ML19257B387: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19257B397
| number = ML19257B397
| issue date = 01/07/1980
| issue date = 01/07/1980
| title = Forwards LER 79-105/03L-0
| title = LER 79-105/03L-0:on 791219,during Normal Testing,Rip Valves X82B & X58B,E & F Found Not Operating Properly.Caused by Limit Switch on X82B,E & F Not Fully Opening,Restricting Valve Operation.Valve Adjusted
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 16:30, 23 January 2020

Forwards LER 79-105/03L-0
Date released: 09/28/2019 Download: ML19257B387


LER 79-105/03L-0:on 791219,during Normal Testing,Rip Valves X82B & X58B,E & F Found Not Operating Properly.Caused by Limit Switch on X82B,E & F Not Fully Opening,Restricting Valve Operation.Valve Adjusted
ML19257B397
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/07/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B397 (2)
Forwards LER 79-105/03L-0
ML19257B386
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/07/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B386 (1)