors (and their subcontractors), and that these identifications can be traced to such associated documents as drawings, specifications, purchase orders, physical and chemical mill test reports; manufacturing, fabrication, assembly, inspection, and test reports; deviation reports; installation; and onsite test reports to the extent of G&H contractual obligations.

17.1.9 CONTROL OF SPECIAL PROCESSES When special processes-are used for the production, fabrication and services involved in purchased items or services, G&H specifies the codes and standards, Regulatory Guides and QA/QC requirements in the procurement documents. Bidders are required, as outlined in subsection 17.1.7 to provide documentation with their propo als, indicating their capability to implement the special process requirements including written procedures and evidence of verification of adherence to such procedures as well as evidence of availability of qualification records for the procedures and for personnel performing such activitites.

Special processes include, but are not necessarily limited to: 1 welding, plating, nondestructive testing, heat-treating, electrochemical machining, and cleaning, and will require certification by a proper authority, of procedures and personnel where appropriate or required by code or NRC Regulatory Guides. Prior to award of a contract, the supplier or constructor will be required to submit to G&H, for review and approval, the procedures it will use to accomplish the special processes specified by the procurement documents, including references to the appropriate codes and standards, and Regulatory l Guides. The pertinent engineering department responsible for the special process requirements described in the procurement 1

L documents, will review and approve these procedures.

l Surveillance personnel observe supplier or constructor (and their

subcontractor's as applicable) operations to ascertain compliance . g.

with the approved procedures, and to review the special process records to determine whether; a. proper documentation of purchased items or services is being maintained; b. materials and parts are being appropriately identified and controlled; and c.

qualifications and certifications are being properly developed and maintained current. Revisions to any special process procedures and requirements require approval by the appropriate G&H engineering department. G&H QA/QC personnel monitor the supplier or constructor to determine compliance with the accepted revisions and maintenance of proper documentation.

17.1.10 INSPECTION G&H prepares a general specification, as part of the procurement documents for nuclear- safety-related structures, system, or components, which requires that suppliers or constructors establish and put into operation a quality program to satisfy the requirements of Appendix B to 10 CFR Part 50, with regard to manufacture, fabrication, assembly, installation, inspection, and testing of materials, equipment, or structures. Each supplier or constructor is required to submit to G&H its existing QA/QC Manual and any other specific procedures detailing the organization and methods for satisfying the requirements that inspection procedures are in effect for the purchased items or services, and that inspection personnel are independent of the group performing the work.

These procedures will be required to address the following:

I a. Identification of the individuals or organization (and their qualifications and authority) performing the inspection activities

b. Identification and control of items or work subject to inspection, such as materials, parts, components, or construction services, includi ng partially complete assemblies or work, to prevent use of incorrect or defective items or work l
c. Identification of quality characteristics to be inspected
d. Acceptance and rejection criteria
e. Measures established to control special processes
f. Description of the methods of inspection or tects to be performed as necessary to verify quality (including indirect control of processing methods, equipment and personnel where direct inspection is not possible)
g. Methods to be followed for calibration of inspection and test equipment
h. Documentary evidence of completion and certification of inspection activities
i. Documentation of nonconformances, and implementation of l

corrective action l

j. That inspections and tests are performed with specified equipment and under suitable environmental conditions,, and prerequisites have been met.

In addition, the supplier or constructor is required to submit a manufacturing schedule or sequence of oper.stions, including witness and hold points critical to the quality of the item or service being performed. G&H will review this schedule and indicate the witness and hold points it wishes to observe in the l

! contractor's facility. Work shall not proceed beyond an l

l

established hold point- without prior. approval by G&H. The QA Department reviews the supplier's or~ constructor's QA/QC Manual to determine its adequacy in meeting ~the requirements of the specification and applicable criteria, codes and standards, and Regulatory Guides. An initial audit is performed by G&H QA personnel at the supplier's or constructor's facility in accordance with the G&H Quality Assurance Manual, to review the procedures detailed in their QA/QC Manual; to ascertain the qualifications of the supplier's or constructor's personnel; and to review the records and procedures required for documenting all critical aspects of their procedures for performing process activities, including inspection. Furthermore, G&H reviews the requirements for supplier's or constructor's senior management involvement in their quality program.

The supplier or constructor is required to notify G&H prior to a required witness or hold point, so that the appropriate surveillance personnel will be available to observe the event.

Surveillance personnel are responsible for periodically observing the supplier's or constructor's implementation of his approved quality procedures in the areas previously listed.

Inspection of modified or repaired items or work is required to be performed by the supplier or constructor in accordance with the same procedures which applied to the original work.

Surveillance reports for each visit are prepared and include

recommendations for corrective action when necessary.

These reports and corrective action requests are distributed to the contractor, Utility Owner, the G&H project manager, and G&H QA Manager, whose department maintains a complete file of QA reports, and keeps senior management appraised of such activities in accordance with G&H established procedures.

l I

17.1.11 TEST CONTROL G&H establishes the- necessary test programs for structures, systems, and components in the appropriate procurement documents which include, as required, proof tests during or after fabrication, assembly, construction or installation, and preoperating tests prior to startup. The supplier or constructor is required to establish a detailed written procedure for.each of 2 the tests that are neccessary to demonstrate that the structures,.

systems, or components will perform satisfactorily in service, in accordance with their design requirements and within their acceptance limits. The test procedures will include provisions for assurance that:

a. The prerequisites for conducting the test have been met
b. Adequate test information is available and will be used
c. Properly identified and calibrated up to date test instrumentation and equipment are available
d. The test is conducted by trained or appropriately qualified personnel
e. Adequate acceptance and rejection criteria are included
f. Proper environmental conditions for the test are maintained during its performance.

e The supplier or constructor is responsible for adequately documenting the test and its results, and for submitting the documentation to G&H for review and acceptance. G&H personnel will witness the test where appropriate, at specified hold points, and will ascertain that the requirements specified in the procurement documents have been satisfactorily met. To ascertain compliance with the contractors approved procedures, surveillance personnel monitor the manufacturing, fabrication, assembly, inspection, and test procedures in the supplier's shops, and the installation, inspection, and test procedures at the construction site in accordance with the G&H Quality Assurance Manual.

l t

17.1.12 CONTROL OF MEASURING AND TEST EQUIPMENT G&H prepares procurement documents which require that suppliers and constructors establish control procedures to assure that all items of measuring and test equipment used in activities affecting quality are properly identified and calibrated, at scheduled intervals, against certified standards- having documented relationship to nationally recognized standards. If no national standard exists, the certification of the calibration used will require verification in accordance with applicable industry standards and documentation of acceptability. The supplier or constructor is required to maintain records that identify the measuring and test equipment and show the latest and next due calibration dates. The calibration interval for each item is to be based on the type of equipment, required accuracy, stability characteristics, use, and other conditions affecting measuring control. Items that have not been properly maintained or calibrated in accordance with specified schedules, or that have been damaged in service will be required to be identified and removed from service.

l The supplier or constructor may perform his own calibration, using duly qualified personnel. As an alternate, the constructor may use the services of an approved standardization laboratory.

Standards are to be maintained, and measuring and test equipment

calibrated in an environment having controlled temperature, l

humidity, and radiation or contamination limits compatible with

the required accuracy and measuring objective of the required test. The error in certified calibration standards shall be less than 1/4 of the tolerance of the equipment being calibrated, unless limited by the state of the art. When discrepancies in measuring and test equipment are found at the next calibration date, the supplier or constructor will be required to determine the corrective action required. Where equipment is shown to be out of calibration, all items inspected or tested since the last acceptable calibration are considered unacceptable until the supplier or constructor demonstrates that the applicable design requirements of those items have been satisfactorily met.

The supplier or constructor is required to maintain the records which indicate the calibration status of all items under the calibraticn system in effect, and which identify the measuring and test equipment. G&H surveillance personnel are responsible for verifying records of the measuring and test equipment calibration; and the reports thereof issued by them will recommend corrective action when required.

17.1.13 HANDLING, STORAGE AND SHIPPING G&H prepares procurement documents containing basic guidelines for the proper handling, cleaning, preservation, storage, packaging and shipping of nuclear safety-related items.

Suppliers and constructors will be required by procurement documents to develop written procedures or instructions detailing protective measures, including the establishment of special environments as may be required to prevent damage or deterioration to items or structures during handling, storage, and shipping at the suppliers' facilities, in transit, or at the construction site. G&H will review and comment on the procedures developed by the suppliers or constructors.

G&H surveillance personnel at the shop or construction site are responsible for ascertaining if the suppliers or constructors actually implen. ant the protective measures in compliance with the previously submitted and accepted procedures. This surveillance activity is performed in accordance with the G&H Quality Assurance Manual procedures and will encompass visual and nondestructive examinations; witnessing of the level of workmanship and care being exercised; and reviewing the documentation that is required. Reports of G&H findings, together with recommendations for improvements or corrective action to be taken, where required are prepared, issued, and distributed as appropriate to the contractor, Utility Owner, the G&H project manager and the G&H QA Manager. Followup surveillance or audits will be instituted as required to establish that improvements and . corrective action have been-effective where indicated.

I l

i

(

17.1.14 INSPECTION, TEST AND OPERATING STATUS G&H prepares procurement documents which require that suppliers and constructors be responsible for establishing procedures for identifying the status of inspection, test, and readiness for operation of nuclear safety-related structures, systems, and components throughout manufacturing, fabrication, installation and testing. G&H also-requires that suppliers and constructors prepare written procedures to establish that the inspection and test status of individual items be indicated by readily identifiable means such as stamps, tags, labels, routing cards, shop travelers, or other suitable indicators. These procedures will also establish the authority for the application and removal of identification and status markings and that this is performed by personnel not s2bject to cost or schedule pressures.

Indicators are required to identify those items which have satisfactorily passed required inspections and tests, to preclude bypassing required inspections and tests, and to prevent the inadvertent use of unsatisfactory items. Where inspection and welding stamps are in use, procedures are required to incorporate controls to prevent deterioration of materials or components.

The suppliers' and constructors' procedures shall also include provisions to control the bypassing of required inspections,

, tests, or other critical operations subject to approval by each of their quality organization.

G&H will be responsible for reviewing and commenting on suppliers and constructors procedures, including requirements for documentation. This . documentation will be required to indicate the types of inspections and tests, and the authority under whom the tests were performed and witnessed. Review of such documentation at the suppliers' shop or the construction site is performed by G&H surveillance personnel to determine correlation with the inspection, test, and operating status of the materials, components, and structures, and to determine conformance to accepted contractors' procedures.

As applicable, procedures will be established by G&H for transfer of equipment or systems from the constructor to the Utility Owner's pperating staff. These procedures will include preparation of suitable records indicating the status of equipment or systems. During construction site testing, l adjustment, trial operation and any other times when hydraulic, I

l mechanical, or electrical systems are energized, the G&H tagging procedure is put into effect to promote equipment, systems and personnel safety, and to prevent inadvertent use. Under this procedure the Utility Owner will have the sole responsibility for operation and maintenance of equipment and systems thus l

transferred to their control.

l

17.1.15 NONCONFORMING MATERIALS, PARTS AND COMPONENTS G&H prepares procurement documents which require that suppliers-and constructors establish, implement, and maintain procedures for the identification, control, and documentation of materials, parts, components, systems, structures, or-processes which do not conform to requirements of the procurement documents, in order to l

prevent their inadvertent use or installation. These procedures l

, are to provide for identification, quality review, segregation, I

{ disposition, verification, and documentation of the nonconforming l

item, structure, system, or process, and notification to affected organizations.

l The supplier or constructor will be required to identify all nonconforming items, structures, or systems by tagging or other l suitable means, and to segregate or isolate them where l practicable, to prevent their unauthorized shipment, installation or use. The identification system is to be established in the written procedures. Special areas for segregation and for storage of nonconforming items will be provided as' required. The contractors' procedures are to include the requirements for maintaining records of all nonconformances and their disposition.

Repairs or rework of nonconforming items will require that j reinspection and retesting be accomplished by methods equivalent to those of the original inspection or test. Acceptance of a nonconformance will require that a written deviation report

(

containing verification of disposition and a technical i

l l

justification establishing that neither safety nor function will be adversely affected shall be submitted to G&H for review and approval. Such. deviation reports for nonconforming items will require review and approval by the responsible G&H engineering department, and a subsequent QA review in accordance with the procedures of the G&H Quality Assurance Manual.

Implementation by contractors of their procedures for handling of nonconformances will be subject to periodic surveillance by G&H personnel.

All deviation or nonconformance reports (including those dispositioned accept as is or repair) generated by suppliers will be required to be forwarded to the construction site, along with those reports generated by constructors which will become part of the QA documentation to be filed at the plant site and transferred to the Utility Owner. Copies of deviation and nonconformance reports are required to be submitted to the G&H project manager and G&H QA Department for review and analysis of quality trends and maintenance of documentation. Situations where supplier's and constructor's quality appears to be trending away from the desired levels, will be reported to the supplier or constructor, the appropriate senior G&H management, and the i

! Utility Owner.

l

17.1.16 CORRECTIVE ACTION G&H has established nonconformance reporting and corrective action procedures to identify conditions that are adverse to quality as discussed in subsection 17.1.15. These procedures are concerned with.the engineering and design activities of G&H, as-well as activities of its suppliers and constructors. The corrective action to be instituted by G&H, its suppliers or constructors will be determined by the source and nature of the nonconformance, and follow-up action as necessary will be performed to verify implementation of the required corrective action.

QA Department personnel perform periodic audits of G&H engineering and design, project administration, procurement, and site QC activities to substantiate that applicable QA procedures and contractual obligations are adhered to, and properly administered by the cognizant organizations. During the course of these audits all nonconformances found are identified to applicable criteria, instructions, procedures, codes, and standards and recorded on an audit report. This audit report is then issued to the project manager and the audited organization to complete the corrective action reply eection within a specified time limit. These actions are performed in accordance with the procedures of the G&H Quality Assurance Manual.

Auditors will assess the corrective action reply to determine that the respondent has included in his reply as

applicable: a. the cause of deficiency or nonconformance; b. the action to be taken to correct the deficiency or nonconformance;

c. the action taken to prevent recurrence; d. the action taken to establish that other areas or previous work completed have not been effected; e. projected date of corrective action completion; and f. identification of cognizant personnel assigned to implement the corrective action. Auditors will also review the corrective action reply to check that the corrective action to be taken is in accordance with the applicable criteria, instructions, codes, standards, contractual requirements, and the procedures of the G&H Quality Assurance Manual. Ecllowup action will be scheduled after the corrective action completion date to confirm that the corrective action indicated has been satisfactorily implemented. Copies of the completed audit report i with the corrective ac ion input are distributed to the cognizant j organization audited, the G&H project manager, and appropriate G&H management personnel in accordance with the G&H Quality l

l Assurance Manual. The original of the audit report is maintained l in the QA files.

I Corrective action is also requested as a result of QA reviews of i

engineering and design documents (including procurement specifications). During the course of the review all l

nonconformances found are identified to applicable instructions, procedures, codes, standards or regulatory criteria and are

recorded on a QA Document Review Record Sheet or for procurement technical specifications comments are noted on the document as described in subsections 17.1.3.3.4 and 17.1.3.3.9.

A copy of this form is issued to the project manager and the applicable discipline / department with instructions to revise the applicable document to incorporate the comments noted within a specified time limit and resubmit the docume'nt to the QA Department to verify that all comments have been incorporated.

Where corrective action is not complete or is inadequate, the QA Manager has the authority to require the project manager to exercise his stop work authority and consult with appropriate G&H Management personnel to resolve the condition.

G&H prepares procurement documents which require that suppliers anc constructc rs establish, implement, and maintain a nonconformance reporting and corrective action system that l identifies conditions adverse to quality, and that appropriate l

action is taken to preclude repetition. Audits and surveillance l

of suppliers and constructors are performed by G&H QA personnel l in accordance with the procedures of the G&H Quality Assurance l

l Manual. During the course of the audit or surveillance activities, all nonconformances or deficiencies found are identified to applicable criteria, instructions, codes, l

l standards, and procedures, and are recorded on an audit report or vendor shop surveillance report. In addition a Nonconformance l

Report and Corrective Action Request Form or a Deficiency Report l

and Corrective Action Request Form will be issued to the supplier or constructor respectively, with instruction to complete the applicable form and return it to G&H for review. The project QA engineer will assess the response in the same manner as previously discussed. Copies of the completed nonconformance or deficiency report and corrective action request form are distributed to the supplier or constructor, the Utility Owner, the G&H QA Manager, the G&H project manager, and appropriate G&H management personnel in accordance with the procedures of the G&H Quality Assurance Manual.

Any significant conditions adverse to quality which are not observed by audits or surveillance nor documented on Nonconformance Report and Corrective Action Request Form or Deficiency Report and Corrective Action Request Form, which are discovered by suppliers or constructors will be recorded on a Design / Engineering Change / Deviation Request Form. Corrective action for these conditions will be individually documented on a memorandum by the project QA engineer and distributed to the QA l

Manager, the project manager and appropriate levels of management in the cognizant areas of the nonconformance or deficiency, to review, make assessment of and institute appropriate corrective action to prevent recurrence.

i

! l _-. .. __ _ _ - .

17.1.17 QUALITY AS.cURANCE. RECORDS G&H maintains- QA records for all its work involving nuclear safety-related structures, systems, and components in accordance with procedures of the G&H Quality Assurance Manual. These procedures are designed to meet the requirements of Appendix B to 10 CER Part 50, Criteria XVII, Quality Assurance Records and establish the requirements for those records to be maintained including duration, location, and assigned responsibility, using as a guide ANSI N45.2.9, Requirements for Collection, Storage, and Maintenance of Quality Assurance Records for Nuclear Power Plants, as applicable in accordance with G&H contractural obligations to the Utility Owner.

Recognizing the obligation of the Utility Owner as the ultimate repository for all required lifetime and nonpermanent records, G&H maintains a complete in-house file of all the documents and records it generates during its phase of the work, and transmits them when completed to the Utility Owner as required with the exception of calculations. Calculations are retained by the job engineer and a copy as applicable furnished to the G&H Print File Department to be maintained until completion of the G&H design activity. These documents are then transferred to the QA files at the site for retention by the Utility Owner for the life of the plant.

C&H prepares procurement documents which require that suppliers 1

and constructors have established procedures detailing the generation, maintenance, and retrievability of records to furnish evidence of activities affecting quality, and provide adequate identification for relating a record to the item or activity to which it applies, as well as to the persons involved; the results, the acceptability, and also recommendations and actions taken in connection with any deviations or deficiencies noted.

Furthermore, G&H requires that suppliers and constructors transmit to the Utility Owner, in due cours(, those lifetime and nonpermanent records which the NRC Regulatory Guides require to be kept at the site.

These records are to include as a minimum: a. material certification and test data for traceability and quality verification, b. reports of inspections, exaninations, and test results for verification of conformance; c. drawings, specifications, procedures, and instructions for use in control of configurations; and d. records of nonconformances or deviations and their corrective action (including those dispositioned accept as is or repair).

Surveillance of suppliers and constructors during manufacture, fabrication, assembly, installation and testing is performed by f QA personnel to verify that the suppliers and constructors are l

l maintaining inspection and test records as required by the i procurement document. QA personnel will review the supplier's and constructor's inspection and test records to verify that they i

l 1

contain as applicable: a. a description of -the type of observation; b. evidence of completing and verifying. a manufacturing inspection, or test operation; c. the date.and results of the inspection or test; d. information related to conditions adverse to quality; e. inspector or data recorder identification; and f. evidence as to the acceptability of the results.

l l

I l

l

V 4

a. ! ,

r s

~

+a.

17.1.18 AUDITS -

s

"\ ,

G&H QA Department personnel perform periodic audits i of' G&H .

engineering and design, project administration, procurement, and site QC operations to substantiate that, applicable QA, procedures, criteria, and contractual obligations are adhered to and properly administered by the cognizant organizations. These audits

, 1 include the objective evaluation of work areas, activities and items, and the review of documents and records, and are performed using written checklists in accordance with the procedure's of"the G&H Quality Assurance Manual and are scheduled on the~ basis of the status and safety importance of the activity beir.g performed.4 Reports documenting the results of these audits are prepared and- - _

issued to the project manager; the audited organizaUion~; the ' -

Vice President Consulting Engineering, QA, and New Technolo.qy and other appropriate G&H management personnel in accordance.with the G&H Quality Assurance Manual. These audit reports' serve as an indication of the quality trends within our own organization.

All nonconformances found are recorded on the audit report and the audited organization is instructed to provide a corrective action reply within a specified time limit as descri$ed in

( subsections 17.1.15 and 17.1.16. Follewup action is scheduied after the corrective action completion date to confirm that the corrective action indicated has been satisfactorily implemented.

i The completed audit report is maintained in the QA files.

s I

': 1; t'

p i & .

. f.

4 )

J 4

Additionally, the Vice Presidents--of Power. Engineering; Power t , .

- v Projects; Consulting-Engineering, QA and New ' Technology; the Manager,- Project Support Services who- is responsible -for 7

-procurement, the LManager Construction Liaison and the Vice President, Regional Office involved- in- performing nuclear safety-related activities,; institute annual management reviews of

.the areas under theirs' cognizance to ' assess the adequacy and 1

Program accordance .w ith the l

effectiveness of the G&H . QA in criteria .of Appendix B ~ to 10CFR Part 50. Management Review-Reports are issued to the appropriate Senior Vice President or Vice President ,and submitted- to the President for approval.

Where Reports identify the need for specific changes or improvements, follow-up action is monitored by the QA Department to verify that implementation is accomplished within a specified time frame. Procedures for performing management reviews are

~

(, established in the G&H Quality Assurance Manual.

I The G&H QA Department also performs periodic audits of suppliers and constructors , as contractually required, to determine that i

they are complying with and implementing the requirements of the procurement documents, their previously approved QA/QC Manual and

! procedures, and the criteria of Appendix B to 10 CFR Part 50.

- ~

These audits include objective evaluation of work areas, activities, processes, and items and the review of documents and records, and are performed using preplanned written checklists l

. based on the status and safety importance of the activities being Amendment 7 August 1983

\

performed in accordance with the procedures of the G&H Quality Assurance Manual. Reports documenting the results of. supplier-or constructor audits are prepared and issued to the contractor, the Utility Owner, the G&H project manager and appropriate G&H management personnel. Nonconformances or deficiencies are handled as described in subsections 17.1.15 and 17.1.16.

Followup action will be scheduled to confirm satisfactory implementation of the required corrective action, and the results are distributed in the same manner as the original report.

f i

GIBBS & HILL QA PROGRAM TOPICAL REPORT APPENDIX A

1. 10 CFR Part 50 Appindix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants.
2. NRC Regulatory Guide 1.28 (Revision 2 - February 1979),

Quality Assurance Program Requirements (Design and Construction), endorses ANSI N45.2.

3. NRC Regulatory Guide 1.30 (Revision 0 - August 1972), Quality Assurance Requirements for Installation, Inspection, and Testing of Instrumentation and Electric Equipment, endorses ANSI N45.2.4.
4. NRC Regulatory Guide 1.37 (Revision 0 - March 1973), Quality Assurance Requirements for Cleaning of Fluid Systems and i Associated Components of Water-Cooled Nuclear Power Plants, endorses ANSI N45.2.1.
5. NRC Regulatory Guide 1.38 (Revision 2 - May 1977), Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants, endorses ANSI 45.2.2.
6. NRC Regulatory Guide 1.39 (Revision 2 -

September 1977),

Housekeeping Requirements for Water-Cooled Nuclear Power Plants, endorsos ANSI N45.2.3.

7. NRC Regulatory Guide 1.58 (Revision 1 - September 1980), as required for the work being done, Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel, endorses ANSI N45.2.6.
8. NRC Regulatory Guide 1.64 (Revision 2 - June 1976), Quality Assurance Requirements for Design of Nuclear Power Plants, endorses ANSI N45.2.11.
9. NRC Regulatory Guide 1.70 (Revision 2 - September 1975),

Standard Format and Content of Snfety Analysis Reports for Nuclear Power Plants.

10. NRC Regulatory Guide 1.74 (Revision 0 -

February 1974),

Quality Assurance Terms and Definitions, endorses l

ANSI 45.2.10.

l

11. NRC Regulatory Guide 1.88 (Revision 2 -

October, 1976),

Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records, endorses ANSI N45.2.9.

l

12. NRC Regulatory Guide 1.94 (Revision 1 - April 1976), Quality Assurance Requirements for Installation, Inspection, and l

Testing of Structural Concrete and Structural Steel During l

l l

l

the Construction Phase of Nuclear Power Plants, endorses ANSI 45.2.5.

13. NRC Regulatory Guide 1.116 (Revision 0 - June 1976) Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems, endorses ANSI N45.2.8.
14. NRC Regulatory Guide 1.123 (Revision 1 - July 1977) Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants, endorses ANSI N45.2.13.
15. NRC Regulatory Guide 1.144 (Revision 1 - September 1980)

Auditing of Quality Assurance Programs for Nuclear Power Plants, endorses ANSI N45.2.12

16. NRC Regulatory Guide 1.146 (Revision 0 - August 1980)

Qualifications of Quality Assurance Program Audit Personnel for Nuclear Power Plants, endorses ANSI N45.2.23

pi - _ _ _ . _ _-

00RRO OF Cl CMAIFDW1 g

l (1 NAfit l

( Ppf St 0E1 eau I OllEF EEEC4 SFFICEI i

R.n. CORN I

pagACFO SE 4109 Cont r avC f l0m VICE PAC 51DEul 48C152] . .- g 8.0. STAsu15 E.L. SCwf

  • PELT l 8 bm e-. - == .. - .-. - -.- - - - m - - - - . - . -

TLCf PRC310Cuf . 93Cf PRE 5!DEtT b-- . - . .

WN#

PonEA PROECTS F:.!4 Eh;InEER!n=

{ AECIfm 0F FICE M.R. AOCR 8.a. vivl4170 P. CARTW4ICMt l

erw. cts manAGen pahat,Em 0F 0FLAA T10h5 PROJECf 3 mova=cto

,f f,CM40LDEF 1.N. GALLO 0.C. PuM37 J.n. Divf 3 NGL A i magasLR S T RUCitP*aL /

PRO CM Civl L/wLAO l t hclhEE R1hG C.R. LGESE J.L. tiCMif R I

PkwGE R R nHMEIR CP 5 PAGJECf$ g pggpeq[get a tuGI4EEnl43 C.F. kIIenth J,g, gypygg l

-u a l .., A2 R

,n%. l MCm g g, EkClhEEhl43 hlRifl83 tS l E.F.CHELCTf!

paGr R nuagt e DF 6 P AQJt CTS Carnt ChAPMICS R.f.

h(R5540f A ( L. A. C OLOTZ!

I

~ pen y______. P -e .

PROJE Cl

.~a n PECIchAL PR3JE CTS -

SvPPGR1 ggtg3 I SERV!CES I" I'O'l h5

l C. A.3f MAU33 J.R. ActtMIC NNA G E R O

l >R4AGER PA%ACER PLMCMa$lh3 15fIrp flhG pgg.gg.a raf 415N11>

9.CL%N14G413 T .P.YOU4C F.M. CL E S l

A.B. CUATIS MN%1 M l P A%CE R P A%A GE R O' E PL94%Ih3 & T E C a* h 0 L C G f P40JE CT S B 3

  • et t ;JL i h G f um5F E4 RAhCEA J. J. J!h[h{ f (C Pg h) P J 34970 $CIE'hCE S- CtERh 0.8. mikson 0 !*t C T09 ("

n ;. ! Fai31 f 4T ACM/ va e 44 CE%ELC' Olvil104  ::sf;Lf!h" E404 Pawg R

i. S. A hL d 1tCM. E %;t w IR! bG

~

J. J. C AS$ 10Y '.P. CfR!teID . Crnven A.R. FCREE3 an:Stagr 6*m u u

'E d *MG '

t tattf 04 #"A* A M A L RF h /;t u tL OP ClaillC4 F SFIC I"L PROJE C T S 1.W. L C055 R 2C R 5. 5. h 80', A 10 c TICE FME51DE41 M A%%ER Ppf 9lCf m1 00altfy

&ltilN R55u*p%CE

$.R. EC3 i W. W. KE DDIS m:s%t9 C*ItF

  • CON 1VL T I%$

( 4G l % E ( P 14G f at tat E *Gl*Ef 8 t.J. pawsrs v.P. 9'JSCEu p4g4g[R Cf 80%M A Pwa t i 140 I

>f m.g ing qg ig ECG%CRIC5 i(

P. E. M3 ' .M.P# Estam I _

  • P al S 10i t ?

084v] $44 i esL1[h

  • , J. C OL Lt *B s

e.

7 l i E

_ _ _ _ _ _ . . _ _ _ _ ._ _ ~ - - - - -

SE 410R TICE PhESIDENT 3Entc9 WICE PREllDENT FlemCE gjC gar F.O. PUTCplu50m N.G. FORNCLLA P. SRERCN VICE PRE 510L41 TICE PRE 5ISEh!

CORPCRATE STRFF COMEST! !T* .

i N.S. SL AIR f.R. CllDIi2J l

RA4AGER OIRECTOR Ci*Ltl69 t C*

00Mt31 tC F l"**C I% r'g 5Y[et t s

~ U ~

5fLES aan 8 8 '" E f "f "'

E.P. REENT .fa1"l'T'R T'Ish G E. MRGNER h f"

' ram *LE4 pa 01 TOR PEsS0ER PSG JECTS SALE S -

F{*]!g - etu t3TR ATI .

6. MSO% IDFE N) l S.I. EHRMAN T. 4 PILLEn na **' PA%a En 1.nh (.La CONTROLLER f

JEl#!.'?i.

sdn!is -

), ggtLErr 0. CDR6v .4.R. FR54aCHT 0. 03YhCW P$$ $

  • gO%)R I iR4pE 4 tER Gha YSI p, pggy D.W. SHIPLEY RS$151Ruf

( b E F CEhE L

[tc]tEER$ GCCCUhf lhG F.M. hESLET

' ICE PRES'"

Also Available On

- t Ran sP.',no"%sn.

Di.i R.P. EN;EL Aperture Card CIPE C TOR -

PfCJE C15 i\ U o.R. Enres0, f

0 .e E .. . ., E R , .. r.A3 T

.0.._,

OIREC TCA

! CAR) .

Or sRtts J Figure 17.1-1

2. C. ,ut ,T.R, s LEGEl4D Amendment 7 flCE Ff E5 tCf.41 CORP. RESPONSIBILITY

(;;CHESA;g;n /

a. sartEn _____- 0.A. RESPONSIBILITY 6304MlZ4T10M CMAMT l

.Olb_bo a Mill, ,,,.

Inc,.

8309070389-o\

l

Figure 17.1-2 DELETED as of Amendment 6 l

1 l

l l

6 l

l

LEGEND 9055o a Hill, Unc.

. .. . , . . . - . . . . - INOICRTES OFFSITE DIRECT PROJECT NUCLERR PR0 JECT PERSONNEL RESPONSIBILITY OR RUDIT 0RGRNIZATION CHRRT -

INDICRTES RESPONSIBILITY ONSITE TECHNICRL PERSONNEL RESPONSIBILITY UTILITY l

OWNER .

MANRGER .

MRNRGERS OF MRNRGER PROJECT ENGINEERING OF PROJECTS SUPPORT l SERVICES DISCIPLINE CONST PROJECT PURCHRS]NG OR

CHIEF ENGRS. MANRGER MRNRGER MRNRGER LlRISON MANRGER l - 's 3

,_______s , _ _ _ . .__a i 8

) 3 3

{ l

INDEPENDENT 8 l

i

' DES. REVIEW I I RSST.OR l

8 ENGINEERS  : MRNRGER I

! I i g

~

i l i l I7 I i

4 i

I I-l b h- I i i l 1 f, i P DISCIPLINE PROJECT PROJECT PROJECT OR VENDOR OR p JOB ENGRS. SCHEDULING PURCHRSING l SUPERVISOR SUPERVISOR

)

- NMEg g

[--i l r --

4 N S OR ENGR.

I FIGURE 17.1-3 i Amendment 7 ,

j _. _

GIf2ba a Hill, Inc.

l QUALITY RSSURANCE DEPARTMENT ORGANIZATION CHART OR MANRGER RSSISTANT OR MANAGER PROJECT VENDOR SITE OR OR OR SUPERVISORS SUPERVISORS SUPERVISORS I

I I 0

. PROJECT QR ENGINEERS VENDOR OR ENGINEERS bh l ENGINEERS ENGINEERS QUALITY RSSURANCE ENGINEERS FIGURE 17.1 tl

l CRITERIA IMPLEMENTATION MATRIX G 8H QUALITY APPENDIX 8 OF 10 CFR 50- QUALITY ASSURANCE ASSURANCE CRITERIA FOR NUCLEAR POWER PLANTS MANUAL PROCEDURES I II 11I E Y 3ZI 3ZII 3El![ 3X I II Ill = xiv' xv 'v0xv= ="=

QAI - A 'O Q AI-BI G Q AI- 82 9 QAI-C 9 QAI-DI $

l QAI- D2 9 l Q AI- E G G QAI- F G GAI-G i l 9 I

QAH-A G l QAI- BI G l QAI-82 9 Q A X - 8 3.1 9 QAX - 8 32 Gl Q AH - 8 4.1 $ l Q AH - B 4.2 9 Q AH -8 5 9 9 9 9 9 9 9 9 9 9 QAH - 8 6 9 QAH - 87 9 Q AE- 8 8 9 9 9 9 9 Q AIE - C $ G QAH -D G l Q AH - E G QAH-F G QAM- A $

Q AM - BI $

Q AM- 82 9 QAM - c 9 9 QAM - D G G Q AM- E G G G QAM- F G G G G G G G G G G G QA IE-A G G G G G G G G G G G G Figure 17.1-3

I TABLE 17.1-1 Sheet 1 of 8 GIBBS & HILL PROCEDURES FOR ESTABLISHING PROJECT QUALITY PROCEDURE NUMBER TITLE PURPOSE Quality Assurance Manual To set forth the G&H Corporate procedures developed to document and control the QA activities concerned with nuclear safety-related structures, systems, and components.

PART I GENERAL QAI-A Glossary of Terms and To define terms important to Definitions the uniform understanding of the Quality Assurance Manual Procedures.

QAI-B1 Quality Assurance To describe the G&H Project and Organizations QA organization and functions established to effectively administer, design and construct nuclear power plants.

QAI-B2 Project Staff Personnel To establish the duties and and their Responsi- responsabilities of G&H l

bilities personnel performing quality related activities during the engineering and design, procu-rement and construction phases of a nuclear project.

QAI-C Quality Assurance To describe the measures by Program Description which the G&H QA Program meets the criteria of Appendix B to 10 CFR Part 50 and to establish G&H Management involvement in the Program.

QAI-D1 Procedure for Control To establish the methods to of Distribution and control distribution and l

Revisions of Quality revisions of the Quality l Assurance Manual Assurance Manual and its procedures.

l l

l

TABLE 17.1-1 Sheet 2 of 8 PROCEDURE NUMBER TITLE PURPOSE QAI-D2 Procedure for Indoctri- To establish the requirements nation and Training for indoctrination and training of personnel performing quality-related activities and to define the methods to be followed for such indoctri-nation and training.

QAI-E Procedure for Control To establish methods for of Nonconformances and documentation and reporting of Corrective Action nonconformances and to control the implementation of corrective action.

QAI-F Procedure for Control To sat forth the requirements fo of QA Documents collection, filing, and reten-tion of QA records generated during the engineering and design, procurement and con-struction phases of a nuclear project.

QAI-G Procedure for Perform- To establish a system of audits ance of Audits to confirm implementation of the internal G&H QA Program as well as external contractor QA l programs.

PART II QUALITY ASSURANCE DURING ENGINEERING AND DESIGN QAII-A Procedure for To define the methods for Dissemination of distribution and maintenance Regulatory Guides and of publications related to other Publications nuclear projects and for i confirming that they are being l received by cognizant engi-neering and design personnel responsible for there imple-mentation.

j l

l

TABLE 17.1-1 Sheet 3 of 8 PROCEDURE NUMBER TITLE PURPOSE QAII-BI Procedure for Prepara- To set forth instructions'for tion of Q-List preparation and control of the list of nuclear safety-related structures, systems and major components and to establish responsibility for originating and maintaining this list.

QAII-B2 Technical Data Input To set forth the methods for Procedure indentification, accumulation, documentation and maintenance of all technical inputs required for engineering and design of nuclear safety-related items generated by G&H personnel and supplied to G&H by other organizations.

QAII-B3.1 Procedure for Prepara- To establish the procedures to tion of Technical be followed for the control of Descriptions preparation, review, distri-bution and maintenance to technical descriptions setting forth design bases to be followed in the design of nuclear safety-related systems and components.

1 QAII-B3.2 Procedure for Prepara- To establish the procedures to tion of Structural be followed for the control of Design Criteria preparation, review, distri-bution and maintenance of structural design criteria setting forth design bases to be followed in the design of nuclear safety-related struc-tures.

TABLE 17.1-1 Sheet 4 of 8 PROCEDURE NUMBER TITLE PURPOSE QAII-B4.1 Analyses and Calcu- To set forth the procedures for lation Procedure - Power the control of preparation, and Energy Division review, documentation and re-(Other than Structural tention of analyses and calcu-and Special Analysis lations concerned with nuclear Departments safety-related power plant

. structures, systems, and com-ponents generated by the Power Division.

QAII-B4.2 -Analyses and Calcu- To set forth the procedures for lations Procedure - the control of preparation, Structural and review, documentation and Special Analysis retention of analyses and Departments calculations concerned with nuclear safety-related' power plant structures, systems, and components generated by the Structural Department.

QAII-B5 Specificaticn Procedure To establish the methods to be followed for the control of.

preparation review documenta-tion and maintenance activities associated with specifications for nuclear safety-related items and services.

QAII-B6 Design Drawing To describe the procedures for Procedure the control of preparation, checking, review, documentation and maintenance activities l

applied to design drawings for j nuclear safety-related j

structures, systems, or compo-

' nents.

l l QAII-B7 Safety Analysis Report To set forth the requirements Procedure for control of preparation, l

l review and documentation of material for inclusion in Safety Analysis Reports and amendments thereto.

l

TABLE 17.1 Sheet 5 of 8 PROCEDURE NUMBER TITLE PURPOSE QAII-B8 Installation and other To establish the instructions Special Design for the control of preparation, Documents Procedure review, documentation and maintenance activities concerned with installation and special design requirements for nuclear safety-related items or services.

QAII-C Interface Control To set forth the methods to be Procedure followed for the identification and control of engineering and design interface infor-mation and to establish the requirements for coordination among G&H engineering disci-plines and between G&H and external participating organ-izations.

QAII-D Engineering and Design To establish the procedures Verification Procedure for performing and documenting independent design verification of those engineering and design documents concerned with nuclear safety-related power plant structures, systems, and components.

QAII-E Engineering and Design To set forth the instructions Document Control to control the distribution Procedure and retention of engineering and design documents prepared by G&H.

QAII-F Design Change Procedure To establish the procedures for the control and documen-tation of changes to engineer-ing and design documents concerned with nuclear safety-related items.

TABLE 17.1-1 Sheet 6 of 8 PROCEDURE NUMBER TITLE PURPOSE PART III QUALITY ASSURANCE DURING PROCUREMENT QAIII-A Procedure for Control To set forth the requirements of Reveiw and for control of the review and Compilation of issuance to be exercised during Procurement Documents the assembly of procurement documents prior to their release.

QAIII-B1 Procedure for Prepara- To establish the procedure for tion of Qualified control of the selection and Bidders List evaluation of acceptable procurement sources for their inclusion in the Qualified Bidders List for nuclear safety-related items or services. This list is limited to those suppliers showing potential for meeting the project QA requirements.

~

QAIII-B2 Procedure for To define the procedures for Performance of Preaward in depth evaluation of techni-Surveys cally acceptable suppliers or constructors QA programs, and implementation in accordance with project requirements.

QAIII-C Bid Proposal Evaluation To define the methods to be Procedure followed during processing of proposals received in reply to invitation to bid requests, including QA review of the contractor's QA/QC programs, and any exceptions taken to specified requirements.

1 I

i l

f l

t

TABLE 17.1-1.

Sheet 7 of 8 PROCEDURE NUMBER TITLE PURPOSE QAIII-D Procedure for Control To set forth the procedures by of Vendor Submitted which G&H controls the receipt, Documents internal distribution, review, documentation, filing and return to vendor of specifica-tions, drawings procedures, test reports and other perti-nent data submitted for infor-mation or comment by contrac-tors in accordance with the requirements of the procurement document.

QAIII-E Procedure for Control To establish the requirements and Evaluation of for audit control and evalu-Supplier Performance ation of supplier performance to determine adherence to his QA program, Appendix B to 10 CFR Part 50, and the procurement document during his

- design, fabriation and pro-curement activities.

QAIII-F Procedure for Sur- Tc describe the performance of veillance of Supplier G&H supplier shop surveillance j Operations activities designed to l

establish confidence that materials, components and equipment conform to the spe-cified requirements and that appropriate quality related documentation has been gener-ated.

PART IV QUALITY ASSURANCE DURING CONSTRUCTION QAIV-A Site Quality Assurance To set forth the procedure for i Procedure a system of site QA activities to monitor site constructors, l subcontractors and suppliers i

engaged in field fabrication,

! installation, erection,

! inspection, testing and i documentation for a nuclear I power plant.

l t

l I

p- - - - e- = w

TABLE 17.1-1 Sheet 8 of 8 PROCEDURE NUMBER TITLE PURPOSE PART V AUTHORIZED INSPECTOR QAV-A Interrelation with This procedure establishes Authorized Inspector the areas of involvement and describes the relationship between the Authorized Nuclear Inspector and G&H.

4 Ad