ML19290C262: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19290C265 | | number = ML19290C265 | ||
| issue date = 01/05/1980 | | issue date = 01/05/1980 | ||
| title = | | title = LER 79-123/03L-0:on 791207,svc Water Pump 3 Strainer Motor Burned Up.Caused by Single Phasing in Breaker BE1280 on Motor Control Ctr E12C.Breaker Repaired on 791212 & Returned to Svc | ||
| author name = Murray T | | author name = Murray T | ||
| author affiliation = TOLEDO EDISON CO. | | author affiliation = TOLEDO EDISON CO. |
Latest revision as of 04:16, 23 January 2020
Date released: 10/31/2019 | Download: ML19290C262 |
---|---|
ML19290C265 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 01/05/1980 |
From: | Murray T TOLEDO EDISON CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19290C265 (2) | |
ML19290C261 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 01/05/1980 |
From: | Murray T TOLEDO EDISON CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19290C261 (1) | |