ML19256A824: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19256A829
| number = ML19256A829
| issue date = 01/11/1979
| issue date = 01/11/1979
| title = Forwards LER 78-091/03L-0
| title = LER 78-091/03L-0 on 781212:train a River Water Pumps Noted to Be in Tripped State,Could Not Be Started from Control Room.Cause Not Yet Determined
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 18:00, 23 January 2020

Forwards LER 78-091/03L-0
Date released: 09/27/2019 Download: ML19256A824


LER 78-091/03L-0 on 781212:train a River Water Pumps Noted to Be in Tripped State,Could Not Be Started from Control Room.Cause Not Yet Determined
ML19256A829
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/11/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19256A829 (1)
Forwards LER 78-091/03L-0
ML19256A823
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/11/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19256A823 (1)