ML19246C150: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19246C156
| number = ML19246C156
| issue date = 07/18/1979
| issue date = 07/18/1979
| title = Forwards LER 79-049/03L-0
| title = LER 79-049/03L-0 on 790619:drywell Oxygen Concentration Exceeded 4% for Approx 4.5-h While Containment Inerting Line Was Under Clearance for Repair.Caused by Rupture of Nitrogen Inerting Line to Reactor Bldg
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 22:13, 23 January 2020

Forwards LER 79-049/03L-0
Date released: 09/17/2019 Download: ML19246C150


LER 79-049/03L-0 on 790619:drywell Oxygen Concentration Exceeded 4% for Approx 4.5-h While Containment Inerting Line Was Under Clearance for Repair.Caused by Rupture of Nitrogen Inerting Line to Reactor Bldg
ML19246C156
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/18/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246C156 (1)
Forwards LER 79-049/03L-0
ML19246C149
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/18/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246C149 (1)