ML19262B569: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
Created page by program invented by StriderTol
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
                                          .                                                                                ,
BOSTON EDISON COMPANY TELECbPY MESSAGE                                    ' '
                                                  .
             '215-337-5324 To:
                                                                                                                                ,
                                                    ,
                    .
                              ..              .      -
                                                                      .
                                                                            '
                                                                                                                                  .
                                                                                                                *
                                    .
BOSTON EDISON COMPANY
          -
        ,
                                      .
                                              .>...''                                                  '
TELECbPY MESSAGE                                    ' '
                                                                          '
                          .
             '215-337-5324
                                                                                  '
To:
Telephone Number                                        T Date/ Time: 12/24/79            /
Telephone Number                                        T Date/ Time: 12/24/79            /
                                                                '
    .
E To: Director, Region I                                                        From: Pilgrim Nuclear Power Station M
E To: Director, Region I                                                        From: Pilgrim Nuclear Power Station M
                                                                                                                                              .
Office of Inspection and Enforcement                                              .RFD #1 Rocky 11111 Road U. S. Nuclear Regulatory Commission                                                  Plymouth, MA 631 Park Avenue                                                                                          02360 King of Prussia, PA 19406 Subj ect: PROMPT REPORTABLE OCCURRENCE                                                                      -
Office of Inspection and Enforcement                                              .RFD #1 Rocky 11111 Road U. S. Nuclear Regulatory Commission                                                  Plymouth, MA 631 Park Avenue                                                                                          02360 King of Prussia, PA 19406 Subj ect: PROMPT REPORTABLE OCCURRENCE                                                                      -
Docket Number 50-293; License DPR-35
Docket Number 50-293; License DPR-35
(
(
Assigned LER Number 79-048/01X-0                                          -
Assigned LER Number 79-048/01X-0                                          -
                                                                                                                                          .
Event
Event


== Description:==
== Description:==
e su        chyard 12$olt M,_bacbp bag day w S Mu
e su        chyard 12$olt M,_bacbp bag day w S Mu because of a failure of the main battery charger en Dec. 23, 1979. At 08 0 Dec. 24, 1979, the backup battery charger tripped and could not be                                        e z' set. This is a limiting condition for operation as addressed in Section 3.9.3.5 of Tech. Specs.
* because of a failure of the main battery charger en Dec. 23, 1979. At 08 0 Dec. 24, 1979, the backup battery charger tripped and could not be                                        e z' set. This is a limiting condition for operation as addressed in Section 3.9.3.5 of Tech. Specs.
Cause and Corrective Actionj                            The cause of the Battery Charger Failures is under in-vestigation. A spare battery charger is being brought on site and is expected to be
Cause and Corrective Actionj                            The cause of the Battery Charger Failures is under in-vestigation. A spare battery charger is being brought on site and is expected to be
                   ~
                   ~
in service by 1300 Dec. 24,1979.
in service by 1300 Dec. 24,1979.
                                            .
Facility Status:
Facility Status:
c) Routine Startup                                                                            1904 % Thermal MW g) Shutdown d) Routine Shutdown e) Steady State                      X h) Refueling f) Load Changing                                                                            1) Other j) Not Applicaple A written follow-up report will be sent within two weeks.                                                                              .
c) Routine Startup                                                                            1904 % Thermal MW g) Shutdown d) Routine Shutdown e) Steady State                      X h) Refueling f) Load Changing                                                                            1) Other j) Not Applicaple A written follow-up report will be sent within two weeks.                                                                              .
HRC person notified Mr. R. McClintock                                                                    Mr. E. T. Graham Prepared by
HRC person notified Mr. R. McClintock                                                                    Mr. E. T. Graham Prepared by
                                                                         ,~                                           *
                                                                         ,~
                                                              .
* Q
                                                                              '        '.
Q
                                                                                       ~~
                                                                                       ~~
P00R BRIGlWl.
P00R BRIGlWl.
                       ^ : .-,
                       ^ : .-,
wa m
wa m
                                    .
                                         . r. . .n.. ., , , ,                .    -
                                         . r. . .n.. ., , , ,                .    -
                                                "                                                                      .
Mail (2) copies to:                                        -
Mail (2) copies to:                                        -
                                                                '
Office of Management Information and Program Control                                                                4 U. S. Nuclear Regulatory Commission
                                                                    -
* Washington, D.C.              20555
                                                                                    .                                    *
                                                                                                                                            .
                                                                                                                                                -
                                                                                                  .                                ,
                                                                                                                          .
Office of Management Information and Program Control                                                                4 U. S. Nuclear Regulatory Commission                                                         *
                                                                                                            ,
Washington, D.C.              20555
* 7912280
* 7912280
                                                                   ,.                    .}}
                                                                   ,.                    .}}

Revision as of 20:13, 1 February 2020

RO-79-048 on 791224:backup Battery Charger,In Use Due to Main Battery Charger 791223 Failure,Tripped & Could Not Be Reset.Cause Under Investigation.Spare Battery Charger Will Be in Svc by 791224
ML19262B569
Person / Time
Site: Pilgrim
Issue date: 12/24/1979
From: Graham E
BOSTON EDISON CO.
To:
References
NUDOCS 7912280475
Download: ML19262B569 (1)


Text

.

BOSTON EDISON COMPANY TELECbPY MESSAGE ' '

'215-337-5324 To:

Telephone Number T Date/ Time: 12/24/79 /

E To: Director, Region I From: Pilgrim Nuclear Power Station M

Office of Inspection and Enforcement .RFD #1 Rocky 11111 Road U. S. Nuclear Regulatory Commission Plymouth, MA 631 Park Avenue 02360 King of Prussia, PA 19406 Subj ect: PROMPT REPORTABLE OCCURRENCE -

Docket Number 50-293; License DPR-35

(

Assigned LER Number 79-048/01X-0 -

Event

Description:

e su chyard 12$olt M,_bacbp bag day w S Mu because of a failure of the main battery charger en Dec. 23, 1979. At 08 0 Dec. 24, 1979, the backup battery charger tripped and could not be e z' set. This is a limiting condition for operation as addressed in Section 3.9.3.5 of Tech. Specs.

Cause and Corrective Actionj The cause of the Battery Charger Failures is under in-vestigation. A spare battery charger is being brought on site and is expected to be

~

in service by 1300 Dec. 24,1979.

Facility Status:

c) Routine Startup 1904 % Thermal MW g) Shutdown d) Routine Shutdown e) Steady State X h) Refueling f) Load Changing 1) Other j) Not Applicaple A written follow-up report will be sent within two weeks. .

HRC person notified Mr. R. McClintock Mr. E. T. Graham Prepared by

,~

  • Q

~~

P00R BRIGlWl.

^ : .-,

wa m

. r. . .n.. ., , , , . -

Mail (2) copies to: -

Office of Management Information and Program Control 4 U. S. Nuclear Regulatory Commission

  • 7912280

,. .