ML19317E693: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-    -                  -.        -  -                        - - .        .                -
{{#Wiki_filter:-
O   .
O IIT Oconec Unit 2 DATE 8/8/75 DOCKET NO.
IIT   Oconec Unit 2 DATE   8/8/75 DOCKET NO.           50-270 PREPARED BY           k. 0..Sharpe OPERATING STATUS
50-270 PREPARED BY
: 1. REPORTING PERIOD: July 1, 1975               THROUGH             July 31, 1975 GROSS HOURS IN REPORTING PERIOD:                 744.00
: k. 0..Sharpe OPERATING STATUS 1.
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):             871
REPORTING PERIOD: July 1, 1975 THROUGH July 31, 1975 GROSS HOURS IN REPORTING PERIOD:
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)                         None
744.00 2.
: 4. REASONS FOR RESTRICTION (IF ANY) hiis Month             Year to Date       Cumulative
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                     561.7                 3599.2           5545.3 i
871 3.
: 6. REACTOR RESERVE SHUTDOWN HOURS               -                      -                -
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
: 7. HOURS GENERATOR ON-LINE                       551.6     _
None 4.
3489.9           5365.3
REASONS FOR RESTRICTION (IF ANY) hiis Month Year to Date Cumulative 5.
: 8. UNIT RESERVE SHUTDOWN HOURS                   -                      -                -
NUMBER OF HOURS THE REACTOR WAS CRITICAL 561.7 3599.2 5545.3 i
: 9. GROSS THERMAL ENERGY GENERATED (MWH) 1363641                         8285879           12592777
6.
: 10. GROSS ELECTRICAL ENERGY GENERATED                                                                     '
REACTOR RESERVE SHUTDOWN HOURS 7.
(MWH)                                       459160     _
HOURS GENERATOR ON-LINE 551.6 3489.9 5365.3 8.
2823460           4292436
UNIT RESERVE SHUTDOWN HOURS 9.
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)                                         435753                 2679407           4066933 4      12. REACTOR SERVICE FACTOR                       75.5                   70.8             70.9
GROSS THERMAL ENERGY GENERATED (MWH) 1363641 8285879 12592777 10.
: 13. REACTOR AVAILABILITY FACTOR                   74.1                   68.8             68.9
GROSS ELECTRICAL ENERGY GENERATED (MWH) 459160 2823460 4292436 11.
,      14. UNIT SERVICE FACTOR                           74.1                   68.6             68.6 l       15. UNIT AVAILABILITY FACTOR                       74.1                   68.6             68.6 i
NET ELECTRICAL ENERGY GENERATED (MWH) 435753 2679407 4066933 12.
: 16. UNIT CAPACITY FACTOR (Using Net               67.2                 60.5             59.7 Capability)
REACTOR SERVICE FACTOR 75.5 70.8 70.9 4
: 17. UNIT CAPACITY FACTOR (Using Design Mwe)                             66.0                 59.4             58.6
13.
: 18. UNIT FORCED OUTAGE RATE                       25.9                 31.0             31.1
REACTOR AVAILABILITY FACTOR 74.1 68.8 68.9 14.
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
UNIT SERVICE FACTOR 74.1 68.6 68.6 l
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
15.
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRITICAT. X 100 110URS IN REPORTING PERIOD REACTOR AVAILABILIW FACTOR = HollRS RFACTOR UAS AVAIIAnl.E TO OPERATE X 100 Il0URS IN REPORTING PERIOD 11 NIT SERVICE l' ACTOR   = HolrPS GEMERATOR ON 1.1NE HOURS IN REPORTING PERIOD                 912180 UNIT AVAIIARTLin FACTOR = 110URS ITNIT WAS AVAITABI.E TO CENERATE X 100 HOURS IN REPORTING PERIOD l
UNIT AVAILABILITY FACTOR 74.1 68.6 68.6 i
UNIT CAPACITY FACTOR.    = NET ELECTRICAL POWER CENERATED
16.
UNIT CAPACITY FACTOR (Using Net 67.2 60.5 59.7 Capability) 17.
UNIT CAPACITY FACTOR (Using Design Mwe) 66.0 59.4 58.6 18.
UNIT FORCED OUTAGE RATE 25.9 31.0 31.1 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRITICAT. X 100 110URS IN REPORTING PERIOD REACTOR AVAILABILIW FACTOR = HollRS RFACTOR UAS AVAIIAnl.E TO OPERATE X 100 Il0URS IN REPORTING PERIOD 11 NIT SERVICE l' ACTOR
= HolrPS GEMERATOR ON 1.1NE HOURS IN REPORTING PERIOD 912180 UNIT AVAIIARTLin FACTOR = 110URS ITNIT WAS AVAITABI.E TO CENERATE X 100 HOURS IN REPORTING PERIOD l
= NET ELECTRICAL POWER CENERATED UNIT CAPACITY FACTOR.
[N *L Capability or Design (Mwe-Net.)] X 1100Rd IN REPOKTfld,-
[N *L Capability or Design (Mwe-Net.)] X 1100Rd IN REPOKTfld,-
PERTOn L_                       UNIT FORCD OUTACE RATE - FOP.Crl],0tQA,G,E_ljojfjlS                     --
PERTOn L_
_      .100   1
UNIT FORCD OUTACE RATE - FOP.Crl],0tQA,G,E_ljojfjlS
.100 1


D CKET No. _50-270 UNIT SHUTDOWNS                                 UNIT NAMii Oconee Unit 2 DATli 8/8/75 REPORT MONTil         July, 1975 TYPE               ,
D CKET No. _50-270 Oconee Unit 2 UNIT SHUTDOWNS UNIT NAMii DATli 8/8/75 REPORT MONTil July, 1975 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.
METHOD OF                                                       -
DATE S-SCHEDULED (HOURS)
F FORCED   DURATION                       SHUTTING DOWN NO. DATE   S-SCHEDULED   (HOURS)   REASON (1)         THE REACTOR (2)         CORRECTIVE ACTIONS /COMMFNTS 11   750701       F       192.37         A                     1         Unit shutdown to investigate low reactor coolant pump motor oil level and to perform surveillance tests.
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS /COMMFNTS 11 750701 F
192.37 A
1 Unit shutdown to investigate low reactor coolant pump motor oil level and to perform surveillance tests.
I I
I I
(I) REASON                   *
(I) REASON (2) METIIOD A -EQUIPMENT I ALLURE (EXPLAIN) 3-MANUAL 3
(2) METIIOD A -EQUIPMENT I ALLURE (EXPLAIN)     3-MANUAL             3 B- MAINT. OR TEST.                   2-MANUAL C- RLEUELING                           SCR AM D-REGULATORY RESTRICTION             3- AUTOM ATIC E-OPER ATOR TRAINING AND               SCRAM LICENSL EXAMINATION F-ADMINISTRATIVE G-OPER ATION AL ER ROR                           '
B-MAINT. OR TEST.
(EXPLAIN)
2-MANUAL C-RLEUELING SCR AM D-REGULATORY RESTRICTION 3-AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICENSL EXAMINATION F-ADMINISTRATIVE G-OPER ATION AL ER ROR (EXPLAIN)
II-OlllLR IEXPLAIN)
II-OlllLR IEXPLAIN)


Line 60: Line 74:


50-270 DOCKET NO.
50-270 DOCKET NO.
UNIT oeonee UnitJ DATE 8/8/75 AVERAGE DAILY UNIT POWER LEVEL July, 1975 MONTH AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY                 (MWe net)           .
UNIT oeonee UnitJ DATE 8/8/75 AVERAGE DAILY UNIT POWER LEVEL MONTH July, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY                   (MWe-net) 17                 823 1
DAY (MWe net) 823 17 1
18 823 2
823 18 2
819 19 3
819 3
20                 814 4
19 20 814 4
21                 815 5
815 21 5
22                  815 6
815 6
                                          -                        23                 812 7
22 812 23 7
812 8
812 24 8
                                          -                        24 813 g                      498                         25 788                           l 10 684                         26                                               l 818                           27               801 11 822                           28               808 12 824                           29               806 13 30              802 14                       825 825                           31               806 15 16                      '825 DAILY UNrr POWER LEVEL FORM INSTRUCTIONS
813 498 25 g
'  -        On this form, list tite average daily unit power level in MWe-net for each day in the reporting month.
788 684 26 l
10 801 818 27 11 808 822 28 12 824 29 806 13 802 14 825 30 806 825 31 15
'825 16 DAILY UNrr POWER LEVEL FORM INSTRUCTIONS On this form, list tite average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level' exceeds the 100'"o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.}}
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level' exceeds the 100'"o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.}}

Latest revision as of 21:54, 1 January 2025

Monthly Operating Rept for Jul 1975
ML19317E693
Person / Time
Site: Oconee  
Issue date: 08/08/1975
From: Sharpe R
DUKE POWER CO.
To:
Shared Package
ML19317E691 List:
References
NUDOCS 7912180849
Download: ML19317E693 (3)


Text

-

O IIT Oconec Unit 2 DATE 8/8/75 DOCKET NO.

50-270 PREPARED BY

k. 0..Sharpe OPERATING STATUS 1.

REPORTING PERIOD: July 1, 1975 THROUGH July 31, 1975 GROSS HOURS IN REPORTING PERIOD:

744.00 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)

None 4.

REASONS FOR RESTRICTION (IF ANY) hiis Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 561.7 3599.2 5545.3 i

6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 551.6 3489.9 5365.3 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH) 1363641 8285879 12592777 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 459160 2823460 4292436 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 435753 2679407 4066933 12.

REACTOR SERVICE FACTOR 75.5 70.8 70.9 4

13.

REACTOR AVAILABILITY FACTOR 74.1 68.8 68.9 14.

UNIT SERVICE FACTOR 74.1 68.6 68.6 l

15.

UNIT AVAILABILITY FACTOR 74.1 68.6 68.6 i

16.

UNIT CAPACITY FACTOR (Using Net 67.2 60.5 59.7 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 66.0 59.4 58.6 18.

UNIT FORCED OUTAGE RATE 25.9 31.0 31.1 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRITICAT. X 100 110URS IN REPORTING PERIOD REACTOR AVAILABILIW FACTOR = HollRS RFACTOR UAS AVAIIAnl.E TO OPERATE X 100 Il0URS IN REPORTING PERIOD 11 NIT SERVICE l' ACTOR

= HolrPS GEMERATOR ON 1.1NE HOURS IN REPORTING PERIOD 912180 UNIT AVAIIARTLin FACTOR = 110URS ITNIT WAS AVAITABI.E TO CENERATE X 100 HOURS IN REPORTING PERIOD l

= NET ELECTRICAL POWER CENERATED UNIT CAPACITY FACTOR.

[N *L Capability or Design (Mwe-Net.)] X 1100Rd IN REPOKTfld,-

PERTOn L_

UNIT FORCD OUTACE RATE - FOP.Crl],0tQA,G,E_ljojfjlS

.100 1

D CKET No. _50-270 Oconee Unit 2 UNIT SHUTDOWNS UNIT NAMii DATli 8/8/75 REPORT MONTil July, 1975 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS /COMMFNTS 11 750701 F

192.37 A

1 Unit shutdown to investigate low reactor coolant pump motor oil level and to perform surveillance tests.

I I

(I) REASON (2) METIIOD A -EQUIPMENT I ALLURE (EXPLAIN) 3-MANUAL 3

B-MAINT. OR TEST.

2-MANUAL C-RLEUELING SCR AM D-REGULATORY RESTRICTION 3-AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICENSL EXAMINATION F-ADMINISTRATIVE G-OPER ATION AL ER ROR (EXPLAIN)

II-OlllLR IEXPLAIN)

SUMMARY

Unit returned to service on July 9, 1975 and operated base loaded for remainder of the month.

50-270 DOCKET NO.

UNIT oeonee UnitJ DATE 8/8/75 AVERAGE DAILY UNIT POWER LEVEL MONTH July, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe net) 823 17 1

823 18 2

819 3

19 20 814 4

815 21 5

815 6

22 812 23 7

812 24 8

813 498 25 g

788 684 26 l

10 801 818 27 11 808 822 28 12 824 29 806 13 802 14 825 30 806 825 31 15

'825 16 DAILY UNrr POWER LEVEL FORM INSTRUCTIONS On this form, list tite average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level' exceeds the 100'"o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.