ML18347A835: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 16: Line 16:
=Text=
=Text=
{{#Wiki_filter:1--
{{#Wiki_filter:1--
    '.                                    \ .:~ -*
\\
consumers Power company August 7 , 197 5 U. S, Nuclear Regulatory Commi13,sion Mail and Records Section Washington, D. C., 20555 Re: License Reports o Operating Data DPR-20 Docket No: 50-255 Gentlemen:
.:~ -*
Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of July, 1975 Sincerely, James A. Meineke General Engineer cc J. G. Kepler, NRC R. L. ~ill>:'J,!1;-litft'r R. B. Sewell 8529
U. S, Nuclear Regulatory Commi13,sion Mail and Records Section Washington, D. C., 20555 Gentlemen:
Re:
License Reports o Operating Data DPR-20 Docket No:
50-255 consumers Power company August 7, 197 5 Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of July, 1975 cc J.
R.
R.
G.
L.
B.
: Kepler,
~ill>:'J,!1;-litft'r Sewell NRC Sincerely, James A. Meineke General Engineer 8529  


.j
.j
*J APPENDIX D*
* J  
. 0 APPENDIX D*
Palisades UNIT---------
Palisades UNIT---------
0
August 4, 1975 DATE 616..:_ ( 64-8913.  
      .                                                                                                              August 4, 1975 DATE     616..:_ ( 64-8913.
. COMPLETED BY J. Meineke DOCKET N0._5_0_-_2_5_5 ____
                                                                                                . COMPLETED BY       J. Meineke DOCKET N0._5_0_-_      2 _5_5_ _ _ __
OPERATING STATUS REPORTING PERIOD: ____
OPERATING STATUS
=7-r5..-0_7_0_l _______ THROUGH __
: 1. REPORTING PERIOD: _ _ _ _=7-r5..-0_7_0_l_ _ _ _ _ _ _ THROUGH _ _7_5_0_7_3_1_ _ _ _ _ _ _ __
7_5_0_7_3_1 ________
HOURS IN REPORTJ:-\G PERIOD: 744
HOURS IN REPORTJ:-\\G PERIOD: 744
                                                  -------:-;=-:=-:----------:----------=:--:-~
: 1.
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth). 2200                         MAX. DEPENDABLE CAPACITY (MWe-NET)               684
-------:-;=-:=-:----------:----------=:--:-~
: 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth). 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684
: 3.
: 3.
* LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWc-NET): . b30                                         *
* LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWc-NET):. b30
: 4. REASONS FOR RESTRICTION (IF AN.Y):               Power restricted to 2100 MWT due t~ reduced-Prim.
: 4.
REASONS FOR RESTRICTION (IF AN.Y):
Power restricted to 2100 MWT due t~ reduced-Prim.
Coolant Flow as a result of steam generator tube plugging.
Coolant Flow as a result of steam generator tube plugging.
THIS                                         CUMULATIVE REPORTING PERIOD         YR TO DATE                  TO DATE 704              2,680.5                    12,917.4
THIS REPORTING PERIOD
: 5. HOURS REACTOR WAS CRITICAL . . . . ; . . . . . . * .
: 5.
: 6. REACTOR RES/::RVE SHUTDOWN HOURS                 ...... .                                       0                          0
HOURS REACTOR WAS CRITICAL.... ;......*.
: 7. HOURS GENERATOR ON LINE.*. . . . . . . . . . . . * .                 697. 7            2., 585. 0                ll,90b.l
: 6.
: 8. UNJT RESERVE SHUTDOWN HOURS . *.. , . . . . . . .                     . 0                      0                          0
REACTOR RES/::RVE SHUTDOWN HOURS.......
: 9. GROSS THERMAL ENERGY GENERATED(MWH) . . . . . . . . . . . . . . . . * . . . .         1,116,216            4,292,088                  18,405,648
: 7.
: 10.                "
HOURS GENERATOR ON LINE.*............*.
GROSS ELEC1RICAL   ENERGY
: 8.
                -GENERATED (~l\\;H) . . . : . . . . . . . . . . . . . . . . . . . 318,620            1,271,460                  5,775,710
UNJT RESERVE SHUTDOWN HOURS. *..,.......
: 11. NET ELECTRICAL ENERGY GENERATED 291,830            1,173,807                  5 ,427 ,512*
: 9.
(~IWll) .........................*.**
: 10.
: 12. RL\CTOR AVAILABILITY FACTOR (1) . . . * . * . * *                     .94.6%            . 52 *. 7%                  41.1%
: 11.
: 13. UNIT AVAILABILITY FACTOR (2) . . . . . . . * . * *
: 12.
* 93.8%              50.8%                    37-9%    *~ .
: 13.
33-7%                    28.9%
: 14.
: 14. l 1NIT CAPACITY FACTOR (3)     .*...*.....***.
: 15.
6.2%               49.2%                     59.4%
GROSS THERMAL ENERGY GENERATED(MWH)................*....
: 15. UNIT FORCED OUTAGE RATE (4) . . . . . . . . . . . .
GROSS ELEC1RICAL ENERGY  
        . 16. SHUTDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
-GENERATED (~l\\\\;H)... :...................
: 17. IF SHUTDOWN AT END OF.REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ _ __
NET ELECTRICAL ENERGY GENERATED
: 18. UNITS IN TEST STATUS (PRIOR.TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(~IWll).........................*.**
DATE LAST            DA TE FORECAST          ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERA T!ON COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I)  R,EACTOR AVAILABILITY FACTOR                ------------~-X                         lQO..
RL\\CTOR AVAILABILITY FACTOR (1)...*.*.**
UNIT AVAILABILITY FACTOR (2).......*.***
l 1NIT CAPACITY FACTOR (3).*...*.....***.
UNIT FORCED OUTAGE RATE (4)............
704 697. 7
. 0 1,116,216 318,620 291,830
.94.6%
93.8%
6.2%
YR TO DATE 2,680.5 0
2., 585. 0 0
4,292,088 1,271,460 1,173,807
. 52 *. 7%
50.8%
33-7%
49.2%
CUMULATIVE TO DATE 12,917.4 0
ll,90b.l 0
18,405,648 5,775,710 5,427,512*
41.1%
37-9%
28.9%
59.4%
. 16.
SHUTDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
: 17.
IF SHUTDOWN AT END OF.REPORT PERIOD, ESTIMATED DATE OF STARTUP: ____________ _
: 18.
UNITS IN TEST STATUS (PRIOR.TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
(I)
R,EACTOR AVAILABILITY FACTOR l2l l:N!T AVAILABILITY FACTOR (3)
LIN ITC AP A CITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERA T!ON COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL  
------------~-X lQO..
HOURS IN REPORTING PERIOD.
HOURS IN REPORTING PERIOD.
HOURS GENERATOR ON LINE l2l  l:N!T AVAILABILITY FACTOR                  -------------XIOO HOURS IN REPORTING PERIOD NFT ELECTRICAL POWFR GFNERATED (3)  LIN ITC AP ACITY FACTOR MAX. DEPENDABLE CAPACITY (MWc-NET) X HOURS IN REPORTING l'ERIOO FORCED OUTAGE !!OURS.
HOURS GENERATOR ON LINE  
HOURS GENERA TOR ON LINE+ FORCED OUT AGE HOURS x 100
-------------XIOO HOURS IN REPORTING PERIOD NFT ELECTRICAL POWFR GFNERATED DATE LAST DA TE FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWc-NET) X HOURS IN REPORTING l'ERIOO FORCED OUTAGE !!OURS.
HOURS GENERA TOR ON LINE+ FORCED OUT AGE HOURS x 100  
*~.


                                                                                                                                                                                                                  - ~   **-
~ **-
      .          ~-                                                                                                                                                             ,~~
~-
rr*ci"r+.wht>*Q       -*...i*+/-Miiw'"'*""'*"_.'iOstu*-*....,'y_,,,.,*...G11rroiol',11111i,.._._ _ _*...,:t....._._,......,..u...,*""''v'"';i_.. ._.
,~~
                                                                                                                                                                      .._**..,..    *..""L,.. ... ,   ,
rr*ci"r+.wht>*Q -*...i*+/-Miiw'"'*""'*"_.'iOstu*-*....,'y_,,,.,*... G11rroiol',11111i,.._. ___
0                                                                                                                                                             0 APPENDIX E UN IT SH UT DOWNS REPORT MONTH                                               July 1975 TYPE                                                                                                                 METHOD OF F*FORCED                           DURATION                                                                         ~HUTTING DOWN NO.           DATE                   S*SCHEDULED                               (HOU.RS)               REASON (1)                                               THE REACTOR (2)                                     CORRECTIVE ACTIONS/COMMENTS 5       750727                                 F.                             46.3                             A                                                 1:                           , Shutdown to repair cont.rel rod drive i
*...,:t..... _._,......,..u...,* ""''v'"';i_  
moto..rs.
*.. ""L,.....,,  
                                                                                                                                                                                                                                                                            /
. 0 0
    --°'
APPENDIX E UN IT SH UT DOWNS REPORT MONTH July 1975 TYPE METHOD OF F*FORCED DURATION  
r:r:                                                                                                                                                                       .        :
~HUTTING DOWN NO.
(1) REASON                                   (2) METHOD
DATE S*SCHEDULED (HOU.RS)
                                                                                                                                                                                                                            . A*-EQUIPMENT FAILURE'(EXPLAlN)             I-MANUAL     . ,
REASON (1)
B- MAI NT, OR TEST                         2-MANUAL
THE REACTOR (2)
                                                                                                                                      .                                                                                        C- REFUELING D-REGULATORY RESTRICTION SCRAM  I 3-A UTOMATlC*
CORRECTIVE ACTIONS/COMMENTS 5
E-Ol'ERATOR TRAINING AND                       SCRAM LICENSE EXAMINATION F-ADMINISTRATI VE             ...
750727 F.
G-OPERATIONAL ERROR               ..
46.3 A
(EXPLAIN)
1:  
, Shutdown to repair cont.rel rod drive i moto..rs.  
/  
--°'
r:r: -
(1) REASON (2) METHOD  
. A*-EQUIPMENT FAILURE'(EXPLAlN)
I-MANUAL B-MAI NT, OR TEST 2-MANUAL C-REFUELING SCRAM I
D-REGULATORY RESTRICTION 3-A UTOMATlC*
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATI VE G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
H-OTHER (EXPLAIN)
The un:l. t operated for the entire mont.h at 80% p@wer exc.ept f'or an Outage caused b;y two :inopOrablO control.driveS * *


==SUMMARY==
==SUMMARY==
:                  The un:l. t operated for the entire mont.h at 80% p@wer exc.ept f'or an                                                            '
t*
Outage caused b;y two :inopOrablO control .driveS *
I*'  
* t*
 
                                .*                                                                                                                                        I*'           ,**
APPENDIXC  
* APPENDIXC
.e DOCKETN0.~
                                                                                                                                                            .e DOCKETN0.~           5 o_~_ 2 55
5 o_~_2_
_~*~-
55~*~-
UNIT _l?_a,_li__*s_a_d_e_s__
UNIT _l?_a,_li__* s_a_d_e_s __
DATE   Aug. 4, 1975 COMPLETED BY             J
DATE Aug. 4, 1975 COMPLETED BY J
* A. Meineke AVERAGE DAILY UNIT POWER LEVEL July 1975 MONTH AVERAGE DAILY POWER LEVEL                                                                                         AVERAGE DAILY POWER LEVEL DAY                                 (l\1We-net)                                                           DAY                                                 (MWe-net)
* A. Meineke AVERAGE DAILY UNIT POWER LEVEL July 1975 MONTH AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (l\\1We-net)
    .,*                              *50.
DAY (MWe-net)  
17* .                                           495*
*50.
                                              ..                                                                                                                *496                                              .--.
17*.
2                                 97                                                                       18
495*
                                    *18'4                                                                                       /
2 97 18  
3                                                                                                           .19'                                           476 261                                                                                                                       496 4                                                                                                            20.
*496
                                  . 332                                                                                                                         498 5                                                                                                          21 6*                               *399                                                                       *22                                             496
*18'4  
                                    **426 7                                                                                                            23                                             .2 4 4 482.                                                                     *24               ....                          .49'5 *.
/
8                                                                                                                                                                                                      .* .
476 3  
: ~.
.19' 4
498                                                                                                                       499 9                                                                                                          25
261
                                  . 495                                                                       . 26                                             492 10 11*                               504                                                                                                                     . 310.
: 20.
27.
496 5
507                                                                                                                          0 12                                                                                                          *28 509                                                                                                                           7 13 ,.-                                                                                                        29.
. 332 21 498 6*  
506                                                                                                                       162 14                                                                                                           30 5Cl3                                                                                                                      481 1"5                                                                                                         31 16                               497 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS
*399  
*22 496 7
**426 23 4 4
.2 8
482.  
*24  
.49'5 *.
9 498 25 499 10
. 495  
. 26 492 11*
504
: 27.
. 310.
12 507
*28 0
13 509
: 29.
7 506 14 30 162 1"5 5Cl3 31 481 16 497 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS  
. On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
. On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usi"ng maximum dependable capacity for the net electrical rating of the unit. there may be. occasions when the daily average po\vcr level exceeds the I 00% line (or the rcstrh:ted power level* line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly .
These figures will be used to plot a graph for each reporting month. Note that by usi"ng maximum dependable capacity for the net electrical rating of the unit. there may be. occasions when the daily average po\\vcr level exceeds the I 00% line (or the rcstrh:ted power level* line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.  
                                                                                                  . l.J (i-C-1
. l.J (i-C-1  
                                                                                                                            . !"'""tt*'"'$'...,,ll~--""'"""*
.,.,, -~......,.., l~""""'l'l*"I ¥ ?-"J'l.'.'f'."'_'.:~."'',.._~.'!"".i:""'"'if45'..,..l?\\~.P4""!'!'>""''""""1P\\!.*""'  
        .,.,, -~ ......,.., l~""""'l'l*"I ¥ ?-"J'l.'.'f'."'_'.:~."'',.._~.'!"".i:""'"'if45'..,..l?\~.P4""!'!'>""''""""1P\!.*""'                       .. -~.         **~ M * *
.. !"'""tt*'"'$'...,,ll~--""'"""*
                                                            .       "-}}
.. -~.  
**~ M  
~.}}

Latest revision as of 08:33, 5 January 2025

Monthly Operating Data for July 1975
ML18347A835
Person / Time
Site: Palisades 
Issue date: 08/07/1975
From: Meincke J
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A835 (4)


Text

1--

\\

.:~ -*

U. S, Nuclear Regulatory Commi13,sion Mail and Records Section Washington, D. C., 20555 Gentlemen:

Re:

License Reports o Operating Data DPR-20 Docket No:

50-255 consumers Power company August 7, 197 5 Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of July, 1975 cc J.

R.

R.

G.

L.

B.

Kepler,

~ill>:'J,!1;-litft'r Sewell NRC Sincerely, James A. Meineke General Engineer 8529

.j

  • J

. 0 APPENDIX D*

Palisades UNIT---------

August 4, 1975 DATE 616..:_ ( 64-8913.

. COMPLETED BY J. Meineke DOCKET N0._5_0_-_2_5_5 ____

OPERATING STATUS REPORTING PERIOD: ____

=7-r5..-0_7_0_l _______ THROUGH __

7_5_0_7_3_1 ________

HOURS IN REPORTJ:-\\G PERIOD: 744

1.

:-;=-:=-:----------:----------=:--:-~

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWth). 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684

3.
  • LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWc-NET):. b30
4.

REASONS FOR RESTRICTION (IF AN.Y):

Power restricted to 2100 MWT due t~ reduced-Prim.

Coolant Flow as a result of steam generator tube plugging.

THIS REPORTING PERIOD

5.

HOURS REACTOR WAS CRITICAL.... ;......*.

6.

REACTOR RES/::RVE SHUTDOWN HOURS.......

7.

HOURS GENERATOR ON LINE.*............*.

8.

UNJT RESERVE SHUTDOWN HOURS. *..,.......

9.
10.
11.
12.
13.
14.
15.

GROSS THERMAL ENERGY GENERATED(MWH)................*....

GROSS ELEC1RICAL ENERGY

-GENERATED (~l\\\\;H)... :...................

NET ELECTRICAL ENERGY GENERATED

(~IWll).........................*.**

RL\\CTOR AVAILABILITY FACTOR (1)...*.*.**

UNIT AVAILABILITY FACTOR (2).......*.***

l 1NIT CAPACITY FACTOR (3).*...*.....***.

UNIT FORCED OUTAGE RATE (4)............

704 697. 7

. 0 1,116,216 318,620 291,830

.94.6%

93.8%

6.2%

YR TO DATE 2,680.5 0

2., 585. 0 0

4,292,088 1,271,460 1,173,807

. 52 *. 7%

50.8%

33-7%

49.2%

CUMULATIVE TO DATE 12,917.4 0

ll,90b.l 0

18,405,648 5,775,710 5,427,512*

41.1%

37-9%

28.9%

59.4%

. 16.

SHUTDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.

IF SHUTDOWN AT END OF.REPORT PERIOD, ESTIMATED DATE OF STARTUP: ____________ _

18.

UNITS IN TEST STATUS (PRIOR.TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

(I)

R,EACTOR AVAILABILITY FACTOR l2l l:N!T AVAILABILITY FACTOR (3)

LIN ITC AP A CITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERA T!ON COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL


~-X lQO..

HOURS IN REPORTING PERIOD.

HOURS GENERATOR ON LINE


XIOO HOURS IN REPORTING PERIOD NFT ELECTRICAL POWFR GFNERATED DATE LAST DA TE FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWc-NET) X HOURS IN REPORTING l'ERIOO FORCED OUTAGE !!OURS.

HOURS GENERA TOR ON LINE+ FORCED OUT AGE HOURS x 100

  • ~.

~ **-

~-

,~~

rr*ci"r+.wht>*Q -*...i*+/-Miiw'"'*""'*"_.'iOstu*-*....,'y_,,,.,*... G11rroiol',11111i,.._. ___

  • ...,:t..... _._,......,..u...,* ""v'"';i_
  • .. ""L,.....,,

. 0 0

APPENDIX E UN IT SH UT DOWNS REPORT MONTH July 1975 TYPE METHOD OF F*FORCED DURATION

~HUTTING DOWN NO.

DATE S*SCHEDULED (HOU.RS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS/COMMENTS 5

750727 F.

46.3 A

1:

, Shutdown to repair cont.rel rod drive i moto..rs.

/

--°'

r:r: -

(1) REASON (2) METHOD

. A*-EQUIPMENT FAILURE'(EXPLAlN)

I-MANUAL B-MAI NT, OR TEST 2-MANUAL C-REFUELING SCRAM I

D-REGULATORY RESTRICTION 3-A UTOMATlC*

E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATI VE G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

The un:l. t operated for the entire mont.h at 80% p@wer exc.ept f'or an Outage caused b;y two :inopOrablO control.driveS * *

SUMMARY

t*

I*'

APPENDIXC

.e DOCKETN0.~

5 o_~_2_

55~*~-

UNIT _l?_a,_li__* s_a_d_e_s __

DATE Aug. 4, 1975 COMPLETED BY J

  • A. Meineke AVERAGE DAILY UNIT POWER LEVEL July 1975 MONTH AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (l\\1We-net)

DAY (MWe-net)

  • 50.

17*.

495*

2 97 18

  • 496
  • 18'4

/

476 3

.19' 4

261

20.

496 5

. 332 21 498 6*

  • 399
  • 22 496 7
    • 426 23 4 4

.2 8

482.

  • 24

.49'5 *.

9 498 25 499 10

. 495

. 26 492 11*

504

27.

. 310.

12 507

  • 28 0

13 509

29.

7 506 14 30 162 1"5 5Cl3 31 481 16 497 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS

. On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usi"ng maximum dependable capacity for the net electrical rating of the unit. there may be. occasions when the daily average po\\vcr level exceeds the I 00% line (or the rcstrh:ted power level* line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

. l.J (i-C-1

.,.,, -~......,.., l~""""'l'l*"I ¥ ?-"J'l.'.'f'."'_'.:~.",.._~.'!"".i:""'"'if45'..,..l?\\~.P4""!'!'>""""""1P\\!.*""'

.. !"'""tt*'"'$'...,,ll~--""'"""*

.. -~.

    • ~ M

~.