ML19030A376: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:,... ...-.*
{{#Wiki_filter:.
Public Service Electric and Gas Company Octobe Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.                 20555
* Public Service Electric and Gas Company Octobe Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555  


==Dear Sir,==
==Dear Sir,==
 
MONTHLY OPERATING REPORT SALEM NO.
MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, and USNRC Regulatory Guide 1.16, 10 copies of the following monthly operating reports for the month of September 1976 are hereby submitted:
1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, and USNRC Regulatory Guide 1.16, 10 copies of the following monthly operating reports for the month of September 1976 are hereby submitted:
Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Sincerely yours,
Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions CC Mr. James P. O'Reilly Director of US NRC Sincerely yours,  
                                                  ~-
~-
Frank P. Li br~
Frank P. Li br~
General Manager -
General Manager -
Electric Production CC            Mr. James P. O'Reilly                                (1 Copy )
Electric Production Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pa.
Director of US NRC Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pa.         19406 Director, Office of Management                       (2 Copies)
19406 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.         20555 The Energy People 95-2001 300M 8-75
20555 The Energy People (1 Copy )
(2 Copies) 95-2001 300M 8-75  


,**. *.-: __:_ .. -**-::---**--     -* --* **----**-       ..* _........:.__ ____________ ~--           ---     . *---***-.--- ..
, **. *.-: _ _:_.. -**-::---**-- -* --* **----**-..* _........:.__ ____________ ~-----. *---***-.---..
APPENDIX B AVERAGE DAILY UNrf. POWER LEVEL                                       *',, /*: ,. .. '
APPENDIX B AVERAGE DAILY UNrf. POWER LEVEL  
DOCKET NO.                     50-272 .
*',, /*:,... '
0 UNIT           Salem No. l 7_6~
DOCKET NO.
DATE _l_0....,./--5.,_/......
50-272.
COJvf PLETED BY ;:i-. M. ~u:E.,ko ,1~'2.F               L 60 TELEPHONE                     i~f~ 5 ;b~o~
0.
MONTI.I             SEPTEMBER 1976 .
UNIT Salem No. l DATE _l_0....,./--5.,_/......
DAY AVERAGE DAILY POWER LEVEL                                           DAY AVERAGE DAILY POWER LEVEL (MWe-Nct)                                                                 (MWe-Nct) 1                 NiA - See Below*                                     17                           N/A 2                 N/A                                                 18                           N,{A 3                 N/A                                                 19                           N/A 4                 N/A                                                 20                           N/A i
7_6 ~
                                                                                                                                                                    /
COJvf PLETED BY ;:i-. M. ~u:E.,ko,1~'2.F L TELEPHONE 60i~f~
5                                                                      21                           N/A 6                 N/A                                                 22                           N/A 7                                                                     23                           N/A 8                 N/A                                                 24 N/A 9                 NLA                                                 25                           N/A 10                 N/A                                                 26                           N/A 11                 NLA                                                 27                           NLA 12                 NLA                                                 28                         . N/A 13                 NLA                                                 29                           N/A 14                 NLA                                                 30                           N/A' 15                 N/A                                                 31                           N/A
5;b~o~
                  . 16                 N/A
MONTI.I SEPTEMBER 1976.
    *Salem No. 1 Unit limited to 1% of core thermal power by operating license No. DPR-70.
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nct)
INSTRUCTIONS                                                                                                                 .
(MWe-Nct) 1 NiA - See Below*
17 N/A 2
N/A 18 N,{A 3
N/A 19 N/A 4
N/A 20 N/A 5
21 N/A 6
N/A 22 N/A 7
23 N/A 8
N/A 24 N/A 9
NLA 25 N/A 10 N/A 26 N/A 11 NLA 27 NLA 12 NLA 28  
. N/A 13 NLA 29 N/A 14 NLA 30 N/A' 15 N/A 31 N/A  
. 16 N/A  
*Salem No. 1 Unit limited to 1% of core thermal power by operating license No. DPR-70.
INSTRUCTIONS i
/
On !his form, !isl lhc average daily unit power Jew! in MWc-Ncl for each da)' in lhc rt'plirling month. Compute to the ne:irest whole nwgawa t t.
On !his form, !isl lhc average daily unit power Jew! in MWc-Ncl for each da)' in lhc rt'plirling month. Compute to the ne:irest whole nwgawa t t.
These nl~llrCS will be used lo plot ;1 ~raph ror rach repo1 li11g lllllllth. Nllle tlt:1t \\'hl'll 111:1ximlllll dq1l'lld:1hk eap:il"ily is Used for the Ill'( clcctrk:tl r;ttill~ or the llllil, there lll:l)' !Je llL'L':lSillllS when the liaily :1\'Cr:tgC !lll\\'l'f fl'WI L'XL'l'\.'t!S the I 00'};, line (or thL~ restridetl. plnwr kl'el linl!). 111 s11L"11 L:;1ses. the an:r;tgL' d:1ily 1111it power oulpul ~hL'L'l slwuld bL' foulnotcd to explain the app:.trl'lll anomaly.
These nl~llrCS will be used lo plot ;1 ~raph ror rach repo1 li11g lllllllth. Nllle tlt:1t \\\\'hl'll 111:1ximlllll dq1l'lld:1hk eap:il"ily is Used for the Ill'( clcctrk:tl r;ttill~ or the llllil, there lll:l)' !Je llL'L':lSillllS when the liaily :1\\'Cr:tgC !lll\\\\'l'f fl'WI L'XL'l'\\.'t!S the I 00'};, line (or thL~ restridetl. plnwr kl'el linl!). 111 s11L"11 L:;1ses. the an:r;tgL' d:1ily 1111it power oulpul ~hL'L'l slwuld bL' foulnotcd to explain the app:.trl'lll anomaly.  


      .. ~.
.. ~.
r;,-: --- -- *---**-. -
APPENDIX C
APPENDIX C
* OPERATING DATA REPORT DOCK ET NO. -""'5'""0._-_,.2......7......2..___ _ __
* OPERATING DATA REPORT DOCK ET NO. -""'5'""0._-_,.2...... 7...... 2..__ ___ _
UNIT Salem No. 1
UNIT Salem No. 1 DATE 10/5/76.
                                                                                            -;    DATE 10/5/76 .
COMPLETED BY J
COMPLETED BY J
* M.                           ZuEko,   Jr" ..
* M. ZuEko, Jr"..
TELEPHONE     609-365-7000                                   [
TELEPHONE 609-365-7000
[
Ext~ 507 OPERATING STATUS
Ext~ 507 OPERATING STATUS
: 1. REPORTING PERIOD: SEPTEMBER 19 7 6,         GROSS                                     . 7 20 ~~~~~.
: 1. REPORTING PERIOD: SEPTEMBER 19 7 6, GROSS HOURS IN REPORT.ING PERIOD:. 7 20 I
HOURS IN REPORT.ING PERIOD: ......,..t_o___,.b~.e=*                     I
......,..t_o___,.b~.e=* ~~~~~.
: 2. CURRENTL y AUTHORIZED POWER LEVEL (MWtl: ...lhJJL MAX. DEPEND. CAPACITY (MWe-Nctl:                           determin'ed DESIGN ELECTRICAL RA!ING (MWe-Net):   1090                                                                               *1
: 2. CURRENTL y AUTHORIZED POWER LEVEL (MWtl:...lhJJL MAX. DEPEND. CAPACITY (MWe-Nctl: determin'ed DESIGN ELECTRICAL RA!ING (MWe-Net):
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY} IMWe-Nct}:   See i tern 4 below
1090
* 1
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY} IMWe-Nct}: See i tern 4 below
: 4. REASONS FOR RESTRICTION (IF ANY}:
: 4. REASONS FOR RESTRICTION (IF ANY}:
Operating license restriction to                   l~
Operating license restriction to l~
THIS MONTH    YR TO DATE                        CUMULATIVE of core thermal power.
of core thermal power.
N/A            .N/A                          N/A
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL *************,
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL     ************* ,
* G. REACTOR RESERVE SHUTDOWN HOURS *******************
* G. REACTOR RESERVE SHUTDOWN HOURS *******************
N/A              N/A                          N/A 7~ HOURS GENERATOR ON UNE **************************                   Ni A            NLA                          NLA Ni A            Ni A                          NLA --.,
7~ HOURS GENERATOR ON UNE **************************
: 8. UNIT RESERVE SHUTDOWN HOURS       **********************
: 8. UNIT RESERVE SHUTDOWN HOURS **********************
                                                                                                                                                    /
: 9. GROSS THERMAL ENERGY GENERATED (MWH).**.....*.*.**
: 9. GROSS THERMAL ENERGY GENERATED (MWH)       .**.....*.*.**           N/A              N/A                          N/A
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) *************
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) *************
N/A              N/A                          N/A
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) **********.***
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)     **********.***           Nl:A            N/A                          NLA
: 12. RE~CTOR SERVICE FACTOR **************., *************
: 12. RE~CTOR   SERVICE FACTOR ************** .,*************
: 13. REACTOR AVAILABILITY FACTOR ********************** _.
* N/A              N/A                          N/A J
: 14. UNIT SERVICE FACTOR ******, * ~......................
: 13. REACTOR AVAILABILITY FACTOR ********************** _.               NLA              Ni A                          NL:A
: 14. UNIT SERVICE FACTOR ****** , *   ~ ..................... .
: 15. UNIT AVAILABILITY FACTOR **************************
: 15. UNIT AVAILABILITY FACTOR **************************
N/~
: 16. 'UNIT CA~ACITY FACTOR (Using MDC) ***.******************
N/A N/A N/A Nl:A NLA I
: 16. 'UNIT CA~ACITY FACTOR (Using MDC) ***.******************
N/A              N/A                          Nf.A
: 17. UNIT CAPACITY FACTOR (Using Design MWcl **************** ',
: 17. UNIT CAPACITY FACTOR (Using Design MWcl **************** ',
N/A              N/A                          N/A
: 18. UNIT FORCED OUTAGE HATE **************************
: 18. UNIT FORCED OUTAGE HATE **************************
N/A             N/A                           Nf.A
THIS MONTH YR TO DATE N/A
.N/A N/A N/A Ni A NLA Ni A Ni A N/A N/A N/A N/A Nl:A N/A
* N/A N/A NLA Ni A N/~
N/A N/A N/A N/A N/A N/A N/A N/A N/A
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND PU RATION OF EACH):
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND PU RATION OF EACH):
: 20. IF SHUT DOWN AT'END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ __
: 20. IF SHUT DOWN AT'END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ______
: 21. UNITS IN TEST STATUS (PRIOR TO COMMrnCIAL OPERATION):         FORECAST    ACHIEVED INITIAL CRITICALITY                                       9L30L76 INITIAL ELECTRICITY                                     11/01/76 COMMERCIAL OPERATION                                      12/20/76 l .16-9 r;,-: --- -- *---**-. -
: 21. UNITS IN TEST STATUS (PRIOR TO COMMrnCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l.16-9 FORECAST ACHIEVED 9L30L76 11/01/76 12/20/76 CUMULATIVE N/A N/A NLA NLA --.,  
/
N/A N/A NLA N/A J NL:A Nl:A I NLA Nf.A N/A Nf.A
 
NO.
DATE


APPENDIX D              ..                  DOCKET NO.        5*0-2 72 .' .,_
==SUMMARY==
(
TYPE F: FORCED S: SCHEDULED 5*0-2 72 DOCKET NO.
i UNIT SHUTDOWNS AND POWER .REDUCTIONS                         UNIT NAME       Sal_em No. 1\   l
APPENDIX D UNIT SHUTDOWNS AND POWER.REDUCTIONS UNIT NAME Sal_em No. 1\\
                                                                                                . !)ATE       10/5/76
. !)ATE 10/5/76  
                                                                                        ~OMPLETED     BY   J.M. Zupko, Jr.
~OMPLETED BY J.M. Zupko, Jr.
REPORT MONTH           SEPTEMBER 19.76               TELEPHONE       609-:-365-7000 Ext. 507 METHOD OF TYPE                              SHUTTING DOWN F: FORCED  DURATION                  THE REAC!OR OR NO. DATE S: SCHEDULED  (HOURS)  REASON (1)    REDUCING POWER (2)             CORRECTIVE ACTIONS/COMMENTS (1) REASON A: EQUIPMENT FAILURE (EXPLAIN)
REPORT MONTH SEPTEMBER 19.76 TELEPHONE 609-:-365-7000 DURATION (HOURS)
REASON (1)
METHOD OF SHUTTING DOWN THE REAC!OR OR REDUCING POWER (2)  
\\~ __ )
Ext.
CORRECTIVE ACTIONS/COMMENTS (1)
REASON A: EQUIPMENT FAILURE (EXPLAIN)
B: MAlNT. OR TEST C: REFUEUNG D: REGULATORY RESTRXCTION E: OPERATOR.TRAINING AND LICENSE EXAMINATION f: AmllNiS'fRAT!VE G: OPERATIONAL ERROR (EXPLAIN)
B: MAlNT. OR TEST C: REFUEUNG D: REGULATORY RESTRXCTION E: OPERATOR.TRAINING AND LICENSE EXAMINATION f: AmllNiS'fRAT!VE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
H: OTHER (EXPLAIN)
(2)   METHOD 1: MANUAL 2: MANUAL SCRAM.
(2)
3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)
METHOD 1: MANUAL 2: MANUAL SCRAM.
Information for this report not applicable -.Salem No. 1 initial startup testing.
3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN) 507 Information for this report not applicable -.Salem No. 1 initial startup testing.
 
(
==SUMMARY==
i l}}
                                                    \~ __ )}}

Latest revision as of 06:43, 5 January 2025

Submit Monthly Operating Report for the Month of September 1976 for Salem No. 1
ML19030A376
Person / Time
Site: Salem  
(DPR-070, DPR-075)
Issue date: 10/18/1976
From: Librizzi F
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A376 (4)


Text

.

  • Public Service Electric and Gas Company Octobe Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir,

MONTHLY OPERATING REPORT SALEM NO.

1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, and USNRC Regulatory Guide 1.16, 10 copies of the following monthly operating reports for the month of September 1976 are hereby submitted:

Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions CC Mr. James P. O'Reilly Director of US NRC Sincerely yours,

~-

Frank P. Li br~

General Manager -

Electric Production Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pa.

19406 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 The Energy People (1 Copy )

(2 Copies) 95-2001 300M 8-75

, **. *.-: _ _:_.. -**-::---**-- -* --* **----**-..* _........:.__ ____________ ~-----. *---***-.---..

APPENDIX B AVERAGE DAILY UNrf. POWER LEVEL

  • ',, /*:,... '

DOCKET NO.

50-272.

0.

UNIT Salem No. l DATE _l_0....,./--5.,_/......

7_6 ~

COJvf PLETED BY ;:i-. M. ~u:E.,ko,1~'2.F L TELEPHONE 60i~f~

5;b~o~

MONTI.I SEPTEMBER 1976.

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nct)

(MWe-Nct) 1 NiA - See Below*

17 N/A 2

N/A 18 N,{A 3

N/A 19 N/A 4

N/A 20 N/A 5

21 N/A 6

N/A 22 N/A 7

23 N/A 8

N/A 24 N/A 9

NLA 25 N/A 10 N/A 26 N/A 11 NLA 27 NLA 12 NLA 28

. N/A 13 NLA 29 N/A 14 NLA 30 N/A' 15 N/A 31 N/A

. 16 N/A

  • Salem No. 1 Unit limited to 1% of core thermal power by operating license No. DPR-70.

INSTRUCTIONS i

/

On !his form, !isl lhc average daily unit power Jew! in MWc-Ncl for each da)' in lhc rt'plirling month. Compute to the ne:irest whole nwgawa t t.

These nl~llrCS will be used lo plot ;1 ~raph ror rach repo1 li11g lllllllth. Nllle tlt:1t \\\\'hl'll 111:1ximlllll dq1l'lld:1hk eap:il"ily is Used for the Ill'( clcctrk:tl r;ttill~ or the llllil, there lll:l)' !Je llL'L':lSillllS when the liaily :1\\'Cr:tgC !lll\\\\'l'f fl'WI L'XL'l'\\.'t!S the I 00'};, line (or thL~ restridetl. plnwr kl'el linl!). 111 s11L"11 L:;1ses. the an:r;tgL' d:1ily 1111it power oulpul ~hL'L'l slwuld bL' foulnotcd to explain the app:.trl'lll anomaly.

.. ~.

r;,-: --- -- *---**-. -

APPENDIX C

  • OPERATING DATA REPORT DOCK ET NO. -""'5'""0._-_,.2...... 7...... 2..__ ___ _

UNIT Salem No. 1 DATE 10/5/76.

COMPLETED BY J

  • M. ZuEko, Jr"..

TELEPHONE 609-365-7000

[

Ext~ 507 OPERATING STATUS

1. REPORTING PERIOD: SEPTEMBER 19 7 6, GROSS HOURS IN REPORT.ING PERIOD:. 7 20 I

......,..t_o___,.b~.e=* ~~~~~.

2. CURRENTL y AUTHORIZED POWER LEVEL (MWtl:...lhJJL MAX. DEPEND. CAPACITY (MWe-Nctl: determin'ed DESIGN ELECTRICAL RA!ING (MWe-Net):

1090

  • 1
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY} IMWe-Nct}: See i tern 4 below
4. REASONS FOR RESTRICTION (IF ANY}:

Operating license restriction to l~

of core thermal power.

5. NUMBER OF HOURS REACTOR WAS CRITICAL *************,
  • G. REACTOR RESERVE SHUTDOWN HOURS *******************

7~ HOURS GENERATOR ON UNE **************************

8. UNIT RESERVE SHUTDOWN HOURS **********************
9. GROSS THERMAL ENERGY GENERATED (MWH).**.....*.*.**
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) *************
11. NET ELECTRICAL ENERGY GENERATED (MWH) **********.***
12. RE~CTOR SERVICE FACTOR **************., *************
13. REACTOR AVAILABILITY FACTOR ********************** _.
14. UNIT SERVICE FACTOR ******, * ~......................
15. UNIT AVAILABILITY FACTOR **************************
16. 'UNIT CA~ACITY FACTOR (Using MDC) ***.******************
17. UNIT CAPACITY FACTOR (Using Design MWcl **************** ',
18. UNIT FORCED OUTAGE HATE **************************

THIS MONTH YR TO DATE N/A

.N/A N/A N/A Ni A NLA Ni A Ni A N/A N/A N/A N/A Nl:A N/A

  • N/A N/A NLA Ni A N/~

N/A N/A N/A N/A N/A N/A N/A N/A N/A

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND PU RATION OF EACH):
20. IF SHUT DOWN AT'END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ______
21. UNITS IN TEST STATUS (PRIOR TO COMMrnCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l.16-9 FORECAST ACHIEVED 9L30L76 11/01/76 12/20/76 CUMULATIVE N/A N/A NLA NLA --.,

/

N/A N/A NLA N/A J NL:A Nl:A I NLA Nf.A N/A Nf.A

NO.

DATE

SUMMARY

TYPE F: FORCED S: SCHEDULED 5*0-2 72 DOCKET NO.

APPENDIX D UNIT SHUTDOWNS AND POWER.REDUCTIONS UNIT NAME Sal_em No. 1\\

. !)ATE 10/5/76

~OMPLETED BY J.M. Zupko, Jr.

REPORT MONTH SEPTEMBER 19.76 TELEPHONE 609-:-365-7000 DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DOWN THE REAC!OR OR REDUCING POWER (2)

\\~ __ )

Ext.

CORRECTIVE ACTIONS/COMMENTS (1)

REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAlNT. OR TEST C: REFUEUNG D: REGULATORY RESTRXCTION E: OPERATOR.TRAINING AND LICENSE EXAMINATION f: AmllNiS'fRAT!VE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

(2)

METHOD 1: MANUAL 2: MANUAL SCRAM.

3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN) 507 Information for this report not applicable -.Salem No. 1 initial startup testing.

(

i l