ML19257B387: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19257B397 | | number = ML19257B397 | ||
| issue date = 01/07/1980 | | issue date = 01/07/1980 | ||
| title = | | title = LER 79-105/03L-0:on 791219,during Normal Testing,Rip Valves X82B & X58B,E & F Found Not Operating Properly.Caused by Limit Switch on X82B,E & F Not Fully Opening,Restricting Valve Operation.Valve Adjusted | ||
| author name = Tollison A | | author name = Tollison A | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. |
Latest revision as of 16:30, 23 January 2020
Date released: 09/28/2019 | Download: ML19257B387 |
---|---|
ML19257B397 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 01/07/1980 |
From: | Tollison A CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19257B397 (2) | |
ML19257B386 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 01/07/1980 |
From: | Tollison A CAROLINA POWER & LIGHT CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19257B386 (1) | |