ML17338A832: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 6: | Line 6: | ||
| number = ML17338A833 | | number = ML17338A833 | ||
| issue date = 06/25/1979 | | issue date = 06/25/1979 | ||
| title = | | title = LER 79-008/03L-0 on 790526:emergency Diesel Generator Stopped Due to Lockout Relay Actuation.Caused by Improper Settings on Undervoltage Time Delay Relays.Relays Reset & Tested.Test Procedures Will Be Revised | ||
| author name = Schoppman M | | author name = Schoppman M | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
Latest revision as of 23:58, 6 March 2020
| Date released: 07/31/2018 | Download: ML17338A832 |
|---|---|
| ML17338A833 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/25/1979 |
| From: | Schoppman M FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML17338A833 (2) | |
| ML17338A831 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/25/1979 |
| From: | Schmidt A FLORIDA POWER & LIGHT CO. |
| To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML17338A831 (2) | |