Regulatory Guide 1.35: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
{{#Wiki_filter:2/5/73 U.S. ATOMIC ENERGY COMMISSION
{{#Wiki_filter:2/5/73 U.S.     ATOMIC ENERGY COMMISSION
REGULATORY  
                                REGULATORY
GI DIRECTORATE  
                                DIRECTORATE OF REGULATORY
OF REGULATORY  
                                                                                                                                GI JIDE
STANDARDS REGULATORY  
                                                                                          STANDARDS
GUIDE 1.35 INSERVICE  
                                                                  REGULATORY GUIDE 1.35 INSERVICE SURVEILLANCE OF UNGROUTED TENDONS
SURVEILLANCE  
                              IN PRESTRESSED CONCRETE CONTAINMENT STRUCTURES
OF UNGROUTED  
TENDONS IN PRESTRESSED  
CONCRETE CONTAINMENT  
STRUCTURES
JIDE


==A. INTRODUCTION==
==A. INTRODUCTION==
General Design Criterion
preventing filler (grease). To the fullest extent practical, it should also cover the ducts that contain the tendons.
53, "Provisions for Containment Testing and Inspection" of Appendix A to 10 CFR Part 50, "General Design Criteria for Nuclear Power Plants," requires, in part, that the reactor containment be designed to permit (1) periodic inspection of all important areas and (2) 'an appropriate surveillance program. This guide describes an acceptable basis for developing an appropriate surveillance program for ungrouted tendons in prestressed concrete containment structures of light-water-cooled reactors.


The Advisory Committee on Reactor Safeguards has been consulted concerning this guide and has concurred in the regulatory position.
General Design Criterion 53, "Provisions for                                  Such a surveillance program is necessary because Containment Testing and Inspection" of Appendix A                                    generally there is no permanent instrumentation to 10 CFR Part 50, "General Design Criteria for                                      installed in the containment that could continuously Nuclear Power Plants," requires, in part, that the                                  monitor its structural behavior.
 
reactor containment be designed to permit (1) periodic inspection of all important areas and (2) 'an                                              When developing a surveillance program, the total appropriate surveillance program. This guide describes                              containment tendon population should be divided into an acceptable basis for developing an appropriate                                  homogeneous subgroups, i.e., tendons having surveillance program for ungrouted tendons in                                      approximately the same probability of corrosion and a prestressed concrete containment structures of                                      similar function in the overall structural capabilities and light-water-cooled reactors. The Advisory Committee                                   properties of the structure. Thus, for each structure the on Reactor Safeguards has been consulted concerning                                 surveillance program. should consider separately the this guide and has concurred in the regulatory position.                            groups of vertical, hoop, and dome tendons.


==B. DISCUSSION==
==B. DISCUSSION==
This guide is applicable to "typical" prestressed concrete containments with ungrouted tendons only, for which the number of tendons does not exceed: 200 in the dome (either three families of tendons 600 apart or two families of tendons 900 apart), 200 vertical (in wall), and 500 complete hoops (in wall).For containments that differ from the "typical" containment described above, the model program presented in this guide should serve as the basis for development of a comparable surveillance program.Surveillance of ungrouted wire and strand tendons of all sizes (up to an ultimate strength of approximately
Consideration of homogeneous tendon subgroups (i.e., vertical, hoop, and dome) establishes a sampling This guide is applicable to "typical" prestressed                             base for determining loss of prestress, the main concrete containments with ungrouted tendons only, for                               characteristic checked by the surveillance program.
1300 tons) and types should be considered (e.g., tendons with parallel wires, with one or several strands, and with different systems of anchors).
Materials for all components should satisfy the requirements of applicable American Society for Testing and Materials (ASTM) material standards.


The surveillance program should cover the anchor hardware and the corrosion- preventing filler (grease).  
which the number of tendons does not exceed: 200 in the dome (either three families of tendons 600 apart or                                    If some tendons are expected to be subject to two families of tendons 900 apart), 200 vertical (in                                greater prestress losses than the rest, this should be taken wall), and 500 complete hoops (in wall).                                            into account in selecting samples..
To the fullest extent practical, it should also cover the ducts that contain the tendons.Such a surveillance program is necessary because generally there is no permanent instrumentation installed in the containment that could continuously monitor its structural behavior.When developing a surveillance program, the total containment tendon population should be divided into homogeneous subgroups, i.e., tendons having approximately the same probability of corrosion and a similar function in the overall structural capabilities and properties of the structure.
        For containments that differ from the "typical"                                      The prestressing force in a tendon may :be 'checked containment described above, the model program                                        by a liftoff or other equivalent test., One of the main presented in this guide should serve as the basis for                                objectives of the test is to discover any brittle, damaged, development of a comparable surveillance program.                                    or broken wires. Any eventual decrease in the prestressing force is due to the simultaneous interaction Surveillance of ungrouted wire and strand tendons                            of several time-dependent factors such as:
of all sizes (up to an ultimate strength of approximately
1300 tons) and types should be considered (e.g., tendons                              a.    Stress relaxation in the wire;
with parallel wires, with one or several strands, and with                            b.    Temperature variation of the wire;
different systems of anchors). Materials for all                                      c.    Shrinkage, creep, and temperature stresses in components should satisfy the requirements of                                                concrete;
applicable American Society for Testing and Materials                                d.    Differential thermal expansion ' or contraction (ASTM) material standards. The surveillance program                                         between the concrete and the tendon; and should cover the anchor hardware and the corrosion-                                  e.    -Eventual deterioration of the wires (corrosion).
                      USAEC REGULATORY GUIDES                                      Copies of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission, Washington, D.C. 20545, Regulatory Guides are issued to describe and make available to the public          Attention: Director of Regulatory Standards. Comments and suggestions for methods acceptable to the AEC Regulatory staff of implementing specific parts of    improvements in these guides are encouraged and should be sent to the Secretary the Commission's regulations, to delineate techniques used by the staff in          of the Commission, U.S. Atomic Energy Commission, Washington, D.C. 20545, evaluating specific problems or postulated accidents, or to provide guidance to    Attention: Chief, Public Proceedings Staff.


Thus, for each structure the surveillance program. should consider separately the groups of vertical, hoop, and dome tendons.Consideration of homogeneous tendon subgroups (i.e., vertical, hoop, and dome) establishes a sampling base for determining loss of prestress, the main characteristic checked by the surveillance program.If some tendons are expected to be subject to greater prestress losses than the rest, this should be taken into account in selecting samples..The prestressing force in a tendon may :be 'checked by a liftoff or other equivalent test., One of the main objectives of the test is to discover any brittle, damaged, or broken wires. Any eventual decrease in the prestressing force is due to the simultaneous interaction of several time-dependent factors such as: a. Stress relaxation in the wire;b. Temperature variation of the wire;c. Shrinkage, creep, and temperature stresses in concrete;d. Differential thermal expansion
applicants. Regulatory Guides are not substitutes for regulations and compliance with them is not required. Methods and solutions different from those set out in   The guides are issued in the following ten broad divisions:
' or contraction between the concrete and the tendon; and e. -Eventual deterioration of the wires (corrosion).
the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.                 1,. Power Reactors                       
USAEC REGULATORY
GUIDES Copies of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission, Washington, D.C. 20545, Regulatory Guides are issued to describe and make available to the public Attention:
Director of Regulatory Standards.


Comments and suggestions for methods acceptable to the AEC Regulatory staff of implementing specific parts of improvements in these guides are encouraged and should be sent to the Secretary the Commission's regulations, to delineate techniques used by the staff in of the Commission, U.S. Atomic Energy Commission, Washington, D.C. 20545, evaluating specific problems or postulated accidents, or to provide guidance to Attention:
===6. Products===
Chief, Public Proceedings Staff.applicants.
                                                                                      2. Research and Test Reactors             


Regulatory Guides are not substitutes for regulations and compliance with them is not required.
===7. Transportation===
 
                                                                                      3. Fuels and Materials Facilities          8. Occupational Health Published guides will be revised periodically, as apprupriate, to accommodate        4. Environmental and Siting                9. Antitrust Review comments and to reflect new information or experience.                                5. Materials and Plant Protection        1
Methods and solutions different from those set out in The guides are issued in the following ten broad divisions:
the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.


1,. Power Reactors 6. Products 2. Research and Test Reactors
===0. General===


===7. Transportation===
A liftoff test does not separate the effects of these        accordance with this guide independently from factors, and corrosion, the factor of greatest concern,          containments at any other site. Where identical cannot be isolated. Therefore, tolerance limits for the          containment structures are located on one site, where no loss of prestressing force, including the effects of              environmental or other differences are apparent, and possible corrosion, should be established, and the                where they were constructed by the same contractor in surveillance procedure oriented toward verifying that            the same manner at the same time (continuous these limits are not exceeded. However, it should be             construction), then every second containment structure noted that only gross deterioration of the prestressing          need only be visually inspected in accordance with C.7.
3. Fuels and Materials Facilities
8. Occupational Health Published guides will be revised periodically, as apprupriate, to accommodate
4. Environmental and Siting 9. Antitrust Review comments and to reflect new information or experience.


5. Materials and Plant Protection
system can be detected.
10. General A liftoff test does not separate the effects of these factors, and corrosion, the factor of greatest concern, cannot be isolated.


Therefore, tolerance limits for the loss of prestressing force, including the effects of possible corrosion, should be established, and the surveillance procedure oriented toward verifying that these limits are not exceeded.
3. Containments should be designed so that the Many hoop tendons are anchored on buttresses                prestressing anchor hardware is accessible for periodic partially located inside the auxiliary building adjacent to      inspection.


However, it should be noted that only gross deterioration of the prestressing system can be detected.Many hoop tendons are anchored on buttresses partially located inside the auxiliary building adjacent to the containment.
the containment. Since these anchors are not easily accessible, especially during operation of the facility,          4. The surveillance measures identified in C.5., C.6.


Since these anchors are not easily accessible, especially during operation of the facility, they present a special problem for liftoff tests. The original layout of tendons should address itself specifically to this problem. Any anchor architectural treatment or environmental protection should be removable without damage to the anchor.Defects that an inspector might uncover during visual inspection of the anchorage assembly should be separated into three groups: a. Defects that can be found when the tendon is in its normally stressed condition;
they present a special problem for liftoff tests. The             and C.7. should be performed 1, 2, and 3 years after the original layout of tendons should address itself                 initial containment structural integrity test and every 5 specifically to this problem. Any anchor architectural           years thereafter.
b. Defects that can be found only after the tendon is tensioned to a higher value than the existing prestressing force; and c. Defects that can be found only after the tendon is detensioned.


If the limits provided in C.5. and C.6. are exceeded or if abnormal material behavior is detected pursuant to inspection in accordance with C.7., then abnormal degradation of the containment structure, a boundary designed to contain radioactive materials, is indicated.
treatment or environmental protection should be removable without damage to the anchor.                           5. Selected tendons should be periodically subjected to liftoff or other equivalent tests to monitor loss of Defects that an inspector might uncover during              prestress. These tests should include the following:
visual inspection of the anchorage assembly should be                  a. Properly calibrated jacks and the simultaneous separated into three groups:                                      measurement of elongation and jacking force. Allowable elongations and jacking loads, allowable tolerances, and a. Defects that can be found when the tendon is in its            the effects of influences such as temperature should be normally stressed condition;                                      established prior to the tests.


In such cases, the reporting provisions of Safety Guide 16,"Reporting of Operating Information," should apply.Included in the report should be a description of the condition of the concrete (especially at tendon anchorages), the surveillance procedure, the tolerances on cracking, and the measures to be used when tolerances are exceeded.C. REGULATORY
b. Defects that can be found only after the tendon is                  b. A maximum test liftoff force greater than the tensioned to a higher value than the existing prestressing        maximum inservice prestressing force. The liftoff test force; and                                                       should include an unloading cycle going down to c. Defects that can be found only after the tendon is            essentially complete detensioning of the tendon to detensioned.                                                      identify broken or damaged wires or strands.
POSITION 1. This guide should be applied to "typical" prestressed concrete containments having a shallow-domed roof on cyclindrical walls about 150 feet in diameter, an overall height of about 200 feet, and for which the number of tendons does not exceed: 200 in the dome (either three families of tendons 600 apart or two families of tendons 90' apart), 200 vertical (in wall), and 500 complete hoops (in wall). For containments that differ from the "typical" containment described above, this guide should serve as the basis for development of a comparable surveillance program, which will be evaluated on a case-by-case basis.2. Each containment structure should be inspected in accordance with this guide independently from containments at any other site. Where identical containment structures are located on one site, where no environmental or other differences are apparent, and where they were constructed by the same contractor in the same manner at the same time (continuous construction), then every second containment structure need only be visually inspected in accordance with C.7.3. Containments should be designed so that the prestressing anchor hardware is accessible for periodic inspection.


4. The surveillance measures identified in C.5., C.6.and C.
c. Selected numbers and types of tendons If the limits provided in C.5. and C.6. are exceeded        periodically tested for loss of prestress:
or if abnormal material behavior is detected pursuant to                    (1) Six dome tendons; two located in each 600
inspection in accordance with C.7., then abnormal                group (i.e.., three families of tendons) and distributed to degradation of the containment structure, a boundary              provide representative, sampling, or three located in each designed to contain radioactive materials, is indicated. In      900 group (i.e., two families of tendons), *
such cases, the reporting provisions of Safety Guide 16,                    (2) Five vertical tendons, randomly but
"Reporting of Operating Information," should apply.              representatively distributed, Included in the report should be a description of the                      (3) Ten hoop tendons (where more than one condition of the concrete (especially at tendon                  tendon comprises the total hoop, one tendon may anchorages), the surveillance procedure, the tolerances          represent the hoop), randomly but representatively on cracking, and the measures to be used when                    distributed.


===7. should be performed ===
tolerances are exceeded.
1, 2, and 3 years after the initial containment structural integrity test and every 5 years thereafter.


5. Selected tendons should be periodically subjected to liftoff or other equivalent tests to monitor loss of prestress.
d.   A measurement of the prestress force for each


These tests should include the following:
==C. REGULATORY POSITION==
a. Properly calibrated jacks and the simultaneous measurement of elongation and jacking force. Allowable elongations and jacking loads, allowable tolerances, and the effects of influences such as temperature should be established prior to the tests.b. A maximum test liftoff force greater than the maximum inservice prestressing force. The liftoff test should include an unloading cycle going down to essentially complete detensioning of the tendon to identify broken or damaged wires or strands.c. Selected numbers and types of tendons periodically tested for loss of prestress:
tendon    tested in C.5.c., with acceptable limits being defined  as not less than the predicted lower bound nor
(1) Six dome tendons; two located in each 600 group (i.e.., three families of tendons) and distributed to provide representative, sampling, or three located in each 900 group (i.e., two families of tendons), *(2) Five vertical tendons, randomly but representatively distributed, (3) Ten hoop tendons (where more than one tendon comprises the total hoop, one tendon may represent the hoop), randomly but representatively distributed.
1. This guide should be applied to "typical"                      greater than the predicted upper bound forces at the prestressed concrete containments having a                        time of the test.


d. A measurement of the prestress force for each tendon tested in C.5.c., with acceptable limits being defined as not less than the predicted lower bound nor greater than the predicted upper bound forces at the time of the test.e. An allowable limit of not more than one defective tendon out of the total sample population.
shallow-domed roof on cyclindrical walls about 150 feet in diameter, an overall height of about 200 feet, and for              e. An allowable limit of not more than one defective tendon out of the total sample population. If which the number of tendons does not exceed: 200 in the dome (either three families of tendons 600 apart or          one sample tendon is defective, an adjacent tendon on each side of the defective tendon should also be two families of tendons 90' apart), 200 vertical (in checked. If both of these tendons are acceptable as wall), and 500 complete hoops (in wall). For defined in C.5.d., then the surveillance program should containments that differ from the "typical"
                                                                  proceed considering the single deficiency as unique and containment described above, this guide should serve as acceptable. However, if either adjacent tendon is the basis for development of a comparable surveillance defective or if more than one tendon out of the original program, which will be evaluated on a case-by-case basis.


If one sample tendon is defective, an adjacent tendon on each side of the defective tendon should also be checked. If both of these tendons are acceptable as defined in C.5.d., then the surveillance program should proceed considering the single deficiency as unique and acceptable.
sample population is defective, abnormal degradation of the containment structure is indicated, and the
2.  Each containment structure should be inspected in            Commission should be notified in accordance with C.8.


However, if either adjacent tendon is defective or if more than one tendon out of the original sample population is defective, abnormal degradation of the containment structure is indicated, and the Commission should be notified in accordance with C.8.1.35-2  
1.35-2
6. The physical condition of the tendon material should be checked as noted below.a. Previously stressed tendon wires or strands from one dome tendon and two wall tendons (one from a vertical tendon and one from a hoop tendon) should be removed for testing and examination over the entire length to determine if evidence of corrosion or other deleterious effects are present. At each successive inspection the samples should be selected from different tendons.b. Tensile tests should be made on at least three samples cut from each removed wire or strand (one at each end and one at mid-length;
the samples being of a maximum length practical for testing).
If frequent stress cycling is suspected, tests simulating his condition should be conducted.


Similarly, where as a result of the surveillance program a potentially corrosive atmosphere is suspected, accelerated corrosion tests should be made.c. Failure below the guaranteed ultimate strength of any one of the three tendon material sample tests should be considered an indication of abnormal degradation of the containment structure, and the Commission should be notified in accordance with C.8.7. Tendon anchorage assembly hardware (such as bearing plates, stressing washers, shims, wedges, and buttonheads)
6. The physical condition of the tendon material                inspected to the extent practical without dismantling should be checked as noted below.                               load-bearing components of the anchorage. The surrounding concrete should also be checked visually for a. Previously stressed tendon wires or strands            indications of abnormal material behavior. If the entire from one dome tendon and two wall tendons (one from            containment is pressurized for leak testing purposes, the a vertical tendon and one from a hoop tendon) should            visual inspection should be scheduled, if possible, to be removed for testing and examination over the entire          coincide with the leak test.
of all tendons inspected pursuant to C.5.and C.6. should be visually inspected.


For those containments for which only visual inspections need be performed, as noted in C.2., the same numbers and types of tendons as noted in C.5.c. should be visually inspected to the extent practical without dismantling load-bearing components of the anchorage.
length to determine if evidence of corrosion or other deleterious effects are present. At each successive The method used for checking the presence of inspection the samples should be selected from different sheathing filler grease should account for: (1) the tendons.


The surrounding concrete should also be checked visually for indications of abnormal material behavior.
minimum grease coverage needed for different parts of the anchorage system including, for example, b. Tensile tests should be made on at least three          buttonheads; (2) the influence of temperature variations, samples cut from each removed wire or strand (one at            especially the lowest temperature likely to occur each end and one at mid-length; the samples being of a          between two successive inspections; (3) the procedure maximum length practical for testing). If frequent stress      used to uncover possible voids in grease in the trumpet;
cycling is suspected, tests simulating his condition            and (4) requirements imposed by grease specifications, should be conducted. Similarly, where as a result of the        qualification tests, and acceptability tolera'nces. The surveillance program a potentially corrosive atmosphere        method used for removing grease in order to permit is suspected, accelerated corrosion tests should be made.      visual inspection of the stressing washers, shims, wedges, and bearing plates should neither increase the effects of c. Failure below the guaranteed ultimate strength corrosion nor damage the steel (for instance, scratch it)
of any one of the three tendon material sample tests            and should be usable even under unfavorable conditions should be considered an indication of abnormal                 so as not to conflict with operational requirements.


If the entire containment is pressurized for leak testing purposes, the visual inspection should be scheduled, if possible, to coincide with the leak test.The method used for checking the presence of sheathing filler grease should account for: (1) the minimum grease coverage needed for different parts of the anchorage system including, for example, buttonheads;
degradation of the containment structure, and the Commission should be notified in accordance with C.8.
(2) the influence of temperature variations, especially the lowest temperature likely to occur between two successive inspections;
(3) the procedure used to uncover possible voids in grease in the trumpet;and (4) requirements imposed by grease specifications, qualification tests, and acceptability tolera'nces.


The method used for removing grease in order to permit visual inspection of the stressing washers, shims, wedges, and bearing plates should neither increase the effects of corrosion nor damage the steel (for instance, scratch it)and should be usable even under unfavorable conditions so as not to conflict with operational requirements.
8. Any significant or critical deterioration of the
7. Tendon anchorage assembly hardware (such as                  containment revealed by the inservice surveillance bearing plates, stressing washers, shims, wedges, and           program should be reported to the Commission as an buttonheads) of all tendons inspected pursuant to C.5.          abnormal occurrence in accordance with Safety Guide and C.6. should be visually inspected. For those                16, "Reporting of Operating Information," except that containments for which only visual inspections need be          the initial report may be made within 10 days of the performed, as noted in C.2., the same numbers and types        completion of the tests, and the detailed report may of tendons as noted in C.5.c. should be visually                follow within 90 days of the completion of the tests.


8. Any significant or critical deterioration of the containment revealed by the inservice surveillance program should be reported to the Commission as an abnormal occurrence in accordance with Safety Guide 16, "Reporting of Operating Information," except that the initial report may be made within 10 days of the completion of the tests, and the detailed report may follow within 90 days of the completion of the tests.1.35-3}}
1.35-3}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 20:46, 11 November 2019

Inservice Surveillance of Ungrouted Tendons in Prestressed Concrete Containment Structures.
ML12305A260
Person / Time
Issue date: 02/05/1973
From:
Office of Nuclear Regulatory Research
To:
References
RG-1.035
Download: ML12305A260 (3)


2/5/73 U.S. ATOMIC ENERGY COMMISSION

REGULATORY

DIRECTORATE OF REGULATORY

GI JIDE

STANDARDS

REGULATORY GUIDE 1.35 INSERVICE SURVEILLANCE OF UNGROUTED TENDONS

IN PRESTRESSED CONCRETE CONTAINMENT STRUCTURES

A. INTRODUCTION

preventing filler (grease). To the fullest extent practical, it should also cover the ducts that contain the tendons.

General Design Criterion 53, "Provisions for Such a surveillance program is necessary because Containment Testing and Inspection" of Appendix A generally there is no permanent instrumentation to 10 CFR Part 50, "General Design Criteria for installed in the containment that could continuously Nuclear Power Plants," requires, in part, that the monitor its structural behavior.

reactor containment be designed to permit (1) periodic inspection of all important areas and (2) 'an When developing a surveillance program, the total appropriate surveillance program. This guide describes containment tendon population should be divided into an acceptable basis for developing an appropriate homogeneous subgroups, i.e., tendons having surveillance program for ungrouted tendons in approximately the same probability of corrosion and a prestressed concrete containment structures of similar function in the overall structural capabilities and light-water-cooled reactors. The Advisory Committee properties of the structure. Thus, for each structure the on Reactor Safeguards has been consulted concerning surveillance program. should consider separately the this guide and has concurred in the regulatory position. groups of vertical, hoop, and dome tendons.

B. DISCUSSION

Consideration of homogeneous tendon subgroups (i.e., vertical, hoop, and dome) establishes a sampling This guide is applicable to "typical" prestressed base for determining loss of prestress, the main concrete containments with ungrouted tendons only, for characteristic checked by the surveillance program.

which the number of tendons does not exceed: 200 in the dome (either three families of tendons 600 apart or If some tendons are expected to be subject to two families of tendons 900 apart), 200 vertical (in greater prestress losses than the rest, this should be taken wall), and 500 complete hoops (in wall). into account in selecting samples..

For containments that differ from the "typical" The prestressing force in a tendon may :be 'checked containment described above, the model program by a liftoff or other equivalent test., One of the main presented in this guide should serve as the basis for objectives of the test is to discover any brittle, damaged, development of a comparable surveillance program. or broken wires. Any eventual decrease in the prestressing force is due to the simultaneous interaction Surveillance of ungrouted wire and strand tendons of several time-dependent factors such as:

of all sizes (up to an ultimate strength of approximately

1300 tons) and types should be considered (e.g., tendons a. Stress relaxation in the wire;

with parallel wires, with one or several strands, and with b. Temperature variation of the wire;

different systems of anchors). Materials for all c. Shrinkage, creep, and temperature stresses in components should satisfy the requirements of concrete;

applicable American Society for Testing and Materials d. Differential thermal expansion ' or contraction (ASTM) material standards. The surveillance program between the concrete and the tendon; and should cover the anchor hardware and the corrosion- e. -Eventual deterioration of the wires (corrosion).

USAEC REGULATORY GUIDES Copies of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission, Washington, D.C. 20545, Regulatory Guides are issued to describe and make available to the public Attention: Director of Regulatory Standards. Comments and suggestions for methods acceptable to the AEC Regulatory staff of implementing specific parts of improvements in these guides are encouraged and should be sent to the Secretary the Commission's regulations, to delineate techniques used by the staff in of the Commission, U.S. Atomic Energy Commission, Washington, D.C. 20545, evaluating specific problems or postulated accidents, or to provide guidance to Attention: Chief, Public Proceedings Staff.

applicants. Regulatory Guides are not substitutes for regulations and compliance with them is not required. Methods and solutions different from those set out in The guides are issued in the following ten broad divisions:

the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission. 1,. Power Reactors

6. Products

2. Research and Test Reactors

7. Transportation

3. Fuels and Materials Facilities 8. Occupational Health Published guides will be revised periodically, as apprupriate, to accommodate 4. Environmental and Siting 9. Antitrust Review comments and to reflect new information or experience. 5. Materials and Plant Protection 1

0. General

A liftoff test does not separate the effects of these accordance with this guide independently from factors, and corrosion, the factor of greatest concern, containments at any other site. Where identical cannot be isolated. Therefore, tolerance limits for the containment structures are located on one site, where no loss of prestressing force, including the effects of environmental or other differences are apparent, and possible corrosion, should be established, and the where they were constructed by the same contractor in surveillance procedure oriented toward verifying that the same manner at the same time (continuous these limits are not exceeded. However, it should be construction), then every second containment structure noted that only gross deterioration of the prestressing need only be visually inspected in accordance with C.7.

system can be detected.

3. Containments should be designed so that the Many hoop tendons are anchored on buttresses prestressing anchor hardware is accessible for periodic partially located inside the auxiliary building adjacent to inspection.

the containment. Since these anchors are not easily accessible, especially during operation of the facility, 4. The surveillance measures identified in C.5., C.6.

they present a special problem for liftoff tests. The and C.7. should be performed 1, 2, and 3 years after the original layout of tendons should address itself initial containment structural integrity test and every 5 specifically to this problem. Any anchor architectural years thereafter.

treatment or environmental protection should be removable without damage to the anchor. 5. Selected tendons should be periodically subjected to liftoff or other equivalent tests to monitor loss of Defects that an inspector might uncover during prestress. These tests should include the following:

visual inspection of the anchorage assembly should be a. Properly calibrated jacks and the simultaneous separated into three groups: measurement of elongation and jacking force. Allowable elongations and jacking loads, allowable tolerances, and a. Defects that can be found when the tendon is in its the effects of influences such as temperature should be normally stressed condition; established prior to the tests.

b. Defects that can be found only after the tendon is b. A maximum test liftoff force greater than the tensioned to a higher value than the existing prestressing maximum inservice prestressing force. The liftoff test force; and should include an unloading cycle going down to c. Defects that can be found only after the tendon is essentially complete detensioning of the tendon to detensioned. identify broken or damaged wires or strands.

c. Selected numbers and types of tendons If the limits provided in C.5. and C.6. are exceeded periodically tested for loss of prestress:

or if abnormal material behavior is detected pursuant to (1) Six dome tendons; two located in each 600

inspection in accordance with C.7., then abnormal group (i.e.., three families of tendons) and distributed to degradation of the containment structure, a boundary provide representative, sampling, or three located in each designed to contain radioactive materials, is indicated. In 900 group (i.e., two families of tendons), *

such cases, the reporting provisions of Safety Guide 16, (2) Five vertical tendons, randomly but

"Reporting of Operating Information," should apply. representatively distributed, Included in the report should be a description of the (3) Ten hoop tendons (where more than one condition of the concrete (especially at tendon tendon comprises the total hoop, one tendon may anchorages), the surveillance procedure, the tolerances represent the hoop), randomly but representatively on cracking, and the measures to be used when distributed.

tolerances are exceeded.

d. A measurement of the prestress force for each

C. REGULATORY POSITION

tendon tested in C.5.c., with acceptable limits being defined as not less than the predicted lower bound nor

1. This guide should be applied to "typical" greater than the predicted upper bound forces at the prestressed concrete containments having a time of the test.

shallow-domed roof on cyclindrical walls about 150 feet in diameter, an overall height of about 200 feet, and for e. An allowable limit of not more than one defective tendon out of the total sample population. If which the number of tendons does not exceed: 200 in the dome (either three families of tendons 600 apart or one sample tendon is defective, an adjacent tendon on each side of the defective tendon should also be two families of tendons 90' apart), 200 vertical (in checked. If both of these tendons are acceptable as wall), and 500 complete hoops (in wall). For defined in C.5.d., then the surveillance program should containments that differ from the "typical"

proceed considering the single deficiency as unique and containment described above, this guide should serve as acceptable. However, if either adjacent tendon is the basis for development of a comparable surveillance defective or if more than one tendon out of the original program, which will be evaluated on a case-by-case basis.

sample population is defective, abnormal degradation of the containment structure is indicated, and the

2. Each containment structure should be inspected in Commission should be notified in accordance with C.8.

1.35-2

6. The physical condition of the tendon material inspected to the extent practical without dismantling should be checked as noted below. load-bearing components of the anchorage. The surrounding concrete should also be checked visually for a. Previously stressed tendon wires or strands indications of abnormal material behavior. If the entire from one dome tendon and two wall tendons (one from containment is pressurized for leak testing purposes, the a vertical tendon and one from a hoop tendon) should visual inspection should be scheduled, if possible, to be removed for testing and examination over the entire coincide with the leak test.

length to determine if evidence of corrosion or other deleterious effects are present. At each successive The method used for checking the presence of inspection the samples should be selected from different sheathing filler grease should account for: (1) the tendons.

minimum grease coverage needed for different parts of the anchorage system including, for example, b. Tensile tests should be made on at least three buttonheads; (2) the influence of temperature variations, samples cut from each removed wire or strand (one at especially the lowest temperature likely to occur each end and one at mid-length; the samples being of a between two successive inspections; (3) the procedure maximum length practical for testing). If frequent stress used to uncover possible voids in grease in the trumpet;

cycling is suspected, tests simulating his condition and (4) requirements imposed by grease specifications, should be conducted. Similarly, where as a result of the qualification tests, and acceptability tolera'nces. The surveillance program a potentially corrosive atmosphere method used for removing grease in order to permit is suspected, accelerated corrosion tests should be made. visual inspection of the stressing washers, shims, wedges, and bearing plates should neither increase the effects of c. Failure below the guaranteed ultimate strength corrosion nor damage the steel (for instance, scratch it)

of any one of the three tendon material sample tests and should be usable even under unfavorable conditions should be considered an indication of abnormal so as not to conflict with operational requirements.

degradation of the containment structure, and the Commission should be notified in accordance with C.8.

8. Any significant or critical deterioration of the

7. Tendon anchorage assembly hardware (such as containment revealed by the inservice surveillance bearing plates, stressing washers, shims, wedges, and program should be reported to the Commission as an buttonheads) of all tendons inspected pursuant to C.5. abnormal occurrence in accordance with Safety Guide and C.6. should be visually inspected. For those 16, "Reporting of Operating Information," except that containments for which only visual inspections need be the initial report may be made within 10 days of the performed, as noted in C.2., the same numbers and types completion of the tests, and the detailed report may of tendons as noted in C.5.c. should be visually follow within 90 days of the completion of the tests.

1.35-3