ENS 54509: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
Line 10: Line 10:
| utype = B, B, B
| utype = B, B, B
| cfr = 10 CFR 50.72(b)(3)(xiii)
| cfr = 10 CFR 50.72(b)(3)(xiii)
| emergency class =  Non Emergency  
| emergency class =  Non Emergency
| notification date = 02/03/2020 09:16
| notification date = 02/03/2020 09:16
| notification by = Jason Orrey
| notification by = Jason Orrey
| NRC officer = Thomas Kendzia
| NRC officer = Thomas Kendzia</Td>
| event date = 02/03/2020 09:15 EST
| event date = 02/03/2020 09:15 EST
| last update date = 02/03/2020
| last update date = 02/03/2020
| title = Loss of Emergency Assessment Capability Due to Planned Tsc and Osc Upgrades  
| title = Loss of Emergency Assessment Capability Due to Planned Tsc and Osc Upgrades
| event text = At 0915 EST on February 3, 2020, planned upgrades to the Technical Support Center (TSC) and Operations Support Center (OSC) will begin. The work includes upgrades to furniture, carpet, telecommunications, celling tiles, and HVAC vent covers and the installation of new Audio-Visual equipment to include monitors, speakers, and microphones. The work duration is approximately eight weeks.  
| event text = "At 0915 EST on February 3, 2020, planned upgrades to the Technical Support Center (TSC) and Operations Support Center (OSC) will begin. The work includes upgrades to furniture, carpet, telecommunications, celling tiles, and HVAC vent covers and the installation of new Audio-Visual equipment to include monitors, speakers, and microphones. The work duration is approximately eight weeks.
If an emergency is declared requiring TSC and OSC activation during this period, the TSC and OSC will be staffed and activated at the alternate location in accordance with applicable site procedures. The Emergency Response Organization team has been notified of the TSC and OSC planned upgrades and the need to assemble and staff the alternate location during an emergency.
 
"If an emergency is declared requiring TSC and OSC activation during this period, the TSC and OSC will be staffed and activated at the alternate location in accordance with applicable site procedures. The Emergency Response Organization team has been notified of the TSC and OSC planned upgrades and the need to assemble and staff the alternate location during an emergency.
This is an eight-hour, non-emergency notification for a planned loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.  
 
There is no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.
"This is an eight-hour, non-emergency notification for a planned loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.
 
"There is no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified."</td>
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200204en.html#en54509
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200204en.html#en54509
}}{{unit info
}}{{unit info
| Unit = 1  
| Unit = 1
| type =  
| type = B&amp;W-L-LP
| Scram code = N  
| Scram code = N
| Reactor critical = Y  
| Reactor critical = Y
| Initial power = 100  
| Initial power = 100
| Initial reactor mode = Power Operation  
| Initial reactor mode = Power Operation
| Current power = 100  
| Current power = 100
| Current reactor mode = Power Operation  
| Current reactor mode = Power Operation
}}{{unit info
}}{{unit info
| Unit = 2  
| Unit = 2
| type =  
| type = B&amp;W-L-LP
| Scram code = N  
| Scram code = N
| Reactor critical = Y  
| Reactor critical = Y
| Initial power = 100  
| Initial power = 100
| Initial reactor mode = Power Operation  
| Initial reactor mode = Power Operation
| Current power = 100  
| Current power = 100
| Current reactor mode = Power Operation  
| Current reactor mode = Power Operation
}}{{unit info
}}{{unit info
| Unit = 3  
| Unit = 3
| type =  
| type = B&amp;W-L-LP
| Scram code = N  
| Scram code = N
| Reactor critical = Y  
| Reactor critical = Y
| Initial power = 100  
| Initial power = 100
| Initial reactor mode = Power Operation  
| Initial reactor mode = Power Operation
| Current power = 100  
| Current power = 100
| Current reactor mode = Power Operation  
| Current reactor mode = Power Operation
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Revision as of 00:35, 15 January 2021

ENS 54509 +/-
Where
Oconee Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4.98 h-0.208 days <br />-0.0296 weeks <br />-0.00682 months <br />)
Opened: Jason Orrey
09:16 Feb 3, 2020
NRC Officer: Thomas Kendzia
Last Updated: Feb 3, 2020
54509 - NRC Website
Loading map...