wdAmeren Calwa lnt MISSOURI CIaa ln MISSOURIDecember 14, 2010 10 CFR 52.75 U.S. Nuclear Regulatory Commission Attmi: Document Control Desk Rockville, MD 20852 ALNRC 00050
Subject:
Union Electric CO. d/b/a Amneren Missouri, Callaway Plant Site Response to Regulatory Inf6rmation Summary 2010-10
References:
- 1)
ALNRC 00047, dated August 31, 2010 "Response to Regulatory Information Summary 2010-01"
- 2)
ALNRC 00049, dated November 22, 2010 "Release of Information Withheld from Public Disclosure" References 1 and 2 notified the NRC of Union Electric.'Company's (d/b/a as Ameren Missouri) intent to file for an Early Site Permit (ESP) for the Callaway Site.
The purpose of this letter is to respond to RIS 2010-10 and to provide the Staff with additional information relative to the long termi plan for the Callaway Plant Site. As stated in Reference 2, Ameren Missouri anticipates, submitting an ESP application for the Callaway Site in the second half of 2011. Union Electric Company's (d/b/a'as Ameren Missouri) will be the applicant and license holder.
Ameren Missouri will establish a Plant Parameter Envelope (PPE) for the Callaway Site using the Guidance of NEI 10-01. The application will include a complete. and integrated emergency plan and no limited work authorization is contemplated.
Ameren Missouri will file. a triennial Integrated Resource Plan (IRP) with the State of Missouri in early 201 1. It is anticipated that this IRP will indicate that additional generation will be needed in the mid-2020 decade and that additional nucleatgeneration is among the top options being considered by Ameren Missouri, if a favorable rate structure is in place during the construction phase. The subsequent 2014 IRP, as well as the interests of the other electrical providers in the State of Missouri, will provide the basis for making decisions on the filing of a follow-on COLA~and its timing relative to the need for additional baseload generation.
0 PO Box 620 Fulton, MO 65251 AmerenMissouri.comr P
ALNRC00050 Page 2 If you have questions, please contact me at 573-676-8519 or SBond2@ameren.com.
SMB/DES/slk Mr. Elmo E. Collins, Jr.
Regional Administrator U.S. Nuclear Regxulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Joseph Colaccino, Chief U.S. EPR Projects Branch Division of New Reactor Licensing Office of New Reactors Joseph.Colaccino(,nrc. gov Sincerely, Scott M. Bond Manager, Nuclear Generation Development Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Prosanta Chowdhur~y Project Manager U.S. EPR Projects Branch Division of New Reactor Licensing Office of New Reactors Pro santa.Chowdhurvadnrc. gov Russ Bell Nuclear Energy Institute (NEI) 1776 "1" Street, NW Suite 400 Washington, DC 20006-3708