ML073111375: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Description Survey Unit Release Record Design # Survey Unit #(s) acquisition of survey measurements.
{{#Wiki_filter:Survey Unit Release Record
                                                                                                -
Design #       EP-FH- 102        Revision #          Original      Page 1 of 3 Survey Unit #(s)                                     FH- 102
: 1) Embedded Pipe (EP) Survey Unit FH-102 meets the definition of embedded pipe for Plum Brook Reactor Facility (PBRF).
: 2) EP FH-102 is a Class 1, Group 3.1 survey unit as per the PBRF Final Status Survey Plan (FSSP) and Technical Basis Document (TBD)-06-004.
: 3) Surveys in EP FH-102 were performed using a scintillation detector optimized to measure gamma energies representative of Cs-137. Sample #EP 3-6 fiom Survey Request (SR)-13 was referenced for this decision.
: 4) Survey Instructions for this survey unit are incorporated into and performed in accordance with (IAW) the Babcock Services Incorporated (BSI)/LVS-002, Work Execution Package (WEP) 05-006. Survey instructions described in this Description document constitute "Special Methods" and the survey design used in the acquisition of survey measurements.
: 5) Instrument efficiency determinations are developed in accordance with the BSVLVS-002, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed.
: 5) Instrument efficiency determinations are developed in accordance with the BSVLVS-002, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed.
CS-0911 EP-FH- 102 FH- 102 1) Embedded Pipe (EP) Survey Unit FH-102 meets the definition of embedded pipe for Plum Brook Reactor Facility (PBRF). 2) EP FH-102 is a Class 1, Group 3.1 survey unit as per the PBRF Final Status Survey Plan (FSSP) and Technical Basis Document (TBD)-06-004.
CS-0911
: 3) Surveys in EP FH-102 were performed using a scintillation detector optimized to measure gamma energies representative of Cs-137. Sample #EP 3-6 fiom Survey Request (SR)-13 was referenced for this decision.
 
: 4) Survey Instructions for this survey unit are incorporated into and performed in accordance with (IAW) the Babcock Services Incorporated (BSI)/LVS-002, Work Execution Package (WEP) 05-006. Survey instructions described in this document constitute "Special Methods" and the survey design used in the Revision # Original - Page 1 of 3 I FSS Design
I FSS Design # EP FH- 102           I Revision # Original            I    ~age2of3      1 I Survey Unit: FH-102                                                                       I 1.1    The subject pipe system is the 4" drain line system for the Fan House (FH). The FH floor drain system consists of two major branches that both tie into the header and sump that services the Hot Pipe Tunnel (HPT). The system was accessed at four different locations on the - 12 ft elevation of the Fan House. The purpose of the system was to convey water from the floor drain openings on the -12 ft elevation of the FH to a sump located on the -12' elevation of the HPT.
# EP FH- 102 I Revision # Original I ~age2of3 1 I Survey Unit: FH- 102 I 1.1 The subject pipe system is the 4" drain line system for the Fan House (FH). The FH floor drain system consists of two major branches that both tie into the header and sump that services the Hot Pipe Tunnel (HPT).
1.2    EP FH-102 consists of approximately 113 feet of drain system piping.
The system was accessed at four different locations on the - 12 ft elevation of the Fan House. The purpose of the system was to convey water from the floor drain openings on the -12 ft elevation of the FH to a sump located on the -1 2' elevation of the HPT. 1.2 EP FH-102 consists of approximately 11 3 feet of drain system piping. Survey Design Information 2.1 EP FH-102 was surveyed IAW Procedure
Survey Design Information 2.1   EP FH-102 was surveyed IAW Procedure #BSI/LVS-002.
#BSI/LVS-002.
2.2    100% of the 4" ID pipe was accessible for survey. The accessible 4" ID pipe was surveyed by static measurement at one foot increments, for a total of 113 survey measurements.
2.2 100% of the 4" ID pipe was accessible for survey. The accessible 4" ID pipe was surveyed by static measurement at one foot increments, for a total of 1 13 survey measurements.
2.3    Surface area for the 4" ID piping is 973 cm2for each foot of piping, corresponding to a total 4" ID piping surface area of 109,935 cm2(1 1.0 m2) for the entire length of (1 13') of 4" piping.
2.3 Surface area for the 4" ID piping is 973 cm2 for each foot of piping, corresponding to a total 4" ID piping surface area of 109,935 cm2 (1 1.0 m2) for the entire length of (1 13') of 4" piping. Survey Unit Measurement Locations/Data 3.1 Pipe interior radiological survey forms are provided in Attachment 2 of this release record. Survey Unit Investigations/Results 4.1 None Data Assessment Results 5.1 Data assessment results are provided in the EPBuried Pipe (BP) Survey Report provided in Attachment
Survey Unit Measurement Locations/Data 3.1    Pipe interior radiological survey forms are provided in Attachment 2 of this release record.
: 1. 5.2 All measurement results are less than the Derived Concentration Guideline Level (DCGL) for radionuclide specific EP that corresponds to the 1 mredyr dose goal established in Table 3-3 of the FSSP. 5.3 When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction (NF), provided in TBD-06-004, the survey unit that is constituted by EP FH- 102 passes FSS. 5.4 Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for this survey unit.
Survey Unit Investigations/Results 4.1     None Data Assessment Results 5.1    Data assessment results are provided in the EPBuried Pipe (BP) Survey Report provided in Attachment 1.
5.5 Statistical Summary Table - Statistical Parameter FSS Design # EP FH-102 Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mredyr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregate of the total dose for both structural scenarios and soils. 6.1 A review of the survey results has shown that the dose contribution for EP FH-102 to be less than 1 mredyr. The dose contribution is estimated to be 0.022 mrernlyr based on the average of the actual gross counts. Attachments Attachment 1 - BSI EPIBP Survey Report Attachment 2 - Pipe Interior Radiological Survey Form Attachment 3 - DQA Worksheet Attachment 4 -Disc containing RR for EP FH-102 & Spreadsheet Survey Unit: FH-102 Revision # Original Page 3 of 3 SECTION 7 ATTACHMENT 1 PAGE(S)
5.2   All measurement results are less than the Derived Concentration Guideline Level (DCGL) for radionuclide specific EP that corresponds to the 1 mredyr dose goal established in Table 3-3 of the FSSP.
C%kw BSI EPIBP SURVEY REPORT Pipe ID Survey Date Survey Time Pipe Size DCGL (dpmIlOOcrn2)
5.3   When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction (NF), provided in TBD-06-004, the survey unit that is constituted by EP FH- 102 passes FSS.
Plpe Area lmrated by Survev Dats tm') Routine Survey QA Survey EP FH-102 02-Nov-06 08: 13 -- 4" 3.79E+06 11 .O X Survey Location 2350-1 # Detector-Sled
5.4    Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for this survey unit.
# Detector Efficiency Fan House 203438 44-1 59 238369 1101 0.00019 Survey Measurement Results Total Number of Survey Measurements Number of Measurements sMDC Number of Measurements Above 50% DCGL PIP ~rea lnmrparated by ~e-r Emflency (In cm2) Field BKG (cprn~ Field MDCRcprn)
 
Nominal MDC (dprmlWcm2) 113 107 0 973 5.1 10.8 9,453 ACTIVITY VALUES NOT BACKGROUND CORRECTED RP Engineer ( Date EP FH-102 4" Pipe TBD 06-004 Group 3.1 EP FH-102 4" Pipe TBD 06-004 Group 3.1 EP FH-102 4" Pipe TBD 06-004 Group 3.1 EP FH-102 4" Pipe TBD 06404 Group 3.1 SECTION 7 ATTACHMENT 2 2 PAGE@)
                                                                  -
BSIlLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date: I I lo~/06 Time: 081 3 Pipe ID#: /f - 1 0 2 Pipe Diameter:
FSS Design # EP FH-102            Revision # Original                    Page 3 of 3 Survey Unit: FH-102 5.5     Statistical Summary Table Statistical Parameter Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mredyr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregate of the total dose for both structural scenarios and soils.
4' Access Point Area: fH- ( Building:
6.1     A review of the survey results has shown that the dose contribution for EP FH-102 to be less than 1 mredyr. The dose contribution is estimated to be 0.022 mrernlyr based on the average of the actual gross counts.
f&J Mbus~ Elevation: - 12' System: FLiZ. b~?~l, Type of Survey Investigation Characterization Final Survey .x Other Gross C06O cs L/ Detector ID# 1 Sled ID# 49 - !.?23WL9 1 10 1 Detector Cal Date: ~/S/OL Detector Cal Due Date:
Attachments Attachment 1 - BSI EPIBP Survey Report Attachment 2 - Pipe Interior Radiological Survey Form Attachment 3 - DQA Worksheet Attachment 4 -Disc containing RR for EP FH-102 & Spreadsheet
9/</& 7 Instrument:
 
7.3 5-0-/ Instrument ID #: ZOwZl? Instrument Cal Date:
SECTION 7 ATTACHMENT 1 PAGE(S)
7/$/0 6 Instrument Cal Due Date:
 
7/</0 7 From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 5 1 cpm MDCRstatic 1 0 9 CPm Efficiency Factor for Pipe Diameter 0.000 \ q (fiom detector efficiency determination)
C%kw                                BSI EPIBP SURVEY REPORT Pipe ID                EP FH-102                         Survey Location                          Fan House Survey Date                02-Nov-06                                2350-1 #                            203438 44-159        238369 Survey Time                  08:13                            Detector-Sled #
MDCstatic 4453 d~m/ \ 00 cm2 Is the MDCsktic acceptable?
1101
@ NO (if no, adjust sample count time and recalculate MDC%,tic, Comments:
-                          -
Y 17vGf -. P~b~rlcd A. IS 4 D~P. F23-6 Techcian Signature Pipe Interior Radiological Survey Package Page 1 of Attachment 3, Page 1 BSIlLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form (Continuation Form)
Pipe Size                    4"                          Detector Efficiency                        0.00019 DCGL        (dpmIlOOcrn2)    3.79E+06              PIP ~ r e alnmrparated by ~e-r Emflency (In cm2)          973 Plpe Area l m r a t e d by Survev Dats tm')            11.O                              Field BKG(cprn~                            5.1 Routine Survey                     X                              Field MDCRcprn)                            10.8 QA Survey                                             Nominal MDC (dprmlWcm2)                          9,453 Survey Measurement Results Total Number of Survey Measurements                                              113 Number of Measurements sMDC                                                  107 Number of MeasurementsAbove 50% DCGL                                                0 ACTIVITY VALUES NOT BACKGROUND CORRECTED RP Engineer ( Date
Date: I 1 /OZ[O L Y Pipe ID#: f1-t - loz Pipe Diameter: Access Point Area:
 
FH- f Building:
EP FH-102 4" Pipe TBD 06-004 Group 3.1
pw WSE Elevation:
 
-1 21 System: C7 b1-205 ' Package Page 2- of - - Attachment 3, Page 2 BSIfLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Suwey Form Date: /l/~z 13 b Time: /os+ Pipe ID#: FH - /O 2 Pipe Diameter:
EP FH-102 4" Pipe TBD 06-004 Group 3.1
9 " Access Point Area:
 
f H - 2 Building:
EP FH-102 4" Pipe TBD 06-004 Group 3.1
F)ki) &US E Elevation:
 
~!2' System: PLR 3Rlt/ rype of Survey Investigation Characterization Final Survey )( Other Gross C06O Cs / Detector Cal Date: ?/J-/o 0 Detector Cal Due Date:
EP FH-102 4" Pipe TBD 06404 Group 3.1
Instrument:
 
23 TO- / Instrument ID #: 20Wg- kc Instrument Cal Date:
SECTION 7 ATTACHMENT 2 2 PAGE@)
7/~/06. Instrument Cal Due Date:
 
7/7/47 From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value cpm MDCRstatic
BSIlLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date:      IIlo~/06                Time:          081 3 Pipe ID#:        /f - 1 0 2      Pipe Diameter:          4'                Access Point Area: f H - (
/O,c CPm Efficiency Factor for Pipe Diameter 0 ,000 \q (from detector efficiency determination)
Building:      f&J    M b u s ~ Elevation:            - 12'                    System:          FLiZ. b ~ ? ~ l ,
MDcstatic 9453 dpm/ 100 cm2 Is the MDCsbtic acceptable?  
Type of Survey      Investigation        Characterization            Final Survey      .x      Other Gross                            C06O                                      c s L/
@ NO (if no, adjust sample count time and recalculate MDC%tatic)
Detector ID# 1Sled ID#          -
Comments:
49 !.?23WL9                  1          10 1 Detector Cal Date:          ~/S/OL                Detector Cal Due Date:              9/</&7 Instrument:          7 . 3 5-0-/                Instrument ID #:                ZOwZl?
POST grL3/zo f~s o R~T~ E73- 6 ?iw"77@? postmod Li4 IS ?/ZC3P Technician Signature Pipe Interior Radiological Survey Package Page 1 of Attachment 3, Page 1 BSYLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date: Pipe ID#: Building:
Instrument Cal Date:          7/$/0 6            Instrument Cal Due Date:                  7/</0 7 From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value        5 1 cpm MDCRstatic      10 9              CPm Efficiency Factor for Pipe Diameter 0.000 \ q                (fiom detector efficiency determination)
Time: I Pipe Diameter:
MDCstatic          4453          d~m/       \ 00        cm2 Is the MDCskticacceptable?        @ NO                (if no, adjust sample count time and recalculate MDC%,tic, Comments:                         Y                        17vGf  -.
Elevation: - 12' Access Point Area:
P ~ b ~ r l c d A. I S 4 D ~ P .
System: Type of Survey Investigation Characterization Final Survey Other 0 Gross C06O a 4 Detector ID# 1 Sled ID# +$-I Y-3 83~ 4 / /6 / Detector Cal Date: Detector Cal Due Date: Instrument:
F23-6 Techcian Signature Pipe Interior Radiological Survey Package Page 1 of Attachment 3, Page 1
Zc@-1 Instrument ID #: Instrument Cal Date: '7/~/0 6 Instrument Cal Due Date: From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 5- ( cpm MDCktatic 10 *8 CP~ Efficiency Factor for Pipe Diameter 6.0 0 0 14 (from detector efficiency determination)
 
MDCstatic 4453 dpd - \ 03 cm2 Is the MDCSbtic acceptable?  
BSIlLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form (Continuation Form)
@ NO (if no, adjust sample count time and recalculate MDCR,tatic)
Date:     I 1/ O Z [ O L Pipe ID#:         -
Comments: - I YDZO RESVRUCC( E?3 -6 i7~7-/~ $'as~-a 32 rs TWE [I ~ZO P* Technician Signature Pipe Interior Radiological Survey Package Page 1 of 2, Attachment 3, Page 1 BSI/LVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form (Continuation Form) Date: r lloz/o~ Pipe ID#: ~Itf - 2 Pipe Diameter:
f1-t l o z      Pipe Diameter:
Access Point Area: Building:
Y Access Point Area:    F H -f Building: p  w WSE              Elevation:       - 1 21        System:           C7  b1-205
p A Elevation:
                                                                    '  Package Page of -
System: FL R DEW, Package Page 2 of 5 Attachment 3, Page 2 BS1,LVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date: 1 1 /OL/OL Time: 134s Pipe ID#: F /-f - / OZ Pipe Diameter:
Attachment 3, Page 2
It Access Point Area: f H 4 Building:
 
r+ Elevation:  
BSIfLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Suwey Form Date:      / l / ~13zb            Time:            /os+
-- IZ' System: %lt DFU Type of Survey Investigation Characterization Final Survey $ Other - Gross C06O Cs fl Detector ID# / Sled ID# 44. / sj 23 l%3 16 4 Detector Cal Date: 415 /6 6 Detector Cal Due Date: 'p/ S/O 7 'lol Instrument:
Pipe ID#: FH /O 2 -            Pipe Diameter:          9"                Access Point Area:         f H-2 Building: F)ki) &US E              Elevation:          ~!2'                      System:            P L R 3Rlt/
23 r0 -/ < Instrument ID #: *34%$? Instrument Cal Date: 7/5/0 6 Instrument Cal Due Date: ~/s/o 7 From the Daily Pipe Survey  
rype of Survey   Investigation          Characterization            Final Survey     )(     Other Gross                            C06O                                      Cs /
~etector Control Form for the Selected Detector Background Value 5 . 1 cpm MDCkkfic /0*8 CPm Efficiency Factor for Pipe Diameter 6. Q 0 a \ q (from detector efficiency determination)
Detector Cal Date:        ?/J-/o  0            Detector Cal Due Date:
MDCstatic
Instrument:          2 3 TO-/                   Instrument ID #:                 20Wg-kc Instrument Cal Date:       7/~/06.              Instrument Cal Due Date:                   7/7/47 From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value                cpm MDCRstatic      /O,c            CPm Efficiency Factor for Pipe Diameter    0 ,000 \q            (from detector efficiency determination)
'i 4.6 3 dpd lop cm2 Is the MDCsbtic acceptable?
MDcstatic        9453          dpm/       100          cm2 Is the MDCsbticacceptable?
@ No (if no, adjust sample count time and recalculate MDCR,tBtic)
                                @          NO (if no, adjust sample count time and recalculate MDC%tatic)
Comments:
Comments:     POST      grL3/zof ~ o R        s    ~        TE 7~3 -    6                            ?iw"77@?
POST GY~M RESIJRUEY EP~-(", Pazmw LS DlzsP - Y Technician Signature Pipe Interior Radiological Survey Package Page 1 of 2 Attachment 3, Page 1 BSYLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form (Continuation Form) Date: / ( 16~10 t Pipe ID#: ~(4 - (b 5 Pipe Diameter:
postmod L i 4I S                  ?/ZC3P Technician Signature Pipe Interior Radiological Survey Package Page 1 of Attachment 3, Page 1
4 Access Point Area: F H -4 Building: ,C-&l\l fi S r- Elevation:
 
-1 t' System: FLR 1312A-fAJ Package Page L of 5 .I- SERVICES INC. Attachment 3, Page 2 
BSYLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date:                             Time:
I Pipe ID#:                      Pipe Diameter:                            Access Point Area:
Building:                         Elevation:       - 12'                        System:
Type of Survey Investigation            Characterization            Final Survey              Other    0 Gross                          C06O                                      a4 Detector ID# 1 Sled ID# +$-IY-3            8 3 4 ~/                       /6/
Detector Cal Date:                                Detector Cal Due Date:
Instrument:          Zc@-1                      Instrument ID #:
Instrument Cal Date:        ' 7 / ~ /60        Instrument Cal Due Date:
From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value         5-( cpm MDCktatic        10 *8        C P  ~
                                  -
Efficiency Factor for Pipe Diameter   6.00 0 14            (from detector efficiency determination)
MDCstatic          4453        dpd        \ 03          cm2 Is the MDCSbticacceptable?     @ NO                 (if no, adjust sample count time and recalculate MDCR,tatic)
Comments:           -
I      YDZO        RESVRUCC(              E?3 -6                                   i 7 ~ 7 - /
                $'as~-a        32 rs TWE          [I ~ Z O P*
Technician Signature Pipe Interior Radiological Survey Package Page 1 of 2, Attachment 3, Page 1
 
BSI/LVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form (Continuation Form)
Date:       r lloz/o~
                  -
Pipe ID#: ~ I t f 2          Pipe Diameter:              Access Point Area:
Building:    p            A    Elevation:                     System:       FL R  DEW, Package Page 2 of 5 Attachment 3, Page 2
 
BS1,LVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date:      1 1/OL/OL              Time:           134s
                    -
                                                                                                          -
Pipe ID#: F /-f / O Z            Pipe Diameter:
It Access Point Area:           fH4 Building:     +
r                    Elevation:          -- IZ'                    System:            %lt DFU Type of Survey      Investigation        Characterization            Final Survey       $      Other Gross                            C06O                                      Cs fl Detector ID# / Sled ID# 44. / s j 2 3 l%316 4            '            l            o            l Detector Cal Date:            415 6/6             Detector Cal Due Date:                  'p/ S/O    7 Instrument:            2 3 r0 -/              < Instrument ID #:                *34%$?
Instrument Cal Date:          7/5/06              Instrument Cal Due Date:               ~ / s /7    o From the Daily Pipe Survey ~etectorControl Form for the Selected Detector Background Value          .
5 1 cpm MDCkkfic          /0*8            CPm Efficiency Factor for Pipe Diameter 6 .Q 0 a \ q            (from detector efficiency determination)
MDCstatic        'i 4.6 3        dpd      lop          cm2 Is the MDCsbticacceptable?        @ No              (if no, adjust sample count time and recalculate MDCR,tBtic)
Comments:       POST G Y ~ M RESIJRUEY                          E P ~ -- ( " ,                    Y Pazmw                  LS            DlzsP Technician Signature Pipe Interior Radiological Survey Package Page 1 of  2 Attachment 3, Page 1
 
BSYLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form (Continuation Form)
Date:       / ( 16~10                              t Pipe ID#: ~ ( (b Building: ,C-&l\l
                  - 4 5S r-fi Pipe Diameter:
Elevation:
4
                                              - 1 t' Access Point Area:
System:
F H -4 FLR  1312A-fAJ Package Page L of   5 Attachment 3, Page 2
          .I-SERVICES INC.
 
SECTION 7 ATTACHMENT 3 I  PAGE(S)
 
                                        'A w
DQA Check Sheet Design #            EP FH-102          Revision #        Original Survey Unit #                                                       EP FH-102 Preliminary Data Review' Answers to the following questions should be fully documented in the Survey Unit Release Record                                              Yes  No  NIA
: 1. Have surveys been performed in accordance with survey instructions in the Survey Design?              X
: 2. Is the instrumentation MDC for structure static measurements below the DCGLw for Class Iand 2 X
survey units, or below 0.5 DCGLWfor Class 3 survey units?
: 3. Is the instrumentation MDC for embeddedlburiedpiping static measurements below the DCGLw ?            X
: 4. Was the instrumentation MDC for structure scan measurements, soil scan measurements, and embeddedlburiedpiping scan measurements below the DCGLW,or, if not, was the need for additional                  X static measurements or soil samples addressed in the survey design?
: 5. Was the instrumentation MDC for volumetric measurements and smear analysis < 10% DCGLw ?                          X
: 6. Were the MDCs and assumptions used to develop them appropriate for the instrumentsand techniques used to perform the survey?
: 7. Were the survey methods used to collect data proper for the types of radiation involved and for the    X media being surveyed?
: 8. Were "Special Methods" for data collection properly applied for the survey unit under review?          X
: 9. Is the data set comprised of qualified measurement results collected in accordance with the survey    X design, which accurately reflects the radiological status of the facility?
Graphical Data Review I    I    I
: 3. Have other graphical data tools been created to assist in analyung the data Page 1 of 1


SECTION 7 ATTACHMENT 3 I PAGE(S) 
SECTION 7 ATTACHMENT 4 1 DISC}}
'A w Page 1 of 1 DQA Check Sheet Design # Survey Unit # EP FH-102 Preliminary Data Review' EP FH-102 Revision # Answers to the following questions should be fully documented in the Survey Unit Release Record
: 1. Have surveys been performed in accordance with survey instructions in the Survey Design?
: 2. Is the instrumentation MDC for structure static measurements below the DCGLw for Class I and 2 survey units, or below 0.5 DCGLW for Class 3 survey units? 3. Is the instrumentation MDC for embeddedlburied piping static measurements below the DCGLw ? 4. Was the instrumentation MDC for structure scan measurements, soil scan measurements, and embeddedlburied piping scan measurements below the DCGLW, or, if not, was the need for additional static measurements or soil samples addressed in the survey design? 5. Was the instrumentation MDC for volumetric measurements and smear analysis < 10% DCGLw ? 6. Were the MDCs and assumptions used to develop them appropriate for the instruments and techniques used to perform the survey? 7. Were the survey methods used to collect data proper for the types of radiation involved and for the media being surveyed?
: 8. Were "Special Methods" for data collection properly applied for the survey unit under review?
: 9. Is the data set comprised of qualified measurement results collected in accordance with the survey design, which accurately reflects the radiological status of the facility?
Original Graphical Data Review I I I 3. Have other graphical data tools been created to assist in analyung the data Yes X X X X X No NIA X X X SECTION 7 ATTACHMENT 4 1 DISC}}

Revision as of 01:52, 23 November 2019

EP-FH-102, Nasa, Survey Unit Release Record
ML073111375
Person / Time
Site: Plum Brook
Issue date: 10/30/2007
From:
US National Aeronautics & Space Admin (NASA)
To:
NRC/RGN-III/DNMS/DB
References
EP-FH-102
Download: ML073111375 (21)


Text

Survey Unit Release Record

-

Design # EP-FH- 102 Revision # Original Page 1 of 3 Survey Unit #(s) FH- 102

1) Embedded Pipe (EP) Survey Unit FH-102 meets the definition of embedded pipe for Plum Brook Reactor Facility (PBRF).
2) EP FH-102 is a Class 1, Group 3.1 survey unit as per the PBRF Final Status Survey Plan (FSSP) and Technical Basis Document (TBD)-06-004.
3) Surveys in EP FH-102 were performed using a scintillation detector optimized to measure gamma energies representative of Cs-137. Sample #EP 3-6 fiom Survey Request (SR)-13 was referenced for this decision.
4) Survey Instructions for this survey unit are incorporated into and performed in accordance with (IAW) the Babcock Services Incorporated (BSI)/LVS-002, Work Execution Package (WEP)05-006. Survey instructions described in this Description document constitute "Special Methods" and the survey design used in the acquisition of survey measurements.
5) Instrument efficiency determinations are developed in accordance with the BSVLVS-002, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed.

CS-0911

I FSS Design # EP FH- 102 I Revision # Original I ~age2of3 1 I Survey Unit: FH-102 I 1.1 The subject pipe system is the 4" drain line system for the Fan House (FH). The FH floor drain system consists of two major branches that both tie into the header and sump that services the Hot Pipe Tunnel (HPT). The system was accessed at four different locations on the - 12 ft elevation of the Fan House. The purpose of the system was to convey water from the floor drain openings on the -12 ft elevation of the FH to a sump located on the -12' elevation of the HPT.

1.2 EP FH-102 consists of approximately 113 feet of drain system piping.

Survey Design Information 2.1 EP FH-102 was surveyed IAW Procedure #BSI/LVS-002.

2.2 100% of the 4" ID pipe was accessible for survey. The accessible 4" ID pipe was surveyed by static measurement at one foot increments, for a total of 113 survey measurements.

2.3 Surface area for the 4" ID piping is 973 cm2for each foot of piping, corresponding to a total 4" ID piping surface area of 109,935 cm2(1 1.0 m2) for the entire length of (1 13') of 4" piping.

Survey Unit Measurement Locations/Data 3.1 Pipe interior radiological survey forms are provided in Attachment 2 of this release record.

Survey Unit Investigations/Results 4.1 None Data Assessment Results 5.1 Data assessment results are provided in the EPBuried Pipe (BP) Survey Report provided in Attachment 1.

5.2 All measurement results are less than the Derived Concentration Guideline Level (DCGL) for radionuclide specific EP that corresponds to the 1 mredyr dose goal established in Table 3-3 of the FSSP.

5.3 When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction (NF), provided in TBD-06-004, the survey unit that is constituted by EP FH- 102 passes FSS.

5.4 Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for this survey unit.

-

FSS Design # EP FH-102 Revision # Original Page 3 of 3 Survey Unit: FH-102 5.5 Statistical Summary Table Statistical Parameter Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mredyr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregate of the total dose for both structural scenarios and soils.

6.1 A review of the survey results has shown that the dose contribution for EP FH-102 to be less than 1 mredyr. The dose contribution is estimated to be 0.022 mrernlyr based on the average of the actual gross counts.

Attachments Attachment 1 - BSI EPIBP Survey Report Attachment 2 - Pipe Interior Radiological Survey Form Attachment 3 - DQA Worksheet Attachment 4 -Disc containing RR for EP FH-102 & Spreadsheet

SECTION 7 ATTACHMENT 1 PAGE(S)

C%kw BSI EPIBP SURVEY REPORT Pipe ID EP FH-102 Survey Location Fan House Survey Date 02-Nov-06 2350-1 # 203438 44-159 238369 Survey Time 08:13 Detector-Sled #

1101

- -

Pipe Size 4" Detector Efficiency 0.00019 DCGL (dpmIlOOcrn2) 3.79E+06 PIP ~ r e alnmrparated by ~e-r Emflency (In cm2) 973 Plpe Area l m r a t e d by Survev Dats tm') 11.O Field BKG(cprn~ 5.1 Routine Survey X Field MDCRcprn) 10.8 QA Survey Nominal MDC (dprmlWcm2) 9,453 Survey Measurement Results Total Number of Survey Measurements 113 Number of Measurements sMDC 107 Number of MeasurementsAbove 50% DCGL 0 ACTIVITY VALUES NOT BACKGROUND CORRECTED RP Engineer ( Date

EP FH-102 4" Pipe TBD 06-004 Group 3.1

EP FH-102 4" Pipe TBD 06-004 Group 3.1

EP FH-102 4" Pipe TBD 06-004 Group 3.1

EP FH-102 4" Pipe TBD 06404 Group 3.1

SECTION 7 ATTACHMENT 2 2 PAGE@)

BSIlLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date: IIlo~/06 Time: 081 3 Pipe ID#: /f - 1 0 2 Pipe Diameter: 4' Access Point Area: f H - (

Building: f&J M b u s ~ Elevation: - 12' System: FLiZ. b ~ ? ~ l ,

Type of Survey Investigation Characterization Final Survey .x Other Gross C06O c s L/

Detector ID# 1Sled ID# -

49 !.?23WL9 1 10 1 Detector Cal Date: ~/S/OL Detector Cal Due Date: 9/</&7 Instrument: 7 . 3 5-0-/ Instrument ID #: ZOwZl?

Instrument Cal Date: 7/$/0 6 Instrument Cal Due Date: 7/</0 7 From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 5 1 cpm MDCRstatic 10 9 CPm Efficiency Factor for Pipe Diameter 0.000 \ q (fiom detector efficiency determination)

MDCstatic 4453 d~m/ \ 00 cm2 Is the MDCskticacceptable? @ NO (if no, adjust sample count time and recalculate MDC%,tic, Comments: Y 17vGf -.

P ~ b ~ r l c d A. I S 4 D ~ P .

F23-6 Techcian Signature Pipe Interior Radiological Survey Package Page 1 of Attachment 3, Page 1

BSIlLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form (Continuation Form)

Date: I 1/ O Z [ O L Pipe ID#: -

f1-t l o z Pipe Diameter:

Y Access Point Area: F H -f Building: p w WSE Elevation: - 1 21 System: C7 b1-205

' Package Page of -

Attachment 3, Page 2

BSIfLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Suwey Form Date: / l / ~13zb Time: /os+

Pipe ID#: FH /O 2 - Pipe Diameter: 9" Access Point Area: f H-2 Building: F)ki) &US E Elevation: ~!2' System: P L R 3Rlt/

rype of Survey Investigation Characterization Final Survey )( Other Gross C06O Cs /

Detector Cal Date:  ?/J-/o 0 Detector Cal Due Date:

Instrument: 2 3 TO-/ Instrument ID #: 20Wg-kc Instrument Cal Date: 7/~/06. Instrument Cal Due Date: 7/7/47 From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value cpm MDCRstatic /O,c CPm Efficiency Factor for Pipe Diameter 0 ,000 \q (from detector efficiency determination)

MDcstatic 9453 dpm/ 100 cm2 Is the MDCsbticacceptable?

@ NO (if no, adjust sample count time and recalculate MDC%tatic)

Comments: POST grL3/zof ~ o R s ~ TE 7~3 - 6 ?iw"77@?

postmod L i 4I S  ?/ZC3P Technician Signature Pipe Interior Radiological Survey Package Page 1 of Attachment 3, Page 1

BSYLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date: Time:

I Pipe ID#: Pipe Diameter: Access Point Area:

Building: Elevation: - 12' System:

Type of Survey Investigation Characterization Final Survey Other 0 Gross C06O a4 Detector ID# 1 Sled ID# +$-IY-3 8 3 4 ~/ /6/

Detector Cal Date: Detector Cal Due Date:

Instrument: Zc@-1 Instrument ID #:

Instrument Cal Date: ' 7 / ~ /60 Instrument Cal Due Date:

From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 5-( cpm MDCktatic 10 *8 C P ~

-

Efficiency Factor for Pipe Diameter 6.00 0 14 (from detector efficiency determination)

MDCstatic 4453 dpd \ 03 cm2 Is the MDCSbticacceptable? @ NO (if no, adjust sample count time and recalculate MDCR,tatic)

Comments: -

I YDZO RESVRUCC( E?3 -6 i 7 ~ 7 - /

$'as~-a 32 rs TWE [I ~ Z O P*

Technician Signature Pipe Interior Radiological Survey Package Page 1 of 2, Attachment 3, Page 1

BSI/LVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form (Continuation Form)

Date: r lloz/o~

-

Pipe ID#: ~ I t f 2 Pipe Diameter: Access Point Area:

Building: p A Elevation: System: FL R DEW, Package Page 2 of 5 Attachment 3, Page 2

BS1,LVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date: 1 1/OL/OL Time: 134s

-

-

Pipe ID#: F /-f / O Z Pipe Diameter:

It Access Point Area: fH4 Building: +

r Elevation: -- IZ' System: %lt DFU Type of Survey Investigation Characterization Final Survey $ Other Gross C06O Cs fl Detector ID# / Sled ID# 44. / s j 2 3 l%316 4 ' l o l Detector Cal Date: 415 6/6 Detector Cal Due Date: 'p/ S/O 7 Instrument: 2 3 r0 -/ < Instrument ID #: *34%$?

Instrument Cal Date: 7/5/06 Instrument Cal Due Date: ~ / s /7 o From the Daily Pipe Survey ~etectorControl Form for the Selected Detector Background Value .

5 1 cpm MDCkkfic /0*8 CPm Efficiency Factor for Pipe Diameter 6 .Q 0 a \ q (from detector efficiency determination)

MDCstatic 'i 4.6 3 dpd lop cm2 Is the MDCsbticacceptable? @ No (if no, adjust sample count time and recalculate MDCR,tBtic)

Comments: POST G Y ~ M RESIJRUEY E P ~ -- ( " , Y Pazmw LS DlzsP Technician Signature Pipe Interior Radiological Survey Package Page 1 of 2 Attachment 3, Page 1

BSYLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form (Continuation Form)

Date: / ( 16~10 t Pipe ID#: ~ ( (b Building: ,C-&l\l

- 4 5S r-fi Pipe Diameter:

Elevation:

4

- 1 t' Access Point Area:

System:

F H -4 FLR 1312A-fAJ Package Page L of 5 Attachment 3, Page 2

.I-SERVICES INC.

SECTION 7 ATTACHMENT 3 I PAGE(S)

'A w

DQA Check Sheet Design # EP FH-102 Revision # Original Survey Unit # EP FH-102 Preliminary Data Review' Answers to the following questions should be fully documented in the Survey Unit Release Record Yes No NIA

1. Have surveys been performed in accordance with survey instructions in the Survey Design? X
2. Is the instrumentation MDC for structure static measurements below the DCGLw for Class Iand 2 X

survey units, or below 0.5 DCGLWfor Class 3 survey units?

3. Is the instrumentation MDC for embeddedlburiedpiping static measurements below the DCGLw ? X
4. Was the instrumentation MDC for structure scan measurements, soil scan measurements, and embeddedlburiedpiping scan measurements below the DCGLW,or, if not, was the need for additional X static measurements or soil samples addressed in the survey design?
5. Was the instrumentation MDC for volumetric measurements and smear analysis < 10% DCGLw ? X
6. Were the MDCs and assumptions used to develop them appropriate for the instrumentsand techniques used to perform the survey?
7. Were the survey methods used to collect data proper for the types of radiation involved and for the X media being surveyed?
8. Were "Special Methods" for data collection properly applied for the survey unit under review? X
9. Is the data set comprised of qualified measurement results collected in accordance with the survey X design, which accurately reflects the radiological status of the facility?

Graphical Data Review I I I

3. Have other graphical data tools been created to assist in analyung the data Page 1 of 1

SECTION 7 ATTACHMENT 4 1 DISC