ML19260D045

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Grit Blasting of Fabricated Piping Assemblies
Date released: 10/01/2019 Download: ML19260D045


Final Deficiency Rept Re Grit Blasting of Fabricated Piping Assemblies.Caused by Operator Sandblasting W/O Diffusers. Straight Nozzle Will Be Locked in Tool Box Under Control of Sandblast Operator
ML19260D051
Person / Time
Site: Hartsville Tennessee Valley Authority icon.png
Issue date: 01/31/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML19260D051 (2)
Forwards Final Deficiency Rept Re Grit Blasting of Fabricated Piping Assemblies
ML19260D044
Person / Time
Site: Hartsville Tennessee Valley Authority icon.png
Issue date: 01/31/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260D044 (1)