ML19246C608: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19246C612
| number = ML19246C612
| issue date = 07/18/1979
| issue date = 07/18/1979
| title = Forwards LER 79-065/03L-0
| title = LER 79-065/03L-0 on 790703:during Surveillance Procedure HNP-2-3055,rod Block Monitor a Downscale Setpoint Found to Be High.Caused by Setpoint Drift.Component Recalibr & Surveillance Procedure Completed
| author name = Nix R
| author name = Nix R
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 22:11, 23 January 2020

Forwards LER 79-065/03L-0
Date released: 09/17/2019 Download: ML19246C608


LER 79-065/03L-0 on 790703:during Surveillance Procedure HNP-2-3055,rod Block Monitor a Downscale Setpoint Found to Be High.Caused by Setpoint Drift.Component Recalibr & Surveillance Procedure Completed
ML19246C612
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/18/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246C612 (1)
Forwards LER 79-065/03L-0
ML19246C607
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/18/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246C607 (1)