Ameren Missouri will file. a triennial Integrated Resource Plan (IRP) with the State of Missouri in early 201 1. It is anticipated that this IRP will indicate that additional generation will be needed in the mid-2020 decade and that additional nucleatgeneration is among the top options being considered by Ameren Missouri, if a favorable rate structure is in place during the construction phase. The subsequent 2014 IRP, as well as the interests of the other electrical providers in the State of Missouri, will provide the basis for making decisions on the filing of a follow-on COLA~and its timing relative to the need for additional baseload generation.
Ameren Missouri will file. a triennial Integrated Resource Plan (IRP) with the State of Missouri in early 201 1. It is anticipated that this IRP will indicate that additional generation will be needed in the mid-2020 decade and that additional nucleatgeneration is among the top options being considered by Ameren Missouri, if a favorable rate structure is in place during the construction phase. The subsequent 2014 IRP, as well as the interests of the other electrical providers in the State of Missouri, will provide the basis for making decisions on the filing of a follow-on COLA~and its timing relative to the need for additional baseload generation.
                                         ....................... PO0 Box 620 Fulton, MO 65251      AmerenMissouri.comr
                                         ....................... PO0 Box 620 Fulton, MO 65251      AmerenMissouri.comr
                                                  ....
                                                  ....
                                                      ....
                                                         ....  .. P
                                                         ....  .. P


ALNRC00050 Page 2 If you have questions, please contact me at 573-676-8519 or SBond2@ameren.com.
ALNRC00050 Page 2 If you have questions, please contact me at 573-676-8519 or SBond2@ameren.com.
Sincerely, Scott M. Bond Manager, Nuclear Generation Development SMB/DES/slk Mr. Elmo E. Collins, Jr.                      Senior Resident Inspector Regional Administrator                        Callaway Resident Office U.S. Nuclear Regxulatory Commission          U.S. Nuclear Regulatory Commission Region IV                                    8201 NRC Road 612 E. Lamar Blvd., Suite 400                Steedman, MO 65077 Arlington, TX 76011-4125 Joseph Colaccino, Chief                      Prosanta Chowdhur~y U.S. EPR Projects Branch                      Project Manager Division of New Reactor Licensing            U.S. EPR Projects Branch Office of New Reactors                        Division of New Reactor Licensing Joseph.Colaccino(,nrc. gov                    Office of New Reactors Pro santa.Chowdhurvadnrc. gov Russ Bell Nuclear Energy Institute (NEI) 1776 "1"Street, NW Suite 400 Washington, DC 20006-3708}}
Sincerely, Scott M. Bond Manager, Nuclear Generation Development SMB/DES/slk Mr. Elmo E. Collins, Jr.                      Senior Resident Inspector Regional Administrator                        Callaway Resident Office U.S. Nuclear Regxulatory Commission          U.S. Nuclear Regulatory Commission Region IV                                    8201 NRC Road 612 E. Lamar Blvd., Suite 400                Steedman, MO 65077 Arlington, TX 76011-4125 Joseph Colaccino, Chief                      Prosanta Chowdhur~y U.S. EPR Projects Branch                      Project Manager Division of New Reactor Licensing            U.S. EPR Projects Branch Office of New Reactors                        Division of New Reactor Licensing Joseph.Colaccino(,nrc. gov                    Office of New Reactors Pro santa.Chowdhurvadnrc. gov Russ Bell Nuclear Energy Institute (NEI) 1776 "1"Street, NW Suite 400 Washington, DC 20006-3708}}

Revision as of 09:22, 11 March 2020

Response to Regulatory Information Summary 2010-10
ML103620636
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/14/2010
From: Bond S
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of New Reactors
References
ALNRC 00050, RIS-10-010
Download: ML103620636 (2)


Text

wdAmeren Calwa lnt MISSOURI MISSOURIDecember 2010 14, CIaa ln 10 CFR 52.75 U.S. Nuclear Regulatory Commission Attmi: Document Control Desk Rockville, MD 20852 ALNRC 00050

Subject:

Union Electric CO. d/b/a Amneren Missouri, Callaway Plant Site Response to Regulatory Inf6rmation Summary 2010-10

References:

1) ALNRC 00047, dated August 31, 2010 "Response to Regulatory Information Summary 2010-01"
2) ALNRC 00049, dated November 22, 2010 "Release of Information Withheld from Public Disclosure" References 1 and 2 notified the NRC of Union Electric.'Company's (d/b/a as Ameren Missouri) intent to file for an Early Site Permit (ESP) for the Callaway Site.

The purpose of this letter is to respond to RIS 2010-10 and to provide the Staff with additional information relative to the long termi plan for the Callaway Plant Site. As stated in Reference 2, Ameren Missouri anticipates, submitting an ESP application for the Callaway Site in the second half of 2011. Union Electric Company's (d/b/a'as Ameren Missouri) will be the applicant and license holder.

Ameren Missouri will establish a Plant Parameter Envelope (PPE) for the Callaway Site using the Guidance of NEI 10-01. The application will include a complete. and integrated emergency plan and no limited work authorization is contemplated.

Ameren Missouri will file. a triennial Integrated Resource Plan (IRP) with the State of Missouri in early 201 1. It is anticipated that this IRP will indicate that additional generation will be needed in the mid-2020 decade and that additional nucleatgeneration is among the top options being considered by Ameren Missouri, if a favorable rate structure is in place during the construction phase. The subsequent 2014 IRP, as well as the interests of the other electrical providers in the State of Missouri, will provide the basis for making decisions on the filing of a follow-on COLA~and its timing relative to the need for additional baseload generation.

....................... PO0 Box 620 Fulton, MO 65251 AmerenMissouri.comr

.... .. P

ALNRC00050 Page 2 If you have questions, please contact me at 573-676-8519 or SBond2@ameren.com.

Sincerely, Scott M. Bond Manager, Nuclear Generation Development SMB/DES/slk Mr. Elmo E. Collins, Jr. Senior Resident Inspector Regional Administrator Callaway Resident Office U.S. Nuclear Regxulatory Commission U.S. Nuclear Regulatory Commission Region IV 8201 NRC Road 612 E. Lamar Blvd., Suite 400 Steedman, MO 65077 Arlington, TX 76011-4125 Joseph Colaccino, Chief Prosanta Chowdhur~y U.S. EPR Projects Branch Project Manager Division of New Reactor Licensing U.S. EPR Projects Branch Office of New Reactors Division of New Reactor Licensing Joseph.Colaccino(,nrc. gov Office of New Reactors Pro santa.Chowdhurvadnrc. gov Russ Bell Nuclear Energy Institute (NEI) 1776 "1"Street, NW Suite 400 Washington, DC 20006-3708