W3F1-2014-0075, Response to Request for Additional Information Regarding Revision 1 to the Cycle 20 Core Operating Limits Report (COLR): Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Entergy Operations, Inc.
{{#Wiki_filter:W3F1-2014-0075 December 10, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852  
17265 River Road Killona, LA 70057-3093 Tel 504-739-6685 Fax 504-739-6678 jjarrel@entergy.com John P. Jarrell Manager, Regulatory Assurance Waterford 3 W3F1-2014-0075 December 10, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852


==Subject:==
==Subject:==
Waterford Steam Electric Station, Unit 3 Response to Request for Additional Information Regarding Revision 1 to the Cycle 20 Core Operating Limits Report (COLR).
Waterford Steam Electric Station, Unit 3 Response to Request for Additional Information Regarding Revision 1 to the Cycle 20 Core Operating Limits Report (COLR).
Waterford Steam Electric Station, Unit 3 (Waterford 3)
Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Docket No. 50-382 License No. NPF-38  


==References:==
==References:==
: 1. Entergy letter W3F1-2014-0047, Core Operating Limits Report -
: 1.
Entergy letter W3F1-2014-0047, Core Operating Limits Report -
Cycle 20 Revision 1, dated July, 29, 2014.
Cycle 20 Revision 1, dated July, 29, 2014.
: 2. NRC email, Request for Information Regarding Waterford 3 Cycle 20 Core Operating Limits Report Revision 2, dated October 21, 2014.
: 2.
NRC email, Request for Information Regarding Waterford 3 Cycle 20 Core Operating Limits Report Revision 2, dated October 21, 2014.  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
 
In {{letter dated|date=July 29, 2014|text=letter dated July 29, 2014}} (Reference 1), Entergy submitted Revision 1 of the Cycle 20 Core Operating Limits Report (COLR) to the NRC in accordance with Waterford 3 Technical Specification (TS) 6.9.1.11.3. This TS requires that the COLR, including any mid-cycle revisions or supplements thereto, be provided upon issuance for each reload cycle to the NRC. In email dated October 21, 2014 (Reference 2), the NRC requested additional information regarding this submittal. This letter provides the response to that request in the attachment.
In letter dated July 29, 2014 (Reference 1), Entergy submitted Revision 1 of the Cycle 20 Core Operating Limits Report (COLR) to the NRC in accordance with Waterford 3 Technical Specification (TS) 6.9.1.11.3. This TS requires that the COLR, including any mid-cycle revisions or supplements thereto, be provided upon issuance for each reload cycle to the NRC. In email dated October 21, 2014 (Reference 2), the NRC requested additional information regarding this submittal. This letter provides the response to that request in the attachment.
There are no new commitments contained in this submittal.
There are no new commitments contained in this submittal.
If you have any questions, please contact the Regulatory Assurance Manager, John P.
If you have any questions, please contact the Regulatory Assurance Manager, John P.
Jarrell, at (504) 739-6685.
Jarrell, at (504) 739-6685.
Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 504-739-6685 Fax 504-739-6678 jjarrel@entergy.com John P. Jarrell Manager, Regulatory Assurance Waterford 3


W3F1-2014-0065 Page 2 of 2
W3F1-2014-0065 Page 2 of 2  


==Attachment:==
==Attachment:==
Waterford 3 Response to Request for Additional Information for Revision 1 to the Waterford 3 Cycle 20 Core Operating Limits Report (COLR) cc:   Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.
Waterford 3 Response to Request for Additional Information for Revision 1 to the Waterford 3 Cycle 20 Core Operating Limits Report (COLR) cc:
Arlington, TX 76011-4511 RidsRgn4MailCenter@nrc.gov NRC Senior Resident Inspector, Waterford 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov Waterford 3 NRR Project Manager Michael.Orenak@nrc.gov
Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.
Arlington, TX 76011-4511 RidsRgn4MailCenter@nrc.gov NRC Senior Resident Inspector, Waterford 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov Waterford 3 NRR Project Manager Michael.Orenak@nrc.gov  
 
Attachment to W3F1-2014-0075 Response to Request for Additional Information for Revision 1 to the Waterford 3 Cycle 20 Core Operating Limits Report (COLR)
 
AttachmenttoW3F120140075 Page1of1 Waterford3ResponsetoRequestforAdditionalInformation


Attachment to W3F1-2014-0075 Response to Request for Additional Information for Revision 1 to the Waterford 3 Cycle 20 Core Operating Limits Report (COLR)
Question1 TheCOLR,Revision1indicatedachangeinAzimuthalPowertiltLimitvaluefromlessthanorequalto 0.03toavalueoflessthanorequalto0.05.Confirmthatthischangedoesnotaffectanydesignbasis analysisinputsorassumptionsorotherpowerdistributionlimits.
Response1 TheimpactofraisingtheCOLRlimitofAzimuthalTiltfrom0.03to0.05ontheWaterford3transientand accidentanalyseshasbeenevaluatedbyAnalysesofRecord(AOR)holder,Westinghouse.Theanalyses assumeaworstcasepowerpeakingandControlElementAssemblyworththatcanbeaffectedby AzimuthalPowerTilt.However,forCycle20theimpactofahigherAzimuthalPowerTiltonthe assumedpowerpeakingandCEAsworthwasevaluatedandshowntobeboundedbythecurrentinputs tothetransientandaccidentanalyses.Basedonreviewofimpactedsafetyanalysesandavailable marginsinassumedpowerpeakingandCEAsworth,changingtheAzimuthalPowerTiltfrom0.03to 0.05willnotresultinanadverseimpactontheanalysesresultsandconclusionsandnoreanalysisof theseeventswasrequiredasaresultofthischange.Westinghousehasexaminedallothertransient andaccidentanalyses,anddeterminedthatthischangehasnoimpactonthoseanalyses.


Attachment to W3F120140075 Page 1 of 1 Waterford 3 Response to Request for Additional Information Question 1 The COLR, Revision 1 indicated a change in Azimuthal Power tilt Limit value from less than or equal to 0.03 to a value of less than or equal to 0.05. Confirm that this change does not affect any design basis analysis inputs or assumptions or other power distribution limits.
Insummary,thechangingtheCOLRlimitforAzimuthalPowerTiltfromlessthanorequalto0.03toless thanorequalto0.05didnotaffectanydesignbasisanalysisinputsorassumptionsorotherpower distributionlimits.}}
Response 1 The impact of raising the COLR limit of Azimuthal Tilt from 0.03 to 0.05 on the Waterford 3 transient and accident analyses has been evaluated by Analyses of Record (AOR) holder, Westinghouse. The analyses assume a worst case power peaking and Control Element Assembly worth that can be affected by Azimuthal Power Tilt. However, for Cycle 20 the impact of a higher Azimuthal Power Tilt on the assumed power peaking and CEAs worth was evaluated and shown to be bounded by the current inputs to the transient and accident analyses. Based on review of impacted safety analyses and available margins in assumed power peaking and CEAs worth, changing the Azimuthal Power Tilt from 0.03 to 0.05 will not result in an adverse impact on the analyses results and conclusions and no reanalysis of these events was required as a result of this change. Westinghouse has examined all other transient and accident analyses, and determined that this change has no impact on those analyses.
In summary, the changing the COLR limit for Azimuthal Power Tilt from less than or equal to 0.03 to less than or equal to 0.05 did not affect any design basis analysis inputs or assumptions or other power distribution limits.}}

Latest revision as of 15:29, 10 January 2025

Response to Request for Additional Information Regarding Revision 1 to the Cycle 20 Core Operating Limits Report (COLR)
ML14344A992
Person / Time
Site: Waterford 
Issue date: 12/10/2014
From: Jarrell J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2014-0075
Download: ML14344A992 (4)


Text

W3F1-2014-0075 December 10, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

Subject:

Waterford Steam Electric Station, Unit 3 Response to Request for Additional Information Regarding Revision 1 to the Cycle 20 Core Operating Limits Report (COLR).

Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

References:

1.

Entergy letter W3F1-2014-0047, Core Operating Limits Report -

Cycle 20 Revision 1, dated July, 29, 2014.

2.

NRC email, Request for Information Regarding Waterford 3 Cycle 20 Core Operating Limits Report Revision 2, dated October 21, 2014.

Dear Sir or Madam:

In letter dated July 29, 2014 (Reference 1), Entergy submitted Revision 1 of the Cycle 20 Core Operating Limits Report (COLR) to the NRC in accordance with Waterford 3 Technical Specification (TS) 6.9.1.11.3. This TS requires that the COLR, including any mid-cycle revisions or supplements thereto, be provided upon issuance for each reload cycle to the NRC. In email dated October 21, 2014 (Reference 2), the NRC requested additional information regarding this submittal. This letter provides the response to that request in the attachment.

There are no new commitments contained in this submittal.

If you have any questions, please contact the Regulatory Assurance Manager, John P.

Jarrell, at (504) 739-6685.

Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 504-739-6685 Fax 504-739-6678 jjarrel@entergy.com John P. Jarrell Manager, Regulatory Assurance Waterford 3

W3F1-2014-0065 Page 2 of 2

Attachment:

Waterford 3 Response to Request for Additional Information for Revision 1 to the Waterford 3 Cycle 20 Core Operating Limits Report (COLR) cc:

Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.

Arlington, TX 76011-4511 RidsRgn4MailCenter@nrc.gov NRC Senior Resident Inspector, Waterford 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov Waterford 3 NRR Project Manager Michael.Orenak@nrc.gov

Attachment to W3F1-2014-0075 Response to Request for Additional Information for Revision 1 to the Waterford 3 Cycle 20 Core Operating Limits Report (COLR)

AttachmenttoW3F120140075 Page1of1 Waterford3ResponsetoRequestforAdditionalInformation

Question1 TheCOLR,Revision1indicatedachangeinAzimuthalPowertiltLimitvaluefromlessthanorequalto 0.03toavalueoflessthanorequalto0.05.Confirmthatthischangedoesnotaffectanydesignbasis analysisinputsorassumptionsorotherpowerdistributionlimits.

Response1 TheimpactofraisingtheCOLRlimitofAzimuthalTiltfrom0.03to0.05ontheWaterford3transientand accidentanalyseshasbeenevaluatedbyAnalysesofRecord(AOR)holder,Westinghouse.Theanalyses assumeaworstcasepowerpeakingandControlElementAssemblyworththatcanbeaffectedby AzimuthalPowerTilt.However,forCycle20theimpactofahigherAzimuthalPowerTiltonthe assumedpowerpeakingandCEAsworthwasevaluatedandshowntobeboundedbythecurrentinputs tothetransientandaccidentanalyses.Basedonreviewofimpactedsafetyanalysesandavailable marginsinassumedpowerpeakingandCEAsworth,changingtheAzimuthalPowerTiltfrom0.03to 0.05willnotresultinanadverseimpactontheanalysesresultsandconclusionsandnoreanalysisof theseeventswasrequiredasaresultofthischange.Westinghousehasexaminedallothertransient andaccidentanalyses,anddeterminedthatthischangehasnoimpactonthoseanalyses.

Insummary,thechangingtheCOLRlimitforAzimuthalPowerTiltfromlessthanorequalto0.03toless thanorequalto0.05didnotaffectanydesignbasisanalysisinputsorassumptionsorotherpower distributionlimits.