{{#Wiki_filter:m ,, , ,9
{{#Wiki_filter:m ,, , ,9
                                                  -
    -  -
                    . .
                                 *    ^
                                 *    ^
                                           *H M-NETROPOL1 TAN EDISON COMPANY suastouavorceneam.rusucununescoaronn_ov POST OFFICE BOX 420 MIDDLETOWM. PENNSYLVANIA 17057                  TELEPMONE 717 944-404*
                                           *H M-NETROPOL1 TAN EDISON COMPANY suastouavorceneam.rusucununescoaronn_ov POST OFFICE BOX 420 MIDDLETOWM. PENNSYLVANIA 17057                  TELEPMONE 717 944-404*
Line 27: Line 24:
fir. J.P. O'Refily, Director Directorate of Regulatory Operations Region I                                  Df                          '
fir. J.P. O'Refily, Director Directorate of Regulatory Operations Region I                                  Df                          '
631 Park Avenue M >v h
631 Park Avenue M >v h
                                                                            -
                                                                                '
{
{
King of Prussia, Pa. 19406                          b. mLMliiOh Sperating License DPR-50 Occket 50-289
King of Prussia, Pa. 19406                          b. mLMliiOh Sperating License DPR-50 Occket 50-289
                                                  -


==Subject:==
==Subject:==
Line 39: Line 33:
I        The following report is submitted in accordance with paragraph 6.7.2.a.1
I        The following report is submitted in accordance with paragraph 6.7.2.a.1
,        (page 6-11) of technical specifications.
,        (page 6-11) of technical specifications.
!
On 21 April, while performing High and Low Pressure Injection Surveillance Testing, RR-P1B (Reactor Building ~ Emergency Cooling River Pu.T.p) failed to start on signal. The punp was then manually started f.om the control room using the control switch.
On 21 April, while performing High and Low Pressure Injection Surveillance Testing, RR-P1B (Reactor Building ~ Emergency Cooling River Pu.T.p) failed to start on signal. The punp was then manually started f.om the control room using the control switch.
l        The redundant pos:p, RR-PIA. was tested to verify operability.
l        The redundant pos:p, RR-PIA. was tested to verify operability.
Line 48: Line 41:
                                             . J        erbein
                                             . J        erbein
(    Station Superintendent JGH/dmn
(    Station Superintendent JGH/dmn
                                                                         -G82
                                                                         -G82 hg1024 0i36            .
                                                                        ,,
      '
                                                ,
hg1024 0i36            .
                                                                                             ]}}
                                                                                             ]}}

Revision as of 05:03, 2 February 2020

Abnormal Occurrence 75-12:on 750421,during High & Low Pressure Injection Surveillance Test,Emergency Cooling River Pump Failed to Start on Signal.Redundant Pump Operated Successfully.Cause of Failure Not Yet Determined
ML19210A223
Person / Time
Site: Crane 
Issue date: 04/22/1975
From: Herbein J
METROPOLITAN EDISON CO.
To:
Shared Package
ML19210A220 List:
References
NUDOCS 7910240936
Download: ML19210A223 (1)


Text

m ,, , ,9

  • ^
  • H M-NETROPOL1 TAN EDISON COMPANY suastouavorceneam.rusucununescoaronn_ov POST OFFICE BOX 420 MIDDLETOWM. PENNSYLVANIA 17057 TELEPMONE 717 944-404*

April 22,1975 g_

= . -

fir. J.P. O'Refily, Director Directorate of Regulatory Operations Region I Df '

631 Park Avenue M >v h

{

King of Prussia, Pa. 19406 b. mLMliiOh Sperating License DPR-50 Occket 50-289

Subject:

Abnormal Occurn!nce No AD 75-12 Cear Mr. O'Reilly: -

This telegram is to confirm the telecon between i.ee Spessard Region I-NRC.

, and J.G. Herbeitn (THI Station Superintendent) at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> 21 April 1975.

I The following report is submitted in accordance with paragraph 6.7.2.a.1

, (page 6-11) of technical specifications.

On 21 April, while performing High and Low Pressure Injection Surveillance Testing, RR-P1B (Reactor Building ~ Emergency Cooling River Pu.T.p) failed to start on signal. The punp was then manually started f.om the control room using the control switch.

l The redundant pos:p, RR-PIA. was tested to verify operability.

An investigation is currently in progress to determine the reason RR-P1B failed to start on receipt of test signal.

Following the detemination of the reason RR-P1B failed to start, the neces-sary corrective action will be taken and RR-PIB will be tested and returned to service.

Very truly yourt, l

, )klh ?E2

. J erbein

( Station Superintendent JGH/dmn