ML18012A266: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 12, 2018 10 CFR 50.4 1O CFR 50, Appendix E, Section V 10 CFR 50.54(q)(5) 10 CFR 72.4 10 CFR 72.44(f)
{{#Wiki_filter:Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 12, 2018 10 CFR 50.4 10 CFR 50, Appendix E, Section V 10 CFR 50.54(q)(5) 10 CFR 72.4 10 CFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391



Revision as of 00:40, 10 November 2019

Unit 2 - Emergency Plan Implementing Procedure Revision
ML18012A266
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 01/12/2018
From: Simmons P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EPIP 12, Rev. 42
Download: ML18012A266 (2)


Text

Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 12, 2018 10 CFR 50.4 10 CFR 50, Appendix E,Section V 10 CFR 50.54(q)(5) 10 CFR 72.4 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391

Subject:

Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V , 10 CFR 50.54(q)(5) , and 10 CFR 72.44(f), the following Emergency Plan Implementing Procedure (EPIP) has been revised with administrative and editorial changes:

EPIP Revision Effective Date 12 0042 Emergency Equipment and Supplies 12/19/2017 The above referenced revision continues to comply with regulations and there is no reduction in effectiveness of the plan . The revision includes adding signature and review blocks to allow for documentation of individual page inventory completion .

There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232.

Respectfully, en Paul Simmons Site Vice President Watts Bar Nuclear Plant

U.S. Regulatory Commission January 12, 2018 Page2 cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant