ML19208A355: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19208A361 | | number = ML19208A361 | ||
| issue date = 09/12/1979 | | issue date = 09/12/1979 | ||
| title = | | title = LER 79-101/03L-0:on 790814,containment Intermediate hi-hi Pressure Channel 2 Trip Bistable Failed in Trip Condition. Caused by Short in Card Component Capacitator.Card Replaced & Calibr.Loop Functionally Tested | ||
| author name = Cartwright W | | author name = Cartwright W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
Latest revision as of 08:38, 24 January 2020
Date released: 08/10/2019 | Download: ML19208A355 |
---|---|
ML19208A361 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 09/12/1979 |
From: | Cartwright W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19208A361 (2) | |
ML19208A354 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 09/12/1979 |
From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19208A354 (1) | |