ML19250B845: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19250B847
| number = ML19250B847
| issue date = 10/25/1979
| issue date = 10/25/1979
| title = Forwards LER 79-057/03L-0
| title = LER 79-057/03L-0:on 790926,containment Atmospheric Monitor CAC-AT-1263 Was Erratic.Zero Ref Shifted Upscale.Instrument Calibr & Returned to Svc.Engineering Considering Replacement for Existing Sys
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 20:35, 23 January 2020

Forwards LER 79-057/03L-0
Date released: 09/21/2019 Download: ML19250B845


LER 79-057/03L-0:on 790926,containment Atmospheric Monitor CAC-AT-1263 Was Erratic.Zero Ref Shifted Upscale.Instrument Calibr & Returned to Svc.Engineering Considering Replacement for Existing Sys
ML19250B847
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/25/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19250B847 (1)
Forwards LER 79-057/03L-0
ML19250B844
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/25/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19250B844 (1)