ML20002B645: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:._
{{#Wiki_filter:._
_../.,!-
y-
y-
_../.,!-                                                    .pp a
.pp a
              ,        ,/--                                          ..
: u, ~_, u.,,.,,
a .: u: u, ~_, u.,:.,.,>,
,/--
                                                                                .)
a.: u
PUBLIC                                                                   :
.)
SERVICE INDIANA                                                                         .
PUBLIC SERVICE INDIANA S. W. Shields Senor Vice Prescent -
S. W. Shields                                                                     _
3 Nuciar civisen Decembed15,1980 i
Senor Vice Prescent -                                                               3 Nuciar civisen                                               Decembed15,1980 i
Mr. James G. Keppler, Director Docket Nos.: STN 50-546 STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:
Mr. James G. Keppler, Director                                 Docket Nos.: STN 50-546 U. S. Nuclear Regulatory Commission                                               STN 50-547 Region III                                                      Construction Permit Nos.:
Region III CPPR - 170 799 Roosevelt Road CPPR - l'il Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2
799 Roosevelt Road                                                               CPPR - 170 Glen Ellyn, Illinois 60137                                                       CPPR - l'il Marble Hill Nuclear Generating Station - Units 1 and 2


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
 
On March 28, 1980, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). While performing surveillance at a piping vendor's facilities, PSI Quality Assurance auditors noted several discrepancies concerning material test reports for weld filler material. These discrepancies were described in more detail in an interim report to your office dated April 25,1980 (DSN 0425804002).
On March 28, 1980, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e) . While performing surveillance at a piping vendor's facilities, PSI Quality Assurance auditors noted several discrepancies concerning material test reports for weld filler material. These discrepancies were described in more detail in an interim report to your office dated April 25,1980 (DSN 0425804002) .
In a subsequent interim report, dated September 29, 1980, (DSN 0929804013)
In a subsequent interim report, dated September 29, 1980, (DSN 0929804013)
PSI identified additional investigation of records at vendor facilities which remained to be performed. Part of this investigation is not yet complete at this time. PSI anticipates this investigation will be complete and the results provided in a final report on or before February 1, 1980.
PSI identified additional investigation of records at vendor facilities which remained to be performed. Part of this investigation is not yet complete at this time. PSI anticipates this investigation will be complete and the results provided in a final report on or before February 1, 1980.
If you have any questions on this matter please feel free to contact me.
If you have any questions on this matter please feel free to contact me.
Sincerely, N
Sincerely, N
f S. W. Shields c= '
f c= '
TDG/cq cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.       20555 E. R. Schweibin , P. E.
S. W. Shields TDG/cq cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
J. J. Harrison G/       O 8012220               $37 P.O. Box 190, New Washington, Indiana 47162             812. 293 .4441
20555 E. R. Schweibin, P. E.
  .  .-                    --        .      -  - - -          ..      _.      . -      -      -.}}
J. J. Harrison G/
O 8012220
$37 P.O. Box 190, New Washington, Indiana 47162 812. 293.4441
-.}}

Latest revision as of 16:49, 23 December 2024

Interim Deficiency Rept Re Discrepancies in Matl Test Repts for Weld Filler Matl,Initially Reported on 800328. Investigation of Addl Records Will Be Performed,W/Results Provided in Final Rept by 810201
ML20002B645
Person / Time
Site: Marble Hill
Issue date: 12/15/1980
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8012220337
Download: ML20002B645 (1)


Text

._

_../.,!-

y-

.pp a

u, ~_, u.,,.,,

,/--

a.: u

.)

PUBLIC SERVICE INDIANA S. W. Shields Senor Vice Prescent -

3 Nuciar civisen Decembed15,1980 i

Mr. James G. Keppler, Director Docket Nos.: STN 50-546 STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - l'il Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On March 28, 1980, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). While performing surveillance at a piping vendor's facilities, PSI Quality Assurance auditors noted several discrepancies concerning material test reports for weld filler material. These discrepancies were described in more detail in an interim report to your office dated April 25,1980 (DSN 0425804002).

In a subsequent interim report, dated September 29, 1980, (DSN 0929804013)

PSI identified additional investigation of records at vendor facilities which remained to be performed. Part of this investigation is not yet complete at this time. PSI anticipates this investigation will be complete and the results provided in a final report on or before February 1, 1980.

If you have any questions on this matter please feel free to contact me.

Sincerely, N

f c= '

S. W. Shields TDG/cq cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 E. R. Schweibin, P. E.

J. J. Harrison G/

O 8012220

$37 P.O. Box 190, New Washington, Indiana 47162 812. 293.4441

-.