ML17128A181: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER | {{#Wiki_filter:Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE JPM Number: A-N-1-R Revision Number: 01 Date: 02/16 Developed By: | ||
A-N-1-R | Instructor Date Approved By: | ||
Instructor Date | Facility Representative Date | ||
Facility Representative Date | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-1-R | Revision Record (Summary) | ||
: 1. This is a tabletop JPM utilizing simulator procedures | Revision 00 New JPM developed for 2009 NRC Exam. | ||
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam. | |||
DOCUMENT PREPARATION 1. Markup a copy of DOS 1100-02. | A-N-1-R Page 2 of 7 | ||
Job Performance Measure (JPM) | |||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | |||
: 2. No Simulator setup needed. | |||
DOCUMENT PREPARATION | |||
: 1. Markup a copy of DOS 1100-02. | |||
A-N-1-R Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. DOS 1100-02 was performed last shift | : 2. DOS 1100-02 was performed last shift. | ||
: 3. The EO reported all surveillance requirements were within specifications. | |||
INITIATING CUE | |||
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct | : 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct. | ||
: 2. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | |||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-1-R Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
: _________ PERFORMANCE CHECKLIST STANDARDS SAT | UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | ||
* 1. Student should identify step I.4 should NOT have been | Provide the examinee with the provided copy of DOS 1100-02. | ||
* 1. Student should identify step Identifies that step should I.4 should NOT have been NOT have been initialed. | |||
_____ | initialed. _____ _____ _____ | ||
* 2. Student should identify step I.9.g should NOT have been N/ | * 2. Student should identify step Identifies that step should I.9.g should NOT have been NOT have been N/Ad. | ||
N/Ad. _____ _____ _____ | |||
: 3. Notify Unit Supervisor of Notifies Unit Supervisor, to discrepancies. verify/correct issues. | |||
_____ _____ _____ | |||
CUE: Acknowledge report of task completion. | CUE: | ||
END | Acknowledge report of task completion. | ||
:_________ | END JPM Stop Time:_________ | ||
A-N-1-R Page 5 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job Title: RO JPM Title: VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE Revision Number: 01 JPM Number: A-N-1-R Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures. | ||
K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 Actual Time Used: minutes | |||
JPM Title: VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE Revision Number: | |||
299L080 | |||
K/A Number and Importance: Generic.2. | |||
1.18 | |||
Simulator Actual Testing Environment: | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
20 | |||
minutes | |||
==References:== | ==References:== | ||
DOS 1100-02, rev 17 EVALUATION | |||
DOS 1100-02 , rev 17 EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Satisfactory Unsatisfactory Comments: | |||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
A-N-1-R Page 6 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. DOS 1100-02 was performed last shift | : 2. DOS 1100-02 was performed last shift. | ||
: 3. The EO reported all surveillance requirements were within specifications. | |||
INITIATING CUE | |||
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct | : 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct. | ||
: 2. Inform the Unit Supervisor when the task is complete. | |||
A-N-1-R Page 7 of 7 | |||
Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER JPM Number: A-N-2-R Revision Number: 00 Date: 02/16 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-2-R | Revision Record (Summary) | ||
: 1. This is a tabletop JPM utilizing simulator procedures | Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam. | ||
A-N-2-R Page 2 of 10 | |||
-15 Sheet 1, M | |||
-16, and M-3658 Sheet 1 on Large TV in simulator. | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | |||
: 2. Pull up prints M-15 Sheet 1, M-16, and M-3658 Sheet 1 on Large TV in simulator. | |||
: 3. Turn TV screen off. | : 3. Turn TV screen off. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Copy of M-15 Sheet 1 | : 1. Copy of M-15 Sheet 1. | ||
: 2. Copy of M-16. | |||
-DR-109-1001. | : 3. Copy of OP-AA-109-101. | ||
: 4. Copy of OP-DR-109-1001. | |||
A-N-2-R Page 3 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an Extra NSO. | : 1. You are an Extra NSO. | ||
: 2. Unit 2 is at 500 MWe. | : 2. Unit 2 is at 500 MWe. | ||
| Line 124: | Line 123: | ||
: 5. Condensate/Condensate Booster Pump seal isolation is not required. | : 5. Condensate/Condensate Booster Pump seal isolation is not required. | ||
: 6. Hydrogen Addition injection isolation is not required. | : 6. Hydrogen Addition injection isolation is not required. | ||
: 7. Passport is not available, but is expected to return this shift | : 7. Passport is not available, but is expected to return this shift. | ||
: 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified. | |||
: 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary. | |||
: 10. Other NSOs are tasked with determining electrical and air isolations. | : 10. Other NSOs are tasked with determining electrical and air isolations. | ||
INITIATING CUE 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header. | INITIATING CUE | ||
: 2. Record recommended Isolation Points and Required Positions on the sheet provided. 3. Inform the Unit Supervisor when the task is complete. | : 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header. | ||
: 2. Record recommended Isolation Points and Required Positions on the sheet provided. | |||
: 3. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
A-N-2-R Page 4 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | |||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-2-R Page 5 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the examinee with the provided copy of M-15 Sheet 1 and M-16. | |||
If the examinee requests Clearance and Tagging procedures, they may be provided. | |||
The following steps may be performed in any order | The following steps may be performed in any order | ||
: 1. Candidate identifies 2C Condensate/Condensate Booster pump on M | : 1. Candidate identifies 2C Candidate correctly locates Condensate/Condensate and identifies 2C Booster pump on M-15 Sheet Condensate/Condensate _____ _____ _____ | ||
-15 Sheet | : 1. Booster pump on M-15 Sheet 1. | ||
-15 Sheet 1. | * 2. Candidate determines Candidate identifies the isolation points and required following valves are positions for 2C condensate necessary isolation points _____ _____ _____ | ||
* 2. Candidate determines isolation points and required positions for 2C condensate | pump for 2C Condensate pump: | ||
(Located on M | (Located on M-15 Sht. 1) | ||
-15 Sht. 1) | |||
* 2-3301-C-500 (Closed) | * 2-3301-C-500 (Closed) | ||
* 2-3302-C-500 (Closed) | * 2-3302-C-500 (Closed) | ||
* 3. Candidate determines Candidate identifies the isolation points and required following valves are positions for 2C condensate necessary isolation points _____ _____ _____ | |||
* 3. Candidate determines isolation points and required positions for 2C condensate | booster pump for 2C Condensate pump: | ||
* 2-3305-C-500 (Closed) (Located on M | * 2-3305-C-500 (Closed) | ||
-15 Sht. 1) | (Located on M-15 Sht. 1) | ||
* 2- | * 2-3401-C-500 (Closed) | ||
-16) | (Located on M-16) | ||
A-N-2-R Page 6 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
* 4. Completes worksheet with | * 4. Completes worksheet with Notifies Unit Supervisor, to EPN and required hang verify/correct issues. | ||
_____ | position. _____ _____ _____ | ||
CUE: Acknowledge report of task completion. END | CUE: | ||
:_________ | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
A-N-2-R Page 7 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job Title: RO JPM Title: DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER Revision Number: 00 JPM Number: A-N-2-R Task Number and Title: 299L012 Determine points of isolation in order to remove a piece of equipment from service. | ||
K/A Number and Importance: Generic.2.2.41 3.5/3.9 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes | |||
JPM Title: DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER Revision Number: | |||
299L012 Determine points of isolation in order to remove a piece of equipment from service. | |||
K/A Number and Importance: Generic.2.2.41 | |||
Suggested Testing | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
15 | |||
minutes | |||
==References:== | ==References:== | ||
OP-AA-109-101 Rev. 10, OP-DR-109-101-1001 Rev. 10, M-15 Sheet 1 Rev. M, M-16 Rev. AP EVALUATION | |||
OP-AA-109-101 Rev. 10 , OP-DR-109-101-1001 Rev. 10, M-15 Sheet 1 Rev. M, M | |||
-16 Rev. AP | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Satisfactory Unsatisfactory | |||
Comments: | |||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
A-N-2-R Page 8 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an Extra NSO. | : 1. You are an Extra NSO. | ||
: 2. Unit 2 is at 500 MWe. | : 2. Unit 2 is at 500 MWe. | ||
| Line 206: | Line 199: | ||
: 5. Condensate/Condensate Booster Pump seal isolation is not required. | : 5. Condensate/Condensate Booster Pump seal isolation is not required. | ||
: 6. Hydrogen Addition injection isolation is not required. | : 6. Hydrogen Addition injection isolation is not required. | ||
: 7. Passport is not available, but is expected to return this shift. 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified | : 7. Passport is not available, but is expected to return this shift. | ||
: 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified. | |||
: 10. Other NSOs are tasked with determining electrical and air isolations | : 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary. | ||
: 10. Other NSOs are tasked with determining electrical and air isolations. | |||
: 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header. | |||
: 2. Record recommended Isolation Points and Required Positions on the sheet provided. | |||
: 3. Inform the Unit Supervisor when the task is complete. | |||
A-N-2-R Page 9 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-2-R | EPN Hang Position A-N-2-R Page 10 of 10 | ||
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-3-R Revision Number: 02 Date: 02/16 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 00 New JPM. | |||
Revision 01 Revised for 2010 NRC exam. | |||
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam. | |||
A-N-3-R Page 2 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
| Line 230: | Line 230: | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a marked up copy of DOS 1500-08. | : 1. Provide a marked up copy of DOS 1500-08. | ||
A-N-3-R Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an extra NSO. 2. The Unit 2 NSO started DOS 1500 | : 1. You are an extra NSO. | ||
-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons. | : 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) | ||
: 3. Only the | HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons. | ||
: 3. Only the A CCSW Heat Exchanger is going to be placed in service. | |||
INITIATING CUE | INITIATING CUE | ||
: 1. Complete the performance of DOS 1500-08. 2. Inform the Unit Supervisor when the task is complete. | : 1. Complete the performance of DOS 1500-08. | ||
: 2. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-3-R Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
: _________ PERFORMANCE CHECKLIST STANDARDS SAT | UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | ||
Provide the examinee with the provided copy of DOS 1500-08. | |||
The following steps can be performed in any order. | |||
If examinee states to stop, due to errors, inform him/her to continue calculations. | If examinee states to stop, due to errors, inform him/her to continue calculations. | ||
* 1. Examinee calculates Dilution flow (1,017,000 gpm) | * 1. Examinee calculates Dilution See attached key. | ||
flow (1,017,000 gpm). | |||
_____ | _____ _____ _____ | ||
: 2. Examinee enters dilution flow (from above) to calculate CCSW Activity Limit. | : 2. Examinee enters dilution flow See attached key. | ||
(from above) to calculate CCSW Activity Limit. _____ _____ _____ | |||
_____ | * 3. Examinee calculates CCSW See attached key. | ||
* 3. Examinee calculates CCSW Activity Limit (2.91 x 10 | Activity Limit (2.91 x 10-5). | ||
-5) | _____ _____ _____ | ||
_____ | * 4. Examinee verifies CCSW Examinee determines Heat Exchanger A sample CCSW Heat Exchanger A activity is less than or equal sample activity is greater _____ _____ _____ | ||
* 4. Examinee verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW | to the calculated CCSW than or equal to the activity limit calculated CCSW activity limit | ||
: 5. Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge. | : 5. Recommends to the Unit Makes recommendation to Supervisor that the calculated Unit Supervisor. | ||
sample limit exceeds the allowable discharge. _____ _____ _____ | |||
: 6. Informs Unit Supervisor task | : 6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | ||
Examinee notifies the Unit Supervisor. | _____ _____ _____ | ||
_____ | CUE: | ||
CUE: Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END | END JPM Stop Time:_________ | ||
:_________ | A-N-3-R Page 5 of 7 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: RO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-3-R Task Number and Title: 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance. | |||
JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: | K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes | ||
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance | |||
Simulator Actual Testing Environment: | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
minutes | |||
==References:== | ==References:== | ||
DOS 1500-08, rev 17 EVALUATION | |||
DOS 1500-08 , rev 17 | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Satisfactory Unsatisfactory | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
A-N-3-R Page 6 of 7 | |||
Job Performance Measure (JPM) | |||
INITIAL CONDITIONS | |||
: 1. You are an extra NSO. | |||
: 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons. | |||
: 3. Only the A CCSW Heat Exchanger is going to be placed in service. | |||
INITIATING CUE | |||
: 1. Complete the performance of DOS 1500-08. | |||
: 2. Inform the Unit Supervisor when the task is complete. | |||
A-N-3-R Page 7 of 7 | |||
Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 01 Date: 02/16 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | |||
Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam. | |||
- | Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam. | ||
A-N-4-R Page 2 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a copy of DOA 0010-10 and DOA 0010 | : 1. Provide a copy of DOA 0010-10 and DOA 0010-S1. | ||
-S1. | A-N-4-R Page 3 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A fire is burning at the Lift Station, no explosion has occurred. | : 2. A fire is burning at the Lift Station, no explosion has occurred. | ||
: 3. The fire has been classified as a major fire. | : 3. The fire has been classified as a major fire. | ||
: 4. Hazmat and rescue response are not required. | : 4. Hazmat and rescue response are not required. | ||
: 5. The Fire brigade has been alerted and is attempting to combat the | : 5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully. | ||
: 6. A dedicated outside line is not available. | : 6. A dedicated outside line is not available. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit supervisor has directed you to enter and execute DOA 0010 | : 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3. | ||
-10, FIRE-EXPLOSION through step D.3 | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | |||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-4-R Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
: _________ PERFORMANCE CHECKLIST STANDARDS SAT | UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | ||
-S1 when requested. | Provide the examinee with the supplied copy of DOA 0010-10. | ||
* 1. Notify Coal City Fire Protection District. (Refer to DOA 0010-S1, Key Phone Numbers for DOA 0010 Block | Provide the examinee with the supplied copy of DOA 0010-S1 when requested. | ||
* 1. Notify Coal City Fire From DOA 0010-S1 Protection District. (Refer to determines that 815-942-DOA 0010-S1, Key Phone 0336 is the number Numbers for DOA 0010 Block needed to contact the _____ _____ _____ | |||
Procedures.) CCFPD. | |||
* 2. Dial 815-942-0336 and Dials 815-942-0336 and communicate the details of communicates the details the fire. of the fire: _____ _____ _____ | |||
* 2. Dial 815-942-0336 and | |||
* Location of fire | * Location of fire | ||
* Assistance is required | * Assistance is required CUE: | ||
If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities. | |||
CUE: If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities. | : 3. Notifies TSO via direct line for Notifies the TSO from a major fire. control room phone using the TSO direct line button and provides call back _____ _____ _____ | ||
: 3. Notifies TSO via direct line for | phone number. | ||
Notifies the TSO from a control room phone using the TSO direct line button and provides call back phone number. | : 4. Notify Security Shift Notifies the Security Shift Supervisor that outside fire Supervisor that the department will be CCFPD will be responding responding AND request to the Lift Station. | ||
assistance in providing access to affected area if _____ _____ _____ | |||
: 4. Notify Security Shift Supervisor that outside fire department will be responding AND request assistance in providing access to affected area if necessary. | necessary. | ||
: 5. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | |||
_____ _____ _____ | |||
CUE: | |||
Examinee notifies the Unit Supervisor. | Acknowledge report of task completion. | ||
_____ | END A-N-4-R Page 5 of 8 | ||
CUE: Acknowledge report of task completion. | |||
END | |||
A-N-4-R | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-4-R | JPM Stop Time:_________ | ||
A-N-4-R Page 6 of 8 | |||
JPM Title: DETERMINE ACTIONS FOR A FIRE Revision Number: 01 JPM Number: | Job Performance Measure (JPM) | ||
A-N-4-R Task Number and Title: 295L009, Respond to a fire/explosion K/A Number and Importance: Generic | Operators Name: | ||
.2.4.27 | Job Title: RO JPM Title: DETERMINE ACTIONS FOR A FIRE Revision Number: 01 JPM Number: A-N-4-R Task Number and Title: 295L009, Respond to a fire/explosion K/A Number and Importance: Generic.2.4.27 3.4 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes | ||
Suggested Testing Environment: | |||
Simulator Actual Testing Environment: | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
: | |||
minutes | |||
==References:== | ==References:== | ||
DOA 0010-10, rev 20; DOA 0010-S1, rev 14 EVALUATION | |||
DOA 0010-10 , rev 20; DOA 0010 | |||
-S1, rev 14 | |||
EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Satisfactory | |||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
A-N-4-R Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A fire is burning at the Lift Station, no explosion has occurred. | : 2. A fire is burning at the Lift Station, no explosion has occurred. | ||
: 3. The fire has been classified as a major fire. | : 3. The fire has been classified as a major fire. | ||
: 4. Hazmat and rescue response are not required. | : 4. Hazmat and rescue response are not required. | ||
: 5. The Fire brigade has been alerted and is attempting to combat the | : 5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully. | ||
: 6. A dedicated outside line is not available. | : 6. A dedicated outside line is not available. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit supervisor has directed you to enter and execute DOA 0010 | : 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3. | ||
-10, FIRE-EXPLOSION through step D.3 | : 2. Inform the Unit Supervisor when the task is complete. | ||
A-N-4-R Page 8 of 8 | |||
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 02/16 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-1-S | Revision Record (Summary) | ||
Revision 00 New JPM developed ILT 15-1 (2016-301) NRC Exam. | |||
A-N-1-S Page 2 of 7 | |||
Job Performance Measure (JPM) | |||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. None. | : 1. None. | ||
A-N-1-S Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 3 Unit Supervisor. 2. Unit 2 and Unit 3 are operating at rated power. | : 1. You are the Unit 3 Unit Supervisor. | ||
: 2. Unit 2 and Unit 3 are operating at rated power. | |||
: 3. The following timeline occurred: | : 3. The following timeline occurred: | ||
* 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system. | * 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system. | ||
* 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated. | * 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated. | ||
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water | * 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge. | ||
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement. Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | INITIATING CUE | ||
Information For | : 1. Utilizing the Reportability Manual, determine the earliest reportability requirement. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | |||
Information For Evaluators Use: | |||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-1-S Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
: _________ PERFORMANCE CHECKLIST STANDARDS SAT | UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | ||
Candidate locates a copy of Reportability Manual. | |||
EXAMINER NOTE: | EXAMINER NOTE: | ||
The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4. | The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4. | ||
* 1. Determines the event is reportable per SAF 1. | * 1. Determines the event is Determines the event is reportable per SAF 1.8. reportable per SAF 1.8, Event or Condition that could have prevented _____ _____ _____ | ||
fulfillment of a Safety Function. | |||
8, | * 2. Determines the time limit to Determines the time limit Notify the NRC Operations to Notify the NRC Center via the ENS as soon Operations Center via the as practical and in all cases, ENS as soon as practical within 8 hours and in all cases within 8 hours of the occurrence (Time 0542). | ||
* 2. Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases, | _____ _____ _____ | ||
END JPM Stop Time:_________ | |||
A-N-1-S Page 5 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job Title: SRO JPM Title: REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and Title: 299L001, Determine Reportability requirements as outlined in station Reportability manual. | ||
SRO JPM Title: REPORTABILITY DETERMINATION Revision Number: | K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 Actual Time Used: minutes | ||
299L001, Determine Reportability requirements as outlined in station Reportability manual. | |||
K/A Number and Importance: Generic.2.1. | |||
2 | |||
: Simulator Actual Testing Environment: | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
20 | |||
minutes | |||
==References:== | ==References:== | ||
Reportability Tables and Decision Trees LS-AA-1020 Rev 23, Safety (SAF) LS-AA-1110 Rev. 22 EVALUATION | |||
Reportability Tables and Decision Trees LS-AA-1020 Rev 23, Safety (SAF) LS | |||
-AA-1110 Rev. 22 | |||
EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Satisfactory Unsatisfactory | |||
Comments: | |||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
A-N-1-S Page 6 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 3 Unit Supervisor. | |||
: 2. Unit 2 and Unit 3 are operating at rated power. | : 2. Unit 2 and Unit 3 are operating at rated power. | ||
: 3. The following timeline occurred: | : 3. The following timeline occurred: | ||
* 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system. | * 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system. | ||
* 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated. | * 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated. | ||
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water | * 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge. | ||
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement | INITIATING CUE | ||
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement. | |||
Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE | A-N-1-S Page 7 of 7 | ||
A-N-2-S | |||
Instructor Date | Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number: A-N-2-S Revision Number: 01 Date: 02/16 Developed By: | ||
Facility Representative Date Job Performance Measure (JPM) | Instructor Date Approved By: | ||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 00 Modified for 2010 Cert Exam. | |||
Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam. | |||
A-N-2-S Page 2 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | |||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Marked up copy of OP | : 1. Marked up copy of OP-AA-105-102. | ||
-AA-105-102. | A-N-2-S Page 3 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Shift Manager | : 1. You are the Shift Manager. | ||
: 2. An SRO is in the process of license reactivation. | |||
: 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee. | |||
INITIATING CUE | |||
Information For | : 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | |||
Information For Evaluators Use: | |||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | |||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-2-S Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
: _________ PERFORMANCE CHECKLIST STANDARDS SAT | UNSAT Comm PERFORMANCE CHECKLIST STANDARDS SAT ent NOTE: | ||
-AA-105-102. 1. Review OP-AA-105-102, | Provide the Examinee the provided marked up copy of OP-AA-105-102. | ||
Reviews OP | : 1. Review OP-AA-105-102, Reviews OP-AA-105-102, Attachment 2. Attachment 2. | ||
-AA-105-102, Attachment 2. | _____ _____ _____ | ||
_____ | : 2. Check that Hours on Shift are in Notes 12.0 hours listed on the same calendar quarter. 6/26/16 are performed during the 2nd calendar _____ _____ _____ | ||
: 2. Check that Hours on Shift are in | quarter and cannot be counted towards license re-activation. | ||
Notes 12.0 hours listed on 6/ | : 3. Check that Hours on Shift are Determines 12.0 hours as applicable for license WEC listed on 07/3/16 reactivation. cannot be credited towards license re-activation. | ||
-activation. | _____ _____ _____ | ||
: 3. Check that Hours on Shift are | |||
Determines 12.0 hours as WEC listed on 07/3/16 cannot be credited towards license re | |||
-activation. | |||
_____ | |||
EXAMINER NOTE: | EXAMINER NOTE: | ||
Steps 2 and 3 lead to the determination in step 4 | Steps 2 and 3 lead to the determination in step 4 | ||
* 4. Check that licensee has the required 40 hours. | * 4. Check that licensee has the Determines that licensee required 40 hours. does NOT have adequate hours to meet the 40 hour _____ _____ _____ | ||
requirement. | |||
_____ | * 5. Verifies Plant Tour completed Determines that Plant Tour per step 4.b date and signature are not completed. _____ _____ _____ | ||
* 5. Verifies Plant Tour completed per step 4.b | : 6. Report the results of the review Returns without signing OP-to the Shift Operations AA-105-102, Attachment 2 Superintendent (SOS). to the SOS. | ||
_____ | Informs the SOS that the licensees license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete. _____ _____ _____ | ||
: 6. Report the results of the review | CUE: | ||
Returns without signing OP | As the SOS, acknowledge the report. | ||
-AA-105-102, Attachment 2 to the SOS. | END A-N-2-S Page 5 of 8 | ||
Informs the SOS that the | |||
_____ | Job Performance Measure (JPM) | ||
CUE: As the SOS, acknowledge the report. END Job Performance Measure (JPM) | JPM Stop Time:_________ | ||
A-N-2-S | A-N-2-S Page 6 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job Title: SRO JPM Title: REACTIVATION OF AN SRO LICENSE Revision Number: 01 JPM Number: A-N-2-S Task Number and Title: Title: 299L024, Maintain an Active License K/A Number and Importance: Generic.2.1.4 3.3 / 3.8 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 Actual Time Used: minutes | ||
SRO JPM Title: | |||
REACTIVATION OF AN SRO LICENSE Revision Number: | |||
Title: 299L024, Maintain an Active | |||
4 | |||
Simulator Actual Testing Environment: | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
12 | |||
==References:== | ==References:== | ||
OP-AA-105-102, Rev. 11 EVALUATION | |||
OP-AA-105-102 , Rev. 11 EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Satisfactory Unsatisfactory Comments: | |||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
A-N-2-S Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Shift Manager | : 1. You are the Shift Manager. | ||
: 2. An SRO is in the process of license reactivation. | |||
: 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee. | |||
INITIATING CUE | |||
: 1. The Shift Operation Superintendent directs you to | : 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions A-N-2-S Page 8 of 8 | ||
-AA-105-102, Attachment 2 for the licensee and report any errors or omissions | |||
Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: | Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-S Revision Number: 04 Date: 02/16 Developed By: | ||
A-N-3-S | Instructor Date Approved By: | ||
Instructor Date | Facility Representative Date | ||
Facility Representative Date Job Performance Measure (JPM) | |||
Job Performance Measure (JPM) | |||
Revision | Revision Record (Summary) | ||
Revision 01 Bank JPM. | |||
Revision 02 Revised for 2010 NRC exam. | |||
Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam. | Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam. | ||
A-N-3-R Page 2 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a marked up copy of DOS 6600-02. | : 1. Provide a marked up copy of DOS 6600-02. | ||
A-N-3-R Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Unit Supervisor | : 1. You are the Unit 2 Unit Supervisor. | ||
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. | |||
: 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you. | |||
: 1. Perform calculation verification and ensure paperwork is correct | : 4. The Equipment Operator reported all surveillance requirements were within specifications. | ||
INITIATING CUE | |||
: 1. Perform calculation verification and ensure paperwork is correct. | |||
: 2. Inform me when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-3-R Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
: _________ PERFORMANCE CHECKLIST STANDARDS SAT | UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | ||
* 1. Candidate should identify step I.1.e has a mathematical | Provide the examinee with the provided copy of DOS 6600-02. | ||
_____ | * 1. Candidate should identify Identifies differential step I.1.e has a mathematical pressure should read 4. | ||
* 2. Candidate should identify step I.1.w OR step I.1.v is signed off as verified dP of <6 (actual is 7). | error. _____ _____ _____ | ||
* 2. Candidate should identify Identifies incorrect step I.1.w OR step I.1.v is verification of dP <6. | |||
signed off as verified dP of <6 _____ _____ _____ | |||
* 3. Candidate should identify that steps I.1.ab have been initialed by the same person performing the surveillance and were NOT independently verified. | (actual is 7). | ||
* 3. Candidate should identify that Identifies step NOT steps I.1.ab have been independently verified. | |||
: 4. Notify Unit Supervisor of | initialed by the same person _____ _____ _____ | ||
Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR. | performing the surveillance and were NOT independently verified. | ||
: 4. Notify Unit Supervisor of Notifies Unit Supervisor, discrepancies. may dispatch Operators to verify/correct issues, also _____ _____ _____ | |||
CUE: Acknowledge report of task completion. | may initiate IR. | ||
END | CUE: | ||
:_________ | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
A-N-3-R Page 5 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job Title: SRO JPM Title: VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 04 JPM Number: A-N-3-S Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 Actual Time Used: minutes | ||
SRO JPM Title: VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: | |||
299L080 | |||
7 / 4.1 | |||
Simulator Actual Testing Environment: | |||
Simulator | |||
: | |||
: | |||
Yes | |||
12 | |||
minutes | |||
==References:== | ==References:== | ||
DOS 6600-02, rev 20 EVALUATION | |||
DOS 6600-02 , rev 20 EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Satisfactory Unsatisfactory | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
A-N-3-R Page 6 of 7 | |||
Job Performance Measure (JPM) | |||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Unit Supervisor. | |||
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. | |||
: 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you. | |||
: 4. The Equipment Operator reported all surveillance requirements were within specifications. | |||
INITIATING CUE | |||
: 1. Perform calculation verification and ensure paperwork is correct. | |||
: 2. Inform me when the task is complete. | |||
A-N-3-R Page 7 of 7 | |||
Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 02 Date: 02/16 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | |||
Revision 00 New JPM. | |||
. 2 | Revision 01 Revised for 2010 NRC exam. | ||
Revision 02 Modified for ILT 15-1 (2016-301) NRC Exam. | |||
A-N-4-S Page 2 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
| Line 699: | Line 662: | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a marked up copy of DOS 1500-08. | : 1. Provide a marked up copy of DOS 1500-08. | ||
A-N-4-S Page 3 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the U2 US. 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS | : 1. You are the U2 US. | ||
: 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS. | |||
: 3. Only the A CCSW Heat Exchanger is going to be placed in service. | |||
INITIATING CUE | INITIATING CUE | ||
: 1. Review and Verify DOS 1500 | : 1. Review and Verify DOS 1500-08. | ||
-08. Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | |||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-4-S Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
: _________ PERFORMANCE CHECKLIST STANDARDS SAT | UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | ||
* 1. Verifies Dilution flow calculation (1,017,000 gpm). | Provide the examinee with the provided copy of DOS 1500-08. | ||
The following steps can be performed in any order. | |||
* 2. Enters dilution flow (1,017,000 gpm) to calculate CCSW Activity Limit. | * 1. Verifies Dilution flow Determines Dilution flow calculation (1,017,000 gpm). was incorrectly determined. Correct Dilution flow is 1,017,000 _____ _____ _____ | ||
gpm. | |||
* 2. Enters dilution flow Determines 2.91 x 10-5 is (1,017,000 gpm) to calculate the correct CCSW sample CCSW Activity Limit. activity limit. | |||
_____ | _____ _____ _____ | ||
NOTE: If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated: | NOTE: | ||
Direct the candidate to complete the review and make any necessary adjustments as necessary | If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated: | ||
: 3. Verifies CCSW Heat | Direct the candidate to complete the review and make any necessary adjustments as necessary and another SRO will review. | ||
* 4. Re-Performs Canal Activity | : 3. Verifies CCSW Heat Determines 2.01 x 10-5 is Exchanger A sample activity less than 2.91 x 10-5. | ||
Uses 1,017,000 gpm as Dilution Flow. Determines incorrect activity level used for | is less than or equal to the calculated CCSW activity limit _____ _____ _____ | ||
* 5. Determines Canal Activity | * 4. Re-Performs Canal Activity Uses 1,017,000 gpm as Calculation. Dilution Flow. Determines incorrect activity level used for A Activity level of CCSW Heat Exchanger. | ||
Determines Canal Activity Concentration is 6.9 x10-8 | Correct value is 2.01 x10-5. _____ _____ _____ | ||
* 5. Determines Canal Activity Determines Canal Activity Concentration. Concentration is 6.9 x10-8 | |||
_____ _____ _____ | |||
A-N-4-S Page 5 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
: 6. Determines need for NSO to Examinee directs NSO to re-perform calculations. re-perform calculations | |||
_____ | _____ _____ _____ | ||
CUE: Acknowledge report of task completion. | CUE: | ||
END | Acknowledge report of task completion. | ||
:_________ | END JPM Stop Time:_________ | ||
A-N-4-S Page 6 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job Title: SRO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-4-S Task Number and Title: 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance. | ||
SRO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: | K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes | ||
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance | |||
Simulator Actual Testing Environment: | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
minutes | |||
==References:== | ==References:== | ||
DOS 1500-08, rev 17 EVALUATION | |||
DOS 1500-08 , rev 17 | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Satisfactory Unsatisfactory | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
Comments: | A-N-4-S Page 7 of 8 | ||
(Print) | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the U2 US. 2. The Unit 2 NSO has completed DOS 1500 | : 1. You are the U2 US. | ||
-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS. | : 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS. | ||
: 3. Only the | : 3. Only the A CCSW Heat Exchanger is going to be placed in service. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. Review and Verify DOS 1500 | : 1. Review and Verify DOS 1500-08. | ||
-08. 2. Inform the Unit 2 Supervisor when the task is complete. | : 2. Inform the Unit 2 Supervisor when the task is complete. | ||
A-N-4-S Page 8 of 8 | |||
Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number: A-N-5-S Revision Number: 00 Date: 02/16 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date SRRS: 3D.105 (when utilized for operator init ial or continuing train ing) | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam. | Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam. | ||
A-N-5-S Page 2 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. For exam purposes/exam security provide a colored copy of a blank NARS form | : 1. For exam purposes/exam security provide a colored copy of a blank NARS form. | ||
A-N-5-S Page 3 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. This is a time critical JPM. | : 1. This is a time critical JPM. | ||
: 2. You are the Shift Emergency Director | : 2. You are the Shift Emergency Director. | ||
: 3. Unit 2 was operating at near rated conditions. | |||
: 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building. | |||
: 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level. | |||
: 6. Visible damage to spent fuel has occurred. | |||
: 7. Fuel pool level is lowering at 1 foot per minute. | |||
: 9. A large hole is present in the Reactor Building wall | : 8. Refuel floor CAM is alarming due to high airborne particulate contamination. | ||
: 9. A large hole is present in the Reactor Building wall. | |||
: 10. There is NO verifier available. | |||
INITIATING CUES | INITIATING CUES | ||
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification. | : 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
A-N-5-S Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | |||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-5-S Page 5 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
: _________ PERFORMANCE CHECKLIST STANDARDS SAT | UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | ||
-AA-1004 charts | Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts. | ||
Provide the supplied NARS Form. | |||
Provide the supplied screen shot of the meteorological data. | Provide the supplied screen shot of the meteorological data. | ||
* 1. Determines a classification of GENERAL EMERGENCY, due to notification from the Security Force that a HOSTILE ACTION is occurring within the protected area AND Damage to spent fuel pool has occurred. | * 1. Determines a classification of Determines highest GENERAL EMERGENCY, classification is a due to notification from the GENERAL EMERGENCY _____ _____ _____ | ||
Security Force that a per EAL HG1 (15 minute HOSTILE ACTION is requirement). | |||
occurring within the protected area AND Damage to spent fuel pool has occurred. | |||
NOTE: Determines classification start time _______ and stop time _______ . | NOTE: | ||
Determines classification start time _______ and stop time _______ . | |||
(15 minute limit) | (15 minute limit) | ||
* 2. Properly fills out NARS form. | * 2. Properly fills out NARS form. See attached key for the areas that must be filled out correctly (12 minute requirement) _____ _____ _____ | ||
See attached key for the areas that must be filled out correctly ( | |||
NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used. | NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used. | ||
NOTE: | |||
NOTE: Fill out NARS form start time (when declaration completed) _______ and stop time _______ . | Fill out NARS form start time (when declaration completed) _______ and stop time _______ . | ||
END | (12 minute limit) | ||
:_________ | END JPM Stop Time:_________ | ||
A-N-5-S Page 6 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: SRO | Job Title: SRO JPM Title: DETERMINE EP PROTECTIVE ACTION RECOMMENDATION Revision Number: 00 JPM Number: A-N-5-S Task Number and Title: 295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes | ||
JPM Title: DETERMINE EP PROTECTIVE ACTION RECOMMENDATION Revision Number: 00 JPM Number: | |||
44 | |||
Simulator Actual Testing Environment: | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
minutes | |||
==References:== | ==References:== | ||
EP-AA-1004 Addendum 3 Rev. 002 EVALUATION | |||
EP-AA-1004 Addendum 3 Rev. 002 | |||
EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Satisfactory Unsatisfactory Comments: | |||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
A-N-5-S Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. This is a time critical JPM. 2. You are the Shift Emergency Director. | : 1. This is a time critical JPM. | ||
: 3. Unit 2 was operating at near rated conditions | : 2. You are the Shift Emergency Director. | ||
: 3. Unit 2 was operating at near rated conditions. | |||
: 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building. | |||
: 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level. | |||
: 6. Visible damage to spent fuel has occurred. | : 6. Visible damage to spent fuel has occurred. | ||
: 7. Fuel pool level is lowering at 1 foot per minute. | : 7. Fuel pool level is lowering at 1 foot per minute. | ||
: 8. Refuel floor CAM is alarming due to high airborne particulate contamination. | : 8. Refuel floor CAM is alarming due to high airborne particulate contamination. | ||
: 9. A large hole is present in the Reactor Building wall. 10. There is NO verifier available. | : 9. A large hole is present in the Reactor Building wall. | ||
: 10. There is NO verifier available. | |||
INITIATING CUES | INITIATING CUES | ||
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification. | : 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. | ||
Give the NARS form to the WEC Supervisor, who will make the state notification. | |||
A-N-5-S Page 8 of 8 | |||
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S-N-a Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 NOTE: All steps of this checklist should be performed upon initial validation. | |||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | |||
________ 1. Task description and number, JPM description and number are identified. | |||
________ 2. Knowledge and Abilities (K/A) references are included. | |||
________ 3. Performance location specified. (in-plant, control room, simulator, or other) | |||
________ 4. Initial setup conditions are identified. | |||
________ 5. Initiating cue (and terminating cue if required) are properly identified. | |||
________ 6. Task standards identified and verified by SME review. | |||
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
________ 8. If an alternate path is used, the task standard contains criteria for successful completion. | |||
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DOP 1100-02 Rev: 19 Procedure Rev: | |||
Procedure Rev: | |||
________ 10. Verify cues both verbal and visual are free of conflict. | |||
________ 11. Verify performance time is accurate | |||
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page | TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary) | ||
-JA-150-02 | Revision 02 Revised for 2013 NRC exam. | ||
Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 | |||
- | |||
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | ||
-JA-150-02 | : 1. Reset the simulator to IC _51_. | ||
: 1. Reset the simulator to IC | NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
: 2. Run CAEP file S-N-a.cae. | |||
: 2. Run CAEP file S-N-a.cae. 3. If the CAEP file cannot be run then insert the following Expert Commands: | : 3. If the CAEP file cannot be run then insert the following Expert Commands: | ||
: a. Insert following Malfunctions and/or Remotes: | : a. Insert following Malfunctions and/or Remotes: | ||
* IMF CIRWCUAP (2 | * IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure). | ||
-1201-1 valve failure to close | * IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure). | ||
- and allows manual closure). | * IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so # | ||
* IMF CIRWCUBP (2 | whichever pump is started first will not develop flow) | ||
-1201-2 valve failure to close - and allows manual closure). | * IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so # | ||
* IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so | whichever pump is started first will not develop flow) | ||
* IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF) | |||
) | : b. Setup the following Triggers: | ||
* IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so | * TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position) | ||
* TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction) | |||
) | * TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position) | ||
* IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF | * TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction) | ||
DOCUMENT PREPARATION Clean copy of DOP 1100-02 hardcard. | |||
* TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position | SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 | ||
) | |||
* TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction | |||
) | |||
* TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position | |||
) | |||
* TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction | |||
) | |||
DOCUMENT PREPARATION Clean copy of DOP 1100 | |||
-02 hardcard. | |||
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
-JA-150-02 | |||
: 1. You are the Unit 2 NSO. | : 1. You are the Unit 2 NSO. | ||
: 2. A transient has occurred, resulting in an ATWS. | : 2. A transient has occurred, resulting in an ATWS. | ||
| Line 939: | Line 889: | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | |||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time: | ||
-JA-150-02 | Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Examinee should locate the hard card, then provide the included copy. | ||
: 1. Selects the correct procedure step. Determines correct procedure step is per DOP 1100-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS) | |||
STEP ELEMENT STANDARD | ___ ___ ___ | ||
: 1. Selects the correct procedure step. | : 2. Place the SBLC INJECTION Turns the SBLC INJECTION CONTROL keylock switch to the CONTROL keylock switch to either SYS 1 OR SYS 2 position. the intermediate right OR intermediate left position. | ||
Determines correct procedure step is per DOP 1100 | ___ ___ ___ | ||
-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS) | : 3. Verifies applicable SQUIB pilot SQUIB A or B light off. | ||
light NOT lit. ___ ___ ___ | |||
___ | Note The selected pump starts but does not develop flow (relief valve failure in the JPM setup). | ||
: 4. Verifies applicable PUMP pilot PUMP light on. | |||
___ | light lit. ___ ___ ___ | ||
BEGIN ALTERNATE PATH | |||
: 5. Verifies FLOW pilot light lit. FLOW light off (SBLC is NOT injecting). ___ ___ ___ | |||
: 6. SBLC SQUIB VLV CKT FAILURE Annunciator 902-5 H-6 illuminated. | |||
___ ___ | annunciator alarms (902-5 H-6). ___ ___ ___ | ||
___ | *7. Places SBLC INJECTION Turns the SBLC INJECTION CONTROL keylock switch to CONTROL keylock switch to the opposite position taken to in step opposite direction turned in step 1. | ||
: 4. Verifies applicable PUMP | 1. | ||
___ ___ ___ | |||
___ | : 8. Verifies opposite PUMP pilot light Opposite PUMP light on. | ||
: 5. Verifies FLOW pilot light lit. | lit. ___ ___ ___ | ||
FLOW light off (SBLC is NOT injecting). | Note Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re-positioned. | ||
___ | : 9. Verifies RWCU valve 2-1201-1 Examinee recognizes that valve 2-closed. 1201-1 valve did NOT close. ___ ___ ___ | ||
-5 H-6 | SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-a Rev 03 | ||
-5 H-6 | |||
___ | |||
: | |||
___ | TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number | ||
*10. Closes RWCU valve 2-1201-1. Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position. | |||
___ ___ ___ | |||
: 11. Verifies RWCU valve 2-1201-1A GREEN light illuminated. | |||
closed. ___ ___ ___ | |||
: 12. Verifies RWCU valve 2-1201-2 Examinee recognizes that valve 2-closed. 1201-2 valve did NOT close. ___ ___ ___ | |||
*13. Closes RWCU valve 2-1201-2. Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position. | |||
___ ___ ___ | |||
: 14. Verifies RWCU valve 2-1201-3 GREEN light illuminated. | |||
closed. ___ ___ ___ | |||
: 15. Verifies RWCU valve 2-1201-7 RED light illuminated. | |||
closed. ___ ___ ___ | |||
: 16. Informs Unit Supervisor task is Reports SBLC is injecting but the complete. first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to close automatically. | |||
___ ___ ___ | |||
Cue Acknowledge report of task completion. | |||
END JPM Stop Time: | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-a Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM | |||
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ | |||
-JA-150-02 | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: Emp. ID#: ____________ | |||
: | Job Title: RO SRO SRO Cert JPM Title: SBLC - Injection with Pump and RWCU Failures JPM Number: S-N-a Revision Number: 03 Task Number and Title: 211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 1100-02, Rev 19 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: minutes EVALUATION | ||
Job Title: | |||
: S-N-a Revision Number | |||
: 03 Task Number and Title | |||
: | |||
: | |||
: | |||
: | |||
: | |||
: | |||
Simulator | |||
Simulate | |||
9 | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name (Print): | ||
Satisfactory Unsatisfactory Comments: | Evaluators Signature: Date: | ||
: | SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-a Rev 03 | ||
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ | |||
-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 NSO. | : 1. You are the Unit 2 NSO. | ||
: 2. A transient has occurred, resulting in an ATWS. | : 2. A transient has occurred, resulting in an ATWS. | ||
| Line 1,048: | Line 961: | ||
: 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card. | : 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S-N-b Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By: | ||
-JA-150-02 | Instructor Date Approved By: | ||
-N-b | Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 | ||
Instructor Date | |||
Facility Representative | |||
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
-JA-150-02 | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
: 1. Reset the simulator to IC | ________ 1. Task description and number, JPM description and number are identified. | ||
________ 2. Knowledge and Abilities (K/A) references are included. | |||
________ 3. Performance location specified. (in-plant, control room, simulator, or other) | |||
________ 4. Initial setup conditions are identified. | |||
________ 5. Initiating cue (and terminating cue if required) are properly identified. | |||
________ 6. Task standards identified and verified by SME review. | |||
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
________ 8. If an alternate path is used, the task standard contains criteria for successful completion. | |||
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DOP 0600-06 Rev: 44 Procedure Rev: | |||
Procedure Rev: | |||
________ 10. Verify cues both verbal and visual are free of conflict. | |||
________ 11. Verify performance time is accurate | |||
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 | |||
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary) | |||
Revision 02 Bank JPM. | |||
Revision 03 Revised for 2009 NRC Exam. | |||
Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 | |||
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator to IC _52_. | |||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Verify BOTH FW REG ISOL VALVES are OPEN: | : 2. Verify BOTH FW REG ISOL VALVES are OPEN: | ||
* MO 2-3206A | * MO 2-3206A | ||
* MO 2-3206B 3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED. | * MO 2-3206B | ||
: 3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED. | |||
: 4. Verify MASTER CONTROL STATION is in MAN. | : 4. Verify MASTER CONTROL STATION is in MAN. | ||
: 5. Low Flow Reg Valve is controlling level at 30 | : 5. Low Flow Reg Valve is controlling level at 30 in AUTO. | ||
: 6. Insert following Malfunctions and/or Remotes: | : 6. Insert following Malfunctions and/or Remotes: | ||
* None. 7. Setup the following Triggers: | * None. | ||
* None. DOCUMENT PREPARATION | : 7. Setup the following Triggers: | ||
* None. | |||
DOCUMENT PREPARATION | |||
: 1. Copy of DOP 0600-06 marked up through limitations and actions. | : 1. Copy of DOP 0600-06 marked up through limitations and actions. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 | |||
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
-JA-150-02 | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Unit Startup is in progress. | : 2. Unit Startup is in progress. | ||
: 3. The FWLCS is controlling level with the Low Flow Reg Valve. | : 3. The FWLCS is controlling level with the Low Flow Reg Valve. | ||
: 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode. | : 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode. | ||
: 5. 2A & 2B FRVs have been pre | : 5. 2A & 2B FRVs have been pre-operationally tested. | ||
-operationally tested. | : 6. Another NSO will acknowledge annunciators not associated with this task. | ||
: 6. Another NSO will acknowledge annunciators not associated with this | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2. | |||
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600 | : 2. Inform the Unit Supervisor when the task is complete. | ||
-06 per step G.2 | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | |||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 | |||
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time: | ||
-JA-150-02 | Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide the examinee with the provided copy of DOP 0600-06. | ||
: 1. Verify 2A and 2B FWRVs have Condition met in initial conditions. | |||
STEP ELEMENT STANDARD | been pre-operationally tested per Step G.1. | ||
-06. 1. Verify 2A and 2B FWRVs have been pre-operationally tested per Step G.1 | ___ ___ ___ | ||
___ | : 2. Verify the following valves are GREEN lights illuminated on the open: following: | ||
___ | |||
* MO 2-3205A, FW LINE STOP. | * MO 2-3205A, FW LINE STOP. | ||
* MO 2-3205A | |||
* MO 2-3205B, FW LINE STOP. | * MO 2-3205B, FW LINE STOP. | ||
* MO 2-3205B | * MO 2-3205B | ||
* MO 2-3206A | * MO 2-3206A, 2A FW REG | ||
* MO 2-3206B | * MO 2-3206A ISOL. | ||
* MO 2-3206B, 2B FW REG | |||
___ | * MO 2-3206B ISOL. | ||
___ ___ ___ | |||
___ | : 3. Adjust MASTER CONTROL Depresses appropriate pushbutton STATION OR RX LO FLOW to verify setpoint to match actual CONTROL STATION, setpoint to RPV level on MASTER match actual RPV level. CONTROL STATION OR RX LO FLOW CONTROL STATION. ___ ___ ___ | ||
: 4. Select appropriate FWLCS RPV Depresses appropriate FWLCS level signal per Section G.17. RPV level signal pushbutton. ___ ___ ___ | |||
: 5. Place RX LO FLOW CONTROL Verifies AUTO light illuminated on STATION to AUTO. RX LO FLOW CONTROL ___ ___ ___ | |||
STATION. | |||
___ | *6. Place one REG VLV CONTROL Depresses AUTO pushbutton on STATION in AUTO. 2B REG VLV CONTROL STATION. | ||
___ ___ ___ | |||
___ | : 7. Verify other REG VLV CONTROL Verifies MAN light illuminated on STATION in MAN. 2A REG VLV CONTROL STATION. | ||
___ ___ ___ | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-b Rev 04 | |||
___ | |||
Verifies AUTO light illuminated on RX LO FLOW CONTROL | |||
___ | |||
Verifies MAN light illuminated on 2A REG VLV CONTROL STATION. | |||
___ | |||
___ | TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number | ||
*8. Place MASTER CONTROL Depresses AUTO pushbutton on STATION in AUTO. FWLC MASTER CONTROL STATION. | |||
___ ___ ___ | |||
Note The LOW FLOW FWRV will automatically transfer to the 2B FWRV when the LOW FLOW FWRV position is 85% feedwater flow. | |||
: 9. Informs Unit Supervisor task is Examinee notifies the Unit complete. Supervisor. ___ ___ ___ | |||
Cue Acknowledge report of task completion. | |||
END JPM Stop Time: | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-b Rev 04 | |||
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM | |||
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ | |||
-JA-150-02 | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: Emp. ID#: ____________ | |||
: | Job Title: RO SRO SRO Cert JPM Title: Place a FRV in Service in Auto During Unit Startup JPM Number: S-N-b Revision Number: 04 Task Number and Title: 259L021, Place FRV in service in AUTO (unit startup). | ||
Job Title: | K/A Number and Importance: 259002.A4.03 3.8 / 3.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 0600-06, Rev 44 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: minutes EVALUATION | ||
: S-N-b Revision Number | |||
: | |||
: | |||
K/A Number and Importance | |||
: | |||
: | |||
: | |||
: | |||
: DOP 0600-06, Rev 44 | |||
Simulator | |||
Simulate | |||
9 | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name (Print): | ||
Satisfactory Unsatisfactory Comments: | Evaluators Signature: Date: | ||
: | SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-b Rev 04 | ||
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ | |||
-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Unit Startup is in progress. | : 2. Unit Startup is in progress. | ||
| Line 1,198: | Line 1,085: | ||
: 6. Another NSO will acknowledge annunciators not associated with this task. | : 6. Another NSO will acknowledge annunciators not associated with this task. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600 | : 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2. | ||
-06 per step G.2 | : 2. Inform the Unit Supervisor when the task is complete. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 | |||
TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ-JA-150-02 Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 | |||
TQ-AA-150-J020 Revision 00 Page | TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
-JA-150-02 | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
________ 1. Task description and number, JPM description and number are identified. | |||
________ 2. Knowledge and Abilities (K/A) references are included. | |||
________ 3. Performance location specified. (in-plant, control room, simulator, or other) | |||
________ 4. Initial setup conditions are identified. | |||
________ 5. Initiating cue (and terminating cue if required) are properly identified. | |||
________ 6. Task standards identified and verified by SME review. | |||
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
________ 8. If an alternate path is used, the task standard contains criteria for successful completion. | |||
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DEOP 0500-03 Rev: 23 Procedure Rev: | |||
Procedure Rev: | |||
________ 10. Verify cues both verbal and visual are free of conflict. | |||
________ 11. Verify performance time is accurate | |||
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 | |||
TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ-JA-150-02 Revision Record (Summary) | |||
Revision 06 Bank JPM. | |||
Revision 07 Revised for ILT 12-1 Cert Exam. | |||
Revision 08 Revised for ILT 14-1 NRC Exam. | |||
Revision 09 Revised for ILT 15-1 (2016-301) NRC Exam. | |||
SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 | |||
-JA-150-02 | |||
Revision 06 Bank JPM. Revision 07 Revised for ILT 12 | |||
-1 Cert Exam. | |||
Revision 08 Revised for ILT 14 | |||
-1 NRC Exam. | |||
Revision 09 Revised for ILT 15 | |||
-1 (2016-301) NRC Exam. | |||
TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | ||
-JA-150-02 | |||
: 1. Reset the simulator to any IC (IC _53__ used for validation). | : 1. Reset the simulator to any IC (IC _53__ used for validation). | ||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
: 2. Verify ALL LP ECCS Pumps are in PTL | : 2. Verify ALL LP ECCS Pumps are in PTL. | ||
: 3. Run the following CAEP file: S-N-d.cae | |||
-N-d.cae 4. If the CAEP cannot be ran, insert the following Expert Commands: | : 4. If the CAEP cannot be ran, insert the following Expert Commands: | ||
* Insert the following Malfunctions, Remotes, and/or Overrides: | * Insert the following Malfunctions, Remotes, and/or Overrides: | ||
o imf ser0016 on o imf ser0155 on o ior lpdvlvcl25 close o ior lpdvlvop16 open o ior rrd5bcls close | o imf ser0016 on o imf ser0155 on o ior lpdvlvcl25 close o ior lpdvlvop16 open o ior rrd5bcls close | ||
* Assign the following trigger assignment: | * Assign the following trigger assignment: | ||
o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500 | o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems. | ||
-03, Alternate Water Injection Systems | SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 | ||
. | |||
TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
-JA-150-02 | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A transient has occurred requiring Alternate Water Injection | : 2. A transient has occurred requiring Alternate Water Injection. | ||
Examiner Note: The following parameters do not match the simulator indications. | |||
: 3. RPV level is | : 3. RPV level is -65 inches and slowly dropping. | ||
-65 inches and slowly dropping. | |||
: 4. RPV pressure is 140 psig and slowly dropping. | : 4. RPV pressure is 140 psig and slowly dropping. | ||
: 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged. | : 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged. | ||
: 6. | : 6. B Loop is selected for injection. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500 | : 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03. | ||
-03. 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Comments relating to procedural or equipment issues should be entered and tracked using the | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 | |||
TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ-JA-150-02 JPM Start Time: | ||
-JA-150-02 | UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | ||
Provide the Examinee with the provided copy of DEOP 0500-03. | |||
PERFORMANCE CHECKLIST STANDARDS SAT | : 1. Verifies 2A LPCI PP control ALL lights extinguished. | ||
-03. 1. Verifies 2A LPCI PP control switch in Pull | switch in Pull-to-Lock. | ||
-to-Lock | _____ _____ _____ | ||
_____ | : 2. Place PP SUCT VLV MO 2- RED light illuminated. | ||
: 2. Place PP SUCT VLV MO 2 | 1501-5A control switch in | ||
_____ _____ _____ | |||
Manual Bypass and verify closed. | |||
: 3. Verify MIN FLOW VLV 2 | : 3. Verify MIN FLOW VLV 2- RED light illuminated. | ||
1501-13A closed if not | |||
_____ | _____ _____ _____ | ||
CUE: 2-1501-13A is not required for 2B LPCI pump. | needed. | ||
NOTE: The following valves may be verified in any order | CUE: | ||
: 4. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed. | 2-1501-13A is not required for 2B LPCI pump. | ||
NOTE: | |||
The following valves may be verified in any order | |||
: 5. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A | : 4. Verify TORUS CLG/TEST GREEN lights illuminated. | ||
_____ | valves 2-1501-20A and | ||
: 6. Verify DW SPRAY VLVs 2 | _____ _____ _____ | ||
2-1501-38A closed. | |||
_____ | : 5. Verify TORUS SPRAY VLVs GREEN lights illuminated. | ||
: 7. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed. | 2-1501-19A and 2-1501-18A | ||
GREEN lights illuminated. | _____ _____ _____ | ||
_____ | closed. | ||
: | : 6. Verify DW SPRAY VLVs 2- GREEN lights illuminated. | ||
1501-28A and 2-1501-27A | |||
_____ _____ _____ | |||
closed. | |||
: 7. Verify TORUS CLG/TEST GREEN lights illuminated. | |||
valves 2-1501-20B and | |||
_____ _____ _____ | |||
2-1501-38B closed. | |||
: 8. Verify TORUS SPRAY VLVs GREEN lights illuminated. | |||
2-1501-19B and 2-1501-18B | |||
_____ _____ _____ | |||
closed. | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09 | |||
2-1501- | TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | ||
_____ | : 9. Verify DW SPRAY VLVs 2- GREEN lights illuminated. | ||
1501-28B and 2-1501-27B | |||
_____ _____ _____ | |||
closed. | |||
NOTE: | |||
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8). | |||
CUE: | |||
When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed. | |||
: 10. Unlock AND open 2-1501- Instructs EO to complete 74A, U2 LPCI A PMP step G.12.c.(5).(a). | |||
_____ _____ _____ | |||
VENT VLV. | |||
: 11. Crack open 2-1501-15A, U2 Instructs EO to complete LPCI A PMP VENT VLV until step G.12.c.(5).(b). | |||
_____ _____ _____ | |||
flow is observed from pipe. | |||
: 12. Close 2(3)-1501-15A, U2 Instructs EO to complete LPCI A PMP VENT VLV. step G.12.c.(5).(c). | |||
_____ _____ _____ | |||
: 13. Close AND lock 2-1501-74A, Instructs EO to complete U2(3) LPCI A PMP step G.12.c.(5).(d). | |||
_____ _____ _____ | |||
VENT VLV. | |||
: 14. Open 2-1501-47A-R, U2 Instructs EO to obtain PI 2-LPCI A PUMP SUCT PI 1501-47A reading per step | |||
_____ _____ _____ | |||
2-1501-47A ROOT VLV (at G.12.c.(6). & G.12.c.(7). | |||
pump) and verify PI 2-1501-47A indicates less than 15 psig. | |||
CUE: | |||
PI 2-1501-47A indicates 15.5 psig. | |||
: 15. Recognizes reading is NOT Determines reading is less than 15 psig. greater than 15 psig. | |||
_____ _____ _____ | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09 | |||
TQ-AA-150-J020 Revision 00 Page | TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | ||
-JA-150-02 | : 16. Close 2-1501-47A-R, U2 Instructs EO to close 2-LPCI A PUMP SUCT PI 1501-47A per step | ||
_____ _____ _____ | |||
2-1501-47A ROOT VLV. G.12.c.(8). | |||
CUE: | |||
2-1501-47A-R is Closed. | |||
: 17. Open PP SUCT VLV MO 2- GREEN light illuminated. | |||
1501-5A. | |||
_____ _____ _____ | |||
: 18. Notify Unit Supervisor that 2A Examinee notifies Unit LPCI pump cannot be used Supervisor of 2A LPCI | |||
_____ _____ _____ | |||
with suction from the CST. pump suction pressure problem when aligned to CST. May recommend using another LPCI pump. | |||
CUE: | |||
Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST. | |||
-1501- | |||
- | |||
_____ | |||
CUE: 2-1501-47A-R is Closed. | |||
: 17. Open PP SUCT VLV MO 2 | |||
- | |||
1501-5A | |||
_____ | |||
: 18. Notify Unit Supervisor that 2A LPCI pump cannot be used with suction from the CST. | |||
CUE: Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST. | |||
Maintain the 2A LPCI pump in PTL. | Maintain the 2A LPCI pump in PTL. | ||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
: 19. Verifies 2C LPCI PP control switch in Pull | : 19. Verifies 2C LPCI PP control ALL lights extinguished. | ||
-to-Lock | switch in Pull-to-Lock. | ||
_____ | _____ _____ _____ | ||
* 20. Place PP SUCT VLV MO 2 | * 20. Place PP SUCT VLV MO 2- RED light illuminated. | ||
1501-5C control switch in | |||
_____ _____ _____ | |||
Manual Bypass and verify closed. | |||
: 21. Verify MIN FLOW VLV 2- RED light illuminated. | |||
_____ | 1501-13B closed if not | ||
CUE: 2-1501-13B is not required for 2D LPCI pump. | _____ _____ _____ | ||
: 22. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed. | needed. | ||
CUE: | |||
2-1501-13B is not required for 2D LPCI pump. | |||
: 22. Verify TORUS CLG/TEST GREEN lights illuminated. | |||
valves 2-1501-20A and | |||
_____ _____ _____ | |||
2-1501-38A closed. | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09 | |||
TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | ||
-JA-150-02 | : 23. Verify TORUS SPRAY VLVs GREEN lights illuminated. | ||
2-1501-19A and 2-1501-18A | |||
_____ | _____ _____ _____ | ||
: 24. Verify DW SPRAY VLVs 2 | closed. | ||
: 24. Verify DW SPRAY VLVs 2- GREEN lights illuminated. | |||
_____ | 1501-28A and 2-1501-27A | ||
: 25. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed. | _____ _____ _____ | ||
GREEN lights illuminated. | closed. | ||
_____ | : 25. Verify TORUS CLG/TEST GREEN lights illuminated. | ||
: | valves 2-1501-20B and | ||
_____ _____ _____ | |||
2-1501-38B closed. | |||
: 26. Verify TORUS SPRAY VLVs GREEN lights illuminated. | |||
2-1501-19B and 2-1501-18B | |||
_____ _____ _____ | |||
closed. | |||
: 27. Verify DW SPRAY VLVs 2- GREEN lights illuminated. | |||
1501-28B and 2-1501-27B | |||
_____ _____ _____ | |||
closed. | |||
: 28. Unlock AND open 2-1501- Instructs EO to complete 74C, U2 LPCI C PMP step G.12.e.(5).(a). | |||
_____ _____ _____ | |||
VENT VLV. | |||
: 29. Crack open 2-1501-15C, U2 Instructs EO to complete LPCI C PMP VENT VLV until step G.12.e.(5).(b). | |||
_____ _____ _____ | |||
flow is observed from pipe. | |||
: 30. Close 2(3)-1501-15C, U2 Instructs EO to complete LPCI C PMP VENT VLV. step G.12.e.(5).(c). | |||
_____ _____ _____ | |||
: 31. Close AND lock 2-1501-74C, Instructs EO to complete U2 LPCI C PMP step G.12.e.(5).(d). | |||
_____ _____ _____ | |||
VENT VLV. | |||
: 32. Open 2-1501-47C-R, U2 LPCI Instructs EO to obtain PI 2-C PUMP SUCT PI 2- 1501-47C reading per step | |||
_____ _____ _____ | |||
1501-47C ROOT VLV (at G.12.e.(6). | |||
pump) and verify PI 2-1501-47C indicates less than 15 psig. | |||
CUE: | |||
Pressure is 10 psig. . | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09 | |||
TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
: 33. Recognizes reading is less Determines reading is than 15 psig. LESS than 15 psig. | |||
_____ _____ _____ | |||
: 34. Close 2-1501-47C-R, U2 LPCI Instructs EO to close 2-C PUMP SUCT PI 1501-47C per step | |||
_____ _____ _____ | |||
2-1501-47C ROOT VLV. G.12.e.(8). | |||
* 35. Unlock AND open 2-1501- Directs EO to perform 31C, U2 LPCI C PMP step G.12.e.(10)(a) _____ _____ _____ | |||
SUCT VLV FROM CST [at 2 C LPCI Pump] | |||
CUE: | |||
2-1501-31C is open. | |||
* 36. Unlock AND open 2-1501- Directs EO to perform 37, U2 LPCI & CS SUCT step G.12.e.(10)(b) _____ _____ _____ | |||
FROM 2/3A CST SV (located at 2/3A CST) | |||
TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ | |||
-JA-150-02 | |||
_____ | |||
: 34. Close 2-1501-47C-R, U2 LPCI C PUMP SUCT PI | |||
-1501-47C | |||
* 35. Unlock AND open 2-1501-31C, U2 LPCI C PMP | |||
_____ | |||
CUE: 2-1501-31C is open | |||
. | |||
* 36. Unlock AND open 2-1501-37, U2 LPCI & | |||
CS SUCT | |||
_____ | |||
Simulator Operator / Evaluator: | Simulator Operator / Evaluator: | ||
Activate Trigger 15 to lineup 2C LPCI pump suction to the CST. | Activate Trigger 15 to lineup 2C LPCI pump suction to the CST. | ||
CUE: 2-1501-37 is open | CUE: | ||
2-1501-37 is open. | |||
-65 | Examiner Note: | ||
* 37. Start 2C LPCI PP Places control switch to start. RED light | If a RPV level band is requested: Direct the candidate to maintain RPV level between +8 and +48 (NOTE: RPV level is -65 and dropping per the cue) | ||
_____ | * 37. Start 2C LPCI PP Places control switch to start. RED light _____ _____ _____ | ||
_____ | illuminated. | ||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09 | |||
S-N-d Rev 09 | |||
TQ-AA-150-J020 Revision 00 Page | TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | ||
-JA-150-02 | : 38. Inform Unit Supervisor that Informs Unit Supervisor 2C LPCI pump is lined up that 2C LPCI pump is _____ _____ _____ | ||
S-N-d Rev 09 JPM | to the CST and the task is lined up to the CST and complete. injecting; the task is complete. | ||
CUE: | |||
Acknowledge report of task completion. | |||
END JPM Stop Time: | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09 | |||
TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ-JA-150-02 JPM | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: Emp. ID#: ____________ | |||
: | Job Title: RO SRO SRO Cert JPM Title: LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number: S-N-d Revision Number: 09 Task Number and Title: 29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A1.04 3.6 / 3.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DEOP 0500-03, Rev 23 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 38 minutes Actual Time Used: minutes EVALUATION | ||
Job Title: | |||
: S-N-d Revision Number | |||
: | |||
: | |||
: | |||
: | |||
: | |||
: | |||
: DEOP 0500-03, Rev 23 Actual Testing Environment: | |||
Simulator | |||
Simulate | |||
38 | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name (Print): | ||
Satisfactory Unsatisfactory Comments: | Evaluators Signature: Date: | ||
: | SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09 | ||
TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ | |||
-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A transient has occurred requiring Alternate Water Injection | : 2. A transient has occurred requiring Alternate Water Injection. | ||
: 3. RPV level is -65 inches and slowly dropping. | |||
-65 inches and slowly dropping. | |||
: 4. RPV pressure is 140 psig and slowly dropping. | : 4. RPV pressure is 140 psig and slowly dropping. | ||
: 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged. | : 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged. | ||
: 6. | : 6. B Loop is selected for injection. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500 | : 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03. | ||
-03. 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 | |||
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure CONTAINMENT - VENT CONTAINMENT WITH APCV - (A) | |||
JPM Number: S-N-e Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 | |||
TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | |||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | |||
________ 1. Task description and number, JPM description and number are identified. | |||
________ 2. Knowledge and Abilities (K/A) references are included. | |||
________ 3. Performance location specified. (in-plant, control room, simulator, or other) | |||
________ 4. Initial setup conditions are identified. | |||
________ 5. Initiating cue (and terminating cue if required) are properly identified. | |||
________ 6. Task standards identified and verified by SME review. | |||
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
________ 8. If an alternate path is used, the task standard contains criteria for successful completion. | |||
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DEOP 0500-04 Rev: 16 Procedure Rev: | |||
Procedure Rev: | |||
________ 10. Verify cues both verbal and visual are free of conflict. | |||
________ 11. Verify performance time is accurate | |||
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 | |||
TQ-AA-150-J020 Revision 00 Page | TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary) | ||
-JA-150-02 | Revision 00 Created for ILT 15-1 (2016-301) NRC Exam. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 | |||
- | |||
TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | ||
-JA-150-02 | : 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. (IC _51__ used for validation). | ||
: 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work | |||
. | |||
NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
: 2. Ensure Torus water level is <30 feet. | : 2. Ensure Torus water level is <30 feet. | ||
: 3. Run the following CAEP file: | : 3. Run the following CAEP file: S-N-e.cae | ||
-N-e.cae 4. If the CAEP file cannot be ran insert the following Expert Commands: a. Insert following Malfunctions, Remotes, and/or Overrides: | : 4. If the CAEP file cannot be ran insert the following Expert Commands: | ||
* IMF CIGP2I | : a. Insert following Malfunctions, Remotes, and/or Overrides: | ||
* IMF CIGP2I (Spurious Group II Isolation) | |||
* Adjusts Torus Level indications to ~20 feet. | * Adjusts Torus Level indications to ~20 feet. | ||
v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20 | v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20 | ||
* Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0 | * Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0 | ||
* Prevents the 2 | * Prevents the 2-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off | ||
-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off | |||
* Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts. | * Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts. | ||
v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled | v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled | ||
| Line 1,515: | Line 1,398: | ||
v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0 | v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0 | ||
: 5. Verify the SBGT system operating and verify flow ~4000 scfm. | : 5. Verify the SBGT system operating and verify flow ~4000 scfm. | ||
: 6. Start ALL available ventilation exhaust fans as directed in DEOP 0500 | : 6. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04. | ||
-04. 7. Place CRM ISOL switch to ISOLATE | : 7. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running. | ||
- wait 10 seconds then verify a C/R Booster Fan is running. | DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting. | ||
DOCUMENT PREPARATION Markup a copy of DEOP | SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 | ||
. | |||
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
-JA-150-02 | : 1. You are the Aux 2 NSO. | ||
: 1. You are the Aux 2 NSO. 2. A break inside the Unit 2 Primary Containment has occurred. | : 2. A break inside the Unit 2 Primary Containment has occurred. | ||
: 3. Torus bottom pressure is about to exceed the | : 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01. | ||
: 4. Torus water level is 20 feet. | |||
: 5. Control Room ventilation has been isolated. | |||
: 6. Reactor Building and Turbine Building have been evacuated. | : 6. Reactor Building and Turbine Building have been evacuated. | ||
: 7. The Instrument Bus and ESS Bus are energized. | : 7. The Instrument Bus and ESS Bus are energized. | ||
| Line 1,529: | Line 1,414: | ||
: 9. The N2 System is in its normal lineup. | : 9. The N2 System is in its normal lineup. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP | : 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | |||
* Denotes critical steps. | * Denotes critical steps. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | |||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 | |||
TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time: | ||
-JA-150-02 | Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide examinee the marked up copy of DEOP 0500-04. | ||
Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM. | |||
STEP ELEMENT STANDARD | : 1. Verify SBGT is operating and flow Verifies 2/3A SBGT train is ~ 4000 scfm. FI 7540-13 is reading ~4000 scfm. ___ ___ ___ | ||
-04. Annunciator 902 | : 2. Verify Reactor Mode switch NOT Verifies Reactor Mode switch NOT in RUN. in RUN. ___ ___ ___ | ||
-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM. | : 3. Place VENT ISOL SIGNAL Momentarily places Bypass switch BYPASS switch on 902-5 panel to to Torus Position. | ||
: 1. Verify SBGT is operating and flow | TORUS. | ||
Verifies 2/3A SBGT train FI 7540-13 is reading ~4000 scfm. | ___ ___ ___ | ||
___ | : 4. Open AO 2-1601-61, TORUS 2- Places AO 2-1601-61 control INCH VENT VLV. switch to OPEN position and determines that the valve will not open. | ||
-5 panel to | ___ ___ ___ | ||
___ | *5. Place the VENT ISOL SIGNAL Places the VENT ISOL SIGNAL BYPASS Switch on 902-5 to BYPASS Switch on 902-5 to DRYWELL. DRYWELL | ||
___ ___ ___ | |||
- | *6. Open AO 2-1601-62, DW 2-INCH Places AO 2-1601-62 control VENT VLV. switch to OPEN. | ||
Places AO 2 | Green light extinguishes and Red light illuminates. ___ ___ ___ | ||
-1601-61 control switch to OPEN position and determines that the valve will not open. | *7. Open AO 2-1601-63, VENT TO Places AO 2-1601-63 control SBGT. switch to OPEN. | ||
___ | Green light extinguishes and Red light illuminates. ___ ___ ___ | ||
: 8. Determine if SBGT flow is Determines Containment pressure adequate to control and maintain trend. | |||
Torus Bottom pressure below the Primary Containment Pressure Limit. ___ ___ ___ | |||
Examiner Note: | |||
DW pressure as indicated on PR/FR 2-8540-2/4 is as read and no change is expected with the small diameter vent path in service. | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00 | |||
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number Cue If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly. | |||
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ | |||
-JA-150-02 | |||
-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly. | |||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
: 9. Determines use of AUGMENTED PRI CNMT VENT (APCV) System is required | : 9. Determines use of AUGMENTED Proceeds to Attachment 1 step 6. | ||
PRI CNMT VENT (APCV) System is required. | |||
___ | ___ ___ ___ | ||
___ | *10. Place AUGMENTED PRI CNMT Rotates control switch clockwise to VENT MODE SWITCH to APCV APCV position on Panel 902-3 | ||
___ ___ ___ | |||
-3 | : 11. Verify closed AO 2-1601-63, VENT Verifies AO-2-1601-63 in closed. | ||
___ | TO SBGT GREEN light lit, RED light extinguished. | ||
___ | ___ ___ ___ | ||
: 12. Verify closed AO 2-1601-91, VENT Verifies AO-2-1601-91 in closed. | |||
-1601-63, VENT | TO RX BLDG EXH SYS RED light lit, GREEN light extinguished. | ||
___ | ___ ___ ___ | ||
___ | *13. Place TORUS ISOLATION Rotates TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 GROUP 2 OVERRIDE 2-1601-60 switch to OVERRIDE and hold on keylock switch clockwise and holds 902-3 Panel | ||
___ ___ ___ | |||
-1601-91, VENT | *14. Place DRYWELL ISOLATION Rotates DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 GROUP 2 OVERRIDE 2-1601-23 switch to OVERRIDE and release keylock switch clockwise and on 902-3 Panel releases | ||
___ | ___ ___ ___ | ||
___ | *15. Release TORUS ISOLATION Releases TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 GROUP 2 OVERRIDE 2-1601-60 on 902-3 Panel keylock switch | ||
___ ___ ___ | |||
-1601-60 | *16. Place CMNT ISOLATION GROUP Rotates CMNT ISOLATION 2 OVERRIDE 2-1601-24 switch to GROUP 2 OVERRIDE 2-1601-24 OVERRIDE and release on 902-3 keylock switch clockwise and Panel releases | ||
-1601-60 keylock switch clockwise and holds | ___ ___ ___ | ||
___ ___ | SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00 | ||
-1601-23 | |||
-1601-23 keylock switch clockwise and releases | |||
___ | |||
-1601-60 keylock switch | |||
___ | |||
___ | |||
-1601-24 switch to | |||
-1601-24 keylock switch clockwise and releases | |||
___ | |||
___ | |||
___ | |||
S-N-e Rev 00 | |||
___ | TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number | ||
*17. Open AO 2-1601-60, TORUS Determines Torus Water Level is VENT VLV. less than 30 feet and opens AO 2-1601-60, TORUS VENT VLV. | |||
___ ___ ___ | |||
*18. Open AO 2-1601-24, VENT TO RX Rotates AO 2-1601-24, VENT TO BLDG EXH SYS. RX BLDG EXH SYS control switch clockwise and verifies GREEN light extinguishes and RED light illuminates ___ ___ ___ | |||
*19. Open AO 2-1601-92 VENT TO Rotates AO 2-1601-92 VENT TO MAIN CHIMNEY to control and MAIN CHIMNEY control switch maintain Primary Containment clockwise and verifies GREEN pressure below limit. light extinguishes and RED light illuminates ___ ___ ___ | |||
Cue: | |||
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit. | |||
If examinee asks, DW pressure recorder PR/FR 2-8540-2/4 is slowly lowering. | |||
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report). | |||
: 20. Informs Unit Supervisor task is Examinee notifies the Unit complete. Supervisor. ___ ___ ___ | |||
Cue Acknowledge report of task completion. | |||
END JPM Stop Time: | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00 | |||
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM | |||
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ | |||
-JA-150-02 | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: Emp. ID#: ____________ | |||
: | Job Title: RO SRO SRO Cert JPM Title: Containment - Vent Containment with APCV - (A) | ||
Job Title: | JPM Number: S-N-e Revision Number: 00 Task Number and Title: 295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit. | ||
- Vent Containment with APCV | K/A Number and Importance: 223001.A4.07 4.2*/4.1 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DEOP 0500-04, Rev 16 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: minutes EVALUATION | ||
- (A) JPM Number | |||
: S-N-e Revision Number | |||
: | |||
: | |||
: | |||
: | |||
: | |||
: | |||
: DEOP 0500-04, Rev 16 Actual Testing Environment: | |||
Simulator | |||
Simulate | |||
9 | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name (Print): | ||
Satisfactory Unsatisfactory Comments: | Evaluators Signature: Date: | ||
: | SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00 | ||
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ | |||
-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
: 1. You are the Aux 2 NSO. 2. A break inside the Unit 2 Primary Containment has occurred. | : 1. You are the Aux 2 NSO. | ||
: 3. Torus bottom pressure is about to exceed the | : 2. A break inside the Unit 2 Primary Containment has occurred. | ||
: 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01. | |||
: 4. Torus water level is 20 feet. | |||
: 5. Control Room ventilation has been isolated. | |||
: 6. Reactor Building and Turbine Building have been evacuated. | : 6. Reactor Building and Turbine Building have been evacuated. | ||
: 7. The Instrument Bus and ESS Bus are energized. | : 7. The Instrument Bus and ESS Bus are energized. | ||
| Line 1,698: | Line 1,512: | ||
: 9. The N2 System is in its normal lineup. | : 9. The N2 System is in its normal lineup. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP | : 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 | |||
TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | |||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | |||
________ 1. Task description and number, JPM description and number are identified. | |||
________ 2. Knowledge and Abilities (K/A) references are included. | |||
________ 3. Performance location specified. (in-plant, control room, simulator, or other) | |||
________ 4. Initial setup conditions are identified. | |||
________ 5. Initiating cue (and terminating cue if required) are properly identified. | |||
________ 6. Task standards identified and verified by SME review. | |||
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
________ 8. If an alternate path is used, the task standard contains criteria for successful completion. | |||
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DOP 6700-18 Rev: 13 Procedure Rev: | |||
Procedure Rev: | |||
________ 10. Verify cues both verbal and visual are free of conflict. | |||
________ 11. Verify performance time is accurate | |||
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary) | |||
Revision 02 Updated to comply with rev 4 of DOP 6500-10 Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page | TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. Reset the simulator to any IC (IC _51__ used for validation). | |||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Hold MCC 29-7/28-7 Feed from Bus 29 in TRIP until MCC 29-7/28-7 Feed from Bus 28 CLOSES. | |||
-JA-150-02 | |||
: 1. Reset the simulator to any IC (IC | |||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Hold MCC 29 | |||
-7/28-7 Feed from Bus 29 in TRIP until MCC 29 | |||
-7/28-7 Feed from Bus 28 CLOSES. | |||
: 3. This completes the setup for this JPM. | : 3. This completes the setup for this JPM. | ||
DOCUMENT PREPARATION Mark up copy of DOP 6700 | DOCUMENT PREPARATION Mark up copy of DOP 6700-18, Bus 28 Outage. | ||
-18, Bus 28 Outage. | SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 | ||
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ | |||
-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
: 1. MCC 28-7/29-7 is powered from Bus 28. | : 1. MCC 28-7/29-7 is powered from Bus 28. | ||
: 2. Power has been restored to Bus 29. | : 2. Power has been restored to Bus 29. | ||
| Line 1,743: | Line 1,556: | ||
: 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor. | : 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28 | : 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5 | ||
-7/29-7 per DOP 6700 | |||
-18 Step G.5 | |||
: 2. Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | : 2. Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Comments relating to procedural or equipment issues should be entered and tracked using the | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time: | ||
-JA-150-02 | Comment SAT UNSAT STEP ELEMENT STANDARD Number | ||
: 1. Declare BOTH LPCI subsystems Informs the Unit Supervisor BOTH inoperable LPCI subsystems must be declared inoperable. | |||
STEP ELEMENT STANDARD | |||
Reference TS 3.5.2 | Reference TS 3.5.2 | ||
___ ___ ___ | |||
Cue Respond: Division 1 and 2 LPCI subsystems are inoperable. | |||
*2. Open the feed breaker from Bus Opens the feed breaker AND 28, MCC 29-7/28-7 FEED FROM maintains the switch in TRIP. | |||
BUS 28, by placing control switch in TRIP AND maintain switch in TRIP. | |||
___ ___ ___ | |||
*3. Close feed breaker from Bus 29, Closes the feed breaker MCC 29-7/28-7 FEED FROM BUS 29. | |||
___ ___ ___ | |||
*4. Release feed breaker from Bus 28, Releases feed breaker control MCC 29-7/28-7 FEED FROM BUS switch 28, control switch. | |||
___ ___ ___ | |||
: 5. Notify the Unit 2 Supervisor that Unit 2 Supervisor notified. | |||
normal feed has been restored to MCC 28-7/29-7. | |||
___ ___ ___ | |||
Cue Acknowledge report of task completion. | |||
END JPM Stop Time: | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-f Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM | |||
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ | |||
-JA-150-02 | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: Emp. ID#: ____________ | |||
: | Job Title: RO SRO SRO Cert JPM Title: Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Task Number and Title: 262L026, Restore Normal Feed to 28-7/29-7 from Bus 29 K/A Number and Importance: 262001.A4.01 3.4 / 3.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 6700-18, Rev 13 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION | ||
Job Title: | |||
-7/29-7 from Bus 29 JPM Number | |||
: S-N-f Revision Number | |||
: | |||
: | |||
-7/29-7 from Bus 29 K/A Number and Importance | |||
: | |||
: | |||
: | |||
: DOP 6700-18, Rev 13 Actual Testing Environment: | |||
Simulator | |||
Simulate | |||
12 | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name (Print): | ||
Satisfactory Unsatisfactory Comments: | Evaluators Signature: Date: | ||
: | SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-f Rev 03 | ||
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ | |||
-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
: 1. MCC 28-7/29-7 is powered from Bus 28. | : 1. MCC 28-7/29-7 is powered from Bus 28. | ||
: 2. Power has been restored to Bus 29. | : 2. Power has been restored to Bus 29. | ||
| Line 1,819: | Line 1,607: | ||
: 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor. | : 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700 | : 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5 | ||
-18 Step G.5 | : 2. Notify the Unit 2 Supervisor when the task is complete SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 | ||
: 2. Notify the Unit 2 Supervisor when the task is complete | |||
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP) | ||
-JA-150-02 | S-N-g Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By: | ||
S-N-g | Instructor Date Approved By: | ||
Instructor Date | Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 | ||
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ | |||
-JA-150- | TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified. | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
________ 2. Knowledge and Abilities (K/A) references are included. | ________ 1. Task description and number, JPM description and number are identified. | ||
________ 3. Performance location specified. (in | ________ 2. Knowledge and Abilities (K/A) references are included. | ||
-plant, control room, simulator, or other) | ________ 3. Performance location specified. (in-plant, control room, simulator, or other) | ||
________ 4. Initial setup conditions are identified. | ________ 4. Initial setup conditions are identified. | ||
________ 5. Initiating cue (and terminating cue if required) are properly identified. | ________ 5. Initiating cue (and terminating cue if required) are properly identified. | ||
________ 6. Task standards identified and verified by SME review. | ________ 6. Task standards identified and verified by SME review. | ||
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | ________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | ||
________ 8. If an alternate path is used, the task standard contains criteria for successful completion. | ________ 8. If an alternate path is used, the task standard contains criteria for successful completion. | ||
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: | ________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: | ||
Procedure | Procedure DOP 0700-01 Rev: 15 Procedure DOA 0700-02 Rev: 13 Procedure Rev: | ||
________ 11. Verify performance time is accurate | ________ 10. Verify cues both verbal and visual are free of conflict. | ||
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | ________ 11. Verify performance time is accurate | ||
________ 13. When JPM is initially validated, sign and date JPM cover page. | ________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | ||
Subsequent validations, sign and date below: | ________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | ||
SME / Instructor Date SME / Instructor Date | SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 | ||
-JA-150- | |||
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary) | |||
Revision 00 New JPM for the 2010 LORT exam. | Revision 00 New JPM for the 2010 LORT exam. | ||
Revision 01 Updated for the 2012 LORT exam. | Revision 01 Updated for the 2012 LORT exam. | ||
Revision 02 Revised for ILT 15 | Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 | ||
-1 (2016-301) NRC Exam | |||
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | ||
-JA-150- | : 1. Reset the simulator to a 2-3% power IC (IC _53__ used for validation). | ||
: 1. Reset the simulator to a 2 | NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
-3% power IC (IC _53__ used for validation). | : 2. Position SRM detectors for a 104 to 105 count rate. (Should not be in the fully withdrawn position) | ||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | : 3. Run CAEP file: S-N-f.cae | ||
: 2. Position SRM detectors for a | : 4. If CAEP file cannot be ran, insert the following Expert Commands: | ||
: 3. Run CAEP file: S | |||
-N-f.cae 4. If CAEP file cannot be ran, insert the following Expert Commands: | |||
: a. Malfunctions required: | : a. Malfunctions required: | ||
: 1) imf nis22det (Inserts SRM 22 stuck malfunction) | : 1) imf nis22det (Inserts SRM 22 stuck malfunction) | ||
: b. Triggers required: | : b. Triggers required: | ||
: 1) trgset 1 | : 1) trgset 1 nilsdet(2) .and. nil104do | ||
: 2) trgset 2 | : 2) trgset 2 et_array(1) .and. nilsdet(2) .and. nil101di | ||
: 3) trg 2 | : 3) trg 2 dmf nis22det DOCUMENT PREPARATION Clean copies of the following procedures: | ||
* DOP 0700-01, Source Range monitor Operation (SRM) | * DOP 0700-01, Source Range monitor Operation (SRM) | ||
* DOA 0700-02, SRM or IRM Detector Stuck | * DOA 0700-02, SRM or IRM Detector Stuck SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 | ||
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
-JA-150- | |||
: 1. Unit 2 startup is in progress. | : 1. Unit 2 startup is in progress. | ||
: 2. You are an extra NSO assisting the startup. | : 2. You are an extra NSO assisting the startup. | ||
: 3. Primary Containment has been established. | : 3. Primary Containment has been established. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700 | : 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM). | ||
-01, Source Range Monitor Operation (SRM). | |||
: 2. Your Pre-Job Brief has been completed. | : 2. Your Pre-Job Brief has been completed. | ||
: 3. Notify the Unit supervisor upon completion of the task. | : 3. Notify the Unit supervisor upon completion of the task. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | |||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 | |||
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time: | ||
-JA-150-02 | Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide the Examinee a copy of DOP 0700-01. | ||
: 1. WHEN IRM down scale alarms IRM down scales are cleared by have cleared, THEN start SRM initial conditions. | |||
STEP ELEMENT STANDARD | withdrawal and maintain SRM Monitors count rate when count rate 290 cps to 8.85x104 withdrawing SRMs. | ||
-01. 1. WHEN IRM down scale alarms have cleared, THEN start SRM withdrawal and maintain SRM count rate 290 cps to 8. | cps. ___ ___ ___ | ||
*2. Depress the applicable Depresses each SRMs SELECT SELECT switch (LIT when switch. | |||
selected). | |||
___ | Verifies SELECT light lit. ___ ___ ___ | ||
*3. Depress and hold the DRIVE Depress and hold the DRIVE OUT OUT switch to withdraw SRMs switch to withdraw SRMs to maintain SRM count rate of 290 cps to 8.85x104 cps. ___ ___ ___ | |||
___ | BEGIN ALTERNATE PATH | ||
: 4. Verify that SRMs indication is For SRMs 21, 23 & 24: | |||
changing as expected. | |||
___ | |||
___ | |||
___ ___ | |||
: 4. Verify that SRMs indication is | |||
For SRMs 21, 23 & 24: | |||
* Count rate drops. | * Count rate drops. | ||
* Period indicates negative. | * Period indicates negative. | ||
* OUT light is lit when detector reaches full out position. | * OUT light is lit when detector reaches full out position. | ||
For SRM 22 indications remain unchanged. | For SRM 22 indications remain unchanged. ___ ___ ___ | ||
: 5. Report SRM 22 detector did not Reports SRM 22 detector did not move and/or appears to be stuck. move and/or appears to be stuck. ___ ___ ___ | |||
Note The Examinee should allow SRMs 21, 23, 24 to fully withdraw. | |||
Cue Acknowledge report. Announce entering DOA 0700-02, SRM or IRM Detector Stuck. Direct the Examinee to perform DOA 0700-02. When the Examinee locates DOA 0700-02, give him the provided copy of DOA 0700-02. | |||
Note The Examinee may have already deselected SRMs earlier. | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-g Rev 02 | |||
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number | |||
*6. Depress SRM SELECT Depresses SRM SELECT switches to establish ONLY switches to establish ONLY SRM 22 selected SRM 22 SELECT light lit. ___ ___ ___ | |||
Note An automatic Trigger is setup to delete the SRM stuck detector malfunction when it is inserted. | |||
*7. Use DRIVE IN AND DRIVE OUT Depresses DRIVE IN switch to switches to move stuck SRM move SRM 22. | |||
detector in both directions to free it. | |||
___ ___ ___ | |||
: 8. Verify indication that SRM 22 is Observes SRM 22: | |||
moving. | |||
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ | |||
-JA-150-02 | |||
___ | |||
___ | |||
___ | |||
___ | |||
* Count rate rises. | * Count rate rises. | ||
* Period indicates positive. | * Period indicates positive. | ||
___ ___ ___ | |||
___ | *9. Depress DRIVE IN switch to stop Depresses DRIVE IN switch to SRM 22. stop SRM 22. | ||
___ ___ ___ | |||
___ | *10. Use DRIVE IN AND DRIVE OUT Depresses and holds DRIVE OUT switches to move stuck SRM switch to move SRM 22. | ||
detector in both directions to free Drives SRM 22 fully out. | |||
it. | |||
___ | ___ ___ ___ | ||
___ | : 11. Verify that SRM 22 indication is Observes SRMs 22: | ||
changing as expected. | |||
___ ___ | |||
* Count rate drops. | * Count rate drops. | ||
* Period indicates negative. | * Period indicates negative. | ||
* OUT light is lit when detector reaches full out position. | * OUT light is lit when detector reaches full out position. ___ ___ ___ | ||
: 12. Report SRM 22 detector is fully Reports SRM 22 detector is fully withdrawn. withdrawn. ___ ___ ___ | |||
___ | Cue Acknowledge report. | ||
___ | END JPM Stop Time: | ||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-g Rev 02 | |||
Reports SRM 22 detector is fully withdrawn. | |||
___ | |||
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM | ||
-JA-150- | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: Emp. ID#: ____________ | |||
: | Job Title: RO SRO SRO Cert JPM Title: Withdraw SRM Detectors with a Stuck SRM Detector (AP) | ||
Job Title: | JPM Number: S-N-g Revision Number: 02 Task Number and Title: 215L022 Respond to an SRM or IRM stuck detector. | ||
JPM Number | K/A Number and Importance: 215004A4.04 3.2 / 3.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 18 minutes Actual Time Used: minutes EVALUATION | ||
: S-N-g Revision Number | |||
: | |||
: | |||
K/A Number and Importance | |||
: | |||
: | |||
: | |||
: | |||
: DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment: | |||
Simulator | |||
Simulate | |||
18 | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name (Print): | ||
Satisfactory Unsatisfactory Comments: | Evaluators Signature: Date: | ||
: | SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-g Rev 02 | ||
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ | |||
-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
: 1. Unit 2 startup is in progress. | : 1. Unit 2 startup is in progress. | ||
: 2. You are an extra NSO assisting the startup. | : 2. You are an extra NSO assisting the startup. | ||
: 3. Primary Containment has been established. | : 3. Primary Containment has been established. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700 | : 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM). | ||
-01, Source Range Monitor Operation (SRM). | : 2. Your Pre-Job Brief has been completed. | ||
: 2. Your Pre-Job Brief has been completed. 3. Notify the Unit supervisor upon completion of the task. | : 3. Notify the Unit supervisor upon completion of the task. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 | |||
TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ-JA-150-02 Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By: | ||
-JA-150-02 | Instructor Date Approved By: | ||
-N-h | Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 | ||
Instructor Date | |||
Facility Representative | |||
TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
-JA-150-02 | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
________ 1. Task description and number, JPM description and number are identified. | |||
________ 2. Knowledge and Abilities (K/A) references are included. | |||
________ 3. Performance location specified. (in-plant, control room, simulator, or other) | |||
________ 4. Initial setup conditions are identified. | |||
________ 5. Initiating cue (and terminating cue if required) are properly identified. | |||
________ 6. Task standards identified and verified by SME review. | |||
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
________ 8. If an alternate path is used, the task standard contains criteria for successful completion. | |||
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DOP 7500-01 Rev: 36 Procedure DAN 902(3)-3 F-14 Rev: 20 Procedure Rev: | |||
________ 10. Verify cues both verbal and visual are free of conflict. | |||
________ 11. Verify performance time is accurate | |||
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ-JA-150-02 Revision Record (Summary) | |||
Revision 01 Bank JPM. | |||
Revision 02 Revised for 2010 Cert Exam. | |||
Revision 03 Modified for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation). | : 1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation). | ||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
: 2. Place the 2/3A SBGT train control switch in STBY. | : 2. Place the 2/3A SBGT train control switch in STBY. | ||
: 3. Place the 2/3B SBGT train control switch in PRI. | : 3. Place the 2/3B SBGT train control switch in PRI. | ||
| Line 2,042: | Line 1,787: | ||
* 3A RX BLDG EXH FAN | * 3A RX BLDG EXH FAN | ||
* 3B RX BLDG EXH FAN | * 3B RX BLDG EXH FAN | ||
: 5. Run CAEP file S | : 5. Run CAEP file S-N-h.cae | ||
-N-h.cae 6. If the CAEP file cannot be ran, insert the following Expert Commands: | : 6. If the CAEP file cannot be ran, insert the following Expert Commands: | ||
: a. ior vrdtp3c trip (Prevents autostart of 2C RB vent fan) | : a. ior vrdtp3c trip (Prevents autostart of 2C RB vent fan) | ||
: b. ior vrdtp4c trip (Prevents autostart of 2C RB exhaust fan) | : b. ior vrdtp4c trip (Prevents autostart of 2C RB exhaust fan) | ||
: c. irf cirbvall lifted (Prevents Secondary Containment Isolation on U2) | : c. irf cirbvall lifted (Prevents Secondary Containment Isolation on U2) | ||
: d. trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START) e. imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal) | : d. trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START) | ||
: e. imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal) | |||
: f. imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan). | : f. imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan). | ||
: g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan). | : g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan). | ||
: h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan). | : h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan). | ||
: i. imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan). | : i. imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan). | ||
DOCUMENT PREPARATION Clean copy of DOP 7500-01. Clean copy of DAN 902(3) | DOCUMENT PREPARATION Clean copy of DOP 7500-01. | ||
-3 F-14 TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ | Clean copy of DAN 902(3)-3 F-14 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 | ||
-JA-150-02 | |||
TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ-JA-150-02 INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train | : 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train. | ||
: 3. DOP 7500-M1/E1 is not required per the Unit Supervisor. | |||
: 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded | : 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded. | ||
: 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours. | |||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500 | : 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01. | ||
-01. 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Then annotate that comment in the | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ | TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ-JA-150-02 JPM Start Time: | ||
-JA-150-02 | Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide the Examinee a copy of DOP 7500-01. | ||
*1. Place the 2/3A SBGT SELECT Places the 2/3A SBGT SELECT switch to A PRI position. switch to the A PRI position. ___ ___ ___ | |||
STEP ELEMENT STANDARD | *2. Place the 2/3B SBGT SELECT Places the 2/3B SBGT SELECT switch to B STBY position. switch to the B STBY position. ___ ___ ___ | ||
Places the 2/3A SBGT SELECT switch to the A PRI position. ___ | : 3. Verify the 2/3A and B AIR Both GREEN lights illuminated. | ||
Places the 2/3B SBGT SELECT switch to the B STBY position. | HEATERs are OFF. ___ ___ ___ | ||
___ | : 4. Verify the 2/3A and B Fans are Both GREEN lights illuminated. | ||
Both GREEN lights illuminated. | OFF. ___ ___ ___ | ||
___ | : 5. Verify annunciators 923-5 A-6 and Both annunciator tiles 923-5 B-6 are NOT in alarm. extinguished. ___ ___ ___ | ||
___ | : 6. Verify 2/3B SBGT SELECT Verifies 2/3 B SBGT Select switch SWITCH in B STBY position. in B STBY. ___ ___ ___ | ||
-5 A-6 and 923-5 B-6 are NOT in alarm. | Note When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds. The resulting Secondary Containment Isolation fails and the operator should complete the isolation. | ||
*7. Starts 2/3A SBGT train. Places 2/3 A SBGT Select switch to START A position. ___ ___ ___ | |||
___ | : 8. Verifies the 2/3A SBGT train Begins verifying the 2/3A SBGT initiated properly. train operating properly. ___ ___ ___ | ||
Verifies 2/3 B SBGT Select switch in B STBY. | : 9. Records the Start Time on Records the Start Time on Operator Aid. Operator Aid ___ ___ ___ | ||
___ | BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur, and perform the Limitations and Actions. | ||
Cue If examinee does not react to the alarm on the 902-3 panel, make the following update: | |||
Places 2/3 A SBGT Select switch to START A position. | Attention for an Update. RX BLDG VENT CH A RAD HI-HI is in. End of Update. | ||
___ | SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03 | ||
Begins verifying the 2/3A SBGT train operating properly. | |||
___ | |||
Records the Start Time on Operator Aid | |||
Cue If examinee does not react to the alarm on the 902 | |||
-3 panel, make the following update: | |||
-HI is in. End of Update. | |||
S-N-h Rev 03 | |||
___ | TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number Note If the examinee starts to head to the 902-3 panel to respond to the 902-3 F-14 annunciator stop them and hand them the provided copy of the DAN. | ||
*10. Verifies trip of 3A RX BLDG VENT Determines 3A RX BLDG VENT FAN. FAN is NOT tripped. (BLUE lights illuminated). | |||
Places control switch 3A RX BLDG VENT FAN to the Trip position. | |||
Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated). | |||
___ ___ ___ | |||
*11. Verifies trip of 3B RX BLDG VENT Determines 3B RX BLDG VENT FAN. FAN is NOT tripped. (BLUE lights illuminated). | |||
Places control switch 3B RX BLDG VENT FAN to the Trip position. | |||
Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated). ___ ___ ___ | |||
: 12. Verifies trip of 3C RX BLDG VENT GREEN light illuminated. | |||
FAN. ___ ___ ___ | |||
*13. Verifies trip of 3A RX BLDG EXH Determines 3A RX EXH VENT FAN. FAN is NOT tripped. (BLUE lights illuminated). | |||
Places control switch 3A RX BLDG EXH FAN to the Trip position. | |||
Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated). ___ ___ ___ | |||
*14. Verifies trip of 3B RX BLDG EXH Determines 3B RX EXH VENT FAN. FAN is NOT tripped. (BLUE lights illuminated). | |||
Places control switch 3B RX BLDG EXH FAN to the Trip position. | |||
Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated). ___ ___ ___ | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number | |||
TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ | : 15. Verifies trip of 3C RX BLDG EXH GREEN light illuminated. | ||
-JA-150-02 | FAN. ___ ___ ___ | ||
: 16. Verifies trip of 2A RX BLDG VENT GREEN and AMBER lights FAN. illuminated. ___ ___ ___ | |||
___ | : 17. Verifies trip of 2B RX BLDG VENT GREEN and AMBER lights FAN. illuminated. ___ ___ ___ | ||
___ | : 18. Verifies trip of 2C RX BLDG VENT GREEN light illuminated. | ||
___ | FAN. ___ ___ ___ | ||
___ | : 19. Verifies trip of 2A RX BLDG EXH GREEN and AMBER lights FAN. illuminated. ___ ___ ___ | ||
___ | : 20. Verifies trip of 2B RX BLDG EXH GREEN and AMBER lights FAN. illuminated. ___ ___ ___ | ||
___ | : 21. Verifies trip of 2C RX BLDG EXH GREEN light illuminated. | ||
___ | FAN. ___ ___ ___ | ||
*22. Verifies 3A INLET DAMPER AO 3- Determines 3A & 3B INLET 5741A closed. DAMPERs AO 3-5741A & B are Verifies 3B INLET DAMPER AO 3- NOT closed (GREEN lights 5741B closed. illuminated). | |||
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B are NOT closed (GREEN lights illuminated). | Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3-5741A & 3-5741B to the CLOSE position. | ||
Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3 | Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated). | ||
-5741A & 3-5741B to the CLOSE position. Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated). | ___ ___ ___ | ||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03 | |||
___ | TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number | ||
*23. Verifies 3A OUTLET DAMPER AO Determines 3A & 2B OUTLET 3-5742A closed. DAMPERs AO 3-5742A & B are Verifies 3B OUTLET DAMPER AO NOT closed (GREEN lights 3-5742B closed. illuminated). | |||
Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position. | |||
Determines 3A & 3B OUTLET DAMPERs AO 3-5742A & B did not close (GREEN lights illuminated). | |||
___ ___ ___ | |||
*24. Verifies 2A INLET DAMPER AO 2- Determines 3A & 3B INLET 5741A closed. DAMPERs AO 2-5741A & B are Verifies 2B INLET DAMPER AO 2- NOT closed (GREEN lights 5741B closed. illuminated). | |||
Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2-5741A & 2-5741B to the CLOSE position. | |||
Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated). | |||
___ ___ ___ | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03 | |||
___ | TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number | ||
*25. Verifies 2A OUTLET DAMPER AO Determines 2A & 2B OUTLET 2-5742A closed. DAMPERs AO 2-5742A & B are Verifies 2B OUTLET DAMPER AO NOT closed (GREEN lights 2-5742B closed. illuminated). | |||
Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position. | |||
Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not close (GREEN lights illuminated). | |||
___ ___ ___ | |||
: 26. Verifies trip of 2A D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___ | |||
: 27. Verifies trip of 2B D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___ | |||
: 28. Verifies trip of 3A D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___ | |||
: 29. Verifies trip of 3B D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___ | |||
: 30. Notifies US of Secondary Examinee notifies the Unit Containment Isolation Failure and Supervisor. | |||
successful manual completion of the isolation. | |||
___ ___ ___ | |||
Cue Acknowledge report. | |||
END JPM Stop Time: | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03 | |||
TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ-JA-150-02 JPM | |||
TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ | |||
-JA-150-02 | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: Emp. ID#: ____________ | |||
: | Job Title: RO SRO SRO Cert JPM Title: SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP) | ||
Job Title: | JPM Number: S-N-h Revision Number: 03 Task Number and Title: 261L002, Start the SBGT system. | ||
: S-N-h Revision Number | K/A Number and Importance: 261000.A4.09 2.7 / 2.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 7500-01, Rev 36 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION | ||
: | |||
: | |||
K/A Number and Importance | |||
: | |||
: | |||
: | |||
: | |||
: DOP 7500-01, Rev 36 Actual Testing Environment: | |||
Simulator | |||
Simulate | |||
15 | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name (Print): | ||
Satisfactory Unsatisfactory Comments: | Evaluators Signature: Date: | ||
: | SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03 | ||
TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ | |||
-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ-JA-150-02 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train | : 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train. | ||
: 3. DOP 7500-M1/E1 is not required per the Unit Supervisor. | |||
: 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded | : 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded. | ||
: 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours. | |||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500 | : 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01. | ||
-01. 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 | |||
Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 00 Date: 02/16 Developed By: | |||
S-N-i | Exam Author Date Approved By: | ||
00 | Facility Representative Date Page 1 of 10 | ||
Exam Author Date | |||
Facility Representative Date Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | |||
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | ||
________ 1. Task description and number, JPM description and number are identified. ________ 2. Knowledge and Abilities (K/A) references are included. | ________ 1. Task description and number, JPM description and number are identified. | ||
________ 3. Performance location specified. (in | ________ 2. Knowledge and Abilities (K/A) references are included. | ||
-plant, control room, simulator, or other) | ________ 3. Performance location specified. (in-plant, control room, simulator, or other) | ||
________ 4. Initial setup conditions are identified. | ________ 4. Initial setup conditions are identified. | ||
________ 5. Initiating cue (and terminating cue if required) are properly identified. | ________ 5. Initiating cue (and terminating cue if required) are properly identified. | ||
________ 6. Task standards identified and verified by SME review. | ________ 6. Task standards identified and verified by SME review. | ||
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision: | ________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk | ||
Procedure DOP 4700-03 | (*). | ||
________ 10. Verify performance time is accurate | ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision: | ||
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | Procedure DOP 4700-03 Rev: 22 Procedure Rev: | ||
Procedure Rev: | |||
________ 9. Verify cues both verbal and visual are free of conflict. | |||
________ 10. Verify performance time is accurate | |||
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Page | Revision Record (Summary) | ||
-Connect Operation to examinee | Revision 00 Created for ILT 15-1 (2016-301) NRC Exam. | ||
Page 3 of 10 | |||
Job Performance Measure (JPM) | |||
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM. | |||
DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation to examinee. | |||
Page 4 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. Unit 3 is shutdown for a refuel outage. | : 1. Unit 3 is shutdown for a refuel outage. | ||
: 2. 2A IAC is unavailable due to an oil leak. | : 2. 2A IAC is unavailable due to an oil leak. | ||
: 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit | : 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit. | ||
: 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly. | |||
: 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2 | : 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2. | ||
: 6. Unit 2 SAC is running. | |||
: 7. Main Control Room is monitoring IA parameters. | : 7. Main Control Room is monitoring IA parameters. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY | : 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY . | ||
: 2. All applicable prerequisites of DOP 4700-03 have been met. | |||
-03 have been met. | |||
: 3. Your Pre Job Brief has been completed. | : 3. Your Pre Job Brief has been completed. | ||
: 4. Notify the Unit Supervisor when you are complete with the task. | : 4. Notify the Unit Supervisor when you are complete with the task. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | |||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
Page 5 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
The timeclock starts when the candidate acknowledges the initiating cue. | |||
Page 6 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
: _________ PERFORMANCE CHECKLIST STANDARDS | Comment # | ||
9 as the correct step in DOP 4700 | SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Provide examinee a current copy of DOP 4700-03. | ||
-03 | : 1. Identifies Step G.9 as the Proceeds to Step G.9. | ||
correct step in DOP 4700-03. | |||
_____ _____ _____ | |||
-4799-501A, | : 2. Verify closed 3-4799-501A, Verifies 3-4799-501A, 3C IAC 3C IAC DISCH TO U-3 DISCH TO U-3 INST AIR INST AIR HEADER ISOL HEADER ISOL VLV stem is in. | ||
VLV. | |||
-4799-501A, 3C IAC DISCH TO U | (Valve is located above 3B IAC) _____ _____ _____ | ||
-3 INST AIR HEADER ISOL VLV stem is in. | CUE The component is in the position you described. | ||
(Valve is located above | *3. Close 2/3-4799-424, U2/U3 Rotates 2/3-4799-424, U2/U3 X-TIE SV. X-TIE SV clockwise until stem is in. | ||
(Valve is located North of 3A IAC) _____ _____ _____ | |||
_____ _____ | |||
CUE The component is in the position you described. | CUE The component is in the position you described. | ||
* | *4. Open 2/3-4799-425, 3C IAC Rotates 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV. TO U2 AIR SYS X-TIE SV counter clockwise until stem is out. | ||
_____ _____ _____ | |||
(Valve is located North of 3A IAC) | |||
-TIE SV. | |||
-TIE SV counter clockwise until stem is out. (Valve is located North of 3A IAC) | |||
CUE The component is in the position you described. | CUE The component is in the position you described. | ||
Page 7 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Comment # | |||
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | |||
*5. Open 2-47350-500, U2 Rotates 47350-500, U2 INST INST AIR SYS XTIE FROM AIR SYS XTIE FROM THE U3 THE U3 INST AIR SYS. INST AIR SYS counter clockwise until stem is out. | |||
*6. Open 2-47350-329, U2 | _____ _____ _____ | ||
(Valve is located North of Cardox tank) | |||
CUE The component is in the position you described. | |||
*6. Open 2-47350-329, U2 Rotates 2-47350-329, U2 INST AIR HDR ISOL VLV. INST AIR HDR ISOL VLV counter clockwise until stem is out. | |||
_____ _____ _____ | |||
(Valve is located North of 2B IAC) | |||
CUE The component is in the position you described. | |||
: 7. Report completion of task to Reports completion of task to Unit Supervisor. Unit Supervisor. | |||
_____ _____ _____ | |||
END JPM Stop Time:_________ | |||
Page 8 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job Title: q RO q SRO JPM Title: Align IACs to Unit 2 Instrument Air header Revision Number: 00 JPM Number: S-N-i Task Number and Title: 278N013 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02 3.3 / 3.1 Suggested Testing Environme nt: In-Plant Suggested Testing Environment: q Simulator Plant q Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete:_ 20__minutes Actual Time Used: _______ minutes | ||
q RO q SRO | |||
Align IACs to Unit 2 Instrument Air header Revision Number: 00 JPM Number: | |||
S-N-i Task Number and Title: | |||
In-Plant Suggested Testing Environment: | |||
q Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
_ | |||
_______ minutes | |||
==References:== | ==References:== | ||
DOP 4700-03, Rev. 22 EVALUATION | DOP 4700-03, Rev. 22 EVALUATION | ||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Satisfactory Unsatisfactory | |||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
Page 9 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. Unit 3 is shutdown for a refuel outage. | : 1. Unit 3 is shutdown for a refuel outage. | ||
: 2. 2A IAC is unavailable due to an oil leak. 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit. | : 2. 2A IAC is unavailable due to an oil leak. | ||
: 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit. | |||
: 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly. | : 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly. | ||
: 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2. | : 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2. | ||
| Line 2,372: | Line 2,050: | ||
: 7. Main Control Room is monitoring IA parameters. | : 7. Main Control Room is monitoring IA parameters. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit 2 Unit Supervisor has directed you to Cross | : 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY . | ||
-connect 3C Instrument Air Compressor to Unit 2 ONLY . | : 2. All applicable prerequisites of DOP 4700-03 have been met. | ||
: 2. All applicable prerequisites of DOP 4700 | |||
-03 have been met. | |||
: 3. Your Pre Job Brief has been completed. | : 3. Your Pre Job Brief has been completed. | ||
: 4. Notify the Unit Supervisor when you are complete with the task. | : 4. Notify the Unit Supervisor when you are complete with the task. | ||
Page 10 of 10 | |||
Job Performance Measure (JPM) | |||
Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number: S-N-j Revision Number: 10 Date: 02/16 Developed By: | |||
Exam Author Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | ||
________ 1. Task description and number, JPM description and number are identified. | ________ 1. Task description and number, JPM description and number are identified. | ||
________ 2. Knowledge and Abilities (K/A) references are included. | ________ 2. Knowledge and Abilities (K/A) references are included. | ||
________ 3. Performance location specified. (in | ________ 3. Performance location specified. (in-plant, control room, simulator, or other) | ||
-plant, control room, simulator, or other) | ________ 4. Initial setup conditions are identified. | ||
________ 4. Initial setup conditions are identified. | ________ 5. Initiating cue (and terminating cue if required) are properly identified. | ||
________ 5. Initiating cue (and terminating cue if required) are properly identified. | ________ 6. Task standards identified and verified by SME review. | ||
________ 6. Task standards identified and verified by SME review. | ________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk | ||
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision: | (*). | ||
Procedure DEOP 500-02 | ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision: | ||
________ 10. Verify performance time is accurate | Procedure DEOP 500-02 Rev: 16 Procedure Rev: | ||
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | Procedure Rev: | ||
________ 9. Verify cues both verbal and visual are free of conflict. | |||
________ 10. Verify performance time is accurate | |||
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | Revision Record (Summary) | ||
Rev 08: Updated for the 2007 LORT exam Rev 09: Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam. | Rev 08: Updated for the 2007 LORT exam Rev 09: Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS N/A: | SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM. | ||
-02, Bypassing Interlocks and Isolations to provide to examinee. | DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations to provide to examinee. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | INITIAL CONDITIONS | ||
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33 | : 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34. | ||
-1 AND 34-1 from Busses 33 AND 34. 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33 | : 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1. | ||
-1 and 34-1. 3. The loss of Busses 33 | : 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers. | ||
-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers. | |||
: 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation. | : 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation. | ||
: 5. Drywell temperature and pressure are rising. | : 5. Drywell temperature and pressure are rising. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. Unit Supervisor has directed you to perform the in | : 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02. | ||
-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500 | : 2. Your Pre Job Brief has been completed. | ||
-02. 2. Your Pre Job Brief has been completed. | : 3. Notify the Unit Supervisor when the in-plant actions are complete. | ||
: 3. Notify the Unit Supervisor when the in | |||
-plant actions are complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Comments relating to procedural or equipment issues should be entered and tracked using the | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time | JPM Start Time: _________ | ||
: _________ | Comment # | ||
-02. 1 Proceed to Step G.3 of | SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Provide examinee a current copy of DEOP 500-02. | ||
Locates Step G.3 | 1 Proceed to Step G.3 of Locates Step G.3 procedure. | ||
_____ | _____ _____ _____ | ||
NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor. | NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor. | ||
NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are: | NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are: | ||
Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet. | Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet. | ||
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room. | Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room. | ||
2 Obtain appropriate Equipment Box from the | 2 Obtain appropriate OBTAINS appropriate Equipment Box from the EQUIPMENT BOX from the | ||
_____ _____ _____ | |||
Control Room DEOP Control Room DEOP Equipment Equipment Storage Storage Cabinet. | |||
Cabinet. | |||
CUE DEOP Equipment Box you have identified is in your hand. | CUE DEOP Equipment Box you have identified is in your hand. | ||
NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and | NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and Locates Panel 903-32. | ||
-32. _____ | panel 903-32. | ||
NOTE Simulated JPM | _____ _____ _____ | ||
- Examinee must explain the task. | NOTE Simulated JPM - Examinee must explain the task. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
PERFORMANCE CHECKLIST STANDARDS | Comment # | ||
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | |||
*4 Lift AND tape lead on On 903-32 panel terminal block 903-32 panel terminal AA terminal point 6 OR terminal block AA terminal point 6 point 7 OR terminal point 7. | |||
* Puts on insulated gloves. | * Puts on insulated gloves. | ||
* Loosens screw with standard screwdriver | * Loosens screw with standard screwdriver. | ||
. | * Uses split blade screwdriver _____ _____ _____ | ||
* Uses split blade screwdriver to grasp screw and remove it | to grasp screw and remove it. | ||
. | * Tapes the loose wire with electricians tape. | ||
* Tapes the loose wire with electricians tape | |||
. | |||
CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped. | CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped. | ||
*5 Lift AND tape lead on On 903-33 panel terminal block 903-33 panel terminal AA terminal point 6 OR terminal block AA terminal point 6 point 7 OR terminal point 7. | |||
* Puts on insulated gloves. | * Puts on insulated gloves. | ||
* Loosens screw with standard screwdriver | * Loosens screw with standard screwdriver. | ||
. | * Uses split blade screwdriver _____ _____ _____ | ||
* Uses split blade screwdriver to grasp screw and remove it | to grasp screw and remove it. | ||
. | * Tapes the loose wire with electricians tape. | ||
* Tapes the loose wire with electricians tape | CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped. | ||
. | 6 Notify Unit Supervisor Notifies Unit Supervisor upon upon completion of task. completion of task. | ||
_____ _____ _____ | |||
CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped. 6 Notify Unit Supervisor upon completion of task. | |||
_____ | |||
CUE Acknowledge report of task completion. | CUE Acknowledge report of task completion. | ||
END | END JPM Stop Time:_________ | ||
:_________ | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: ___________________________________ | |||
Job Title: q RO q SRO JPM Title: Bypass the Trip of Drywell Coolers Revision Number: 10 JPM Number: S-N-j Task Number and Title: 295L074, Bypass the Trip of Drywell Coolers. | |||
K/A Number and Importance: 295028.A1.03 3.9 / 3.9 Suggested Testing Environment: q Simulator Plant q Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: _______ minutes | |||
Job Title: | |||
q RO q SRO JPM Title: | |||
Bypass the Trip of Drywell Coolers Revision Number: | |||
10 JPM Number: | |||
S-N-j | |||
K/A Number and Importance: 295028 | |||
.A1.03 | |||
q Simulator | |||
Testing Method: | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
15 | |||
minutes | |||
==References:== | ==References:== | ||
DEOP 500-02, Rev 16 EVALUATION | |||
DEOP 500-02, Rev 16 | |||
EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Satisfactory Unsatisfactory Comments: | Evaluators Name: ____________________________ | ||
(Print) | |||
(Print) | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33 | : 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34. | ||
-1 AND 34-1 from Busses 33 AND 34. 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33 | : 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1. | ||
-1 and 34-1. 3. The loss of Busses 33 | : 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers. | ||
-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers. 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation. | : 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation. | ||
: 5. Drywell temperature and pressure are rising. | : 5. Drywell temperature and pressure are rising. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. Unit Supervisor has directed you to perform the in | : 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02. | ||
-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500 | : 2. Your Pre-Job Brief has been completed. | ||
-02. 2. Your Pre-Job Brief has been completed. | : 3. Notify the Unit Supervisor when the in-plant actions are complete Page 9 of 9 | ||
: 3. Notify the Unit Supervisor when the in | |||
-plant actions are complete | Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number: S-N-k Revision Number: 15 Date: 02/16 Developed By: | ||
Exam Author Date Approved By: | |||
Facility Representative Date Page 1 of 11 | |||
Job Performance Measure (JPM) | |||
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | |||
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | ||
________ 1. Task description and number, JPM description and number are identified. | ________ 1. Task description and number, JPM description and number are identified. | ||
________ 2. Knowledge and Abilities (K/A) references are included. | ________ 2. Knowledge and Abilities (K/A) references are included. | ||
________ 3. Performance location specified. (in | ________ 3. Performance location specified. (in-plant, control room, simulator, or other) | ||
-plant, control room, simulator, or other) | ________ 4. Initial setup conditions are identified. | ||
________ 4. Initial setup conditions are identified. | ________ 5. Initiating cue (and terminating cue if required) are properly identified. | ||
________ 5. Initiating cue (and terminating cue if required) are properly identified. | ________ 6. Task standards identified and verified by SME review. | ||
________ 6. Task standards identified and verified by SME review. | ________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk | ||
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision: | (*). | ||
Procedure DOP 0300-03 | ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision: | ||
________ 10. Verify performance time is accurate | Procedure DOP 0300-03 Rev: 25 Procedure Rev: | ||
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | Procedure Rev: | ||
________ 9. Verify cues both verbal and visual are free of conflict. | |||
________ 10. Verify performance time is accurate | |||
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11 | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 14 Updated for the 2007 LORT exam. | Revision 14 Updated for the 2007 LORT exam. | ||
Revision 15 Revised for ILT 15 | Revision 15 Revised for ILT 15-1 (2016-301) NRC Exam. | ||
-1 (2016-301) NRC Exam. | Page 3 of 11 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS: | |||
N/A: | N/A: In-Plant JPM. | ||
DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee. | |||
Page 4 of 11 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation. | : 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation. | ||
: 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer. | : 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer. | ||
: 3. The Unit Supervisor has reviewed the TRM and has taken required actions. | : 3. The Unit Supervisor has reviewed the TRM and has taken required actions. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to perform the in | : 1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03. | ||
-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300 | : 2. Prerequisites have been met. | ||
-03. 2. Prerequisites have been met. | |||
: 3. Your Pre-Job Brief is complete. | : 3. Your Pre-Job Brief is complete. | ||
: 4. Notify the Unit Supervisor upon completion of in | : 4. Notify the Unit Supervisor upon completion of in-plant actions. | ||
-plant actions. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information for | Information for Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The time clock starts when the candidate acknowledges the initiating cue. | The time clock starts when the candidate acknowledges the initiating cue. | ||
Page 5 of 11 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
: _________ PERFORMANCE CHECKLIST STANDARDS | Comment # | ||
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | |||
: 1. Proceed to Unit 2 CRD CRD FCVs located and Flow Control Valves communications established (FCVs) and establish with control room. | |||
communications with the _______ ______ _____ | |||
control room. | |||
NOTE Step G.2 is N/A. | NOTE Step G.2 is N/A. | ||
: 2. Verify OPEN 2 | : 2. Verify OPEN 2-0301-30, Verifies 2-0301-30 U2 CRD SYS FCV CONT stem/handwheel backed out. | ||
-0301-30, | _______ ______ _____ | ||
Verifies 2 | AIR PRV ISOL VLV. | ||
-0301-30 stem/handwheel backed out. | |||
_______ | |||
CUE Valve 2-0301-30 stem/ handwheel is backed out. | CUE Valve 2-0301-30 stem/ handwheel is backed out. | ||
: 3. Verify OPEN 2 | : 3. Verify OPEN 2-0301-144B, Verifies 2-0301-144B valve U2 CRD SYS FCV 2-0302- stem/handwheel backed out. | ||
-0301-144B, U2 CRD SYS FCV 2 | _______ ______ _____ | ||
-0302- | 6B AIR ISOL VLV. | ||
_______ | |||
CUE Valve 2-0301-144B stem/handwheel is backed out. | CUE Valve 2-0301-144B stem/handwheel is backed out. | ||
: 4. Verify OPEN 2 | : 4. Verify OPEN 2-0301-40B, Verifies 2-0301-40B valve U2 CRD SYS B FCV stem/handwheel backed out. | ||
-0301-40B, | _______ ______ _____ | ||
Verifies 2 | INLET VLV. | ||
-0301-40B valve stem/handwheel backed out. | |||
_______ | |||
CUE Valve 2-0301-40B stem/handwheel is backed out. | CUE Valve 2-0301-40B stem/handwheel is backed out. | ||
: 5. Cycle the 2B FCV full open | : 5. Cycle the 2B FCV full open Adjusts PRV 2-0301-34 locally and full closed by adjusting to cycle 2B FCV. | ||
PRV 2-0301-34 locally. | |||
-0301-34 locally | Verifies cycling by observing stem position and/or light indication on the CRD FCV _______ ______ _____ | ||
Verifies cycling by observing stem position and/or light indication on the CRD FCV electrical transfer station. | electrical transfer station. | ||
CUE 2B FCV cycles full open and then full closed. | CUE 2B FCV cycles full open and then full closed. | ||
Page 6 of 11 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Comment # | |||
: 6. Verify PRV 2 | SAT UNSAT PERFORMANCE CHECKLIST STANDARDS NOTE The Unit Supervisor has addressed the TRM per the Initial Conditions (addresses note preceding G.5 of DOP). | ||
-0301-34 | : 6. Verify PRV 2-0301-34 Verifies PRV 2-0301-34 valve closed. stem backed out and turning | ||
-0301-34 valve stem backed out and turning | _______ ______ _____ | ||
freely. | |||
CUE PRV 2-0301-34 valve stem is backed out and turning freely. | CUE PRV 2-0301-34 valve stem is backed out and turning freely. | ||
: 7. Verify Pressure gauge PI 2-0302-60 indicates 0 psig. | : 7. Verify Pressure gauge PI Verifies pressure gauge PI 2-2-0302-60 indicates 0 psig. 0302-60 reading 0 psig. | ||
_______ ______ _____ | |||
0302-60 reading 0 psig. | |||
_______ | |||
CUE After examinee locates and observes the indicator, then cue: | CUE After examinee locates and observes the indicator, then cue: | ||
PI 2-0302-60 is reading 0 psig. | PI 2-0302-60 is reading 0 psig. | ||
: 8. Verify via U2 NSO that CRD FCV Controller in MANUAL and demand is set to minimum. | : 8. Verify via U2 NSO that Calls U2 NSO to verify CRD CRD FCV Controller in FCV Controller configuration MANUAL and demand is set to minimum. _______ ______ _____ | ||
_______ | |||
CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum. | CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum. | ||
*9. At CRD Electrical Transfer, place the transfer switch TS160 to the "Valve B" | *9. At CRD Electrical Transfer, At CRD Electrical Transfer place the transfer switch Station, places the transfer TS160 to the "Valve B" switch to the "Valve B" position position to place FCV 2- to place FCV 2-0302-6B in 0302-6B in service. service _______ ______ _____ | ||
-0302-6B in service | |||
_______ | |||
CUE The transfer switch is in the "Valve B" position. | CUE The transfer switch is in the "Valve B" position. | ||
*10. Select the 2B E/P Selects the 2B E/P converter converter by placing U2 by placing 2-0301-29 to B. | |||
-0301-29 to | CRD SYS FCV A/B SELECTOR VLV 2-0301- _______ ______ _____ | ||
29 to B. | |||
-0301-29 to | Page 7 of 11 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Comment # | |||
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS CUE The 2-0301-29 Unit 2 CRD MANUAL E/P SELECTOR VALVE is in the B position. | |||
Examiner Note: | Examiner Note: | ||
On valves 2 | On valves 2-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve. | ||
-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve. | *11. Place U2 CRD SYS FCV Places 2-0302-6B selector 2-0302-6B MAN/AUTO switch to the automatic SELECTOR VLV, 2-0301- position. | ||
38, switch to the automatic _______ ______ _____ | |||
-0301-38, switch to the automatic | position. | ||
CUE 2-0302-6B selector switch is in automatic. | CUE 2-0302-6B selector switch is in automatic. | ||
*12. Place the U2 CRD SYS Places the 2-0302-6A selector FCV 2-0302-6A switch to the manual position. | |||
MAN/AUTO SELECTOR VLV, 2-0301-37, to the _______ ______ _____ | |||
manual position. | |||
CUE The 2-0302-6A selector switch is in manual. | CUE The 2-0302-6A selector switch is in manual. | ||
*13. Open 2-0301-41B, U2 Opens 2-0301-41B valve. | |||
Opens 2-0301-41B valve. | CRD SYS A/B FCV Full CCW, stem/handwheel _______ ______ _____ | ||
Full CCW, stem/ | OUTLET VLV. | ||
backed out. | backed out. | ||
CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out. | CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out. | ||
: 14. Notify Unit NSO that the 2B CRD FCV can now be controlled from the 902 | : 14. Notify Unit NSO that the Notifies Unit NSO of 2B CRD 2B CRD FCV can now be FCV status and directs Unit controlled from the 902-5 NSO to adjust system flow rate Panel AND that system to maintain stable flow. | ||
-5 Panel AND that system | flow should be adjusted to _______ ______ _____ | ||
maintain stable flow rate. | |||
CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate. | CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate. | ||
Page 8 of 11 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Comment # | |||
-0301-41A, U2 CRD SYS A/B FCV | SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | ||
*15. Slowly close 2-0301-41A, Closes 2-0301-41A valve U2 CRD SYS A/B FCV slowly (full CW or stem/ | |||
handwheel in). | _______ ______ _____ | ||
OUTLET VLV. handwheel in). | |||
CUE The 2-0301-41A valve stem/handwheel is full CW or in. | CUE The 2-0301-41A valve stem/handwheel is full CW or in. | ||
: 16. Notifies Unit Supervisor of completion of in | : 16. Notifies Unit Supervisor of Unit Supervisor notified of completion of in-plant completion of in-plant actions. | ||
-plant actions per DOP and that the remaining steps are from the 902 | actions per DOP and that the remaining steps are _______ ______ _____ | ||
-5 panel. | from the 902-5 panel. | ||
CUE Acknowledge report of task completion. | |||
END JPM Stop Time:_________ | |||
Page 9 of 11 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: ___________________________________ | |||
___________________________________ | Job Title: rRO rSRO JPM Title: Swap CRD Flow Control Valves Revision Number: 15 JPM Number: S-N-k Task Number and Title: 201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001.A4.03 2.9/2.8 Suggested Testing Environme nt: In-Plant Suggested Testing Environment: q Simulator Plant q Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: _ 23__ minutes Actual Time Used: _______ minutes | ||
Job Title: | |||
Swap CRD Flow Control Valves Revision Number: 15 JPM Number: | |||
S-N-k | |||
.A4.03 | |||
In-Plant Suggested Testing Environment: | |||
q Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
_ | |||
minutes | |||
==References:== | ==References:== | ||
DOP 0300-03, Rev. 25 EVALUATION | DOP 0300-03, Rev. 25 EVALUATION | ||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name: ____________________________ | ||
Comments: | |||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | |||
Page 10 of 11 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation. | : 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation. | ||
: 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer. | : 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer. | ||
: 4. The Unit Supervisor has reviewed the TRM and has taken required actions. | : 4. The Unit Supervisor has reviewed the TRM and has taken required actions. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to perform the in | : 1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03. | ||
-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300 | : 2. Prerequisites have been met. | ||
-03. 2. Prerequisites have been met. | |||
: 3. Your Pre-Job Brief is complete. | : 3. Your Pre-Job Brief is complete. | ||
: 4. Notify the Unit Supervisor upon completion of in | : 4. Notify the Unit Supervisor upon completion of in-plant actions. | ||
-plant actions.}} | Page 11 of 11}} | ||
Revision as of 03:52, 30 October 2019
| ML17128A181 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 09/01/2016 |
| From: | Chuck Zoia Exelon Generation Co |
| To: | NRC/RGN-III/DRS/OLB |
| Shared Package | |
| ML16257A680 | List: |
| References | |
| Download: ML17128A181 (170) | |
Text
Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE JPM Number: A-N-1-R Revision Number: 01 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM developed for 2009 NRC Exam.
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.
A-N-1-R Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Markup a copy of DOS 1100-02.
A-N-1-R Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. DOS 1100-02 was performed last shift.
- 3. The EO reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-R Page 4 of 7
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of DOS 1100-02.
- 1. Student should identify step Identifies that step should I.4 should NOT have been NOT have been initialed.
initialed. _____ _____ _____
- 2. Student should identify step Identifies that step should I.9.g should NOT have been NOT have been N/Ad.
N/Ad. _____ _____ _____
- 3. Notify Unit Supervisor of Notifies Unit Supervisor, to discrepancies. verify/correct issues.
_____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-1-R Page 5 of 7
Operators Name:
Job Title: RO JPM Title: VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE Revision Number: 01 JPM Number: A-N-1-R Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.
K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 Actual Time Used: minutes
References:
DOS 1100-02, rev 17 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-1-R Page 6 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. DOS 1100-02 was performed last shift.
- 3. The EO reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
- 2. Inform the Unit Supervisor when the task is complete.
A-N-1-R Page 7 of 7
Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER JPM Number: A-N-2-R Revision Number: 00 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.
A-N-2-R Page 2 of 10
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. Pull up prints M-15 Sheet 1, M-16, and M-3658 Sheet 1 on Large TV in simulator.
- 3. Turn TV screen off.
DOCUMENT PREPARATION
- 1. Copy of M-15 Sheet 1.
- 2. Copy of M-16.
- 3. Copy of OP-AA-109-101.
- 4. Copy of OP-DR-109-1001.
A-N-2-R Page 3 of 10
INITIAL CONDITIONS
- 1. You are an Extra NSO.
- 2. Unit 2 is at 500 MWe.
- 3. 2C Condensate/Condensate Booster pump requires removal from service due to a leak.
- 4. Vent and Drain paths do NOT require manipulation.
- 5. Condensate/Condensate Booster Pump seal isolation is not required.
- 6. Hydrogen Addition injection isolation is not required.
- 7. Passport is not available, but is expected to return this shift.
- 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
- 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
- 10. Other NSOs are tasked with determining electrical and air isolations.
INITIATING CUE
- 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
- 2. Record recommended Isolation Points and Required Positions on the sheet provided.
- 3. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
A-N-2-R Page 4 of 10
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-R Page 5 of 10
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of M-15 Sheet 1 and M-16.
If the examinee requests Clearance and Tagging procedures, they may be provided.
The following steps may be performed in any order
- 1. Candidate identifies 2C Candidate correctly locates Condensate/Condensate and identifies 2C Booster pump on M-15 Sheet Condensate/Condensate _____ _____ _____
- 1. Booster pump on M-15 Sheet 1.
- 2. Candidate determines Candidate identifies the isolation points and required following valves are positions for 2C condensate necessary isolation points _____ _____ _____
pump for 2C Condensate pump:
(Located on M-15 Sht. 1)
- 2-3301-C-500 (Closed)
- 2-3302-C-500 (Closed)
- 3. Candidate determines Candidate identifies the isolation points and required following valves are positions for 2C condensate necessary isolation points _____ _____ _____
booster pump for 2C Condensate pump:
- 2-3305-C-500 (Closed)
(Located on M-15 Sht. 1)
- 2-3401-C-500 (Closed)
(Located on M-16)
A-N-2-R Page 6 of 10
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 4. Completes worksheet with Notifies Unit Supervisor, to EPN and required hang verify/correct issues.
position. _____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-2-R Page 7 of 10
Operators Name:
Job Title: RO JPM Title: DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER Revision Number: 00 JPM Number: A-N-2-R Task Number and Title: 299L012 Determine points of isolation in order to remove a piece of equipment from service.
K/A Number and Importance: Generic.2.2.41 3.5/3.9 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes
References:
OP-AA-109-101 Rev. 10, OP-DR-109-101-1001 Rev. 10, M-15 Sheet 1 Rev. M, M-16 Rev. AP EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-2-R Page 8 of 10
INITIAL CONDITIONS
- 1. You are an Extra NSO.
- 2. Unit 2 is at 500 MWe.
- 3. 2C Condensate/Condensate Booster pump requires removal from service due to a leak.
- 4. Vent and Drain paths do NOT require manipulation.
- 5. Condensate/Condensate Booster Pump seal isolation is not required.
- 6. Hydrogen Addition injection isolation is not required.
- 7. Passport is not available, but is expected to return this shift.
- 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
- 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
- 10. Other NSOs are tasked with determining electrical and air isolations.
INITIATING CUE
- 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
- 2. Record recommended Isolation Points and Required Positions on the sheet provided.
- 3. Inform the Unit Supervisor when the task is complete.
A-N-2-R Page 9 of 10
EPN Hang Position A-N-2-R Page 10 of 10
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-3-R Revision Number: 02 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam.
A-N-3-R Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
- 3. Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 1500-08.
A-N-3-R Page 3 of 7
INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI)
HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
- 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
- 1. Complete the performance of DOS 1500-08.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-R Page 4 of 7
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of DOS 1500-08.
The following steps can be performed in any order.
If examinee states to stop, due to errors, inform him/her to continue calculations.
- 1. Examinee calculates Dilution See attached key.
flow (1,017,000 gpm).
_____ _____ _____
- 2. Examinee enters dilution flow See attached key.
(from above) to calculate CCSW Activity Limit. _____ _____ _____
- 3. Examinee calculates CCSW See attached key.
Activity Limit (2.91 x 10-5).
_____ _____ _____
- 4. Examinee verifies CCSW Examinee determines Heat Exchanger A sample CCSW Heat Exchanger A activity is less than or equal sample activity is greater _____ _____ _____
to the calculated CCSW than or equal to the activity limit calculated CCSW activity limit
- 5. Recommends to the Unit Makes recommendation to Supervisor that the calculated Unit Supervisor.
sample limit exceeds the allowable discharge. _____ _____ _____
- 6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
_____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-3-R Page 5 of 7
Operators Name:
Job Title: RO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-3-R Task Number and Title: 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes
References:
DOS 1500-08, rev 17 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-3-R Page 6 of 7
INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
- 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
- 1. Complete the performance of DOS 1500-08.
- 2. Inform the Unit Supervisor when the task is complete.
A-N-3-R Page 7 of 7
Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 01 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.
A-N-4-R Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a copy of DOA 0010-10 and DOA 0010-S1.
A-N-4-R Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A fire is burning at the Lift Station, no explosion has occurred.
- 3. The fire has been classified as a major fire.
- 4. Hazmat and rescue response are not required.
- 5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
- 6. A dedicated outside line is not available.
INITIATING CUE
- 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-R Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the supplied copy of DOA 0010-10.
Provide the examinee with the supplied copy of DOA 0010-S1 when requested.
- 1. Notify Coal City Fire From DOA 0010-S1 Protection District. (Refer to determines that 815-942-DOA 0010-S1, Key Phone 0336 is the number Numbers for DOA 0010 Block needed to contact the _____ _____ _____
Procedures.) CCFPD.
- 2. Dial 815-942-0336 and Dials 815-942-0336 and communicate the details of communicates the details the fire. of the fire: _____ _____ _____
- Location of fire
- Assistance is required CUE:
If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities.
- 3. Notifies TSO via direct line for Notifies the TSO from a major fire. control room phone using the TSO direct line button and provides call back _____ _____ _____
phone number.
- 4. Notify Security Shift Notifies the Security Shift Supervisor that outside fire Supervisor that the department will be CCFPD will be responding responding AND request to the Lift Station.
assistance in providing access to affected area if _____ _____ _____
necessary.
- 5. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
_____ _____ _____
CUE:
Acknowledge report of task completion.
END A-N-4-R Page 5 of 8
JPM Stop Time:_________
A-N-4-R Page 6 of 8
Operators Name:
Job Title: RO JPM Title: DETERMINE ACTIONS FOR A FIRE Revision Number: 01 JPM Number: A-N-4-R Task Number and Title: 295L009, Respond to a fire/explosion K/A Number and Importance: Generic.2.4.27 3.4 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes
References:
DOA 0010-10, rev 20; DOA 0010-S1, rev 14 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-4-R Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A fire is burning at the Lift Station, no explosion has occurred.
- 3. The fire has been classified as a major fire.
- 4. Hazmat and rescue response are not required.
- 5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
- 6. A dedicated outside line is not available.
INITIATING CUE
- 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
- 2. Inform the Unit Supervisor when the task is complete.
A-N-4-R Page 8 of 8
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM developed ILT 15-1 (2016-301) NRC Exam.
A-N-1-S Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION
- 1. None.
A-N-1-S Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. Unit 2 and Unit 3 are operating at rated power.
- 3. The following timeline occurred:
- 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
- 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
- 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.
INITIATING CUE
- 1. Utilizing the Reportability Manual, determine the earliest reportability requirement.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-S Page 4 of 7
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Candidate locates a copy of Reportability Manual.
EXAMINER NOTE:
The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4.
- 1. Determines the event is Determines the event is reportable per SAF 1.8. reportable per SAF 1.8, Event or Condition that could have prevented _____ _____ _____
fulfillment of a Safety Function.
- 2. Determines the time limit to Determines the time limit Notify the NRC Operations to Notify the NRC Center via the ENS as soon Operations Center via the as practical and in all cases, ENS as soon as practical within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and in all cases within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of the occurrence (Time 0542).
_____ _____ _____
END JPM Stop Time:_________
A-N-1-S Page 5 of 7
Operators Name:
Job Title: SRO JPM Title: REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and Title: 299L001, Determine Reportability requirements as outlined in station Reportability manual.
K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 Actual Time Used: minutes
References:
Reportability Tables and Decision Trees LS-AA-1020 Rev 23, Safety (SAF) LS-AA-1110 Rev. 22 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-1-S Page 6 of 7
INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. Unit 2 and Unit 3 are operating at rated power.
- 3. The following timeline occurred:
- 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
- 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
- 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.
INITIATING CUE
- 1. Utilizing the Reportability Manual, determine the earliest reportability requirement.
A-N-1-S Page 7 of 7
Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number: A-N-2-S Revision Number: 01 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 Modified for 2010 Cert Exam.
Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam.
A-N-2-S Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Marked up copy of OP-AA-105-102.
A-N-2-S Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Shift Manager.
- 2. An SRO is in the process of license reactivation.
- 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.
INITIATING CUE
- 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-S Page 4 of 8
JPM Start Time: _________
UNSAT Comm PERFORMANCE CHECKLIST STANDARDS SAT ent NOTE:
Provide the Examinee the provided marked up copy of OP-AA-105-102.
- 1. Review OP-AA-105-102, Reviews OP-AA-105-102, Attachment 2. Attachment 2.
_____ _____ _____
- 2. Check that Hours on Shift are in Notes 12.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> listed on the same calendar quarter. 6/26/16 are performed during the 2nd calendar _____ _____ _____
quarter and cannot be counted towards license re-activation.
- 3. Check that Hours on Shift are Determines 12.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> as applicable for license WEC listed on 07/3/16 reactivation. cannot be credited towards license re-activation.
_____ _____ _____
EXAMINER NOTE:
Steps 2 and 3 lead to the determination in step 4
- 4. Check that licensee has the Determines that licensee required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />. does NOT have adequate hours to meet the 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> _____ _____ _____
requirement.
- 5. Verifies Plant Tour completed Determines that Plant Tour per step 4.b date and signature are not completed. _____ _____ _____
- 6. Report the results of the review Returns without signing OP-to the Shift Operations AA-105-102, Attachment 2 Superintendent (SOS). to the SOS.
Informs the SOS that the licensees license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete. _____ _____ _____
CUE:
As the SOS, acknowledge the report.
END A-N-2-S Page 5 of 8
JPM Stop Time:_________
A-N-2-S Page 6 of 8
Operators Name:
Job Title: SRO JPM Title: REACTIVATION OF AN SRO LICENSE Revision Number: 01 JPM Number: A-N-2-S Task Number and Title: Title: 299L024, Maintain an Active License K/A Number and Importance: Generic.2.1.4 3.3 / 3.8 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 Actual Time Used: minutes
References:
OP-AA-105-102, Rev. 11 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-2-S Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Shift Manager.
- 2. An SRO is in the process of license reactivation.
- 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.
INITIATING CUE
- 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions A-N-2-S Page 8 of 8
Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-S Revision Number: 04 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam.
A-N-3-R Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 6600-02.
A-N-3-R Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Unit Supervisor.
- 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
- 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
- 4. The Equipment Operator reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. Perform calculation verification and ensure paperwork is correct.
- 2. Inform me when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-R Page 4 of 7
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of DOS 6600-02.
- 1. Candidate should identify Identifies differential step I.1.e has a mathematical pressure should read 4.
error. _____ _____ _____
- 2. Candidate should identify Identifies incorrect step I.1.w OR step I.1.v is verification of dP <6.
signed off as verified dP of <6 _____ _____ _____
(actual is 7).
- 3. Candidate should identify that Identifies step NOT steps I.1.ab have been independently verified.
initialed by the same person _____ _____ _____
performing the surveillance and were NOT independently verified.
- 4. Notify Unit Supervisor of Notifies Unit Supervisor, discrepancies. may dispatch Operators to verify/correct issues, also _____ _____ _____
may initiate IR.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-3-R Page 5 of 7
Operators Name:
Job Title: SRO JPM Title: VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 04 JPM Number: A-N-3-S Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 Actual Time Used: minutes
References:
DOS 6600-02, rev 20 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-3-R Page 6 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Unit Supervisor.
- 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
- 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
- 4. The Equipment Operator reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. Perform calculation verification and ensure paperwork is correct.
- 2. Inform me when the task is complete.
A-N-3-R Page 7 of 7
Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 02 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
Revision 02 Modified for ILT 15-1 (2016-301) NRC Exam.
A-N-4-S Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
- 3. Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 1500-08.
A-N-4-S Page 3 of 8
INITIAL CONDITIONS
- 1. You are the U2 US.
- 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
- 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
- 1. Review and Verify DOS 1500-08.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-S Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of DOS 1500-08.
The following steps can be performed in any order.
- 1. Verifies Dilution flow Determines Dilution flow calculation (1,017,000 gpm). was incorrectly determined. Correct Dilution flow is 1,017,000 _____ _____ _____
gpm.
- 2. Enters dilution flow Determines 2.91 x 10-5 is (1,017,000 gpm) to calculate the correct CCSW sample CCSW Activity Limit. activity limit.
_____ _____ _____
NOTE:
If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated:
Direct the candidate to complete the review and make any necessary adjustments as necessary and another SRO will review.
- 3. Verifies CCSW Heat Determines 2.01 x 10-5 is Exchanger A sample activity less than 2.91 x 10-5.
is less than or equal to the calculated CCSW activity limit _____ _____ _____
- 4. Re-Performs Canal Activity Uses 1,017,000 gpm as Calculation. Dilution Flow. Determines incorrect activity level used for A Activity level of CCSW Heat Exchanger.
Correct value is 2.01 x10-5. _____ _____ _____
- 5. Determines Canal Activity Determines Canal Activity Concentration. Concentration is 6.9 x10-8
_____ _____ _____
A-N-4-S Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 6. Determines need for NSO to Examinee directs NSO to re-perform calculations. re-perform calculations
_____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-4-S Page 6 of 8
Operators Name:
Job Title: SRO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-4-S Task Number and Title: 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes
References:
DOS 1500-08, rev 17 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-4-S Page 7 of 8
INITIAL CONDITIONS
- 1. You are the U2 US.
- 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
- 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
- 1. Review and Verify DOS 1500-08.
- 2. Inform the Unit 2 Supervisor when the task is complete.
A-N-4-S Page 8 of 8
Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number: A-N-5-S Revision Number: 00 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date SRRS: 3D.105 (when utilized for operator init ial or continuing train ing)
Revision Record (Summary)
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.
A-N-5-S Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION
- 1. For exam purposes/exam security provide a colored copy of a blank NARS form.
A-N-5-S Page 3 of 8
INITIAL CONDITIONS
- 1. This is a time critical JPM.
- 2. You are the Shift Emergency Director.
- 3. Unit 2 was operating at near rated conditions.
- 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
- 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
- 6. Visible damage to spent fuel has occurred.
- 7. Fuel pool level is lowering at 1 foot per minute.
- 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
- 9. A large hole is present in the Reactor Building wall.
- 10. There is NO verifier available.
INITIATING CUES
- 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
A-N-5-S Page 4 of 8
Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-5-S Page 5 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts.
Provide the supplied NARS Form.
Provide the supplied screen shot of the meteorological data.
- 1. Determines a classification of Determines highest GENERAL EMERGENCY, classification is a due to notification from the GENERAL EMERGENCY _____ _____ _____
Security Force that a per EAL HG1 (15 minute HOSTILE ACTION is requirement).
occurring within the protected area AND Damage to spent fuel pool has occurred.
NOTE:
Determines classification start time _______ and stop time _______ .
(15 minute limit)
- 2. Properly fills out NARS form. See attached key for the areas that must be filled out correctly (12 minute requirement) _____ _____ _____
NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used.
NOTE:
Fill out NARS form start time (when declaration completed) _______ and stop time _______ .
(12 minute limit)
END JPM Stop Time:_________
A-N-5-S Page 6 of 8
Operators Name:
Job Title: SRO JPM Title: DETERMINE EP PROTECTIVE ACTION RECOMMENDATION Revision Number: 00 JPM Number: A-N-5-S Task Number and Title: 295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes
References:
EP-AA-1004 Addendum 3 Rev. 002 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-5-S Page 7 of 8
INITIAL CONDITIONS
- 1. This is a time critical JPM.
- 2. You are the Shift Emergency Director.
- 3. Unit 2 was operating at near rated conditions.
- 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
- 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
- 6. Visible damage to spent fuel has occurred.
- 7. Fuel pool level is lowering at 1 foot per minute.
- 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
- 9. A large hole is present in the Reactor Building wall.
- 10. There is NO verifier available.
INITIATING CUES
Give the NARS form to the WEC Supervisor, who will make the state notification.
A-N-5-S Page 8 of 8
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S-N-a Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 1100-02 Rev: 19 Procedure Rev:
Procedure Rev:
________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 02 Revised for 2013 NRC exam.
Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC _51_.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Run CAEP file S-N-a.cae.
- 3. If the CAEP file cannot be run then insert the following Expert Commands:
- a. Insert following Malfunctions and/or Remotes:
- IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
- IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
- IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #
whichever pump is started first will not develop flow)
- IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #
whichever pump is started first will not develop flow)
- IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF)
- b. Setup the following Triggers:
- TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position)
- TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction)
- TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position)
- TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction)
DOCUMENT PREPARATION Clean copy of DOP 1100-02 hardcard.
SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 3. The Unit Supervisor has authorized the use of Hard Cards.
INITIATING CUE
- 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Examinee should locate the hard card, then provide the included copy.
- 1. Selects the correct procedure step. Determines correct procedure step is per DOP 1100-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS)
___ ___ ___
- 2. Place the SBLC INJECTION Turns the SBLC INJECTION CONTROL keylock switch to the CONTROL keylock switch to either SYS 1 OR SYS 2 position. the intermediate right OR intermediate left position.
___ ___ ___
light NOT lit. ___ ___ ___
Note The selected pump starts but does not develop flow (relief valve failure in the JPM setup).
- 4. Verifies applicable PUMP pilot PUMP light on.
light lit. ___ ___ ___
BEGIN ALTERNATE PATH
- 5. Verifies FLOW pilot light lit. FLOW light off (SBLC is NOT injecting). ___ ___ ___
- 6. SBLC SQUIB VLV CKT FAILURE Annunciator 902-5 H-6 illuminated.
annunciator alarms (902-5 H-6). ___ ___ ___
- 7. Places SBLC INJECTION Turns the SBLC INJECTION CONTROL keylock switch to CONTROL keylock switch to the opposite position taken to in step opposite direction turned in step 1.
1.
___ ___ ___
- 8. Verifies opposite PUMP pilot light Opposite PUMP light on.
lit. ___ ___ ___
Note Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re-positioned.
- 9. Verifies RWCU valve 2-1201-1 Examinee recognizes that valve 2-closed. 1201-1 valve did NOT close. ___ ___ ___
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-a Rev 03
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 10. Closes RWCU valve 2-1201-1. Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position.
___ ___ ___
- 11. Verifies RWCU valve 2-1201-1A GREEN light illuminated.
closed. ___ ___ ___
- 12. Verifies RWCU valve 2-1201-2 Examinee recognizes that valve 2-closed. 1201-2 valve did NOT close. ___ ___ ___
- 13. Closes RWCU valve 2-1201-2. Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position.
___ ___ ___
- 14. Verifies RWCU valve 2-1201-3 GREEN light illuminated.
closed. ___ ___ ___
- 15. Verifies RWCU valve 2-1201-7 RED light illuminated.
closed. ___ ___ ___
- 16. Informs Unit Supervisor task is Reports SBLC is injecting but the complete. first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to close automatically.
___ ___ ___
Cue Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-a Rev 03
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM
SUMMARY
Operators Name: Emp. ID#: ____________
Job Title: RO SRO SRO Cert JPM Title: SBLC - Injection with Pump and RWCU Failures JPM Number: S-N-a Revision Number: 03 Task Number and Title: 211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 1100-02, Rev 19 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-a Rev 03
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 3. The Unit Supervisor has authorized the use of Hard Cards.
INITIATING CUE
- 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
- 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S-N-b Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0600-06 Rev: 44 Procedure Rev:
Procedure Rev:
________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 02 Bank JPM.
Revision 03 Revised for 2009 NRC Exam.
Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC _52_.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify BOTH FW REG ISOL VALVES are OPEN:
- MO 2-3206A
- MO 2-3206B
- 3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED.
- 4. Verify MASTER CONTROL STATION is in MAN.
- 5. Low Flow Reg Valve is controlling level at 30 in AUTO.
- 6. Insert following Malfunctions and/or Remotes:
- None.
- 7. Setup the following Triggers:
- None.
DOCUMENT PREPARATION
- 1. Copy of DOP 0600-06 marked up through limitations and actions.
SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit Startup is in progress.
- 3. The FWLCS is controlling level with the Low Flow Reg Valve.
- 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
- 5. 2A & 2B FRVs have been pre-operationally tested.
- 6. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide the examinee with the provided copy of DOP 0600-06.
- 1. Verify 2A and 2B FWRVs have Condition met in initial conditions.
been pre-operationally tested per Step G.1.
___ ___ ___
- 2. Verify the following valves are GREEN lights illuminated on the open: following:
- MO 2-3205A, FW LINE STOP.
- MO 2-3205A
- MO 2-3205B, FW LINE STOP.
- MO 2-3205B
- MO 2-3206A, 2A FW REG
- MO 2-3206A ISOL.
- MO 2-3206B, 2B FW REG
- MO 2-3206B ISOL.
___ ___ ___
- 3. Adjust MASTER CONTROL Depresses appropriate pushbutton STATION OR RX LO FLOW to verify setpoint to match actual CONTROL STATION, setpoint to RPV level on MASTER match actual RPV level. CONTROL STATION OR RX LO FLOW CONTROL STATION. ___ ___ ___
- 4. Select appropriate FWLCS RPV Depresses appropriate FWLCS level signal per Section G.17. RPV level signal pushbutton. ___ ___ ___
- 5. Place RX LO FLOW CONTROL Verifies AUTO light illuminated on STATION to AUTO. RX LO FLOW CONTROL ___ ___ ___
STATION.
- 6. Place one REG VLV CONTROL Depresses AUTO pushbutton on STATION in AUTO. 2B REG VLV CONTROL STATION.
___ ___ ___
- 7. Verify other REG VLV CONTROL Verifies MAN light illuminated on STATION in MAN. 2A REG VLV CONTROL STATION.
___ ___ ___
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-b Rev 04
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 8. Place MASTER CONTROL Depresses AUTO pushbutton on STATION in AUTO. FWLC MASTER CONTROL STATION.
___ ___ ___
Note The LOW FLOW FWRV will automatically transfer to the 2B FWRV when the LOW FLOW FWRV position is 85% feedwater flow.
- 9. Informs Unit Supervisor task is Examinee notifies the Unit complete. Supervisor. ___ ___ ___
Cue Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-b Rev 04
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM
SUMMARY
Operators Name: Emp. ID#: ____________
Job Title: RO SRO SRO Cert JPM Title: Place a FRV in Service in Auto During Unit Startup JPM Number: S-N-b Revision Number: 04 Task Number and Title: 259L021, Place FRV in service in AUTO (unit startup).
K/A Number and Importance: 259002.A4.03 3.8 / 3.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 0600-06, Rev 44 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-b Rev 04
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit Startup is in progress.
- 3. The FWLCS is controlling level with the Low Flow Reg Valve.
- 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
- 5. 2A & 2B FRVs have been pre-operationally tested.
- 6. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
- 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04
TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ-JA-150-02 Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-03 Rev: 23 Procedure Rev:
Procedure Rev:
________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for ILT 12-1 Cert Exam.
Revision 08 Revised for ILT 14-1 NRC Exam.
Revision 09 Revised for ILT 15-1 (2016-301) NRC Exam.
SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 3. Run the following CAEP file: S-N-d.cae
- 4. If the CAEP cannot be ran, insert the following Expert Commands:
- Insert the following Malfunctions, Remotes, and/or Overrides:
o imf ser0016 on o imf ser0155 on o ior lpdvlvcl25 close o ior lpdvlvop16 open o ior rrd5bcls close
- Assign the following trigger assignment:
o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems.
SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
Examiner Note: The following parameters do not match the simulator indications.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 140 psig and slowly dropping.
- 6. B Loop is selected for injection.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ-JA-150-02 JPM Start Time:
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the provided copy of DEOP 0500-03.
- 1. Verifies 2A LPCI PP control ALL lights extinguished.
switch in Pull-to-Lock.
_____ _____ _____
- 2. Place PP SUCT VLV MO 2- RED light illuminated.
1501-5A control switch in
_____ _____ _____
Manual Bypass and verify closed.
- 3. Verify MIN FLOW VLV 2- RED light illuminated.
1501-13A closed if not
_____ _____ _____
needed.
CUE:
2-1501-13A is not required for 2B LPCI pump.
NOTE:
The following valves may be verified in any order
- 4. Verify TORUS CLG/TEST GREEN lights illuminated.
valves 2-1501-20A and
_____ _____ _____
2-1501-38A closed.
- 5. Verify TORUS SPRAY VLVs GREEN lights illuminated.
2-1501-19A and 2-1501-18A
_____ _____ _____
closed.
1501-28A and 2-1501-27A
_____ _____ _____
closed.
- 7. Verify TORUS CLG/TEST GREEN lights illuminated.
valves 2-1501-20B and
_____ _____ _____
2-1501-38B closed.
- 8. Verify TORUS SPRAY VLVs GREEN lights illuminated.
2-1501-19B and 2-1501-18B
_____ _____ _____
closed.
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
1501-28B and 2-1501-27B
_____ _____ _____
closed.
NOTE:
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
CUE:
When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed.
_____ _____ _____
VENT VLV.
- 11. Crack open 2-1501-15A, U2 Instructs EO to complete LPCI A PMP VENT VLV until step G.12.c.(5).(b).
_____ _____ _____
flow is observed from pipe.
_____ _____ _____
_____ _____ _____
VENT VLV.
_____ _____ _____
2-1501-47A ROOT VLV (at G.12.c.(6). & G.12.c.(7).
pump) and verify PI 2-1501-47A indicates less than 15 psig.
CUE:
PI 2-1501-47A indicates 15.5 psig.
- 15. Recognizes reading is NOT Determines reading is less than 15 psig. greater than 15 psig.
_____ _____ _____
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
_____ _____ _____
2-1501-47A ROOT VLV. G.12.c.(8).
CUE:
2-1501-47A-R is Closed.
- 17. Open PP SUCT VLV MO 2- GREEN light illuminated.
1501-5A.
_____ _____ _____
- 18. Notify Unit Supervisor that 2A Examinee notifies Unit LPCI pump cannot be used Supervisor of 2A LPCI
_____ _____ _____
with suction from the CST. pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
CUE:
Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.
Maintain the 2A LPCI pump in PTL.
BEGIN ALTERNATE PATH
- 19. Verifies 2C LPCI PP control ALL lights extinguished.
switch in Pull-to-Lock.
_____ _____ _____
- 20. Place PP SUCT VLV MO 2- RED light illuminated.
1501-5C control switch in
_____ _____ _____
Manual Bypass and verify closed.
- 21. Verify MIN FLOW VLV 2- RED light illuminated.
1501-13B closed if not
_____ _____ _____
needed.
CUE:
2-1501-13B is not required for 2D LPCI pump.
- 22. Verify TORUS CLG/TEST GREEN lights illuminated.
valves 2-1501-20A and
_____ _____ _____
2-1501-38A closed.
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 23. Verify TORUS SPRAY VLVs GREEN lights illuminated.
2-1501-19A and 2-1501-18A
_____ _____ _____
closed.
1501-28A and 2-1501-27A
_____ _____ _____
closed.
- 25. Verify TORUS CLG/TEST GREEN lights illuminated.
valves 2-1501-20B and
_____ _____ _____
2-1501-38B closed.
- 26. Verify TORUS SPRAY VLVs GREEN lights illuminated.
2-1501-19B and 2-1501-18B
_____ _____ _____
closed.
1501-28B and 2-1501-27B
_____ _____ _____
closed.
_____ _____ _____
VENT VLV.
- 29. Crack open 2-1501-15C, U2 Instructs EO to complete LPCI C PMP VENT VLV until step G.12.e.(5).(b).
_____ _____ _____
flow is observed from pipe.
_____ _____ _____
_____ _____ _____
VENT VLV.
- 32. Open 2-1501-47C-R, U2 LPCI Instructs EO to obtain PI 2-C PUMP SUCT PI 2- 1501-47C reading per step
_____ _____ _____
1501-47C ROOT VLV (at G.12.e.(6).
pump) and verify PI 2-1501-47C indicates less than 15 psig.
CUE:
Pressure is 10 psig. .
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 33. Recognizes reading is less Determines reading is than 15 psig. LESS than 15 psig.
_____ _____ _____
_____ _____ _____
2-1501-47C ROOT VLV. G.12.e.(8).
- 35. Unlock AND open 2-1501- Directs EO to perform 31C, U2 LPCI C PMP step G.12.e.(10)(a) _____ _____ _____
SUCT VLV FROM CST [at 2 C LPCI Pump]
CUE:
2-1501-31C is open.
- 36. Unlock AND open 2-1501- Directs EO to perform 37, U2 LPCI & CS SUCT step G.12.e.(10)(b) _____ _____ _____
FROM 2/3A CST SV (located at 2/3A CST)
Simulator Operator / Evaluator:
Activate Trigger 15 to lineup 2C LPCI pump suction to the CST.
CUE:
2-1501-37 is open.
Examiner Note:
If a RPV level band is requested: Direct the candidate to maintain RPV level between +8 and +48 (NOTE: RPV level is -65 and dropping per the cue)
- 37. Start 2C LPCI PP Places control switch to start. RED light _____ _____ _____
illuminated.
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 38. Inform Unit Supervisor that Informs Unit Supervisor 2C LPCI pump is lined up that 2C LPCI pump is _____ _____ _____
to the CST and the task is lined up to the CST and complete. injecting; the task is complete.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ-JA-150-02 JPM
SUMMARY
Operators Name: Emp. ID#: ____________
Job Title: RO SRO SRO Cert JPM Title: LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number: S-N-d Revision Number: 09 Task Number and Title: 29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A1.04 3.6 / 3.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DEOP 0500-03, Rev 23 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 38 minutes Actual Time Used: minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 140 psig and slowly dropping.
- 6. B Loop is selected for injection.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
- 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure CONTAINMENT - VENT CONTAINMENT WITH APCV - (A)
JPM Number: S-N-e Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-04 Rev: 16 Procedure Rev:
Procedure Rev:
________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.
SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. (IC _51__ used for validation).
NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Ensure Torus water level is <30 feet.
- 3. Run the following CAEP file: S-N-e.cae
- 4. If the CAEP file cannot be ran insert the following Expert Commands:
- a. Insert following Malfunctions, Remotes, and/or Overrides:
- IMF CIGP2I (Spurious Group II Isolation)
- Adjusts Torus Level indications to ~20 feet.
v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20
- Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0
- Prevents the 2-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off
v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled
- Adjusts Drywell & Torus pressures to 50.0 psig.
v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0
- 6. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04.
- 7. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.
SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. You are the Aux 2 NSO.
- 2. A break inside the Unit 2 Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
- 4. Torus water level is 20 feet.
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
- 9. The N2 System is in its normal lineup.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time:
Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide examinee the marked up copy of DEOP 0500-04.
Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.
- 1. Verify SBGT is operating and flow Verifies 2/3A SBGT train is ~ 4000 scfm. FI 7540-13 is reading ~4000 scfm. ___ ___ ___
- 2. Verify Reactor Mode switch NOT Verifies Reactor Mode switch NOT in RUN. in RUN. ___ ___ ___
- 3. Place VENT ISOL SIGNAL Momentarily places Bypass switch BYPASS switch on 902-5 panel to to Torus Position.
TORUS.
___ ___ ___
- 4. Open AO 2-1601-61, TORUS 2- Places AO 2-1601-61 control INCH VENT VLV. switch to OPEN position and determines that the valve will not open.
___ ___ ___
- 5. Place the VENT ISOL SIGNAL Places the VENT ISOL SIGNAL BYPASS Switch on 902-5 to BYPASS Switch on 902-5 to DRYWELL. DRYWELL
___ ___ ___
Green light extinguishes and Red light illuminates. ___ ___ ___
Green light extinguishes and Red light illuminates. ___ ___ ___
- 8. Determine if SBGT flow is Determines Containment pressure adequate to control and maintain trend.
Torus Bottom pressure below the Primary Containment Pressure Limit. ___ ___ ___
Examiner Note:
DW pressure as indicated on PR/FR 2-8540-2/4 is as read and no change is expected with the small diameter vent path in service.
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number Cue If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
BEGIN ALTERNATE PATH
- 9. Determines use of AUGMENTED Proceeds to Attachment 1 step 6.
PRI CNMT VENT (APCV) System is required.
___ ___ ___
- 10. Place AUGMENTED PRI CNMT Rotates control switch clockwise to VENT MODE SWITCH to APCV APCV position on Panel 902-3
___ ___ ___
- 11. Verify closed AO 2-1601-63, VENT Verifies AO-2-1601-63 in closed.
TO SBGT GREEN light lit, RED light extinguished.
___ ___ ___
- 12. Verify closed AO 2-1601-91, VENT Verifies AO-2-1601-91 in closed.
TO RX BLDG EXH SYS RED light lit, GREEN light extinguished.
___ ___ ___
- 13. Place TORUS ISOLATION Rotates TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 GROUP 2 OVERRIDE 2-1601-60 switch to OVERRIDE and hold on keylock switch clockwise and holds 902-3 Panel
___ ___ ___
- 14. Place DRYWELL ISOLATION Rotates DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 GROUP 2 OVERRIDE 2-1601-23 switch to OVERRIDE and release keylock switch clockwise and on 902-3 Panel releases
___ ___ ___
- 15. Release TORUS ISOLATION Releases TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 GROUP 2 OVERRIDE 2-1601-60 on 902-3 Panel keylock switch
___ ___ ___
- 16. Place CMNT ISOLATION GROUP Rotates CMNT ISOLATION 2 OVERRIDE 2-1601-24 switch to GROUP 2 OVERRIDE 2-1601-24 OVERRIDE and release on 902-3 keylock switch clockwise and Panel releases
___ ___ ___
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 17. Open AO 2-1601-60, TORUS Determines Torus Water Level is VENT VLV. less than 30 feet and opens AO 2-1601-60, TORUS VENT VLV.
___ ___ ___
- 18. Open AO 2-1601-24, VENT TO RX Rotates AO 2-1601-24, VENT TO BLDG EXH SYS. RX BLDG EXH SYS control switch clockwise and verifies GREEN light extinguishes and RED light illuminates ___ ___ ___
- 19. Open AO 2-1601-92 VENT TO Rotates AO 2-1601-92 VENT TO MAIN CHIMNEY to control and MAIN CHIMNEY control switch maintain Primary Containment clockwise and verifies GREEN pressure below limit. light extinguishes and RED light illuminates ___ ___ ___
Cue:
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks, DW pressure recorder PR/FR 2-8540-2/4 is slowly lowering.
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
- 20. Informs Unit Supervisor task is Examinee notifies the Unit complete. Supervisor. ___ ___ ___
Cue Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM
SUMMARY
Operators Name: Emp. ID#: ____________
Job Title: RO SRO SRO Cert JPM Title: Containment - Vent Containment with APCV - (A)
JPM Number: S-N-e Revision Number: 00 Task Number and Title: 295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit.
K/A Number and Importance: 223001.A4.07 4.2*/4.1 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DEOP 0500-04, Rev 16 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. You are the Aux 2 NSO.
- 2. A break inside the Unit 2 Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
- 4. Torus water level is 20 feet.
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
- 9. The N2 System is in its normal lineup.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 6700-18 Rev: 13 Procedure Rev:
Procedure Rev:
________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 02 Updated to comply with rev 4 of DOP 6500-10 Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 3. This completes the setup for this JPM.
DOCUMENT PREPARATION Mark up copy of DOP 6700-18, Bus 28 Outage.
SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. MCC 28-7/29-7 is powered from Bus 28.
- 2. Power has been restored to Bus 29.
- 3. You are the Unit 2 Assistant NSO.
- 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
INITIATING CUE
- 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
- 2. Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time:
Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 1. Declare BOTH LPCI subsystems Informs the Unit Supervisor BOTH inoperable LPCI subsystems must be declared inoperable.
Reference TS 3.5.2
___ ___ ___
Cue Respond: Division 1 and 2 LPCI subsystems are inoperable.
- 2. Open the feed breaker from Bus Opens the feed breaker AND 28, MCC 29-7/28-7 FEED FROM maintains the switch in TRIP.
BUS 28, by placing control switch in TRIP AND maintain switch in TRIP.
___ ___ ___
- 3. Close feed breaker from Bus 29, Closes the feed breaker MCC 29-7/28-7 FEED FROM BUS 29.
___ ___ ___
- 4. Release feed breaker from Bus 28, Releases feed breaker control MCC 29-7/28-7 FEED FROM BUS switch 28, control switch.
___ ___ ___
- 5. Notify the Unit 2 Supervisor that Unit 2 Supervisor notified.
normal feed has been restored to MCC 28-7/29-7.
___ ___ ___
Cue Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM
SUMMARY
Operators Name: Emp. ID#: ____________
Job Title: RO SRO SRO Cert JPM Title: Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Task Number and Title: 262L026, Restore Normal Feed to 28-7/29-7 from Bus 29 K/A Number and Importance: 262001.A4.01 3.4 / 3.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 6700-18, Rev 13 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. MCC 28-7/29-7 is powered from Bus 28.
- 2. Power has been restored to Bus 29.
- 3. You are the Unit 2 Assistant NSO.
- 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
INITIATING CUE
- 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
- 2. Notify the Unit 2 Supervisor when the task is complete SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP)
S-N-g Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0700-01 Rev: 15 Procedure DOA 0700-02 Rev: 13 Procedure Rev:
________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 00 New JPM for the 2010 LORT exam.
Revision 01 Updated for the 2012 LORT exam.
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Position SRM detectors for a 104 to 105 count rate. (Should not be in the fully withdrawn position)
- 3. Run CAEP file: S-N-f.cae
- 4. If CAEP file cannot be ran, insert the following Expert Commands:
- a. Malfunctions required:
- 1) imf nis22det (Inserts SRM 22 stuck malfunction)
- b. Triggers required:
- 1) trgset 1 nilsdet(2) .and. nil104do
- 2) trgset 2 et_array(1) .and. nilsdet(2) .and. nil101di
- 3) trg 2 dmf nis22det DOCUMENT PREPARATION Clean copies of the following procedures:
- DOA 0700-02, SRM or IRM Detector Stuck SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. Unit 2 startup is in progress.
- 2. You are an extra NSO assisting the startup.
- 3. Primary Containment has been established.
INITIATING CUE
- 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
- 2. Your Pre-Job Brief has been completed.
- 3. Notify the Unit supervisor upon completion of the task.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide the Examinee a copy of DOP 0700-01.
- 1. WHEN IRM down scale alarms IRM down scales are cleared by have cleared, THEN start SRM initial conditions.
withdrawal and maintain SRM Monitors count rate when count rate 290 cps to 8.85x104 withdrawing SRMs.
cps. ___ ___ ___
- 2. Depress the applicable Depresses each SRMs SELECT SELECT switch (LIT when switch.
selected).
Verifies SELECT light lit. ___ ___ ___
- 3. Depress and hold the DRIVE Depress and hold the DRIVE OUT OUT switch to withdraw SRMs switch to withdraw SRMs to maintain SRM count rate of 290 cps to 8.85x104 cps. ___ ___ ___
BEGIN ALTERNATE PATH
changing as expected.
- Count rate drops.
- Period indicates negative.
- OUT light is lit when detector reaches full out position.
For SRM 22 indications remain unchanged. ___ ___ ___
- 5. Report SRM 22 detector did not Reports SRM 22 detector did not move and/or appears to be stuck. move and/or appears to be stuck. ___ ___ ___
Note The Examinee should allow SRMs 21, 23, 24 to fully withdraw.
Cue Acknowledge report. Announce entering DOA 0700-02, SRM or IRM Detector Stuck. Direct the Examinee to perform DOA 0700-02. When the Examinee locates DOA 0700-02, give him the provided copy of DOA 0700-02.
Note The Examinee may have already deselected SRMs earlier.
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-g Rev 02
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 6. Depress SRM SELECT Depresses SRM SELECT switches to establish ONLY switches to establish ONLY SRM 22 selected SRM 22 SELECT light lit. ___ ___ ___
Note An automatic Trigger is setup to delete the SRM stuck detector malfunction when it is inserted.
detector in both directions to free it.
___ ___ ___
moving.
- Count rate rises.
- Period indicates positive.
___ ___ ___
___ ___ ___
- 10. Use DRIVE IN AND DRIVE OUT Depresses and holds DRIVE OUT switches to move stuck SRM switch to move SRM 22.
detector in both directions to free Drives SRM 22 fully out.
it.
___ ___ ___
changing as expected.
- Count rate drops.
- Period indicates negative.
- OUT light is lit when detector reaches full out position. ___ ___ ___
- 12. Report SRM 22 detector is fully Reports SRM 22 detector is fully withdrawn. withdrawn. ___ ___ ___
Cue Acknowledge report.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-g Rev 02
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM
SUMMARY
Operators Name: Emp. ID#: ____________
Job Title: RO SRO SRO Cert JPM Title: Withdraw SRM Detectors with a Stuck SRM Detector (AP)
JPM Number: S-N-g Revision Number: 02 Task Number and Title: 215L022 Respond to an SRM or IRM stuck detector.
K/A Number and Importance: 215004A4.04 3.2 / 3.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 18 minutes Actual Time Used: minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-g Rev 02
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. Unit 2 startup is in progress.
- 2. You are an extra NSO assisting the startup.
- 3. Primary Containment has been established.
INITIATING CUE
- 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
- 2. Your Pre-Job Brief has been completed.
- 3. Notify the Unit supervisor upon completion of the task.
SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02
TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ-JA-150-02 Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 7500-01 Rev: 36 Procedure DAN 902(3)-3 F-14 Rev: 20 Procedure Rev:
________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 Cert Exam.
Revision 03 Modified for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation).
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Place the 2/3A SBGT train control switch in STBY.
- 4. Verify the following fans operating:
- 2A RX BLDG VENT FAN
- 2B RX BLDG VENT FAN
- 2A RX BLDG EXH FAN
- 2B RX BLDG EXH FAN
- 3A RX BLDG VENT FAN
- 3B RX BLDG VENT FAN
- 3A RX BLDG EXH FAN
- 3B RX BLDG EXH FAN
- 5. Run CAEP file S-N-h.cae
- 6. If the CAEP file cannot be ran, insert the following Expert Commands:
- a. ior vrdtp3c trip (Prevents autostart of 2C RB vent fan)
- b. ior vrdtp4c trip (Prevents autostart of 2C RB exhaust fan)
- c. irf cirbvall lifted (Prevents Secondary Containment Isolation on U2)
- d. trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START)
- e. imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal)
- f. imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan).
- g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan).
- h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan).
- i. imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan).
DOCUMENT PREPARATION Clean copy of DOP 7500-01.
Clean copy of DAN 902(3)-3 F-14 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
- 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
- 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
INITIATING CUE
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ-JA-150-02 JPM Start Time:
Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide the Examinee a copy of DOP 7500-01.
- 1. Place the 2/3A SBGT SELECT Places the 2/3A SBGT SELECT switch to A PRI position. switch to the A PRI position. ___ ___ ___
- 2. Place the 2/3B SBGT SELECT Places the 2/3B SBGT SELECT switch to B STBY position. switch to the B STBY position. ___ ___ ___
- 3. Verify the 2/3A and B AIR Both GREEN lights illuminated.
HEATERs are OFF. ___ ___ ___
- 4. Verify the 2/3A and B Fans are Both GREEN lights illuminated.
OFF. ___ ___ ___
- 5. Verify annunciators 923-5 A-6 and Both annunciator tiles 923-5 B-6 are NOT in alarm. extinguished. ___ ___ ___
- 6. Verify 2/3B SBGT SELECT Verifies 2/3 B SBGT Select switch SWITCH in B STBY position. in B STBY. ___ ___ ___
Note When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds. The resulting Secondary Containment Isolation fails and the operator should complete the isolation.
- 8. Verifies the 2/3A SBGT train Begins verifying the 2/3A SBGT initiated properly. train operating properly. ___ ___ ___
- 9. Records the Start Time on Records the Start Time on Operator Aid. Operator Aid ___ ___ ___
BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur, and perform the Limitations and Actions.
Cue If examinee does not react to the alarm on the 902-3 panel, make the following update:
Attention for an Update. RX BLDG VENT CH A RAD HI-HI is in. End of Update.
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number Note If the examinee starts to head to the 902-3 panel to respond to the 902-3 F-14 annunciator stop them and hand them the provided copy of the DAN.
- 10. Verifies trip of 3A RX BLDG VENT Determines 3A RX BLDG VENT FAN. FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG VENT FAN to the Trip position.
Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated).
___ ___ ___
- 11. Verifies trip of 3B RX BLDG VENT Determines 3B RX BLDG VENT FAN. FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG VENT FAN to the Trip position.
Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated). ___ ___ ___
- 12. Verifies trip of 3C RX BLDG VENT GREEN light illuminated.
FAN. ___ ___ ___
- 13. Verifies trip of 3A RX BLDG EXH Determines 3A RX EXH VENT FAN. FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG EXH FAN to the Trip position.
Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated). ___ ___ ___
- 14. Verifies trip of 3B RX BLDG EXH Determines 3B RX EXH VENT FAN. FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG EXH FAN to the Trip position.
Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated). ___ ___ ___
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 15. Verifies trip of 3C RX BLDG EXH GREEN light illuminated.
FAN. ___ ___ ___
- 16. Verifies trip of 2A RX BLDG VENT GREEN and AMBER lights FAN. illuminated. ___ ___ ___
- 17. Verifies trip of 2B RX BLDG VENT GREEN and AMBER lights FAN. illuminated. ___ ___ ___
- 18. Verifies trip of 2C RX BLDG VENT GREEN light illuminated.
FAN. ___ ___ ___
- 19. Verifies trip of 2A RX BLDG EXH GREEN and AMBER lights FAN. illuminated. ___ ___ ___
- 20. Verifies trip of 2B RX BLDG EXH GREEN and AMBER lights FAN. illuminated. ___ ___ ___
- 21. Verifies trip of 2C RX BLDG EXH GREEN light illuminated.
FAN. ___ ___ ___
- 22. Verifies 3A INLET DAMPER AO 3- Determines 3A & 3B INLET 5741A closed. DAMPERs AO 3-5741A & B are Verifies 3B INLET DAMPER AO 3- NOT closed (GREEN lights 5741B closed. illuminated).
Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3-5741A & 3-5741B to the CLOSE position.
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated).
___ ___ ___
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 23. Verifies 3A OUTLET DAMPER AO Determines 3A & 2B OUTLET 3-5742A closed. DAMPERs AO 3-5742A & B are Verifies 3B OUTLET DAMPER AO NOT closed (GREEN lights 3-5742B closed. illuminated).
Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position.
Determines 3A & 3B OUTLET DAMPERs AO 3-5742A & B did not close (GREEN lights illuminated).
___ ___ ___
- 24. Verifies 2A INLET DAMPER AO 2- Determines 3A & 3B INLET 5741A closed. DAMPERs AO 2-5741A & B are Verifies 2B INLET DAMPER AO 2- NOT closed (GREEN lights 5741B closed. illuminated).
Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2-5741A & 2-5741B to the CLOSE position.
Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated).
___ ___ ___
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number
- 25. Verifies 2A OUTLET DAMPER AO Determines 2A & 2B OUTLET 2-5742A closed. DAMPERs AO 2-5742A & B are Verifies 2B OUTLET DAMPER AO NOT closed (GREEN lights 2-5742B closed. illuminated).
Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position.
Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not close (GREEN lights illuminated).
___ ___ ___
- 26. Verifies trip of 2A D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___
- 27. Verifies trip of 2B D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___
- 28. Verifies trip of 3A D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___
- 29. Verifies trip of 3B D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___
- 30. Notifies US of Secondary Examinee notifies the Unit Containment Isolation Failure and Supervisor.
successful manual completion of the isolation.
___ ___ ___
Cue Acknowledge report.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ-JA-150-02 JPM
SUMMARY
Operators Name: Emp. ID#: ____________
Job Title: RO SRO SRO Cert JPM Title: SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP)
JPM Number: S-N-h Revision Number: 03 Task Number and Title: 261L002, Start the SBGT system.
K/A Number and Importance: 261000.A4.09 2.7 / 2.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 7500-01, Rev 36 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ-JA-150-02 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
- 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
- 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
INITIATING CUE
- 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03
Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 00 Date: 02/16 Developed By:
Exam Author Date Approved By:
Facility Representative Date Page 1 of 10
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 4700-03 Rev: 22 Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10
Revision Record (Summary)
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.
Page 3 of 10
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.
DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation to examinee.
Page 4 of 10
INITIAL CONDITIONS
- 1. Unit 3 is shutdown for a refuel outage.
- 2. 2A IAC is unavailable due to an oil leak.
- 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
- 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
- 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
- 6. Unit 2 SAC is running.
- 7. Main Control Room is monitoring IA parameters.
INITIATING CUE
- 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY .
- 2. All applicable prerequisites of DOP 4700-03 have been met.
- 3. Your Pre Job Brief has been completed.
- 4. Notify the Unit Supervisor when you are complete with the task.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Page 5 of 10
The timeclock starts when the candidate acknowledges the initiating cue.
Page 6 of 10
JPM Start Time: _________
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Provide examinee a current copy of DOP 4700-03.
- 1. Identifies Step G.9 as the Proceeds to Step G.9.
correct step in DOP 4700-03.
_____ _____ _____
- 2. Verify closed 3-4799-501A, Verifies 3-4799-501A, 3C IAC 3C IAC DISCH TO U-3 DISCH TO U-3 INST AIR INST AIR HEADER ISOL HEADER ISOL VLV stem is in.
VLV.
(Valve is located above 3B IAC) _____ _____ _____
CUE The component is in the position you described.
- 3. Close 2/3-4799-424, U2/U3 Rotates 2/3-4799-424, U2/U3 X-TIE SV. X-TIE SV clockwise until stem is in.
(Valve is located North of 3A IAC) _____ _____ _____
CUE The component is in the position you described.
- 4. Open 2/3-4799-425, 3C IAC Rotates 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV. TO U2 AIR SYS X-TIE SV counter clockwise until stem is out.
_____ _____ _____
(Valve is located North of 3A IAC)
CUE The component is in the position you described.
Page 7 of 10
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 5. Open 2-47350-500, U2 Rotates 47350-500, U2 INST INST AIR SYS XTIE FROM AIR SYS XTIE FROM THE U3 THE U3 INST AIR SYS. INST AIR SYS counter clockwise until stem is out.
_____ _____ _____
(Valve is located North of Cardox tank)
CUE The component is in the position you described.
- 6. Open 2-47350-329, U2 Rotates 2-47350-329, U2 INST AIR HDR ISOL VLV. INST AIR HDR ISOL VLV counter clockwise until stem is out.
_____ _____ _____
(Valve is located North of 2B IAC)
CUE The component is in the position you described.
- 7. Report completion of task to Reports completion of task to Unit Supervisor. Unit Supervisor.
_____ _____ _____
END JPM Stop Time:_________
Page 8 of 10
Operators Name:
Job Title: q RO q SRO JPM Title: Align IACs to Unit 2 Instrument Air header Revision Number: 00 JPM Number: S-N-i Task Number and Title: 278N013 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02 3.3 / 3.1 Suggested Testing Environme nt: In-Plant Suggested Testing Environment: q Simulator Plant q Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete:_ 20__minutes Actual Time Used: _______ minutes
References:
DOP 4700-03, Rev. 22 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 9 of 10
INITIAL CONDITIONS
- 1. Unit 3 is shutdown for a refuel outage.
- 2. 2A IAC is unavailable due to an oil leak.
- 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
- 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
- 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
- 6. Unit 2 SAC is running.
- 7. Main Control Room is monitoring IA parameters.
INITIATING CUE
- 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY .
- 2. All applicable prerequisites of DOP 4700-03 have been met.
- 3. Your Pre Job Brief has been completed.
- 4. Notify the Unit Supervisor when you are complete with the task.
Page 10 of 10
Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number: S-N-j Revision Number: 10 Date: 02/16 Developed By:
Exam Author Date Approved By:
Facility Representative Date
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 500-02 Rev: 16 Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
Revision Record (Summary)
Rev 08: Updated for the 2007 LORT exam Rev 09: Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam.
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.
DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations to provide to examinee.
INITIAL CONDITIONS
- 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
- 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
- 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
- 5. Drywell temperature and pressure are rising.
INITIATING CUE
- 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
- 2. Your Pre Job Brief has been completed.
- 3. Notify the Unit Supervisor when the in-plant actions are complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
JPM Start Time: _________
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Provide examinee a current copy of DEOP 500-02.
1 Proceed to Step G.3 of Locates Step G.3 procedure.
_____ _____ _____
NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.
NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are:
Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.
2 Obtain appropriate OBTAINS appropriate Equipment Box from the EQUIPMENT BOX from the
_____ _____ _____
Control Room DEOP Control Room DEOP Equipment Equipment Storage Storage Cabinet.
Cabinet.
CUE DEOP Equipment Box you have identified is in your hand.
NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and Locates Panel 903-32.
panel 903-32.
_____ _____ _____
NOTE Simulated JPM - Examinee must explain the task.
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 4 Lift AND tape lead on On 903-32 panel terminal block 903-32 panel terminal AA terminal point 6 OR terminal block AA terminal point 6 point 7 OR terminal point 7.
- Puts on insulated gloves.
- Loosens screw with standard screwdriver.
- Uses split blade screwdriver _____ _____ _____
to grasp screw and remove it.
- Tapes the loose wire with electricians tape.
CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.
- 5 Lift AND tape lead on On 903-33 panel terminal block 903-33 panel terminal AA terminal point 6 OR terminal block AA terminal point 6 point 7 OR terminal point 7.
- Puts on insulated gloves.
- Loosens screw with standard screwdriver.
- Uses split blade screwdriver _____ _____ _____
to grasp screw and remove it.
- Tapes the loose wire with electricians tape.
CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.
6 Notify Unit Supervisor Notifies Unit Supervisor upon upon completion of task. completion of task.
_____ _____ _____
CUE Acknowledge report of task completion.
END JPM Stop Time:_________
Operators Name: ___________________________________
Job Title: q RO q SRO JPM Title: Bypass the Trip of Drywell Coolers Revision Number: 10 JPM Number: S-N-j Task Number and Title: 295L074, Bypass the Trip of Drywell Coolers.
K/A Number and Importance: 295028.A1.03 3.9 / 3.9 Suggested Testing Environment: q Simulator Plant q Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: _______ minutes
References:
DEOP 500-02, Rev 16 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
INITIAL CONDITIONS
- 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
- 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
- 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
- 5. Drywell temperature and pressure are rising.
INITIATING CUE
- 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
- 2. Your Pre-Job Brief has been completed.
- 3. Notify the Unit Supervisor when the in-plant actions are complete Page 9 of 9
Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number: S-N-k Revision Number: 15 Date: 02/16 Developed By:
Exam Author Date Approved By:
Facility Representative Date Page 1 of 11
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0300-03 Rev: 25 Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11
Revision Record (Summary)
Revision 14 Updated for the 2007 LORT exam.
Revision 15 Revised for ILT 15-1 (2016-301) NRC Exam.
Page 3 of 11
SIMULATOR SETUP INSTRUCTIONS:
N/A: In-Plant JPM.
DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee.
Page 4 of 11
INITIAL CONDITIONS
- 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
- 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
- 3. The Unit Supervisor has reviewed the TRM and has taken required actions.
INITIATING CUE
- 1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
- 2. Prerequisites have been met.
- 3. Your Pre-Job Brief is complete.
- 4. Notify the Unit Supervisor upon completion of in-plant actions.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
Page 5 of 11
JPM Start Time: _________
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 1. Proceed to Unit 2 CRD CRD FCVs located and Flow Control Valves communications established (FCVs) and establish with control room.
communications with the _______ ______ _____
control room.
NOTE Step G.2 is N/A.
_______ ______ _____
AIR PRV ISOL VLV.
CUE Valve 2-0301-30 stem/ handwheel is backed out.
- 3. Verify OPEN 2-0301-144B, Verifies 2-0301-144B valve U2 CRD SYS FCV 2-0302- stem/handwheel backed out.
_______ ______ _____
6B AIR ISOL VLV.
CUE Valve 2-0301-144B stem/handwheel is backed out.
_______ ______ _____
INLET VLV.
CUE Valve 2-0301-40B stem/handwheel is backed out.
- 5. Cycle the 2B FCV full open Adjusts PRV 2-0301-34 locally and full closed by adjusting to cycle 2B FCV.
PRV 2-0301-34 locally.
Verifies cycling by observing stem position and/or light indication on the CRD FCV _______ ______ _____
electrical transfer station.
CUE 2B FCV cycles full open and then full closed.
Page 6 of 11
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS NOTE The Unit Supervisor has addressed the TRM per the Initial Conditions (addresses note preceding G.5 of DOP).
- 6. Verify PRV 2-0301-34 Verifies PRV 2-0301-34 valve closed. stem backed out and turning
_______ ______ _____
freely.
CUE PRV 2-0301-34 valve stem is backed out and turning freely.
- 7. Verify Pressure gauge PI Verifies pressure gauge PI 2-2-0302-60 indicates 0 psig. 0302-60 reading 0 psig.
_______ ______ _____
CUE After examinee locates and observes the indicator, then cue:
PI 2-0302-60 is reading 0 psig.
- 8. Verify via U2 NSO that Calls U2 NSO to verify CRD CRD FCV Controller in FCV Controller configuration MANUAL and demand is set to minimum. _______ ______ _____
CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum.
- 9. At CRD Electrical Transfer, At CRD Electrical Transfer place the transfer switch Station, places the transfer TS160 to the "Valve B" switch to the "Valve B" position position to place FCV 2- to place FCV 2-0302-6B in 0302-6B in service. service _______ ______ _____
CUE The transfer switch is in the "Valve B" position.
- 10. Select the 2B E/P Selects the 2B E/P converter converter by placing U2 by placing 2-0301-29 to B.
CRD SYS FCV A/B SELECTOR VLV 2-0301- _______ ______ _____
29 to B.
Page 7 of 11
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS CUE The 2-0301-29 Unit 2 CRD MANUAL E/P SELECTOR VALVE is in the B position.
Examiner Note:
On valves 2-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve.
- 11. Place U2 CRD SYS FCV Places 2-0302-6B selector 2-0302-6B MAN/AUTO switch to the automatic SELECTOR VLV, 2-0301- position.
38, switch to the automatic _______ ______ _____
position.
CUE 2-0302-6B selector switch is in automatic.
MAN/AUTO SELECTOR VLV, 2-0301-37, to the _______ ______ _____
manual position.
CUE The 2-0302-6A selector switch is in manual.
- 13. Open 2-0301-41B, U2 Opens 2-0301-41B valve.
CRD SYS A/B FCV Full CCW, stem/handwheel _______ ______ _____
OUTLET VLV.
backed out.
CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out.
- 14. Notify Unit NSO that the Notifies Unit NSO of 2B CRD 2B CRD FCV can now be FCV status and directs Unit controlled from the 902-5 NSO to adjust system flow rate Panel AND that system to maintain stable flow.
flow should be adjusted to _______ ______ _____
maintain stable flow rate.
CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate.
Page 8 of 11
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
_______ ______ _____
OUTLET VLV. handwheel in).
CUE The 2-0301-41A valve stem/handwheel is full CW or in.
- 16. Notifies Unit Supervisor of Unit Supervisor notified of completion of in-plant completion of in-plant actions.
actions per DOP and that the remaining steps are _______ ______ _____
from the 902-5 panel.
CUE Acknowledge report of task completion.
END JPM Stop Time:_________
Page 9 of 11
Operators Name: ___________________________________
Job Title: rRO rSRO JPM Title: Swap CRD Flow Control Valves Revision Number: 15 JPM Number: S-N-k Task Number and Title: 201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001.A4.03 2.9/2.8 Suggested Testing Environme nt: In-Plant Suggested Testing Environment: q Simulator Plant q Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: _ 23__ minutes Actual Time Used: _______ minutes
References:
DOP 0300-03, Rev. 25 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 10 of 11
INITIAL CONDITIONS
- 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
- 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
- 4. The Unit Supervisor has reviewed the TRM and has taken required actions.
INITIATING CUE
- 1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
- 2. Prerequisites have been met.
- 3. Your Pre-Job Brief is complete.
- 4. Notify the Unit Supervisor upon completion of in-plant actions.
Page 11 of 11