ML19260D045: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19260D051 | | number = ML19260D051 | ||
| issue date = 01/31/1980 | | issue date = 01/31/1980 | ||
| title = | | title = Final Deficiency Rept Re Grit Blasting of Fabricated Piping Assemblies.Caused by Operator Sandblasting W/O Diffusers. Straight Nozzle Will Be Locked in Tool Box Under Control of Sandblast Operator | ||
| author name = | | author name = | ||
| author affiliation = TENNESSEE VALLEY AUTHORITY | | author affiliation = TENNESSEE VALLEY AUTHORITY |
Latest revision as of 13:00, 23 January 2020
Date released: 10/01/2019 | Download: ML19260D045 |
---|---|
ML19260D051 | |
Person / Time | |
---|---|
Site: | Hartsville |
Issue date: | 01/31/1980 |
From: | TENNESSEE VALLEY AUTHORITY |
To: | |
References | |
Download: ML19260D051 (2) | |
ML19260D044 | |
Person / Time | |
---|---|
Site: | Hartsville |
Issue date: | 01/31/1980 |
From: | Mills L TENNESSEE VALLEY AUTHORITY |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19260D044 (1) | |