ML19246C608

From kanterella
Jump to navigation Jump to search
Forwards LER 79-065/03L-0
Date released: 09/17/2019 Download: ML19246C608


LER 79-065/03L-0 on 790703:during Surveillance Procedure HNP-2-3055,rod Block Monitor a Downscale Setpoint Found to Be High.Caused by Setpoint Drift.Component Recalibr & Surveillance Procedure Completed
ML19246C612
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/18/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246C612 (1)
Forwards LER 79-065/03L-0
ML19246C607
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/18/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246C607 (1)