SBK-L-11151, Environmental Permit Renewals NextEra Energy Seabrook License Renewal Environmental Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 21: Line 21:


==References:==
==References:==
: 1. NextEra Energy Seabrook, LLC letter SBK-L- 10077, "Seabrook Station Application for Renewed Operating License," May 25, 2010. (Accession Number ML101590099)
: 1.
NextEra Energy Seabrook, LLC letter SBK-L-10077, "Seabrook Station Application for Renewed Operating License," May 25, 2010. (Accession Number ML101590099)
In Reference 1, NextEra Energy Seabrook, LLC (NextEra) submitted an application for a renewed facility operating license for Seabrook Station Unit 1 in accordance with the Code of Federal Regulations, Title 10, Parts 50, 51, and 54.
In Reference 1, NextEra Energy Seabrook, LLC (NextEra) submitted an application for a renewed facility operating license for Seabrook Station Unit 1 in accordance with the Code of Federal Regulations, Title 10, Parts 50, 51, and 54.
As discussed with the staff and license renewal project management, NextEra Energy Seabrook is enclosing a copy of a recently obtained State of New Hampshire letter regarding State Certification pursuant to Section 401 of the Clean Water Act for the Seabrook Station NPDES permit.
As discussed with the staff and license renewal project management, NextEra Energy Seabrook is enclosing a copy of a recently obtained State of New Hampshire letter regarding State Certification pursuant to Section 401 of the Clean Water Act for the Seabrook Station NPDES permit.
Line 27: Line 28:
3/4 t/I NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874
3/4 t/I NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874


United States Nuclear Regulatory Commission SBK-L- 11151 /Page 2 If you have any questions regarding this correspondence, please contact Mr. Michael O'Keefe, Licensing Manager, at (603) 773-7745.
United States Nuclear Regulatory Commission SBK-L-11151 /Page 2 If you have any questions regarding this correspondence, Licensing Manager, at (603) 773-7745.
Sincerely, NextEra Energy Seabrook, LLC.
please contact Mr. Michael O'Keefe, Sincerely, NextEra Energy Seabrook, LLC.
a, Paul 0. Freeman Site Vice President Enclosure cc:
a, Paul 0. Freeman Site Vice President Enclosure cc:
W. M. Dean,             NRC Region I Administrator G. E. Miller,           NRC Project Manager, Project Directorate 1-2 W. J. Raymond,         NRC Resident Inspector R. A. Plasse Jr.,       NRC Project Manager, License Renewal M. Wentzel,            NRC Project Manager, License Renewal Mr. Christopher M. Pope Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 John Giarrusso, Jr.
W. M. Dean, G. E. Miller, W. J. Raymond, R. A. Plasse Jr.,
M. Wentzel, NRC Region I Administrator NRC Project Manager, Project Directorate 1-2 NRC Resident Inspector NRC Project Manager, License Renewal NRC Project Manager, License Renewal Mr. Christopher M. Pope Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 John Giarrusso, Jr.
Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399
Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399


United States Nuclear Regulatory Commission SBK-L- 11151 NExTera
United States Nuclear Regulatory Commission SBK-L-11151 NExTera
: ENERGY, SEABROK I, Paul 0. Freeman, Site Vice President of NextEra Energy Seabrook, LLC hereby affirn that the information and statements contained within are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
: ENERGY, SEABROK I, Paul 0. Freeman, Site Vice President of NextEra Energy Seabrook, LLC hereby affirn that the information and statements contained within are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
Sworn and Subscribed Before me this c2(-     day of   *,2011 Paul 0. Freeman Site Vice President Notary Public
Sworn and Subscribed Before me this c2(-
day of *,2011 Paul 0. Freeman Site Vice President Notary Public


United States Nuclear Regulatory Commission SBK-L-1 1151 Enclosure to SBK-11151
United States Nuclear Regulatory Commission SBK-L-1 1151 Enclosure to SBK-11151


State of New Hampshire DEPARTMENT OF ENVIRONMENTAL SERVICES 6 Hazen Drive, P.O. Box 95, Concord, NH 03302-0095
State of New Hampshire DEPARTMENT OF ENVIRONMENTAL SERVICES 6 Hazen Drive, P.O. Box 95, Concord, NH 03302-0095
    '----E *(603)                               271-3503     FAX (603) 271-2982 January 23, 2002 Mr. Brian Pitt, Team Leader NPDES Task Force Office of Ecosystem Protection EPA New England.
'----E *(603) 271-3503 FAX (603) 271-2982 January 23, 2002 Mr. Brian Pitt, Team Leader NPDES Task Force Office of Ecosystem Protection EPA New England.
Mail Code CPE 1 Congress St - Suite 1100 Boston, MA 02114-2023
Mail Code CPE 1 Congress St - Suite 1100 Boston, MA 02114-2023


Line 48: Line 51:


==Dear Mr. Pitt:==
==Dear Mr. Pitt:==
 
By {{letter dated|date=December 5, 2001|text=letter dated December 5, 2001}}, the U.S. Environmental Protection Agency (EPA) requested State Certification of the NPDES Permit scheduled to be issued to Seabrook Station..
By letter dated December 5, 2001, the U.S. Environmental Protection Agency (EPA) requested State Certification of the NPDES Permit scheduled to be issued to Seabrook Station..
After appropriate staff review, State Certification is hereby granted pursuant to Section 401 of the Clean Water Act.
After appropriate staff review, State Certification is hereby granted pursuant to Section 401 of the Clean Water Act.
Upon final issuance by the federal EPA, the Departmentof Environmental- Services may.
Upon final issuance by the federal EPA, the Departmentof Environmental-Services may.
adopt the permit, including all terms and, conditions, as: a state permit pursuant to RSA' 485-A:13.
adopt the permit, including all terms and, conditions, as: a state permit pursuant to RSA' 485-A:13.
SJgcrely, JGeorgger. Bier, andi, ý..
: SJgcrely, JGeorgger.
Bier, andi, ý..
Sanitary Engineer.
Sanitary Engineer.
Wastewater Engineering Bureau GCB/jga2 cc: John Bush, P.E., DES Frederick B. Gay, EPA-NE Damien Houlihan, EPA-NE Brian Mazerski, OSP http://www.state.nh.us'                                                                 TDD Access: Relay NH 1-800-735-2964}}
Wastewater Engineering Bureau GCB/jga2 cc: John Bush, P.E., DES Frederick B. Gay, EPA-NE Damien Houlihan, EPA-NE Brian Mazerski, OSP http://www.state.nh.us' TDD Access: Relay NH 1-800-735-2964}}

Latest revision as of 05:11, 13 January 2025

Environmental Permit Renewals NextEra Energy Seabrook License Renewal Environmental Report
ML11210B392
Person / Time
Site: Seabrook 
Issue date: 07/26/2011
From: Freeman P
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-11151
Download: ML11210B392 (5)


Text

NEXTeraM ENERGY July 26, 2011 SBK-L-1 1151 Docket No. 50-443 U.S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Seabrook Station Environmental Permit Renewals NextEra Energy Seabrook License Renewal Environmental Report

References:

1.

NextEra Energy Seabrook, LLC letter SBK-L-10077, "Seabrook Station Application for Renewed Operating License," May 25, 2010. (Accession Number ML101590099)

In Reference 1, NextEra Energy Seabrook, LLC (NextEra) submitted an application for a renewed facility operating license for Seabrook Station Unit 1 in accordance with the Code of Federal Regulations, Title 10, Parts 50, 51, and 54.

As discussed with the staff and license renewal project management, NextEra Energy Seabrook is enclosing a copy of a recently obtained State of New Hampshire letter regarding State Certification pursuant to Section 401 of the Clean Water Act for the Seabrook Station NPDES permit.

If there are any questions or additional information is needed, please contact Mr. Richard R. Cliche, License Renewal Project Manager, at (603) 773-7003.

3/4 t/I NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874

United States Nuclear Regulatory Commission SBK-L-11151 /Page 2 If you have any questions regarding this correspondence, Licensing Manager, at (603) 773-7745.

please contact Mr. Michael O'Keefe, Sincerely, NextEra Energy Seabrook, LLC.

a, Paul 0. Freeman Site Vice President Enclosure cc:

W. M. Dean, G. E. Miller, W. J. Raymond, R. A. Plasse Jr.,

M. Wentzel, NRC Region I Administrator NRC Project Manager, Project Directorate 1-2 NRC Resident Inspector NRC Project Manager, License Renewal NRC Project Manager, License Renewal Mr. Christopher M. Pope Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 John Giarrusso, Jr.

Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399

United States Nuclear Regulatory Commission SBK-L-11151 NExTera

ENERGY, SEABROK I, Paul 0. Freeman, Site Vice President of NextEra Energy Seabrook, LLC hereby affirn that the information and statements contained within are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

Sworn and Subscribed Before me this c2(-

day of *,2011 Paul 0. Freeman Site Vice President Notary Public

United States Nuclear Regulatory Commission SBK-L-1 1151 Enclosure to SBK-11151

State of New Hampshire DEPARTMENT OF ENVIRONMENTAL SERVICES 6 Hazen Drive, P.O. Box 95, Concord, NH 03302-0095

'----E *(603) 271-3503 FAX (603) 271-2982 January 23, 2002 Mr. Brian Pitt, Team Leader NPDES Task Force Office of Ecosystem Protection EPA New England.

Mail Code CPE 1 Congress St - Suite 1100 Boston, MA 02114-2023

Subject:

Certification of NPDES Permit Reissuance North Atlantic Energy Service Corporation (Seabrook Station)

NPDES/State Permit No. NH0020338

Dear Mr. Pitt:

By letter dated December 5, 2001, the U.S. Environmental Protection Agency (EPA) requested State Certification of the NPDES Permit scheduled to be issued to Seabrook Station..

After appropriate staff review, State Certification is hereby granted pursuant to Section 401 of the Clean Water Act.

Upon final issuance by the federal EPA, the Departmentof Environmental-Services may.

adopt the permit, including all terms and, conditions, as: a state permit pursuant to RSA' 485-A:13.

SJgcrely, JGeorgger.

Bier, andi, ý..

Sanitary Engineer.

Wastewater Engineering Bureau GCB/jga2 cc: John Bush, P.E., DES Frederick B. Gay, EPA-NE Damien Houlihan, EPA-NE Brian Mazerski, OSP http://www.state.nh.us' TDD Access: Relay NH 1-800-735-2964