{{#Wiki_filter:Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLAN CE  JPM Number:
{{#Wiki_filter:Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE JPM Number: A-N-1-R Revision Number: 01 Date: 02/16 Developed By:
A-N-1-R Revision Number: 0 1  Date: 02/16         Developed By:
Instructor                   Date Approved By:
Instructor Date     Approved By:
Facility Representative       Date
Facility Representative Date Job Performance Measure (JPM)
 
A-N-1-R  Page 2 of 7  Revision Record (Summary)
Revision 0 0 New JPM developed for 2009 NRC Exam
. Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
Revision Record (Summary)
: 1. This is a tabletop JPM utilizing simulator procedures
Revision 00 New JPM developed for 2009 NRC Exam.
. 2. No Simulator setup needed.
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.
DOCUMENT PREPARATION 1. Markup a copy of DOS 1100-02.  
A-N-1-R                                                 Page 2 of 7
 
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
: 1. Markup a copy of DOS 1100-02.
A-N-1-R                                                    Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 4 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. DOS 1100-02 was performed last shift
: 2. DOS 1100-02 was performed last shift.
. 3. The EO reported all surveillance requirements were within specifications
: 3. The EO reported all surveillance requirements were within specifications.
. INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-R                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the provided copy of DOS 1100-02.
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
* 1. Student should identify step I.4 should NOT have been initialed.
Provide the examinee with the provided copy of DOS 1100-02.
Identifies that step should NOT have been initialed.
* 1. Student should identify step   Identifies that step should I.4 should NOT have been       NOT have been initialed.
_____         _____         _____
initialed.                                                    _____   _____     _____
* 2. Student should identify step I.9.g should NOT have been N/A'd. Identifies that step should NOT have been N/A'd. _____         _____         _
* 2. Student should identify step   Identifies that step should I.9.g should NOT have been      NOT have been N/Ad.
____  3. Notify Unit Supervisor of discrepancies
N/Ad.                                                         _____   _____      _____
. Notifies Unit Supervisor, to verify/correct issues
: 3. Notify Unit Supervisor of       Notifies Unit Supervisor, to discrepancies.                  verify/correct issues.
. _____         _____         _____
_____   _____     _____
CUE: Acknowledge report of task completion.
CUE:
END   JPM Stop Time
Acknowledge report of task completion.
:_________
END JPM Stop Time:_________
A-N-1-R                                                                    Page 5 of 7
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 6 of 7  Operator's Name:
Operators Name:
Job Title:     RO
Job Title:   RO JPM Title: VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE Revision Number: 01 JPM Number: A-N-1-R Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.
 
K/A Number and Importance: Generic.2.1.18         3.6 / 3.8 Suggested Testing Environme nt: Simulator Actual Testing Environment:               Simulator     Control Room           In-Plant Testing Method:         Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete:           20             Actual Time Used:               minutes
JPM Title: VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE Revision Number: 0 1 JPM Number: A-N-1-R Task Number and Title:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedure
: s.
K/A Number and Importance: Generic.2.
1.18     3.6 / 3.8 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
20       Actual Time Used:
minutes


==References:==
==References:==
 
DOS 1100-02, rev 17 EVALUATION  
DOS 1100-02 , rev 17 EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name: ____________________________
Satisfactory Unsatisfactory Comments:                 Evaluator's Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________
A-N-1-R                                                                        Page 6 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 7 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. DOS 1100-02 was performed last shift
: 2. DOS 1100-02 was performed last shift.
. 3. The EO reported all surveillance requirements were within specifications
: 3. The EO reported all surveillance requirements were within specifications.
. INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
A-N-1-R                                                              Page 7 of 7
 
Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER JPM Number: A-N-2-R Revision Number: 00 Date: 02/16 Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEAR A NCE ORDER  JPM Number:
A-N-2-R  Revision Number: 0 0  Date: 02/16        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-2-R  Page 2 of 10  Revision Record (Summary)
Revision 0 0 New JPM developed for ILT 15-1 (2016-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS
Revision Record (Summary)
: 1. This is a tabletop JPM utilizing simulator procedures
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.
. 2. Pull up prints M
A-N-2-R                                                         Page 2 of 10
-15 Sheet 1, M
 
-16, and M-3658 Sheet 1 on Large TV in simulator.
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. Pull up prints M-15 Sheet 1, M-16, and M-3658 Sheet 1 on Large TV in simulator.
: 3. Turn TV screen off.
: 3. Turn TV screen off.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Copy of M-15 Sheet 1
: 1. Copy of M-15 Sheet 1.
. 2. Copy of M-16. 3. Copy of OP-AA-109-101. 4. Copy of OP
: 2. Copy of M-16.
-DR-109-1001.
: 3. Copy of OP-AA-109-101.
: 4. Copy of OP-DR-109-1001.
A-N-2-R                                                          Page 3 of 10
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 4 of 10  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an Extra NSO.
: 1. You are an Extra NSO.
: 2. Unit 2 is at 500 MWe.
: 2. Unit 2 is at 500 MWe.
Line 124: Line 123:
: 5. Condensate/Condensate Booster Pump seal isolation is not required.
: 5. Condensate/Condensate Booster Pump seal isolation is not required.
: 6. Hydrogen Addition injection isolation is not required.
: 6. Hydrogen Addition injection isolation is not required.
: 7. Passport is not available, but is expected to return this shift
: 7. Passport is not available, but is expected to return this shift.
. 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified
: 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
. 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
: 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
: 10. Other NSOs are tasked with determining electrical and air isolations.
: 10. Other NSOs are tasked with determining electrical and air isolations.
INITIATING CUE 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
INITIATING CUE
: 2. Record recommended Isolation Points and Required Positions on the sheet provided. 3. Inform the Unit Supervisor when the task is complete.
: 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
: 2. Record recommended Isolation Points and Required Positions on the sheet provided.
: 3. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
A-N-2-R                                                              Page 4 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 5 of 10  Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-R                                                                      Page 5 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 6 of 10  JPM Start Time: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the provided copy of M-15 Sheet 1 and M-16. If the examinee requests Clearance and Tagging procedures, they may be provided.
JPM Start Time: _________
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS               SAT NOTE:
Provide the examinee with the provided copy of M-15 Sheet 1 and M-16.
If the examinee requests Clearance and Tagging procedures, they may be provided.
The following steps may be performed in any order
The following steps may be performed in any order
: 1. Candidate identifies 2C Condensate/Condensate Booster pump on M
: 1. Candidate identifies 2C         Candidate correctly locates Condensate/Condensate           and identifies 2C Booster pump on M-15 Sheet     Condensate/Condensate         _____    _____        _____
-15 Sheet 1. Candidate correctly locates and identifies 2C Condensate/Condensate Booster pump on M
: 1.                              Booster pump on M-15 Sheet 1.
-15 Sheet 1. _____        _____        _____
* 2. Candidate determines           Candidate identifies the isolation points and required   following valves are positions for 2C condensate     necessary isolation points   _____    _____        _____
* 2. Candidate determines isolation points and required positions for 2C condensate pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump:
pump                            for 2C Condensate pump:
(Located on M
(Located on M-15 Sht. 1)
-15 Sht. 1)
* 2-3301-C-500 (Closed)
* 2-3301-C-500 (Closed)
* 2-3302-C-500 (Closed) _____        _____
* 2-3302-C-500 (Closed)
_____
* 3. Candidate determines           Candidate identifies the isolation points and required   following valves are positions for 2C condensate     necessary isolation points   _____    _____        _____
* 3. Candidate determines isolation points and required positions for 2C condensate booster pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump:
booster pump                    for 2C Condensate pump:
* 2-3305-C-500 (Closed) (Located on M
* 2-3305-C-500 (Closed)
-15 Sht. 1)
(Located on M-15 Sht. 1)
* 2-34 01-C-500 (Closed) (Located on M
* 2-3401-C-500 (Closed)
-16)   _____        _____        _____
(Located on M-16)
A-N-2-R                                                                  Page 6 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 7 of 10  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
UNSAT    Comment PERFORMANCE CHECKLIST                   STANDARDS                 SAT
* 4. Completes worksheet with EPN and required hang position. Notifies Unit Supervisor, to verify/correct issues.
* 4. Completes worksheet with     Notifies Unit Supervisor, to EPN and required hang        verify/correct issues.
_____         _____         _____
position.                                                  _____   _____     _____
CUE: Acknowledge report of task completion. END   JPM Stop Time
CUE:
:_________
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-2-R                                                                Page 7 of 10
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 8 of 10  Operator's Name:
Operators Name:
Job Title:     RO  
Job Title:   RO JPM Title: DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER Revision Number: 00 JPM Number: A-N-2-R Task Number and Title: 299L012 Determine points of isolation in order to remove a piece of equipment from service.
 
K/A Number and Importance: Generic.2.2.41         3.5/3.9 Suggested Testing Environme nt: Simulator Actual Testing Environment:               Simulator     Control Room          In-Plant Testing Method:         Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete:           15             Actual Time Used:               minutes
JPM Title: DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER Revision Number: 0 0 JPM Number: A-N-2-R Task Number and Title:
299L012 Determine points of isolation in order to remove a piece of equipment from service.
 
K/A Number and Importance: Generic.2.2.41     3.5/3.9
 
Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Roo m  In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
15       Actual Time Used:
minutes


==References:==
==References:==
 
OP-AA-109-101 Rev. 10, OP-DR-109-101-1001 Rev. 10, M-15 Sheet 1 Rev. M, M-16 Rev. AP EVALUATION  
OP-AA-109-101 Rev. 10 , OP-DR-109-101-1001 Rev. 10, M-15 Sheet 1 Rev. M, M
-16 Rev. AP EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name: ____________________________
Satisfactory Unsatisfactory
 
Comments:                 Evaluator's Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________
A-N-2-R                                                                      Page 8 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 9 of 10  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an Extra NSO.
: 1. You are an Extra NSO.
: 2. Unit 2 is at 500 MWe.
: 2. Unit 2 is at 500 MWe.
Line 206: Line 199:
: 5. Condensate/Condensate Booster Pump seal isolation is not required.
: 5. Condensate/Condensate Booster Pump seal isolation is not required.
: 6. Hydrogen Addition injection isolation is not required.
: 6. Hydrogen Addition injection isolation is not required.
: 7. Passport is not available, but is expected to return this shift. 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified
: 7. Passport is not available, but is expected to return this shift.
. 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
: 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
: 10. Other NSOs are tasked with determining electrical and air isolations
: 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
. INITIATING CUE
: 10. Other NSOs are tasked with determining electrical and air isolations.
: 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header
INITIATING CUE
. 2. Record recommended Isolation Points and Required Positions on the sheet provided. 3. Inform the Unit Supervisor when the task is complete.
: 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
: 2. Record recommended Isolation Points and Required Positions on the sheet provided.
: 3. Inform the Unit Supervisor when the task is complete.
A-N-2-R                                                              Page 9 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R Page 10 of 10   EPN Hang Position
EPN                                  Hang Position A-N-2-R                                   Page 10 of 10
 
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-3-R Revision Number: 02 Date: 02/16 Developed By:
Instructor                    Date Approved By:
Facility Representative        Date


Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number:
Job Performance Measure (JPM)
A-N-3-R  Revision Number: 0 2  Date: 0 2/1 6        Developed By:
Revision Record (Summary)
Instructor Date    Approved By:
Revision 00 New JPM.
Facility Representative Date Job Performance Measure (JPM)
Revision 01 Revised for 2010 NRC exam.
A-N-3-R  Page 2 of 7  Revision Record (Summary) Revision 0 0 New JPM. Revision 0 1 Revised for 2010 NRC exam
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam.
. Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam.
A-N-3-R                                                  Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 3 of 7  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
Line 230: Line 230:
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 1500-08.
: 1. Provide a marked up copy of DOS 1500-08.
A-N-3-R                                                            Page 3 of 7
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 4 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO. 2. The Unit 2 NSO started DOS 1500
: 1. You are an extra NSO.
-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
: 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI)
: 3. Only the "A" CCSW Heat Exchanger is going to be placed in service.
HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
: 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
INITIATING CUE
: 1. Complete the performance of DOS 1500-08. 2. Inform the Unit Supervisor when the task is complete.
: 1. Complete the performance of DOS 1500-08.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-R                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the provided copy of DOS 1500-08. The following steps can be performed in any order.
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT NOTE:
Provide the examinee with the provided copy of DOS 1500-08.
The following steps can be performed in any order.
If examinee states to stop, due to errors, inform him/her to continue calculations.
If examinee states to stop, due to errors, inform him/her to continue calculations.
* 1. Examinee calculates Dilution flow (1,017,000 gpm).
* 1. Examinee calculates Dilution     See attached key.
See attached key.
flow (1,017,000 gpm).
_____         _____         _____
_____       _____       _____
: 2. Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.
: 2. Examinee enters dilution flow   See attached key.
See attached key.
(from above) to calculate CCSW Activity Limit.                                           _____       _____       _____
_____         _____         _____
* 3. Examinee calculates CCSW         See attached key.
* 3. Examinee calculates CCSW Activity Limit (2.91 x 10
Activity Limit (2.91 x 10-5).
-5). See attached key.
_____       _____       _____
_____         _____         _____
* 4. Examinee verifies CCSW           Examinee determines Heat Exchanger A sample         CCSW Heat Exchanger A activity is less than or equal   sample activity is greater    _____      _____      _____
* 4. Examinee verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Examinee determines CCSW Heat Exchanger A sample activity is greater than or equal to the calculated CCSW activity limit _____        _____        _____
to the calculated CCSW           than or equal to the activity limit                  calculated CCSW activity limit
: 5. Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge.
: 5. Recommends to the Unit           Makes recommendation to Supervisor that the calculated   Unit Supervisor.
Makes recommendation to Unit Supervisor. _____         _____         _____
sample limit exceeds the allowable discharge.                                           _____       _____       _____
: 6. Informs Unit Supervisor task is complete.
: 6. Informs Unit Supervisor task     Examinee notifies the Unit is complete.                    Supervisor.
Examinee notifies the Unit Supervisor.
_____       _____       _____
_____         _____         _____
CUE:
CUE: Acknowledge report of task completion.
Acknowledge report of task completion.
END   JPM Stop Time
END JPM Stop Time:_________
:_________
A-N-3-R                                                                      Page 5 of 7
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 6 of 7  Operator's Name:       Job Title:     RO  
Operators Name:
 
Job Title:   RO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-3-R Task Number and Title: 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 0 2 JPM Number: A-N-3-R Task Number and Title:
K/A Number and Importance: Generic.2.3.11         3.8 / 4.3 Suggested Testing Environment:         Simulator Actual Testing Environment:               Simulator     Control Room           In-Plant Testing Method:         Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete:           15            Actual Time Used:               minutes
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance
. K/A Number and Importance: Generic.2.3.11     3.8 / 4.3 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
1 5        Actual Time Used:
minutes


==References:==
==References:==
 
DOS 1500-08, rev 17 EVALUATION  
DOS 1500-08 , rev 17 EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name: ____________________________
Satisfactory Unsatisfactory
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-3-R                                                                        Page 6 of 7
 
Job Performance Measure (JPM)
INITIAL CONDITIONS
: 1. You are an extra NSO.
: 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
: 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
: 1. Complete the performance of DOS 1500-08.
: 2. Inform the Unit Supervisor when the task is complete.
A-N-3-R                                                            Page 7 of 7


Comments:                 Evaluator's Name: ____________________________
Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 01 Date: 02/16 Developed By:
(Print)  Evaluator's Signature: __________________________
Instructor                  Date Approved By:
_ Date: _________
Facility Representative      Date


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 7 of 7  INITIAL CONDITIONS
Revision Record (Summary)
: 1. You are an extra NSO. 2. The Unit 2 NSO started DOS 1500
Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.
-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.
: 3. Only the "A" CCSW Heat Exchanger is going to be placed in service.
A-N-4-R                                                  Page 2 of 8
INITIATING CUE
: 1. Complete the performance of DOS 1500-08. 2. Inform the Unit Supervisor when the task is complete.


Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE  JPM Number:
A-N-4-R  Revision Number: 0 1  Date: 02/16        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-4-R  Page 2 of 8  Revision Record (Summary)
Revision 0 0 New JPM for ILT 12
-1 (2013-301) NRC Exam
. Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a copy of DOA 0010-10 and DOA 0010
: 1. Provide a copy of DOA 0010-10 and DOA 0010-S1.
-S1.  
A-N-4-R                                                    Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 3. The fire has been classified as a major fire.
: 3. The fire has been classified as a major fire.
: 4. Hazmat and rescue response are not required.
: 4. Hazmat and rescue response are not required.
: 5. The Fire brigade has been alerted and is attempting to combat the fir e unsuccessfully.
: 5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
: 6. A dedicated outside line is not available.
: 6. A dedicated outside line is not available.
INITIATING CUE
INITIATING CUE
: 1. The Unit supervisor has directed you to enter and execute DOA 0010
: 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
-10, FIRE-EXPLOSION through step D.3
: 2. Inform the Unit Supervisor when the task is complete.
. 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-R                                                                        Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of DOA 0010-10. Provide the examinee with the supplied copy of DOA 0010
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                 SAT NOTE:
-S1 when requested.
Provide the examinee with the supplied copy of DOA 0010-10.
* 1. Notify Coal City Fire Protection District. (Refer to DOA 0010-S1, Key Phone Numbers for DOA 0010 Block Procedures.)
Provide the examinee with the supplied copy of DOA 0010-S1 when requested.
From DOA 0010
* 1. Notify Coal City Fire         From DOA 0010-S1 Protection District. (Refer to determines that 815-942-DOA 0010-S1, Key Phone         0336 is the number Numbers for DOA 0010 Block needed to contact the           _____     _____         _____
-S1 determines that 815
Procedures.)                  CCFPD.
-942-0336 is the number needed to contact the CCFPD. _____         _____         _____
* 2. Dial 815-942-0336 and             Dials 815-942-0336 and communicate the details of        communicates the details the fire.                          of the fire:                 _____    _____      _____
* 2. Dial 815-942-0336 and communicate the details of the fire. Dials 815-942-0336 and communicates the details of the fire:
* Location of fire
* Location of fire
* Assistance is required
* Assistance is required CUE:
_____        _____        _____
If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities.
CUE: If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities.
: 3. Notifies TSO via direct line for   Notifies the TSO from a major fire.                        control room phone using the TSO direct line button and provides call back       _____    _____      _____
: 3. Notifies TSO via direct line for major fire.
phone number.
Notifies the TSO from a control room phone using the TSO direct line button and provides call back phone number.
: 4. Notify Security Shift              Notifies the Security Shift Supervisor that outside fire       Supervisor that the department will be                CCFPD will be responding responding AND request             to the Lift Station.
_____        _____        _____
assistance in providing access to affected area if                                       _____    _____      _____
: 4. Notify Security Shift Supervisor that outside fire department will be responding AND request assistance in providing access to affected area if necessary.
necessary.
Notifies the Security Shift Supervisor that the CCFPD will be responding to the Lift Station.
: 5. Informs Unit Supervisor task       Examinee notifies the Unit is complete.                      Supervisor.
_____        _____
_____   _____     _____
_____  5. Informs Unit Supervisor task is complete.
CUE:
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
_____         _____         _____
END A-N-4-R                                                                       Page 5 of 8
CUE: Acknowledge report of task completion.
 
END Job Performance Measure (JPM)
A-N-4-R Page 6 of 8 JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R Page 7 of 8 Operator's Name:
JPM Stop Time:_________
Job Title:    RO   
A-N-4-R                                             Page 6 of 8


JPM Title: DETERMINE ACTIONS FOR A FIRE Revision Number: 01 JPM Number:
Job Performance Measure (JPM)
A-N-4-R Task Number and Title: 295L009, Respond to a fire/explosion K/A Number and Importance: Generic
Operators Name:
.2.4.27     3.4 / 3.9
Job Title:  RO JPM Title: DETERMINE ACTIONS FOR A FIRE Revision Number: 01 JPM Number: A-N-4-R Task Number and Title: 295L009, Respond to a fire/explosion K/A Number and Importance: Generic.2.4.27         3.4 / 3.9 Suggested Testing Environment:         Simulator Actual Testing Environment:               Simulator     Control Room           In-Plant Testing Method:         Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete:           15     minutes  Actual Time Used:             minutes
 
Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Onl y: Yes No Time Critical:
Yes No Estimated Time to Complete
:       15       minutes  Actual Time Used:
minutes


==References:==
==References:==
 
DOA 0010-10, rev 20; DOA 0010-S1, rev 14 EVALUATION  
DOA 0010-10 , rev 20; DOA 0010
-S1, rev 14
 
EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name: ____________________________
Satisfactory Unsatisfactory Comments:
Evaluator's Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________
A-N-4-R                                                                        Page 7 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 3. The fire has been classified as a major fire.
: 3. The fire has been classified as a major fire.
: 4. Hazmat and rescue response are not required.
: 4. Hazmat and rescue response are not required.
: 5. The Fire brigade has been alerted and is attempting to combat the fir e unsuccessfully.
: 5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
: 6. A dedicated outside line is not available.
: 6. A dedicated outside line is not available.
INITIATING CUE
INITIATING CUE
: 1. The Unit supervisor has directed you to enter and execute DOA 0010
: 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
-10, FIRE-EXPLOSION through step D.3
: 2. Inform the Unit Supervisor when the task is complete.
. 2. Inform the Unit Supervisor when the task is complete.
A-N-4-R                                                              Page 8 of 8
 
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 02/16 Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION  JPM Number:
A-N-1-S  Revision Number: 0 0  Date: 02/16        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-1-S  Page 2 of 7  Revision Record (Summary)
Revision 0 0 New JPM developed ILT 15-1 (2016-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
Revision Record (Summary)
Revision 00 New JPM developed ILT 15-1 (2016-301) NRC Exam.
A-N-1-S                                                     Page 2 of 7
 
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. None.    
: 1. None.
A-N-1-S                                                    Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 4 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 3 Unit Supervisor. 2. Unit 2 and Unit 3 are operating at rated power.
: 1. You are the Unit 3 Unit Supervisor.
: 2. Unit 2 and Unit 3 are operating at rated power.
: 3. The following timeline occurred:
: 3. The following timeline occurred:
* 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
* 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
* 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
* 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gau ge. INITIATING CUE
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
INITIATING CUE
Information For Evaluator's Use:
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-S                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Candidate locates a copy of Reportability Manual.
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
Candidate locates a copy of Reportability Manual.
EXAMINER NOTE:
EXAMINER NOTE:
The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4.
The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4.
* 1. Determines the event is reportable per SAF 1.
* 1. Determines the event is          Determines the event is reportable per SAF 1.8.         reportable per SAF 1.8, Event or Condition that could have prevented       _____        _____      _____
: 8. Determines the event is reportable per SAF 1.
fulfillment of a Safety Function.
8, Event or Condition that could have prevented fulfillment of a Safety Function. _____        _____        _____
* 2. Determines the time limit to     Determines the time limit Notify the NRC Operations       to Notify the NRC Center via the ENS as soon       Operations Center via the as practical and in all cases,   ENS as soon as practical within 8 hours                  and in all cases within 8 hours of the occurrence (Time 0542).
* 2. Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases, within 8 hours Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases within 8 hours of the occurrence
_____        _____      _____
END JPM Stop Time:_________
A-N-1-S                                                                          Page 5 of 7


(Time 0542)
.
_____        _____        _____
END  JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 6 of 7  Operator's Name:
Operators Name:
Job Title:
Job Title:   SRO JPM Title: REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and Title: 299L001, Determine Reportability requirements as outlined in station Reportability manual.
SRO JPM Title: REPORTABILITY DETERMINATION Revision Number: 0 0 JPM Number: A-N-1-S Task Number and Title:
K/A Number and Importance: Generic.2.1.2         4.1 / 4.4 Suggested Testing Environme nt: Simulator Actual Testing Environment:               Simulator       Control Room           In-Plant Testing Method:         Simulate           Alternate Path:       Yes           No Perform                  SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete:           20             Actual Time Used:                 minutes
299L001, Determine Reportability requirements as outlined in station Reportability manual.
K/A Number and Importance: Generic.2.1.
2     4.1 / 4.4 Suggested Testing Environment
: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perfor m SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
20       Actual Time Used:
minutes


==References:==
==References:==
 
Reportability Tables and Decision Trees LS-AA-1020 Rev 23, Safety (SAF) LS-AA-1110 Rev. 22 EVALUATION  
Reportability Tables and Decision Trees LS-AA-1020 Rev 23, Safety (SAF) LS
-AA-1110 Rev. 22
 
EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name: ____________________________
Satisfactory Unsatisfactory
 
Comments:
Evaluator's Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________
A-N-1-S                                                                          Page 6 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 7 of 7  INITIAL CONDITION S 1. You are the Unit 3 Unit Supervisor.
INITIAL CONDITIONS
: 1. You are the Unit 3 Unit Supervisor.
: 2. Unit 2 and Unit 3 are operating at rated power.
: 2. Unit 2 and Unit 3 are operating at rated power.
: 3. The following timeline occurred:
: 3. The following timeline occurred:
* 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
* 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
* 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
* 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water g a u ge. INITIATING CUE
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement
INITIATING CUE
.
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement.
Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number:
A-N-1-S                                                                  Page 7 of 7
A-N-2-S Revision Number: 0 1  Date: 0 2/1 6        Developed By:
 
Instructor Date     Approved By:
Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number: A-N-2-S Revision Number: 01 Date: 02/16 Developed By:
Facility Representative Date Job Performance Measure (JPM)
Instructor                   Date Approved By:
A-N-2-S  Page 2 of 8  Revision Record (Summar y) Revision 0 0 Modified for 20 10 Cert Exam. Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam.
Facility Representative       Date
 
Job Performance Measure (JPM)
Revision Record (Summary)
Revision 00 Modified for 2010 Cert Exam.
Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam.
A-N-2-S                                                  Page 2 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures
: 1. This is a tabletop JPM utilizing simulator procedures.
. 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Marked up copy of OP
: 1. Marked up copy of OP-AA-105-102.
-AA-105-102.  
A-N-2-S                                                    Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Shift Manager
: 1. You are the Shift Manager.
. 2. An SRO is in the process of license reactivation
: 2. An SRO is in the process of license reactivation.
. 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee
: 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.
. INITIATING C UE  1. The Shift Operation Superintendent directs you to "perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions". Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
INITIATING CUE
Information For Evaluator's Use:
: 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-S                                                                        Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the Examinee the provided marked up copy of OP
UNSAT Comm PERFORMANCE CHECKLIST                           STANDARDS                   SAT ent NOTE:
-AA-105-102. 1. Review OP-AA-105-102, Attachment 2.
Provide the Examinee the provided marked up copy of OP-AA-105-102.
Reviews OP
: 1. Review OP-AA-105-102,             Reviews OP-AA-105-102, Attachment 2.                      Attachment 2.
-AA-105-102, Attachment 2.
_____       _____       _____
_____         _____         _____
: 2. Check that Hours on Shift are in   Notes 12.0 hours listed on the same calendar quarter.        6/26/16 are performed during the 2nd calendar       _____      _____      _____
: 2. Check that Hours on Shift are in the same calendar quarter.
quarter and cannot be counted towards license re-activation.
Notes 12.0 hours listed on 6/2 6/16 are performed during the 2nd calendar quarter and cannot be counted towards license re
: 3. Check that Hours on Shift are     Determines 12.0 hours as applicable for license            WEC listed on 07/3/16 reactivation.                      cannot be credited towards license re-activation.
-activation.
_____       _____       _____
_____        _____        _____
: 3. Check that Hours on Shift are applicable for license reactivation.
Determines 12.0 hours as WEC listed on 07/3/16 cannot be credited towards license re
-activation.
_____         _____         _____
EXAMINER NOTE:
EXAMINER NOTE:
Steps 2 and 3 lead to the determination in step 4
Steps 2 and 3 lead to the determination in step 4
* 4. Check that licensee has the required 40 hours.
* 4. Check that licensee has the       Determines that licensee required 40 hours.                 does NOT have adequate hours to meet the 40 hour     _____       _____       _____
Determines that licensee does NOT have adequate hours to meet the 40 hour requirement.
requirement.
_____         _____         _____
* 5. Verifies Plant Tour completed     Determines that Plant Tour per step 4.b                       date and signature are not completed.                   _____       _____       _____
* 5. Verifies Plant Tour completed per step 4.b Determines that Plant Tour date and signature are not completed.
: 6. Report the results of the review   Returns without signing OP-to the Shift Operations            AA-105-102, Attachment 2 Superintendent (SOS).              to the SOS.
_____         _____         _____
Informs the SOS that the licensees license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete. _____       _____       _____
: 6. Report the results of the review to the Shift Operations Superintendent (SOS).
CUE:
Returns without signing OP
As the SOS, acknowledge the report.
-AA-105-102, Attachment 2 to the SOS.
END A-N-2-S                                                                          Page 5 of 8
Informs the SOS that the licensee's license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete.
 
_____         _____         _____
Job Performance Measure (JPM)
CUE: As the SOS, acknowledge the report. END Job Performance Measure (JPM)
JPM Stop Time:_________
A-N-2-S Page 6 of 8   JPM Stop Time
A-N-2-S                                             Page 6 of 8
:_________
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:
Job Title:   SRO JPM Title: REACTIVATION OF AN SRO LICENSE Revision Number: 01 JPM Number: A-N-2-S Task Number and Title: Title: 299L024, Maintain an Active License K/A Number and Importance: Generic.2.1.4         3.3 / 3.8 Suggested Testing Environme nt: Simulator Actual Testing Environment:               Simulator       Control Room           In-Plant Testing Method:         Simulate           Alternate Path:       Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete:           12             Actual Time Used:                 minutes
SRO JPM Title:
REACTIVATION OF AN SRO LICENSE Revision Number: 0 1 JPM Number: A-N-2-S Task Number and Title:
Title: 299L024, Maintain an Active Licens e  K/A Number and Importance: Generic.2.1.
4     3.3 / 3.8 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
12       Actual Time Used:     minutes


==References:==
==References:==
 
OP-AA-105-102, Rev. 11 EVALUATION  
OP-AA-105-102 , Rev. 11 EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name: ____________________________
Satisfactory Unsatisfactory Comments:                 Evaluator's Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________
A-N-2-S                                                                          Page 7 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Shift Manager
: 1. You are the Shift Manager.
. 2. An SRO is in the process of license reactivation
: 2. An SRO is in the process of license reactivation.
. 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee
: 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.
. INITIATING CUE
INITIATING CUE
: 1. The Shift Operation Superintendent directs you to "perform the Shift Manager review of OP
: 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions A-N-2-S                                                            Page 8 of 8
-AA-105-102, Attachment 2 for the licensee and report any errors or omissions


Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number:
Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-S Revision Number: 04 Date: 02/16 Developed By:
A-N-3-S Revision Number: 0 4  Date: 0 2/1 6        Developed By:
Instructor                 Date Approved By:
Instructor Date     Approved By:
Facility Representative     Date
Facility Representative Date Job Performance Measure (JPM)
 
A-N-3-R  Page 2 of 7  Revision Record (Summary)
Job Performance Measure (JPM)
Revision 0 1 Bank JPM. Revision 0 2 Revised for 2010 NRC exam.
Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam.
Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam.
A-N-3-R                                                Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 3 of 7  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 6600-02.  
: 1. Provide a marked up copy of DOS 6600-02.
A-N-3-R                                                    Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 4 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Unit Supervisor
: 1. You are the Unit 2 Unit Supervisor.
. 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you. 4. The Equipment Operator reported all surveillance requirements were within specifications
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
. INITIATING CUE
: 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
: 1. Perform calculation verification and ensure paperwork is correct
: 4. The Equipment Operator reported all surveillance requirements were within specifications.
. 2. Inform me when the task is complete.
INITIATING CUE
: 1. Perform calculation verification and ensure paperwork is correct.
: 2. Inform me when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-R                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the provided copy of DOS 6600-02.
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS               SAT NOTE:
* 1. Candidate should identify step I.1.e has a mathematical error. Identifies differential pressure should read 4. _____
Provide the examinee with the provided copy of DOS 6600-02.
_____         _____
* 1. Candidate should identify         Identifies differential step I.1.e has a mathematical     pressure should read 4.
* 2. Candidate should identify step I.1.w OR step I.1.v is signed off as verified dP of <6 (actual is 7).
error.                                                          _____   _____     _____
Identifies incorrect verification of dP <6.
* 2. Candidate should identify         Identifies incorrect step I.1.w OR step I.1.v is       verification of dP <6.
_____        _____        _____
signed off as verified dP of <6                                 _____    _____      _____
* 3. Candidate should identify that steps I.1.ab have been initialed by the same person performing the surveillance and were NOT independently verified. Identifies step NOT independently verified.
(actual is 7).
_____        _____        _____
* 3. Candidate should identify that   Identifies step NOT steps I.1.ab have been           independently verified.
: 4. Notify Unit Supervisor of discrepancies.
initialed by the same person                                   _____    _____      _____
Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR.
performing the surveillance and were NOT independently verified.
_____        _____        _____
: 4. Notify Unit Supervisor of         Notifies Unit Supervisor, discrepancies.                    may dispatch Operators to verify/correct issues, also   _____    _____      _____
CUE: Acknowledge report of task completion.
may initiate IR.
END   JPM Stop Time
CUE:
:_________
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-3-R                                                                      Page 5 of 7
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 6 of 7  Operator's Name:
Operators Name:
Job Title:
Job Title:   SRO JPM Title: VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 04 JPM Number: A-N-3-S Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12           3.7 / 4.1 Suggested Testing Environment:         Simulator Actual Testing Environment:                 Simulator     Control Room           In-Plant Testing Method:           Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete:           12             Actual Time Used:               minutes
SRO JPM Title: VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 0 4 JPM Number: A-N-3-S Task Number and Title:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12     3.
7 / 4.1 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method
: Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
12       Actual Time Used:
minutes


==References:==
==References:==
 
DOS 6600-02, rev 20 EVALUATION  
DOS 6600-02 , rev 20 EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                       Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name: ____________________________
Satisfactory Unsatisfactory
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-3-R                                                                          Page 6 of 7


Comments:
Job Performance Measure (JPM)
Evaluator's Name: ____________________________
INITIAL CONDITIONS
(Print)
: 1. You are the Unit 2 Unit Supervisor.
Evaluator's Signature: _____________________
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
______ Date: _________
: 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
: 4. The Equipment Operator reported all surveillance requirements were within specifications.
INITIATING CUE
: 1. Perform calculation verification and ensure paperwork is correct.
: 2. Inform me when the task is complete.
A-N-3-R                                                              Page 7 of 7
 
Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 02 Date: 02/16 Developed By:
Instructor                    Date Approved By:
Facility Representative        Date


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 7 of 7  INITIAL CONDITIONS
Revision Record (Summary)
: 1. You are the Unit 2 Unit Supervisor
Revision 00 New JPM.
. 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal
Revision 01 Revised for 2010 NRC exam.
. 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you
Revision 02 Modified for ILT 15-1 (2016-301) NRC Exam.
. 4. The Equipment Operator reported all surveillance requirements were within specifications
A-N-4-S                                                  Page 2 of 8
. INITIATING CUE
: 1. Perform calculation verification and ensure paperwork is correct
. 2. Inform me when the task is complete.


Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION  JPM Number:
A-N-4-S  Revision Number: 0 2  Date: 0 2/1 6        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-4-S  Page 2 of 8  Revision Record (Summary) Revision 0 0 New JPM. Revision 01 Revised for 2010 NRC exam.
Revision 02 Modified for ILT 15
-1 (2016-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
Line 699: Line 662:
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 1500-08.
: 1. Provide a marked up copy of DOS 1500-08.
A-N-4-S                                                            Page 3 of 8
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the U2 US. 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS
: 1. You are the U2 US.
. 3. Only the "A" CCSW Heat Exchanger is going to be placed in service.
: 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
: 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
INITIATING CUE
: 1. Review and Verify DOS 1500
: 1. Review and Verify DOS 1500-08.
-08. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-S                                                                        Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the provided copy of DOS 1500-08. The following steps can be performed in any order.
UNSAT      Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
* 1. Verifies Dilution flow calculation (1,017,000 gpm).
Provide the examinee with the provided copy of DOS 1500-08.
Determines Dilution flow was incorrectly determined. Correct Dilution flow is 1,017,000 gpm. _____         _____         _____
The following steps can be performed in any order.
* 2. Enters dilution flow (1,017,000 gpm) to calculate CCSW Activity Limit.
* 1. Verifies Dilution flow          Determines Dilution flow calculation (1,017,000 gpm). was incorrectly determined. Correct Dilution flow is 1,017,000     _____     _____       _____
Determines 2.91 x 10
gpm.
-5 is the correct CCSW sample activity limit.
* 2. Enters dilution flow             Determines 2.91 x 10-5 is (1,017,000 gpm) to calculate     the correct CCSW sample CCSW Activity Limit.             activity limit.
_____         _____         _____
_____     _____       _____
NOTE: If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated:
NOTE:
Direct the candidate to complete the review and make any necessary adjustments as necessary     and another SRO will review.
If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated:
: 3. Verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Determines 2.01 x 10-5 is less than 2.91 x 10-5. _____         _____         _____
Direct the candidate to complete the review and make any necessary adjustments as necessary and another SRO will review.
* 4. Re-Performs Canal Activity Calculation.
: 3. Verifies CCSW Heat               Determines 2.01 x 10-5 is Exchanger A sample activity      less than 2.91 x 10-5.
Uses 1,017,000 gpm as Dilution Flow. Determines incorrect activity level used for "A" Activity level of CCSW Heat Exchanger. Correct value is 2.01 x10-5. _____         _____         _____
is less than or equal to the calculated CCSW activity limit                                  _____     _____       _____
* 5. Determines Canal Activity Concentration.
* 4. Re-Performs Canal Activity       Uses 1,017,000 gpm as Calculation.                    Dilution Flow. Determines incorrect activity level used for A Activity level of CCSW Heat Exchanger.
Determines Canal Activity Concentration is 6.9 x10-8   _____         _____         _____
Correct value is 2.01 x10-5. _____     _____       _____
* 5. Determines Canal Activity       Determines Canal Activity Concentration.                  Concentration is 6.9 x10-8
_____     _____       _____
A-N-4-S                                                                      Page 5 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  6. Determines need for NSO to re-perform calculations.
UNSAT    Comment PERFORMANCE CHECKLIST                     STANDARDS                 SAT
Examinee directs NSO to re-perform calculations
: 6. Determines need for NSO to  Examinee directs NSO to re-perform calculations. re-perform calculations
_____         _____         _____
_____   _____     _____
CUE: Acknowledge report of task completion.
CUE:
END   JPM Stop Time
Acknowledge report of task completion.
:_________
END JPM Stop Time:_________
A-N-4-S                                                                  Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:
Job Title:   SRO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-4-S Task Number and Title: 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
SRO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 0 2 JPM Number: A-N-4-S Task Number and Title:
K/A Number and Importance: Generic.2.3.11         3.8 / 4.3 Suggested Testing Environme nt: Simulator Actual Testing Environment:               Simulator     Control Room           In-Plant Testing Method:         Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete:           15            Actual Time Used:               minutes
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance
. K/A Number and Importance: Generic.2.3.11     3.8
/ 4.3 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
1 5        Actual Time Used:
minutes


==References:==
==References:==
 
DOS 1500-08, rev 17 EVALUATION  
DOS 1500-08 , rev 17 EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name: ____________________________
Satisfactory Unsatisfactory
(Print)
 
Evaluators Signature: ___________________________ Date: _________
Comments:                 Evaluator's Name: ____________________________
A-N-4-S                                                                        Page 7 of 8
(Print) Evaluator's Signature: ___________________________ Date: _________


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the U2 US. 2. The Unit 2 NSO has completed DOS 1500
: 1. You are the U2 US.
-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
: 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
: 3. Only the "A" CCSW Heat Exchanger is going to be placed in service.
: 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
INITIATING CUE
: 1. Review and Verify DOS 1500
: 1. Review and Verify DOS 1500-08.
-08. 2. Inform the Unit 2 Supervisor when the task is complete.
: 2. Inform the Unit 2 Supervisor when the task is complete.
A-N-4-S                                                            Page 8 of 8
 
Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number: A-N-5-S Revision Number: 00 Date: 02/16 Developed By:
Instructor                                      Date Approved By:
Facility Representative                          Date SRRS: 3D.105 (when utilized for operator init ial or continuing train ing)


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number:
Revision Record (Summary)
A-N-5-S  Revision Number:
00  Date: 02/16        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-5-S  Page 2 of 8  Revision Record (Summary)
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.
A-N-5-S                                                        Page 2 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. For exam purposes/exam security provide a colored copy of a blank NARS form
: 1. For exam purposes/exam security provide a colored copy of a blank NARS form.
.
A-N-5-S                                                            Page 3 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. This is a time critical JPM.
: 1. This is a time critical JPM.
: 2. You are the Shift Emergency Director
: 2. You are the Shift Emergency Director.
. 3. Unit 2 was operating at near rated conditions
: 3. Unit 2 was operating at near rated conditions.
. 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building
: 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
. 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level. 6. Visible damage to spent fuel has occurred
: 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
. 7. Fuel pool level is lowering at 1 foot per minute
: 6. Visible damage to spent fuel has occurred.
. 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
: 7. Fuel pool level is lowering at 1 foot per minute.
: 9. A large hole is present in the Reactor Building wall
: 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
. 10. There is NO verifier available.
: 9. A large hole is present in the Reactor Building wall.
: 10. There is NO verifier available.
INITIATING CUES
INITIATING CUES
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
A-N-5-S                                                                    Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 5 of 8  Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-5-S                                                                        Page 5 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 6 of 8  JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
-AA-1004 charts
Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts.
. Provide the supplied NARS Form.
Provide the supplied NARS Form.
Provide the supplied screen shot of the meteorological data.
Provide the supplied screen shot of the meteorological data.
* 1. Determines a classification of GENERAL EMERGENCY, due to notification from the Security Force that a HOSTILE ACTION is occurring within the protected area AND Damage to spent fuel pool has occurred.
* 1. Determines a classification of   Determines highest GENERAL EMERGENCY,               classification is a due to notification from the     GENERAL EMERGENCY            _____        _____      _____
Determines highest classification is a GENERAL EMERGENCY per EAL HG1 (15 minute requirement).
Security Force that a           per EAL HG1 (15 minute HOSTILE ACTION is               requirement).
_____        _____        _____
occurring within the protected area AND Damage to spent fuel pool has occurred.
NOTE: Determines classification start time _______ and stop time _______ .
NOTE:
Determines classification start time _______ and stop time _______ .
(15 minute limit)
(15 minute limit)
* 2. Properly fills out NARS form.
* 2. Properly fills out NARS form. See attached key for the areas that must be filled out correctly (12 minute requirement)                 _____        _____      _____
See attached key for the areas that must be filled out correctly (1 2 minute requirement)
NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used.
NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used.
_____        _____        _____
NOTE:
NOTE: Fill out NARS form start time (when declaration completed) _______ and stop time _______ .                 (12 minute limit)
Fill out NARS form start time (when declaration completed) _______ and stop time _______ .
END   JPM Stop Time
(12 minute limit)
:_________
END JPM Stop Time:_________
A-N-5-S                                                                      Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:    SRO  
Job Title:    SRO JPM Title: DETERMINE EP PROTECTIVE ACTION RECOMMENDATION Revision Number: 00 JPM Number: A-N-5-S Task Number and Title: 295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44         2.4 / 4.4 Suggested Testing Environment:         Simulator Actual Testing Environment:               Simulator     Control Room           In-Plant Testing Method:         Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete:           15            Actual Time Used:               minutes
 
JPM Title: DETERMINE EP PROTECTIVE ACTION RECOMMENDATION Revision Number: 00 JPM Number: A-N-5-S Task Number and Title: 295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.
44     2.4 / 4.4 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
1 5        Actual Time Used:
minutes


==References:==
==References:==
 
EP-AA-1004 Addendum 3 Rev. 002 EVALUATION  
EP-AA-1004 Addendum 3 Rev. 002
 
EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name: ____________________________
Satisfactory Unsatisfactory Comments:
Evaluator's Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________
A-N-5-S                                                                        Page 7 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Pag e 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. This is a time critical JPM. 2. You are the Shift Emergency Director.
: 1. This is a time critical JPM.
: 3. Unit 2 was operating at near rated conditions
: 2. You are the Shift Emergency Director.
. 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building
: 3. Unit 2 was operating at near rated conditions.
. 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
: 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
: 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
: 6. Visible damage to spent fuel has occurred.
: 6. Visible damage to spent fuel has occurred.
: 7. Fuel pool level is lowering at 1 foot per minute.
: 7. Fuel pool level is lowering at 1 foot per minute.
: 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
: 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
: 9. A large hole is present in the Reactor Building wall. 10. There is NO verifier available.
: 9. A large hole is present in the Reactor Building wall.
: 10. There is NO verifier available.
INITIATING CUES
INITIATING CUES
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form.
Give the NARS form to the WEC Supervisor, who will make the state notification.
A-N-5-S                                                                  Page 8 of 8
 
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S-N-a Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By:
Instructor            Date Approved By:
Facility Representative        Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST SRRS: 3D.100; There are no retention requirements for this section                  S-N-a Rev 03
 
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 1100-02                Rev: 19 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section                        S-N-a Rev 03


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S
Revision 02 Revised for 2013 NRC exam.
-N-a  Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By:
Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section                 S-N-a Rev 03
Instructor Date  Approved By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03  NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DOP 1100-02  Rev:    19  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 Revision Record (Summary)
Revision 0 2 Revised for 201 3 NRC exam. Revision 03 Revised for ILT 15
-1 (2016-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC _51_.
: 1. Reset the simulator to IC _
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
51_. NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Run CAEP file S-N-a.cae.
: 2. Run CAEP file S-N-a.cae. 3. If the CAEP file cannot be run then insert the following Expert Commands:
: 3. If the CAEP file cannot be run then insert the following Expert Commands:
: a. Insert following Malfunctions and/or Remotes:
: a. Insert following Malfunctions and/or Remotes:
* IMF CIRWCUAP (2
* IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
-1201-1 valve failure to close  
* IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
- and allows manual closure).
* IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #
* IMF CIRWCUBP (2
whichever pump is started first will not develop flow)
-1201-2 valve failure to close - and allows manual closure).
* IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #
* IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so
whichever pump is started first will not develop flow)
# whichever pump is started first will not develop flow
* IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF)
)
: b. Setup the following Triggers:
* IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so
* TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position)
# whichever pump is started first will not develop flow
* TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction)
)
* TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position)
* IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF
* TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction)
) b. Setup the following Triggers:
DOCUMENT PREPARATION Clean copy of DOP 1100-02 hardcard.
* TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position
SRRS: 3D.100; There are no retention requirements for this section                              S-N-a Rev 03
)
* TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction
)
* TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position
)
* TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction
)
DOCUMENT PREPARATION Clean copy of DOP 1100
-02 hardcard.


TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. A transient has occurred, resulting in an ATWS.
: 2. A transient has occurred, resulting in an ATWS.
Line 939: Line 889:
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section                    S-N-a Rev 03


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number Note     Examinee should locate the hard card, then provide the included copy.
S-N-a Rev 03  JPM Start Time:
: 1. Selects the correct procedure step. Determines correct procedure step is per DOP 1100-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS)
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Examinee should locate the hard card, then provide the included copy.
___   ___      ___
: 1. Selects the correct procedure step.
: 2. Place the SBLC INJECTION                  Turns the SBLC INJECTION CONTROL keylock switch to the             CONTROL keylock switch to either SYS 1 OR SYS 2 position.                   the intermediate right OR intermediate left position.
Determines correct procedure step is per DOP 1100
___    ___     ___
-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS)
: 3. Verifies applicable SQUIB pilot           SQUIB A or B light off.
 
light NOT lit.                                                                    ___   ___     ___
___
Note     The selected pump starts but does not develop flow (relief valve failure in the JPM setup).
 
: 4. Verifies applicable PUMP pilot             PUMP light on.
___
light lit.                                                                         ___   ___     ___
 
BEGIN ALTERNATE PATH
___ 2. Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 OR SYS 2 position.
: 5. Verifies FLOW pilot light lit.             FLOW light off (SBLC is NOT injecting).                             ___   ___     ___
Turns the SBLC INJECTION CONTROL keylock switch to either the intermediate right OR intermediate left position.
: 6. SBLC SQUIB VLV CKT FAILURE                 Annunciator 902-5 H-6 illuminated.
___    ___   ___ 3. Verifies applicable SQUIB pilot light NOT lit. SQUIB "A" or "B" light off.
annunciator alarms (902-5 H-6).                                                   ___   ___     ___
___ ___ ___ Note The selected pump starts but does not develop flow (relief valve failure in the JPM setup).
  *7. Places SBLC INJECTION                      Turns the SBLC INJECTION CONTROL keylock switch to                 CONTROL keylock switch to the opposite position taken to in step         opposite direction turned in step 1.
: 4. Verifies applicable PUMP pilot light lit.
1.
PUMP light on.
___    ___      ___
___ ___ ___ BEGIN ALTERNATE PATH
: 8. Verifies opposite PUMP pilot light        Opposite PUMP light on.
: 5. Verifies FLOW pilot light lit.
lit.                                                                               ___    ___      ___
FLOW light off (SBLC is NOT injecting).
Note    Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re-positioned.
___ ___ ___ 6. SBLC SQUIB VLV CKT FAILURE annunciator alarms (902
: 9. Verifies RWCU valve 2-1201-1              Examinee recognizes that valve 2-closed.                                    1201-1 valve did NOT close.             ___    ___      ___
-5 H-6). Annunciator 902
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            S-N-a Rev 03
-5 H-6 illuminated.
___ ___ ___ *7. Places SBLC INJECTION CONTROL keylock switch to opposite position taken to in step
: 1. Turns the SBLC INJECTION CONTROL keylock switch to the opposite direction turned in step 1.


___   
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT    UNSAT STEP                  ELEMENT                                  STANDARD Number
*10. Closes RWCU valve 2-1201-1.                Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position.
___    ___      ___
: 11. Verifies RWCU valve 2-1201-1A              GREEN light illuminated.
closed.                                                                          ___   ___      ___
: 12. Verifies RWCU valve 2-1201-2              Examinee recognizes that valve 2-closed.                                    1201-2 valve did NOT close.            ___    ___      ___
  *13. Closes RWCU valve 2-1201-2.                Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position.
___    ___      ___
: 14. Verifies RWCU valve 2-1201-3              GREEN light illuminated.
closed.                                                                          ___    ___      ___
: 15. Verifies RWCU valve 2-1201-7              RED light illuminated.
closed.                                                                          ___    ___      ___
: 16. Informs Unit Supervisor task is            Reports SBLC is injecting but the complete.                                  first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to close automatically.
___    ___      ___
Cue      Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                          S-N-a Rev 03


___ 
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM  
 
___ 8. Verifies opposite PUMP pilot light lit. Opposite PUMP light on.
___  ___  ___ Note Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re
-positioned.
: 9. Verifies RWCU valve 2-1201-1 closed. Examinee recognizes that valve 2
-1201-1 valve did NOT close. ___  ___  ___
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-a Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number *10. Closes RWCU valve 2
-1201-1. Takes manual action for a failed automatic action and closes 2
-1201-1 valve, by placing c/s in the CLOSED position.
___    ___    ___ 11. Verifies RWCU valve 2
-1201-1A closed. GREEN light illuminated.
___  ___  ___ 12. Verifies RWCU valve 2
-1201-2 closed. Examinee recognizes that valve 2
-1201-2 valve did NOT close. ___  ___  ___ *13. Closes RWCU valve 2
-1201-2. Takes manual action for a failed automatic action and closes 2
-
1201-2 valve, by placing c/s in the CLOSED position.
 
___ 
 
___ 
 
___ 14. Verifies RWCU valve 2
-1201-3 closed. GREEN light illuminated.
___  ___  ___ 15. Verifies RWCU valve 2-1201-7 closed. RED light illuminated.
___  ___  ___ 16. Informs Unit Supervisor task is complete. Reports SBLC is injecting but the first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to close automatically.
 
___ 
 
___ 
 
___ Cue Acknowledge report of task completion.
END  JPM Stop Time:
 
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-a Rev 03 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:           RO         SRO             SRO Cert JPM Title: SBLC - Injection with Pump and RWCU Failures JPM Number: S-N-a                                   Revision Number: 03 Task Number and Title: 211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08                   4.2 / 4.2 Suggested Testing Environment: Simulator Alternate Path:     Yes       No     SRO Only:           Yes       No   Time Critical:   Yes     No Reference(s): DOP 1100-02, Rev 19 Actual Testing Environment:             Simulator             Control Room       In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 9 minutes                           Actual Time Used:           minutes EVALUATION  
Job Title:   RO     SRO     SRO Cert JPM Title:   SBLC - Injection with Pump and RWCU Failures JPM Number
: S-N-a Revision Number
: 03 Task Number and Title
: 211L002, Injection of Standby Liquid Control System K/A Number and Importance
:   211000.A4.08     4.2 / 4.2 Suggested Testing Environment
:   Simulator Alternate Path
: Yes No SRO Only: Yes No Time Critical
: Yes No Reference(s)
: DO P 1100-02, Rev 19 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
9 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-a Rev 03
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03  INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. A transient has occurred, resulting in an ATWS.
: 2. A transient has occurred, resulting in an ATWS.
Line 1,048: Line 961:
: 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
: 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section                S-N-a Rev 03


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S-N-b Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 0 4  Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S
Instructor             Date Approved By:
-N-b Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By:
Facility Representative        Date SRRS: 3D.100; There are no retention requirements for this section                 S-N-b Rev 04
Instructor Date Approved By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 0 4 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DOP 0600-06  Rev:    44  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 0 4 Revision Record (Summary)
Revision 02 Bank JPM. Revision 03 Revised for 2009 NRC Exam.
Revision 04 Revised for ILT 15
-1 (2016-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 0 4 SIMULATOR SETUP INSTRUCTIONS
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
: 1. Reset the simulator to IC _
________    1. Task description and number, JPM description and number are identified.
52_. NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0600-06                Rev: 44 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section                        S-N-b Rev 04
 
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 02 Bank JPM.
Revision 03 Revised for 2009 NRC Exam.
Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section                 S-N-b Rev 04
 
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC _52_.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Verify BOTH FW REG ISOL VALVES are OPEN:
: 2. Verify BOTH FW REG ISOL VALVES are OPEN:
* MO 2-3206A
* MO 2-3206A
* MO 2-3206B 3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED.
* MO 2-3206B
: 3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED.
: 4. Verify MASTER CONTROL STATION is in MAN.
: 4. Verify MASTER CONTROL STATION is in MAN.
: 5. Low Flow Reg Valve is controlling level at 30" in AUTO.
: 5. Low Flow Reg Valve is controlling level at 30 in AUTO.
: 6. Insert following Malfunctions and/or Remotes:
: 6. Insert following Malfunctions and/or Remotes:
* None. 7. Setup the following Triggers:
* None.
* None. DOCUMENT PREPARATION
: 7. Setup the following Triggers:
* None.
DOCUMENT PREPARATION
: 1. Copy of DOP 0600-06 marked up through limitations and actions.
: 1. Copy of DOP 0600-06 marked up through limitations and actions.
SRRS: 3D.100; There are no retention requirements for this section                              S-N-b Rev 04


TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 0 4 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit Startup is in progress.
: 2. Unit Startup is in progress.
: 3. The FWLCS is controlling level with the Low Flow Reg Valve.
: 3. The FWLCS is controlling level with the Low Flow Reg Valve.
: 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
: 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
: 5. 2A & 2B FRVs have been pre
: 5. 2A & 2B FRVs have been pre-operationally tested.
-operationally tested.
: 6. Another NSO will acknowledge annunciators not associated with this task.
: 6. Another NSO will acknowledge annunciators not associated with this tas
INITIATING CUE
: k. INITIATING CUE
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600
: 2. Inform the Unit Supervisor when the task is complete.
-06 per step G.2
. 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section                    S-N-b Rev 04


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number Note     Provide the examinee with the provided copy of DOP 0600-06.
S-N-b Rev 04  JPM Start Time:
: 1. Verify 2A and 2B FWRVs have               Condition met in initial conditions.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the examinee with the provided copy of DOP 0600
been pre-operationally tested per Step G.1.
-06. 1. Verify 2A and 2B FWRVs have been pre-operationally tested per Step G.1. Condition met in initial conditions.
___   ___      ___
___
: 2. Verify the following valves are           GREEN lights illuminated on the open:                                      following:
___
___ 2. Verify the following valves are open:
* MO 2-3205A, FW LINE STOP.
* MO 2-3205A, FW LINE STOP.
* MO 2-3205A
* MO 2-3205B, FW LINE STOP.
* MO 2-3205B, FW LINE STOP.
* MO 2-3206A, 2A FW REG ISOL.
* MO 2-3206B, 2B FW REG ISOL. GREEN lights illuminated on the following:
* MO 2-3205A
* MO 2-3205B
* MO 2-3205B
* MO 2-3206A
* MO 2-3206A, 2A FW REG
* MO 2-3206B    
* MO 2-3206A ISOL.
 
* MO 2-3206B, 2B FW REG
___
* MO 2-3206B ISOL.
 
___   ___      ___
___
: 3. Adjust MASTER CONTROL                     Depresses appropriate pushbutton STATION OR RX LO FLOW                     to verify setpoint to match actual CONTROL STATION, setpoint to               RPV level on MASTER match actual RPV level.                    CONTROL STATION OR RX LO FLOW CONTROL STATION.                 ___    ___     ___
 
: 4. Select appropriate FWLCS RPV               Depresses appropriate FWLCS level signal per Section G.17.             RPV level signal pushbutton.           ___   ___     ___
___ 3. Adjust MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION, setpoint to match actual RPV level.
: 5. Place RX LO FLOW CONTROL                   Verifies AUTO light illuminated on STATION to AUTO.                          RX LO FLOW CONTROL                     ___   ___     ___
Depresses appropriate pushbutton to verify  setpoint to match actual RPV level on  MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION.
STATION.
___
  *6. Place one REG VLV CONTROL                 Depresses AUTO pushbutton on STATION in AUTO.                           2B REG VLV CONTROL STATION.
 
___    ___     ___
___
: 7. Verify other REG VLV CONTROL               Verifies MAN light illuminated on STATION in MAN.                            2A REG VLV CONTROL STATION.
 
___   ___      ___
___ 4. Select appropriate FWLCS RPV level signal per Section G.17.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                          S-N-b Rev 04
Depresses appropriate FWLCS RPV level signal pushbutton.
___ ___ ___ 5. Place RX LO FLOW CONTROL STATION to AUTO.
Verifies AUTO light illuminated on RX LO FLOW CONTROL STATION. ___ ___ ___ *6. Place one REG VLV CONTROL STATION in AUTO.
Depresses AUTO pushbutton on 2B REG VLV CONTROL STATION. ___
___
___ 7. Verify other REG VLV CONTROL STATION in MAN.
Verifies MAN light illuminated on 2A REG VLV CONTROL STATION.
___


___
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT    UNSAT STEP                  ELEMENT                                  STANDARD Number
  *8. Place MASTER CONTROL                      Depresses AUTO pushbutton on STATION in AUTO.                          FWLC MASTER CONTROL STATION.
___   ___      ___
Note    The LOW FLOW FWRV will automatically transfer to the 2B FWRV when the LOW FLOW FWRV position is 85% feedwater flow.
: 9. Informs Unit Supervisor task is            Examinee notifies the Unit complete.                                  Supervisor.                        ___    ___      ___
Cue      Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                      S-N-b Rev 04


___
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM  
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-b Rev 04 STEP ELEMENT STANDARD SAT UNSAT Comment Number *8. Place MASTER CONTROL STATION in AUTO.
Depresses AUTO pushbutton on FWLC MASTER CONTROL STATION. ___
___
___ Note The LOW FLOW FWRV will automatically transfer to the 2B FWRV                                                          when the LOW FLOW FWRV position is 85% feedwater flow.
: 9. Informs Unit Supervisor task is complete. Examinee notifies the Unit Supervisor.
___  ___  ___ Cue Acknowledge report of task completion.
END  JPM Stop Time:
 
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-b Rev 04 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:           RO         SRO             SRO Cert JPM Title: Place a FRV in Service in Auto During Unit Startup JPM Number: S-N-b                                   Revision Number: 04 Task Number and Title: 259L021, Place FRV in service in AUTO (unit startup).
Job Title:   RO     SRO     SRO Cert JPM Tit le:   Place a FRV in Service in Auto During Unit Startup JPM Number
K/A Number and Importance:               259002.A4.03         3.8 / 3.6 Suggested Testing Environment: Simulator Alternate Path:     Yes       No     SRO Only:         Yes         No   Time Critical:   Yes     No Reference(s): DOP 0600-06, Rev 44 Actual Testing Environment:             Simulator           Control Room         In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 9 minutes                         Actual Time Used:           minutes EVALUATION  
: S-N-b Revision Number
: 0 4 Task Number and Title
: 259L021, Place FRV in service in AUTO (unit startup).
K/A Number and Importance
:   259002.A4.03     3.8 / 3.6 Suggested Testing Environment
:   Simulator Alternate Path
: Yes No SRO Only: Yes No Time Critical
: Yes No Reference(s)
: DOP 0600-06, Rev 44 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
9 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-b Rev 04
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04  INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit Startup is in progress.
: 2. Unit Startup is in progress.
Line 1,198: Line 1,085:
: 6. Another NSO will acknowledge annunciators not associated with this task.
: 6. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
-06 per step G.2
: 2. Inform the Unit Supervisor when the task is complete.
. 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section                S-N-b Rev 04
 
TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ-JA-150-02 Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By:
Instructor            Date Approved By:
Facility Representative        Date SRRS: 3D.100; There are no retention requirements for this section                  S-N-d Rev 09


TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09   Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE         
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-03 Rev: 23 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section                         S-N-d Rev 09


WHILE LINING UP TO CST SUCTION FOR INJECTION  JPM Number: S
TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ-JA-150-02 Revision Record (Summary)
-N-d  Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By:
Revision 06 Bank JPM.
Instructor Date Approved By:
Revision 07 Revised for ILT 12-1 Cert Exam.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ
Revision 08 Revised for ILT 14-1 NRC Exam.
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Revision 09 Revised for ILT 15-1 (2016-301) NRC Exam.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
SRRS: 3D.100; There are no retention requirements for this section                S-N-d Rev 09
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DEOP 0500-03  Rev:  23  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 Revision Record (Summary)
Revision 06 Bank JPM. Revision 07 Revised for ILT 12
-1 Cert Exam.
Revision 08 Revised for ILT 14
-1 NRC Exam.
Revision 09 Revised for ILT 15
-1 (2016-301) NRC Exam.


TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC (IC _53__ used for validation).
: 1. Reset the simulator to any IC (IC _53__ used for validation).
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Verify ALL LP ECCS Pumps are in PTL
: 2. Verify ALL LP ECCS Pumps are in PTL.
. 3. Run the following CAEP file: S
: 3. Run the following CAEP file: S-N-d.cae
-N-d.cae 4. If the CAEP cannot be ran, insert the following Expert Commands:
: 4. If the CAEP cannot be ran, insert the following Expert Commands:
* Insert the following Malfunctions, Remotes, and/or Overrides:
* Insert the following Malfunctions, Remotes, and/or Overrides:
o imf ser0016 on o imf ser0155 on o ior lpdvlvcl25 close o ior lpdvlvop16 open o ior rrd5bcls close
o   imf ser0016 on o   imf ser0155 on o   ior lpdvlvcl25 close o   ior lpdvlvop16 open o   ior rrd5bcls close
* Assign the following trigger assignment:
* Assign the following trigger assignment:
o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500
o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems.
-03, Alternate Water Injection Systems
SRRS: 3D.100; There are no retention requirements for this section                              S-N-d Rev 09
.
 
TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred requiring Alternate Water Injection
: 2. A transient has occurred requiring Alternate Water Injection.
. Examiner Note: The following parameters do not match the simulator indications.
Examiner Note: The following parameters do not match the simulator indications.
: 3. RPV level is  
: 3. RPV level is -65 inches and slowly dropping.
-65 inches and slowly dropping.
: 4. RPV pressure is 140 psig and slowly dropping.
: 4. RPV pressure is 140 psig and slowly dropping.
: 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
: 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
: 6. 'B' Loop is selected for injection.
: 6. B Loop is selected for injection.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
-03. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section                    S-N-d Rev 09


TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
UNSAT        Comment PERFORMANCE CHECKLIST                             STANDARDS               SAT NOTE:
S-N-d Rev 09  JPM Start Time:
Provide the Examinee with the provided copy of DEOP 0500-03.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the Examinee with the provided copy of DEOP 0500
: 1. Verifies 2A LPCI PP control         ALL lights extinguished.
-03. 1. Verifies 2A LPCI PP control switch in Pull
switch in Pull-to-Lock.
-to-Lock. ALL lights extinguished.
_____     _____         _____
_____         _____         _____
: 2. Place PP SUCT VLV MO 2-              RED light illuminated.
: 2. Place PP SUCT VLV MO 2
1501-5A control switch in
-1501-5A control switch in Manual Bypass and verify closed. RED light illuminated
_____    _____          _____
. _____        _____        _____
Manual Bypass and verify closed.
: 3. Verify MIN FLOW VLV 2
: 3. Verify MIN FLOW VLV 2-              RED light illuminated.
-1501-13A closed if not needed. RED light illuminated.
1501-13A closed if not
_____         _____         _____
_____     _____         _____
CUE: 2-1501-13A is not required for 2B LPCI pump.
needed.
NOTE: The following valves may be verified in any order
CUE:
: 4. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
2-1501-13A is not required for 2B LPCI pump.
GREEN lights illuminated.
NOTE:
_____        _____        _____
The following valves may be verified in any order
: 5. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed. GREEN lights illuminated.
: 4. Verify TORUS CLG/TEST               GREEN lights illuminated.
_____         _____         _____
valves 2-1501-20A and
: 6. Verify DW SPRAY VLVs 2
_____    _____          _____
-1501-28A and 2-1501-27A closed. GREEN lights illuminated.
2-1501-38A closed.
_____         _____         _____
: 5. Verify TORUS SPRAY VLVs             GREEN lights illuminated.
: 7. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
2-1501-19A and 2-1501-18A
GREEN lights illuminated.
_____     _____         _____
_____         _____         _____
closed.
: 8. Verify TORUS SPRAY VLVs
: 6. Verify DW SPRAY VLVs 2-              GREEN lights illuminated.
1501-28A and 2-1501-27A
_____     _____         _____
closed.
: 7. Verify TORUS CLG/TEST               GREEN lights illuminated.
valves 2-1501-20B and
_____    _____          _____
2-1501-38B closed.
: 8. Verify TORUS SPRAY VLVs              GREEN lights illuminated.
2-1501-19B and 2-1501-18B
_____     _____         _____
closed.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-d Rev 09


2-1501-19B and 2-1501-18B closed. GREEN lights illuminated.
TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ-JA-150-02 UNSAT        Comment PERFORMANCE CHECKLIST                            STANDARDS                  SAT
_____         _____         _____
: 9. Verify DW SPRAY VLVs 2-             GREEN lights illuminated.
1501-28B and 2-1501-27B
_____    _____          _____
closed.
NOTE:
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
CUE:
When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed.
: 10. Unlock AND open 2-1501-                Instructs EO to complete 74A, U2 LPCI A PMP                  step G.12.c.(5).(a).
_____    _____          _____
VENT VLV.
: 11. Crack open 2-1501-15A, U2              Instructs EO to complete LPCI A PMP VENT VLV until            step G.12.c.(5).(b).
_____    _____          _____
flow is observed from pipe.
: 12. Close 2(3)-1501-15A, U2                Instructs EO to complete LPCI A PMP VENT VLV.                step G.12.c.(5).(c).
_____    _____          _____
: 13. Close AND lock 2-1501-74A,            Instructs EO to complete U2(3) LPCI A PMP                    step G.12.c.(5).(d).
_____    _____          _____
VENT VLV.
: 14. Open 2-1501-47A-R, U2                  Instructs EO to obtain PI 2-LPCI A PUMP SUCT PI                  1501-47A reading per step
_____    _____          _____
2-1501-47A ROOT VLV (at              G.12.c.(6). & G.12.c.(7).
pump) and verify PI 2-1501-47A indicates less than 15 psig.
CUE:
PI 2-1501-47A indicates 15.5 psig.
: 15. Recognizes reading is NOT              Determines reading is less than 15 psig.                  greater than 15 psig.
_____     _____         _____
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            S-N-d Rev 09


TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ-JA-150-02 UNSAT        Comment PERFORMANCE CHECKLIST                           STANDARDS               SAT
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 16. Close 2-1501-47A-R, U2               Instructs EO to close 2-LPCI A PUMP SUCT PI                 1501-47A per step
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  9. Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed. GREEN lights illuminated.
_____     _____           _____
_____        _____        _____
2-1501-47A ROOT VLV.                 G.12.c.(8).
NOTE: For bleeding off the pressure in the suction piping,                                                                                    the examinee may communicate each of the following steps individually OR                                            instruct the EO to complete actions of DEOP 0500
CUE:
-03 step G.12.c.(5 thru 8).
2-1501-47A-R is Closed.
CUE: When directed, as the EO in the field, communicate that the steps                                                        (either individually of as a whole) have been completed.
: 17. Open PP SUCT VLV MO 2-               GREEN light illuminated.
: 10. Unlock AND open 2
1501-5A.
-1501-74A, U2 LPCI A PMP VENT VLV. Instructs EO to complete step G.12.c.(5).(a).
_____     _____           _____
_____        _____        _____
: 18. Notify Unit Supervisor that 2A       Examinee notifies Unit LPCI pump cannot be used           Supervisor of 2A LPCI
: 11. Crack open 2-1501-15A, U2 LPCI A PMP VENT VLV until flow is observed from pipe.
_____    _____          _____
Instructs EO to complete step G.12.c.(5).(b).
with suction from the CST.         pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
_____        _____        _____
CUE:
: 12. Close 2(3)
Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.
-1501-15A, U2 LPCI A PMP VENT VLV.
Instructs EO to complete step G.12.c.(5).(c).
_____
_____        _____
: 13. Close AND lock 2
-1501-74A, U2(3) LPCI A PMP VENT VLV. Instructs EO to complete step G.12.c.(5).(d).
_____        _____        _____
: 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig. Instructs EO to obtain PI 2
-1501-47A reading per step G.12.c.(6). & G.12.c.(7).
_____         _____         _____
CUE: PI 2-1501-47A indicates 15.5 psig.
: 15. Recognizes reading is NOT less than 15 psig.
Determines reading is greater than 15 psig.
_____        _____        _____
 
TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  16. Close 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV.
Instructs EO to close 2
-1501-47A per step G.12.c.(8).
_____        _____        _____
CUE: 2-1501-47A-R is Closed.
: 17. Open PP SUCT VLV MO 2
-
1501-5A. GREEN light illuminated.
_____         _____         _____
: 18. Notify Unit Supervisor that 2A LPCI pump cannot be used with suction from the CST.
Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
_____        _____        _____
CUE: Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.
Maintain the 2A LPCI pump in PTL.
Maintain the 2A LPCI pump in PTL.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
: 19. Verifies 2C LPCI PP control switch in Pull
: 19. Verifies 2C LPCI PP control           ALL lights extinguished.
-to-Lock. ALL lights extinguished.
switch in Pull-to-Lock.
_____         _____         _____
_____     _____           _____
* 20. Place PP SUCT VLV MO 2
* 20. Place PP SUCT VLV MO 2-              RED light illuminated.
-1501-5C control switch in Manual Bypass and verify closed. RED light illuminated
1501-5C control switch in
. _____        _____
_____    _____          _____
_____  21. Verify MIN FLOW VLV 2
Manual Bypass and verify closed.
-1501-13B closed if not needed. RED light illuminated.
: 21. Verify MIN FLOW VLV 2-                RED light illuminated.
_____         _____         _____
1501-13B closed if not
CUE: 2-1501-13B is not required for 2D LPCI pump.
_____     _____           _____
: 22. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
needed.
GREEN lights illuminated.
CUE:
_____        _____        _____
2-1501-13B is not required for 2D LPCI pump.
: 22. Verify TORUS CLG/TEST                 GREEN lights illuminated.
valves 2-1501-20A and
_____    _____          _____
2-1501-38A closed.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                          S-N-d Rev 09


TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ-JA-150-02 UNSAT        Comment PERFORMANCE CHECKLIST                             STANDARDS               SAT
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 23. Verify TORUS SPRAY VLVs               GREEN lights illuminated.
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  23. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed. GREEN lights illuminated.
2-1501-19A and 2-1501-18A
_____         _____         _____
_____     _____         _____
: 24. Verify DW SPRAY VLVs 2
closed.
-1501-28A and 2-1501-27A closed. GREEN lights illuminated.
: 24. Verify DW SPRAY VLVs 2-                GREEN lights illuminated.
_____         _____         _____
1501-28A and 2-1501-27A
: 25. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
_____     _____         _____
GREEN lights illuminated.
closed.
_____         _____         _____
: 25. Verify TORUS CLG/TEST                 GREEN lights illuminated.
: 26. Verify TORUS SPRAY VLVs  
valves 2-1501-20B and
_____    _____          _____
2-1501-38B closed.
: 26. Verify TORUS SPRAY VLVs                GREEN lights illuminated.
2-1501-19B and 2-1501-18B
_____     _____         _____
closed.
: 27. Verify DW SPRAY VLVs 2-                GREEN lights illuminated.
1501-28B and 2-1501-27B
_____    _____          _____
closed.
: 28. Unlock AND open 2-1501-                Instructs EO to complete 74C, U2 LPCI C PMP                  step G.12.e.(5).(a).
_____    _____          _____
VENT VLV.
: 29. Crack open 2-1501-15C, U2              Instructs EO to complete LPCI C PMP VENT VLV until            step G.12.e.(5).(b).
_____    _____          _____
flow is observed from pipe.
: 30. Close 2(3)-1501-15C, U2                Instructs EO to complete LPCI C PMP VENT VLV.                step G.12.e.(5).(c).
_____    _____          _____
: 31. Close AND lock 2-1501-74C,            Instructs EO to complete U2 LPCI C PMP                        step G.12.e.(5).(d).
_____    _____          _____
VENT VLV.
: 32. Open 2-1501-47C-R, U2 LPCI Instructs EO to obtain PI 2-C PUMP SUCT PI        2-            1501-47C reading per step
_____    _____          _____
1501-47C ROOT VLV (at                G.12.e.(6).
pump) and verify PI 2-1501-47C indicates less than 15 psig.
CUE:
Pressure is 10 psig. .
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-d Rev 09


2-1501-19B and 2-1501-18B closed. GREEN lights illuminated.
TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ-JA-150-02 UNSAT        Comment PERFORMANCE CHECKLIST                           STANDARDS             SAT
_____        _____        _____
: 33. Recognizes reading is less           Determines reading is than 15 psig.                       LESS than 15 psig.
: 27. Verify DW SPRAY VLVs 2
_____       _____         _____
-1501-28B and 2-1501-27B closed. GREEN lights illuminated.
: 34. Close 2-1501-47C-R, U2 LPCI Instructs EO to close 2-C PUMP SUCT PI                     1501-47C per step
_____        _____        _____
_____      _____          _____
: 28. Unlock AND open 2
2-1501-47C ROOT VLV.                G.12.e.(8).
-1501-74C, U2 LPCI C PMP VENT VLV. Instructs EO to complete step G.12.e.(5).(a).
* 35. Unlock AND open 2-1501-             Directs EO to perform 31C, U2 LPCI C PMP                   step G.12.e.(10)(a)       _____       _____         _____
_____        _____        _____
SUCT VLV FROM CST [at 2 C LPCI Pump]
: 29. Crack open 2
CUE:
-1501-15C, U2 LPCI C PMP VENT VLV until flow is observed from pipe.
2-1501-31C is open.
Instructs EO to complete step G.12.e.(5).(b).
* 36. Unlock AND open 2-1501-             Directs EO to perform 37, U2 LPCI & CS SUCT               step G.12.e.(10)(b)       _____       _____         _____
_____        _____        _____
FROM 2/3A CST SV (located at 2/3A CST)
: 30. Close 2(3)
-1501-15C, U2 LPCI C PMP VENT VLV. Instructs EO to complete step G.12.e.(5).(c).
_____        _____        _____
: 31. Close AND lock 2
-1501-74C, U2 LPCI C PMP VENT VLV. Instructs EO to complete step G.12.e.(5).(d).
_____        _____        _____
: 32. Open 2-1501-47C-R, U2 LPCI C PUMP SUCT PI      2
-1501-47C ROOT VLV (at pump) and verify PI 2
-1501-47C indicates less than 15 psig. Instructs EO to obtain PI 2
-
1501-47C reading per step G.12.e.(6).
_____        _____        _____
CUE: Pressure is 10 psig. .
 
TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  33. Recognizes reading is less than 15 psig.
Determines reading is LESS than 15 psig.
_____         _____         _____
: 34. Close 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV.
Instructs EO to close 2
-1501-47C per step G.12.e.(8).
_____        _____        _____
* 35. Unlock AND open 2-1501-31C, U2 LPCI C PMP SUCT VLV FROM CST [at 2 C LPCI Pump]
Directs EO to perform step G.12.e.(10)(a)
_____         _____         _____
CUE: 2-1501-31C is open
.
* 36. Unlock AND open 2-1501-37, U2 LPCI &
CS SUCT FROM 2/3A CST SV (located at 2/3A CST)
Directs EO to perform step G.12.e.(10)(b)
_____         _____         _____
Simulator Operator / Evaluator:
Simulator Operator / Evaluator:
Activate Trigger 15 to lineup 2C LPCI pump suction to the CST.
Activate Trigger 15 to lineup 2C LPCI pump suction to the CST.
CUE: 2-1501-37 is open
CUE:
. Examiner Note: If a RPV level band is requested: Direct the candidate to maintain RPV level between +8" and +48" (NOTE: RPV level is  
2-1501-37 is open.
-65" and dropping per the cue)
Examiner Note:
* 37. Start 2C LPCI PP Places control switch to start. RED light illuminated.
If a RPV level band is requested: Direct the candidate to maintain RPV level between +8 and +48 (NOTE: RPV level is -65 and dropping per the cue)
_____         _____
* 37. Start 2C LPCI PP                     Places control switch to start. RED light           _____       _____         _____
_____
illuminated.
TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ
SRRS: 3D.105 (when utilized for operator initial or continuing training)                         S-N-d Rev 09
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  38. Inform Unit Supervisor that 2C LPCI pump is lined up to the CST and the task is complete. Informs Unit Supervisor that 2C LPCI pump is lined up to the CST and injecting; the task is complete. _____        _____        _____
CUE: Acknowledge report of task completion.
END  JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ-JA-150-02 UNSAT        Comment PERFORMANCE CHECKLIST                            STANDARDS                SAT
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 38. Inform Unit Supervisor that            Informs Unit Supervisor 2C LPCI pump is lined up              that 2C LPCI pump is        _____    _____          _____
S-N-d Rev 09 JPM  
to the CST and the task is            lined up to the CST and complete.                              injecting; the task is complete.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                         S-N-d Rev 09
 
TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ-JA-150-02 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:           RO         SRO             SRO Cert JPM Title: LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number: S-N-d                                   Revision Number: 09 Task Number and Title: 29502LK061, Lineup LPCI to the CST K/A Number and Importance:               203000.A1.04              3.6 / 3.6 Suggested Testing Environment: Simulator Alternate Path:     Yes       No     SRO Only:         Yes         No     Time Critical:   Yes     No Reference(s): DEOP 0500-03, Rev 23 Actual Testing Environment:             Simulator           Control Room           In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 38 minutes                         Actual Time Used:             minutes EVALUATION  
Job Title:   RO     SRO     SRO Cert JPM Title:   LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number
: S-N-d Revision Number
: 0 9 Task Number and Title
: 29502LK061, Lineup LPCI to the CST K/A Number and Importance
:   203 000.A1.0 4 3.6 / 3.6 Suggested Testing Environment
:   Simulator Alternate Path
: Yes No SRO Only: Yes No Time Critical
: Yes No Reference(s)
: DEOP 0500-03, Rev 23 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
38 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                       Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                          S-N-d Rev 09
TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred requiring Alternate Water Injection
: 2. A transient has occurred requiring Alternate Water Injection.
. 3. RPV level is  
: 3. RPV level is -65 inches and slowly dropping.
-65 inches and slowly dropping.
: 4. RPV pressure is 140 psig and slowly dropping.
: 4. RPV pressure is 140 psig and slowly dropping.
: 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
: 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
: 6. 'B' Loop is selected for injection.
: 6. B Loop is selected for injection.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
-03. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section                  S-N-d Rev 09
 
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure CONTAINMENT - VENT CONTAINMENT WITH APCV - (A)
JPM Number: S-N-e Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By:
Instructor            Date Approved By:
Facility Representative        Date SRRS: 3D.100; There are no retention requirements for this section                  S-N-e Rev 00
 
TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-04 Rev: 16 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section                        S-N-e Rev 00


TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 0 0  Job Performance Measure CONTAINMENT
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.
- VENT CONTAINMENT WITH APCV - (A) JPM Number: S
SRRS: 3D.100; There are no retention requirements for this section                 S-N-e Rev 00
-N-e  Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date  Approved By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 0 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DEOP 0500-0 4  Rev:  16  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 0 0 Revision Record (Summary)
Revision 00 Created for ILT 15
-1 (2016-301) NRC Exam.


TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 0 0 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. (IC _51__ used for validation).
: 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work
. (IC _51__ used for validation).
NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Ensure Torus water level is <30 feet.
: 2. Ensure Torus water level is <30 feet.
: 3. Run the following CAEP file: S
: 3. Run the following CAEP file: S-N-e.cae
-N-e.cae 4. If the CAEP file cannot be ran insert the following Expert Commands: a. Insert following Malfunctions, Remotes, and/or Overrides:
: 4. If the CAEP file cannot be ran insert the following Expert Commands:
* IMF CIGP2I (Spurious Group II Isolation)
: a. Insert following Malfunctions, Remotes, and/or Overrides:
* IMF CIGP2I (Spurious Group II Isolation)
* Adjusts Torus Level indications to ~20 feet.
* Adjusts Torus Level indications to ~20 feet.
v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20
v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20
* Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0
* Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0
* Prevents the 2
* Prevents the 2-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off
-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off
* Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
* Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled
v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled
Line 1,515: Line 1,398:
v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0
v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0
: 5. Verify the SBGT system operating and verify flow ~4000 scfm.
: 5. Verify the SBGT system operating and verify flow ~4000 scfm.
: 6. Start ALL available ventilation exhaust fans as directed in DEOP 0500
: 6. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04.
-04. 7. Place CRM ISOL switch to ISOLATE  
: 7. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
- wait 10 seconds then verify a C/R Booster Fan is running.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.
DOCUMENT PREPARATION Markup a copy of DEOP 0 500-04 , Containment Venting
SRRS: 3D.100; There are no retention requirements for this section                          S-N-e Rev 00
.
 
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 0 0 INITIAL CONDITIONS
: 1. You are the Aux 2 NSO.
: 1. You are the Aux 2 NSO. 2. A break inside the Unit 2 Primary Containment has occurred.
: 2. A break inside the Unit 2 Primary Containment has occurred.
: 3. Torus bottom pressure is about to exceed the P CP limit in DEOP 0 200-01. 4. Torus water level is 20 feet. 5. Control Room ventilation has been isolated.
: 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
: 4. Torus water level is 20 feet.
: 5. Control Room ventilation has been isolated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 7. The Instrument Bus and ESS Bus are energized.
: 7. The Instrument Bus and ESS Bus are energized.
Line 1,529: Line 1,414:
: 9. The N2 System is in its normal lineup.
: 9. The N2 System is in its normal lineup.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0 500-04 , to control Primary Containment pressure.
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use: UNSAT requires written comments on respective step.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section                    S-N-e Rev 00


TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number Note     Provide examinee the marked up copy of DEOP 0500-04.
S-N-e Rev 00  JPM Start Time:
Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide examinee the marked up copy of DEOP 0500
: 1. Verify SBGT is operating and flow         Verifies 2/3A SBGT train is ~ 4000 scfm.                            FI 7540-13 is reading ~4000 scfm. ___   ___     ___
-04. Annunciator 902
: 2. Verify Reactor Mode switch NOT             Verifies Reactor Mode switch NOT in RUN.                                   in RUN.                              ___   ___     ___
-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.
: 3. Place VENT ISOL SIGNAL                     Momentarily places Bypass switch BYPASS switch on 902-5 panel to           to Torus Position.
: 1. Verify SBGT is operating and flow is ~ 4000 scfm.
TORUS.
Verifies 2/3A SBGT train FI 7540-13 is reading ~4000 scfm.
___    ___     ___
___ ___ ___ 2. Verify Reactor Mode switch NOT in RUN. Verifies Reactor Mode switch NOT in RUN. ___ ___ ___ 3. Place VENT ISOL SIGNAL BYPASS switch on 902
: 4. Open AO 2-1601-61, TORUS 2-               Places AO 2-1601-61 control INCH VENT VLV.                            switch to OPEN position and determines that the valve will not open.
-5 panel to TORUS. Momentarily places Bypass switch to Torus Position.
___   ___      ___
___   ___
  *5. Place the VENT ISOL SIGNAL                Places the VENT ISOL SIGNAL BYPASS Switch on 902-5 to                  BYPASS Switch on 902-5 to DRYWELL.                                  DRYWELL
___ 4. Open AO 2-1601-61, TORUS 2
___    ___      ___
-INCH VENT VLV.
  *6. Open AO 2-1601-62, DW 2-INCH              Places AO 2-1601-62 control VENT VLV.                                  switch to OPEN.
Places AO 2
Green light extinguishes and Red light illuminates.              ___    ___      ___
-1601-61 control switch to OPEN position and determines that the valve will not open.
  *7. Open AO 2-1601-63, VENT TO                Places AO 2-1601-63 control SBGT.                                      switch to OPEN.
___
Green light extinguishes and Red light illuminates.              ___    ___      ___
: 8. Determine if SBGT flow is                  Determines Containment pressure adequate to control and maintain          trend.
Torus Bottom pressure below the Primary Containment Pressure Limit.                                                                          ___    ___      ___
Examiner Note:
DW pressure as indicated on PR/FR 2-8540-2/4 is as read and no change is expected with the small diameter vent path in service.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-e Rev 00


___ 
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number Cue If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
 
___ *5. Place the VENT ISOL SIGNAL BYPASS Switch on 902
-5 to DRYWELL. Places the VENT ISOL SIGNAL BYPASS Switch on 902
-5 to DRYWELL  ___
___
___ *6. Open AO 2-1601-62, DW 2-INCH VENT VLV. Places AO 2
-1601-62 control switch to OPEN.
Green light extinguishes and Red light illuminates.
 
___ 
 
___ 
 
___ *7. Open AO 2-1601-63, VENT TO SBGT. Places AO 2
-1601-63 control switch to OPEN.
Green light extinguishes and Red light illuminates.
 
___ 
 
___ 
 
___ 8. Determine if SBGT flow is adequate to control and maintain Torus Bottom pressure below the Primary Containment Pressure Limit. Determines Containment pressure trend. ___
___ 
 
___ Examiner Note:
DW pressure as indicated on PR/FR 2
-8540-2/4 is as read and no change is expected with the small diameter vent path in service.
 
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number Cue If examinee reads TORUS BOTTOM PRESS PI 2
-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
: 9. Determines use of AUGMENTED PRI CNMT VENT (APCV) System is required
: 9. Determines use of AUGMENTED               Proceeds to Attachment 1 step 6.
. Proceeds to Attachment 1 step 6.
PRI CNMT VENT (APCV) System is required.
___
___   ___      ___
___
*10. Place AUGMENTED PRI CNMT                   Rotates control switch clockwise to VENT MODE SWITCH to APCV                   APCV position on Panel 902-3
___ *10. Place AUGMENTED PRI CNMT VENT MODE SWITCH to APCV on Panel 902
___   ___      ___
-3 Rotates control switch clockwise to APCV position
: 11. Verify closed AO 2-1601-63, VENT           Verifies AO-2-1601-63 in closed.
___
TO SBGT                                    GREEN light lit, RED light extinguished.
___
___   ___      ___
___ 11. Verify closed AO 2
: 12. Verify closed AO 2-1601-91, VENT           Verifies AO-2-1601-91 in closed.
-1601-63, VENT TO SBGT Verifies AO-2-1601-63 in closed. GREEN light lit, RED light extinguished.
TO RX BLDG EXH SYS                        RED light lit, GREEN light extinguished.
___
___   ___      ___
___
*13. Place TORUS ISOLATION                      Rotates TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60                 GROUP 2 OVERRIDE 2-1601-60 switch to OVERRIDE and hold on            keylock switch clockwise and holds 902-3 Panel
___ 12. Verify closed AO 2
___    ___     ___
-1601-91, VENT TO RX BLDG EXH SYS Verifies AO 1601-91 in closed. RED light lit, GREEN light extinguished.
*14. Place DRYWELL ISOLATION                    Rotates DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23                 GROUP 2 OVERRIDE 2-1601-23 switch to OVERRIDE and release            keylock switch clockwise and on 902-3 Panel                            releases
___
___   ___      ___
___
  *15. Release TORUS ISOLATION                    Releases TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60                 GROUP 2 OVERRIDE 2-1601-60 on 902-3 Panel                            keylock switch
___ *13. Place TORUS ISOLATION GROUP 2 OVERRIDE 2
___   ___      ___
-1601-60 switch to OVERRIDE and hold on 902-3 Panel Rotates TORUS ISOLATION GROUP 2 OVERRIDE 2
*16. Place CMNT ISOLATION GROUP                 Rotates CMNT ISOLATION 2 OVERRIDE 2-1601-24 switch to             GROUP 2 OVERRIDE 2-1601-24 OVERRIDE and release on 902-3              keylock switch clockwise and Panel                                      releases
-1601-60 keylock switch clockwise and holds
___   ___     ___
___    ___   ___ *14. Place DRYWELL ISOLATION GROUP 2 OVERRIDE 2
SRRS: 3D.105 (when utilized for operator initial or continuing training)                         S-N-e Rev 00
-1601-23 switch to OVERRIDE and release on 902-3 Panel Rotates DRYWELL ISOLATION GROUP 2 OVERRIDE 2
-1601-23 keylock switch clockwise and releases
___
 
___  
 
___ *15. Release TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 on 902-3 Panel Releases TORUS ISOLATION GROUP 2 OVERRIDE 2
-1601-60 keylock switch
___
___
___ *16. Place CMNT ISOLATION GROUP 2 OVERRIDE 2
-1601-24 switch to OVERRIDE and release on 902
-3 Panel Rotates CMNT ISOLATION GROUP 2 OVERRIDE 2
-1601-24 keylock switch clockwise and releases
___
 
___
 
___
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number *17. Open AO 2-1601-60, TORUS VENT VLV. Determines Torus Water Level is less than 30 feet and opens AO 2
-1601-60, TORUS VENT VLV.
___
___
___ *18. Open AO 2-1601-24, VENT TO RX BLDG EXH SYS.
Rotates AO 2
-1601-24, VENT TO RX BLDG EXH SYS control switch clockwise and verifies GREEN light extinguishes and RED light illuminates
 
___ 
 
___ 
 
___ *19. Open AO 2-1601-92 VENT TO MAIN CHIMNEY to control and maintain Primary Containment pressure below limit.
Rotates AO 2
-1601-92 VENT TO MAIN CHIMNEY control switch clockwise and verifies GREEN light extinguishes and RED light illuminates
 
___ 


___   
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 Comment SAT    UNSAT STEP                  ELEMENT                                  STANDARD Number
*17. Open AO 2-1601-60, TORUS                  Determines Torus Water Level is VENT VLV.                                  less than 30 feet and opens AO 2-1601-60, TORUS VENT VLV.
___    ___      ___
  *18. Open AO 2-1601-24, VENT TO RX Rotates AO 2-1601-24, VENT TO BLDG EXH SYS.                RX BLDG EXH SYS control switch clockwise and verifies GREEN light extinguishes and RED light illuminates                                      ___    ___      ___
*19. Open AO 2-1601-92 VENT TO                  Rotates AO 2-1601-92 VENT TO MAIN CHIMNEY to control and                MAIN CHIMNEY control switch maintain Primary Containment              clockwise and verifies GREEN pressure below limit.                      light extinguishes and RED light illuminates                        ___    ___      ___
Cue:
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks, DW pressure recorder PR/FR 2-8540-2/4 is slowly lowering.
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
: 20. Informs Unit Supervisor task is            Examinee notifies the Unit complete.                                  Supervisor.                        ___    ___      ___
Cue      Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-e Rev 00


___ Cue: DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM  
If examinee asks, DW pressure recorder PR/FR 2
-8540-2/4 is slowly lowering.
If examinee asks reading on TORUS BOTTOM PRESS PI 2
-1640-103,                                                      inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
: 20. Informs Unit Supervisor task is complete. Examinee notifies the Unit Supervisor.
___  ___  ___ Cue Acknowledge report of task completion.
END  JPM Stop Time:
 
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:           RO         SRO             SRO Cert JPM Title: Containment - Vent Containment with APCV - (A)
Job Title:   RO     SRO     SRO Cert JPM Title:   Containment  
JPM Number: S-N-e                                   Revision Number: 00 Task Number and Title: 295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit.
- Vent Containment with APCV  
K/A Number and Importance:               223001.A4.07         4.2*/4.1 Suggested Testing Environment: Simulator Alternate Path:     Yes       No     SRO Only:         Yes         No   Time Critical:   Yes     No Reference(s): DEOP 0500-04, Rev 16 Actual Testing Environment:             Simulator           Control Room         In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 9 minutes                         Actual Time Used:           minutes EVALUATION  
- (A) JPM Number
: S-N-e Revision Number
: 0 0 Task Number and Title
: 295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit. K/A Number and Importance
:   223001.A4.07     4.2*/4.1 Suggested Testing Environment
:   Simulator Alternate Path
: Yes No SRO Only: Yes No Time Critical
: Yes No Reference(s)
: DEOP 0500-04, Rev 16 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
9 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00  INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Aux 2 NSO. 2. A break inside the Unit 2 Primary Containment has occurred.
: 1. You are the Aux 2 NSO.
: 3. Torus bottom pressure is about to exceed the P CP limit in DEOP 0 200-01. 4. Torus water level is 20 feet. 5. Control Room ventilation has been isolated.
: 2. A break inside the Unit 2 Primary Containment has occurred.
: 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
: 4. Torus water level is 20 feet.
: 5. Control Room ventilation has been isolated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 7. The Instrument Bus and ESS Bus are energized.
: 7. The Instrument Bus and ESS Bus are energized.
Line 1,698: Line 1,512:
: 9. The N2 System is in its normal lineup.
: 9. The N2 System is in its normal lineup.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0 500-04 , to control Primary Containment pressure.
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section                S-N-e Rev 00
TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
Instructor            Date Approved By:
Facility Representative        Date SRRS: 3D.100; There are no retention requirements for this section                  S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 6700-18                Rev: 13 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section                          S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 02 Updated to comply with rev 4 of DOP 6500-10 Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section                  S-N-f Rev 03


TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03  Job Performance Measure Restore Normal Feed to 28
: 1. Reset the simulator to any IC (IC _51__ used for validation).
-7/29-7 from Bus 29 JPM Number: S
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
-N-f  Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
: 2. Hold MCC 29-7/28-7 Feed from Bus 29 in TRIP until MCC 29-7/28-7 Feed from Bus 28 CLOSES.
Instructor Date  Approved By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DOP 6700-18  Rev:  1 3  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 Revision Record (Summary)
Revision 02 Updated to comply with rev 4 of DOP 6500
-10 Revision 03 Revised for ILT 15
-1 (2016-301) NRC Exam TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC (IC _5 1__ used for validation).
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Hold MCC 29
-7/28-7 Feed from Bus 29 in TRIP until MCC 29
-7/28-7 Feed from Bus 28 CLOSES.
: 3. This completes the setup for this JPM.
: 3. This completes the setup for this JPM.
DOCUMENT PREPARATION Mark up copy of DOP 6700
DOCUMENT PREPARATION Mark up copy of DOP 6700-18, Bus 28 Outage.
-18, Bus 28 Outage.
SRRS: 3D.100; There are no retention requirements for this section                            S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. MCC 28-7/29-7 is powered from Bus 28.
: 1. MCC 28-7/29-7 is powered from Bus 28.
: 2. Power has been restored to Bus 29.
: 2. Power has been restored to Bus 29.
Line 1,743: Line 1,556:
: 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
: 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
INITIATING CUE
INITIATING CUE
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
-7/29-7 per DOP 6700
-18 Step G.5
: 2. Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
: 2. Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section                      S-N-f Rev 03


TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number
S-N-f Rev 03  JPM Start Time:
: 1. Declare BOTH LPCI subsystems               Informs the Unit Supervisor BOTH inoperable                                LPCI subsystems must be declared inoperable.
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1. Declare BOTH LPCI subsystems inoperable Informs the Unit Supervisor BOTH LPCI subsystems must be declared inoperable.
Reference TS 3.5.2
Reference TS 3.5.2
___    ___      ___
Cue      Respond: Division 1 and 2 LPCI subsystems are inoperable.
  *2. Open the feed breaker from Bus            Opens the feed breaker AND 28, MCC 29-7/28-7 FEED FROM                maintains the switch in TRIP.
BUS 28, by placing control switch in TRIP AND maintain switch in TRIP.
___    ___      ___
  *3. Close feed breaker from Bus 29,            Closes the feed breaker MCC 29-7/28-7 FEED FROM BUS 29.
___    ___      ___
  *4. Release feed breaker from Bus 28,          Releases feed breaker control MCC 29-7/28-7 FEED FROM BUS                switch 28, control switch.
___    ___      ___
: 5. Notify the Unit 2 Supervisor that          Unit 2 Supervisor notified.
normal feed has been restored to MCC 28-7/29-7.
___    ___      ___
Cue      Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-f Rev 03


___ 
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM  
 
___ 
 
___ Cue Respond: Division 1 and 2 LPCI subsystems are inoperable.
*2. Open the feed breaker from Bus 28, MCC 29
-7/28-7 FEED FROM BUS 28, by placing control switch in TRIP AND maintain switch in TRIP. Opens the feed breaker AND maintains the switch in TRIP.
 
___
___
___ *3. Close feed breaker from Bus 29, MCC 29-7/28-7 FEED FROM BUS
: 29. Closes the feed breaker
___  ___
___ *4. Release feed breaker from Bus 28, MCC 29-7/28-7 FEED FROM BUS 28, control switch.
Releases feed breaker control switch  ___
___
___ 5. Notify the Unit 2 Supervisor that normal feed has been restored to MCC 28-7/29-7. Unit 2 Supervisor notified.
___
___
___ Cue Acknowledge report of task completion.
END  JPM Stop Time:
 
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-f Rev 03 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:           RO         SRO             SRO Cert JPM Title: Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f                                   Revision Number: 03 Task Number and Title: 262L026, Restore Normal Feed to 28-7/29-7 from Bus 29 K/A Number and Importance:               262001.A4.01             3.4 / 3.7 Suggested Testing Environment: Simulator Alternate Path:     Yes       No     SRO Only:         Yes         No     Time Critical:   Yes       No Reference(s): DOP 6700-18, Rev 13 Actual Testing Environment:             Simulator           Control Room           In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 12 minutes                         Actual Time Used:             minutes EVALUATION  
Job Title:   RO     SRO     SRO Cert JPM Title:   Restore Normal Feed to 28
-7/29-7 from Bus 29 JPM Number
: S-N-f Revision Number
: 0 3 Task Number and Title
: 262L026, Restore Normal Feed to 28
-7/29-7 from Bus 29 K/A Number and Importance
:   262001.A4.01 3.4 / 3.7 Suggested Testing Environment
:   Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical
: Yes No Reference(s)
: DOP 6700-18, Rev 13 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
12 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                       Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                          S-N-f Rev 03
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 0 3  INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. MCC 28-7/29-7 is powered from Bus 28.
: 1. MCC 28-7/29-7 is powered from Bus 28.
: 2. Power has been restored to Bus 29.
: 2. Power has been restored to Bus 29.
Line 1,819: Line 1,607:
: 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
: 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
INITIATING CUE
INITIATING CUE
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
-18 Step G.5
: 2. Notify the Unit 2 Supervisor when the task is complete SRRS: 3D.100; There are no retention requirements for this section                  S-N-f Rev 03
: 2. Notify the Unit 2 Supervisor when the task is complete


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02  Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP)
S-N-g Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By:
S-N-g Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By:
Instructor             Date Approved By:
Instructor Date Approved By:
Facility Representative       Date SRRS: 3D.100; There are no retention requirements for this section                  S-N-g Rev 02
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
 
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 2. Knowledge and Abilities (K/A) references are included.
________     1. Task description and number, JPM description and number are identified.
________ 3. Performance location specified. (in
________     2. Knowledge and Abilities (K/A) references are included.
-plant, control room, simulator, or other)
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________     4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________     6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure   DOP 0700-01 Rev:   1 5  Procedure   DOA 0700-02 Rev:   13 Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict.
Procedure DOP 0700-01               Rev: 15 Procedure DOA 0700-02               Rev: 13 Procedure                           Rev:
________ 11. Verify performance time is accurate
________     10. Verify cues both verbal and visual are free of conflict.
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     11. Verify performance time is accurate
________ 13. When JPM is initially validated, sign and date JPM cover page.
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Subsequent validations, sign and date below:
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.100; There are no retention requirements for this section                        S-N-g Rev 02
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 Revision Record (Summary)
 
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 00 New JPM for the 2010 LORT exam.
Revision 00 New JPM for the 2010 LORT exam.
Revision 01 Updated for the 2012 LORT exam.
Revision 01 Updated for the 2012 LORT exam.
Revision 02 Revised for ILT 15
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section                S-N-g Rev 02
-1 (2016-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to a 2-3% power IC (IC _53__ used for validation).
: 1. Reset the simulator to a 2
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
-3% power IC (IC _53__ used for validation).
: 2. Position SRM detectors for a 104 to 105 count rate. (Should not be in the fully withdrawn position)
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 3. Run CAEP file: S-N-f.cae
: 2. Position SRM detectors for a 10 4 to 105 count rate. (Should not be in the fully withdrawn position)
: 4. If CAEP file cannot be ran, insert the following Expert Commands:
: 3. Run CAEP file: S
-N-f.cae 4. If CAEP file cannot be ran, insert the following Expert Commands:
: a. Malfunctions required:
: a. Malfunctions required:
: 1) imf nis22det (Inserts SRM 22 stuck malfunction)
: 1) imf nis22det (Inserts SRM 22 stuck malfunction)
: b. Triggers required:
: b. Triggers required:
: 1) trgset 1 "nilsdet(2) .and. nil104do"
: 1) trgset 1 nilsdet(2) .and. nil104do
: 2) trgset 2 "et_array(1) .and. nilsdet(2) .and. nil101di"
: 2) trgset 2 et_array(1) .and. nilsdet(2) .and. nil101di
: 3) trg 2 "dmf nis22det" DOCUMENT PREPARATION Clean copies of the following procedures:
: 3) trg 2 dmf nis22det DOCUMENT PREPARATION Clean copies of the following procedures:
* DOP 0700-01, Source Range monitor Operation (SRM)
* DOP 0700-01, Source Range monitor Operation (SRM)
* DOA 0700-02, SRM or IRM Detector Stuck
* DOA 0700-02, SRM or IRM Detector Stuck SRRS: 3D.100; There are no retention requirements for this section                            S-N-g Rev 02


TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 INITIAL CONDITIONS
: 1. Unit 2 startup is in progress.
: 1. Unit 2 startup is in progress.
: 2. You are an extra NSO assisting the startup.
: 2. You are an extra NSO assisting the startup.
: 3. Primary Containment has been established.
: 3. Primary Containment has been established.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
-01, Source Range Monitor Operation (SRM).
: 2. Your Pre-Job Brief has been completed.
: 2. Your Pre-Job Brief has been completed.
: 3. Notify the Unit supervisor upon completion of the task.
: 3. Notify the Unit supervisor upon completion of the task.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section                    S-N-g Rev 02


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number Note     Provide the Examinee a copy of DOP 0700-01.
S-N-g Rev 02  JPM Start Time:
: 1. WHEN IRM down scale alarms                 IRM down scales are cleared by have cleared, THEN start SRM               initial conditions.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 0700
withdrawal and maintain SRM               Monitors count rate when count rate 290 cps to 8.85x104            withdrawing SRMs.
-01. 1. WHEN IRM down scale alarms have cleared, THEN start SRM withdrawal and maintain SRM count rate 290 cps to 8.85x10 4 cps. IRM down scales are cleared by initial conditions.
cps.                                                                              ___    ___     ___
Monitors count rate when withdrawing SRMs.
  *2. Depress the applicable                     Depresses each SRMs SELECT SELECT switch (LIT when                   switch.
 
selected).
___
Verifies SELECT light lit.             ___    ___     ___
 
  *3. Depress and hold the DRIVE                 Depress and hold the DRIVE OUT OUT switch to withdraw SRMs                switch to withdraw SRMs to maintain SRM count rate of 290 cps to 8.85x104 cps.                                                         ___    ___     ___
___
BEGIN ALTERNATE PATH
 
: 4. Verify that SRMs indication is             For SRMs 21, 23 & 24:
___ *2. Depress the applicable SELECT switch (LIT when selected).
changing as expected.
Depresses each SRM's SELECT switch. Verifies SELECT light lit.
 
___
 
___
 
___ *3. Depress and hold the DRIVE OUT switch to withdraw SRMs to maintain SRM count rate of 290 cps to 8.85x10 4 cps. Depress and hold the DRIVE OUT switch to withdraw SRMs
___    ___   ___ BEGIN ALTERNATE PATH
: 4. Verify that SRMs indication is changing as expected.
For SRMs 21, 23 & 24:
* Count rate drops.
* Count rate drops.
* Period indicates negative.
* Period indicates negative.
* OUT light is lit when detector reaches full out position.
* OUT light is lit when detector reaches full out position.
For SRM 22 indications remain unchanged.
For SRM 22 indications remain unchanged.                             ___    ___      ___
: 5. Report SRM 22 detector did not            Reports SRM 22 detector did not move and/or appears to be stuck.          move and/or appears to be stuck.      ___    ___      ___
Note    The Examinee should allow SRMs 21, 23, 24 to fully withdraw.
Cue      Acknowledge report. Announce entering DOA 0700-02, SRM or IRM Detector Stuck. Direct the Examinee to perform DOA 0700-02. When the Examinee locates DOA 0700-02, give him the provided copy of DOA 0700-02.
Note    The Examinee may have already deselected SRMs earlier.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                          S-N-g Rev 02


___ 
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number
 
  *6. Depress SRM SELECT                        Depresses SRM SELECT switches to establish ONLY                 switches to establish ONLY SRM 22 selected                            SRM 22 SELECT light lit.             ___   ___     ___
___ 
Note     An automatic Trigger is setup to delete the SRM stuck detector malfunction when it is inserted.
 
  *7. Use DRIVE IN AND DRIVE OUT                 Depresses DRIVE IN switch to switches to move stuck SRM                 move SRM 22.
___ 5. Report SRM 22 detector did not move and/or appears to be stuck.
detector in both directions to free it.
Reports SRM 22 detector did not move and/or appears to be stuck.
___   ___      ___
___  ___  ___ Note The Examinee should allow SRMs 21, 23, 24 to fully withdraw. Cue Acknowledge report. Announce "entering DOA 0700
: 8. Verify indication that SRM 22 is           Observes SRM 22:
-02, SRM or IRM Detector Stuck". Direct the Examinee to "perform DOA 0700
moving.
-02". When the Examinee locates DOA 0700
-02, give him the provided copy of DOA 0700
-02. Note The Examinee may have already deselected SRMs earlier.
 
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-g Rev 02 STEP ELEMENT STANDARD SAT UNSAT Comment Number *6. Depress SRM SELECT switches to establish ONLY SRM 22 selected Depresses SRM SELECT switches to establish ONLY SRM 22 SELECT light lit.
___
___   ___ Note An automatic Trigger is setup to delete the SRM stuck detector malfunction when it is inserted. *7. Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it. Depress es DRIVE IN switch to move SRM 22.
 
___
 
___
 
___ 8. Verify indication that SRM 22 is moving. Observes SRM 22:
* Count rate rises.
* Count rate rises.
* Period indicates positive.
* Period indicates positive.
 
___   ___      ___
___
  *9. Depress DRIVE IN switch to stop           Depresses DRIVE IN switch to SRM 22.                                    stop SRM 22.
 
___   ___      ___
___
*10. Use DRIVE IN AND DRIVE OUT                Depresses and holds DRIVE OUT switches to move stuck SRM                 switch to move SRM 22.
 
detector in both directions to free       Drives SRM 22 fully out.
___ *9. Depress DRIVE IN switch to stop SRM 22. Depresses DRIVE IN switch to stop SRM 22.
it.
___
___    ___     ___
___
: 11. Verify that SRM 22 indication is           Observes SRMs 22:
___ *10. Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it. Depresses and holds DRIVE OUT switch to move SRM
changing as expected.
: 22. Drives SRM 22 fully out.
___    ___   ___ 11. Verify that SRM 22 indication is changing as expected.
Observes SRMs 22:
* Count rate drops.
* Count rate drops.
* Period indicates negative.
* Period indicates negative.
* OUT light is lit when detector reaches full out position.
* OUT light is lit when detector reaches full out position.         ___    ___     ___
 
: 12. Report SRM 22 detector is fully           Reports SRM 22 detector is fully withdrawn.                                 withdrawn.                            ___   ___     ___
___
Cue     Acknowledge report.
___
END JPM Stop Time:
___ 12. Report SRM 22 detector is fully withdrawn.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                          S-N-g Rev 02
Reports SRM 22 detector is fully withdrawn.
___ ___ ___ Cue Acknowledge report. END JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM  
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-g Rev 02 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:           RO         SRO             SRO Cert JPM Title: Withdraw SRM Detectors with a Stuck SRM Detector (AP)
Job Title:   RO     SRO     SRO Cert JPM Title:   Withdraw SRM Detectors with a Stuck SRM Detector (AP)
JPM Number: S-N-g                                   Revision Number: 02 Task Number and Title: 215L022 Respond to an SRM or IRM stuck detector.
JPM Number
K/A Number and Importance:               215004A4.04               3.2 / 3.2 Suggested Testing Environment: Simulator Alternate Path:     Yes       No     SRO Only:         Yes         No     Time Critical:   Yes     No Reference(s): DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment:             Simulator           Control Room           In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 18 minutes                         Actual Time Used:             minutes EVALUATION  
: S-N-g Revision Number
: 0 2 Task Number and Title
: 215L022   Respond to an SRM or IRM stuck detector.
K/A Number and Importance
:   215004A4.04 3.2 / 3.2 Suggested Testing Environment
:   Simulator Alternate Path
: Yes No SRO Only: Yes No Time Critical
: Yes No Reference(s)
: DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
18 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                       Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                          S-N-g Rev 02
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02  INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. Unit 2 startup is in progress.
: 1. Unit 2 startup is in progress.
: 2. You are an extra NSO assisting the startup.
: 2. You are an extra NSO assisting the startup.
: 3. Primary Containment has been established.
: 3. Primary Containment has been established.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
-01, Source Range Monitor Operation (SRM).
: 2. Your Pre-Job Brief has been completed.
: 2. Your Pre-Job Brief has been completed. 3. Notify the Unit supervisor upon completion of the task.
: 3. Notify the Unit supervisor upon completion of the task.
SRRS: 3D.100; There are no retention requirements for this section                S-N-g Rev 02


TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ-JA-150-02 Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03  Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S
Instructor             Date Approved By:
-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
Facility Representative        Date SRRS: 3D.100; There are no retention requirements for this section                 S-N-h Rev 03
Instructor Date Approved By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DOP 7500-01  Rev:  36  Procedure DAN 902(3)
-3 F-14 Rev:  20  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 Revision Record (Summary)
Revision 01 Bank JPM. Revision 02 Revised for 2010 Cert Exam.
Revision 03 Modified for ILT 15
-1 (2016-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 SIMULATOR SETUP INSTRUCTIONS
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 7500-01                Rev: 36 Procedure DAN 902(3)-3 F-14 Rev: 20 Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section                        S-N-h Rev 03
 
TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 Cert Exam.
Revision 03 Modified for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section                 S-N-h Rev 03
 
TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation).
: 1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation).
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:       It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Place the 2/3A SBGT train control switch in STBY.
: 2. Place the 2/3A SBGT train control switch in STBY.
: 3. Place the 2/3B SBGT train control switch in PRI.
: 3. Place the 2/3B SBGT train control switch in PRI.
Line 2,042: Line 1,787:
* 3A RX BLDG EXH FAN
* 3A RX BLDG EXH FAN
* 3B RX BLDG EXH FAN
* 3B RX BLDG EXH FAN
: 5. Run CAEP file S
: 5. Run CAEP file S-N-h.cae
-N-h.cae 6. If the CAEP file cannot be ran, insert the following Expert Commands:
: 6. If the CAEP file cannot be ran, insert the following Expert Commands:
: a. ior vrdtp3c trip (Prevents autostart of 2C RB vent fan)
: a. ior vrdtp3c trip (Prevents autostart of 2C RB vent fan)
: b. ior vrdtp4c trip (Prevents autostart of 2C RB exhaust fan)
: b. ior vrdtp4c trip (Prevents autostart of 2C RB exhaust fan)
: c. irf cirbvall lifted (Prevents Secondary Containment Isolation on U2)
: c. irf cirbvall lifted (Prevents Secondary Containment Isolation on U2)
: d. trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START) e. imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal)
: d. trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START)
: e. imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal)
: f. imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan).
: f. imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan).
: g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan).
: g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan).
: h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan).
: h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan).
: i. imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan).
: i. imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan).
DOCUMENT PREPARATION Clean copy of DOP 7500-01. Clean copy of DAN 902(3)
DOCUMENT PREPARATION Clean copy of DOP 7500-01.
-3 F-14 TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ
Clean copy of DAN 902(3)-3 F-14 SRRS: 3D.100; There are no retention requirements for this section                                S-N-h Rev 03
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 INITIAL CONDITIONS
 
TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train.
. 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
: 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
: 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded
: 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
. 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours.
: 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01.
-01. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section                    S-N-h Rev 03


TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number Note     Provide the Examinee a copy of DOP 7500-01.
S-N-h Rev 03  JPM Start Time:
  *1. Place the 2/3A SBGT SELECT                 Places the 2/3A SBGT SELECT switch to A PRI position.                  switch to the A PRI position.       ___   ___     ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 7500-01. *1. Place the 2/3A SBGT SELECT switch to A PRI position.
  *2. Place the 2/3B SBGT SELECT                 Places the 2/3B SBGT SELECT switch to B STBY position.                switch to the B STBY position.     ___   ___     ___
Places the 2/3A SBGT SELECT switch to the A PRI position. ___ ___ ___ *2. Place the 2/3B SBGT SELECT switch to B STBY position.
: 3. Verify the 2/3A and B AIR                 Both GREEN lights illuminated.
Places the 2/3B SBGT SELECT switch to the B STBY position.
HEATERs are OFF.                                                              ___   ___     ___
___ ___ ___ 3. Verify the 2/3A and B AIR HEATERs are OFF.
: 4. Verify the 2/3A and B Fans are             Both GREEN lights illuminated.
Both GREEN lights illuminated.
OFF.                                                                          ___   ___     ___
___ ___ ___ 4. Verify the 2/3A and B Fans are OFF. Both GREEN lights illuminated.
: 5. Verify annunciators 923-5 A-6 and         Both annunciator tiles 923-5 B-6 are NOT in alarm.               extinguished.                       ___   ___     ___
___ ___ ___ 5. Verify annunciators 923
: 6. Verify 2/3B SBGT SELECT                   Verifies 2/3 B SBGT Select switch SWITCH in B STBY position.                in B STBY.                         ___   ___     ___
-5 A-6 and 923-5 B-6 are NOT in alarm.
Note     When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds. The resulting Secondary Containment Isolation fails and the operator should complete the isolation.
Both annunciator tiles extinguished.
  *7. Starts 2/3A SBGT train.                   Places 2/3 A SBGT Select switch to START A position.               ___   ___     ___
___ ___ ___ 6. Verify 2/3B SBGT SELECT SWITCH in B STBY position.
: 8. Verifies the 2/3A SBGT train               Begins verifying the 2/3A SBGT initiated properly.                        train operating properly.           ___   ___     ___
Verifies 2/3 B SBGT Select switch in B STBY.
: 9. Records the Start Time on                 Records the Start Time on Operator Aid.                              Operator Aid                        ___   ___     ___
___ ___ ___ Note When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds. The resulting Secondary Containment Isolation fails and the operator should complete the isolation.
BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur, and perform the Limitations and Actions.
*7. Starts 2/3A SBGT train.
Cue If examinee does not react to the alarm on the 902-3 panel, make the following update:
Places 2/3 A SBGT Select switch to START A position.
Attention for an Update. RX BLDG VENT CH A RAD HI-HI is in. End of Update.
___ ___ ___ 8. Verifies the 2/3A SBGT train initiated properly.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                       S-N-h Rev 03
Begins verifying the 2/3A SBGT train operating properly.
___ ___ ___ 9. Records the Start Time on Operator Aid.
Records the Start Time on Operator Aid ___ ___ ___ BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur,                     and perform the Limitations and Actions.
Cue If examinee does not react to the alarm on the 902
-3 panel, make the following update:
"Attention for an Update. RX BLDG VENT CH A RAD HI
-HI is in. End of Update."
 
TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number Note If the examinee starts to head to the 902
-3 panel to respond to the 902
-3 F-14 annunciator stop them and hand them the provided copy of the DAN.
*10. Verifies trip of 3A RX BLDG VENT FAN. Determines 3A RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG VENT FAN to the Trip position. Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated).
 
___ 
 
___ 
 
___ *11. Verifies trip of 3B RX BLDG VENT FAN. Determines 3B RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG VENT FAN to the Trip position. Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated).
 
___ 
 
___ 
 
___ 12. Verifies trip of 3C RX BLDG VENT FAN. GREEN light illuminated.
___  ___  ___ *13. Verifies trip of 3A RX BLDG EXH FAN. Determines 3A RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG EXH FAN to the Trip position. Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated).
 
___ 
 
___ 
 
___ *14. Verifies trip of 3B RX BLDG EXH FAN. Determines 3B RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG EXH FAN to the Trip position. Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated).
 
___ 


___   
TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ-JA-150-02 Comment SAT    UNSAT STEP                  ELEMENT                                  STANDARD Number Note If the examinee starts to head to the 902-3 panel to respond to the 902-3 F-14 annunciator stop them and hand them the provided copy of the DAN.
*10. Verifies trip of 3A RX BLDG VENT          Determines 3A RX BLDG VENT FAN.                                      FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG VENT FAN to the Trip position.
Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated).
___   ___      ___
  *11. Verifies trip of 3B RX BLDG VENT          Determines 3B RX BLDG VENT FAN.                                      FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG VENT FAN to the Trip position.
Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated).                        ___    ___      ___
: 12. Verifies trip of 3C RX BLDG VENT          GREEN light illuminated.
FAN.                                                                            ___    ___      ___
*13. Verifies trip of 3A RX BLDG EXH            Determines 3A RX EXH VENT FAN.                                      FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG EXH FAN to the Trip position.
Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated).                        ___    ___      ___
*14. Verifies trip of 3B RX BLDG EXH            Determines 3B RX EXH VENT FAN.                                      FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG EXH FAN to the Trip position.
Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated).                        ___    ___      ___
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-h Rev 03


___
TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ-JA-150-02 Comment SAT    UNSAT STEP                   ELEMENT                                   STANDARD Number
TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ
: 15. Verifies trip of 3C RX BLDG EXH           GREEN light illuminated.
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
FAN.                                                                            ___   ___     ___
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number 15. Verifies trip of 3C RX BLDG EXH FAN. GREEN light illuminated.
: 16. Verifies trip of 2A RX BLDG VENT           GREEN and AMBER lights FAN.                                      illuminated.                         ___   ___     ___
___ ___ ___ 16. Verifies trip of 2A RX BLDG VENT FAN. GREEN and AMBER lights illuminated.
: 17. Verifies trip of 2B RX BLDG VENT           GREEN and AMBER lights FAN.                                      illuminated.                         ___   ___     ___
___ ___ ___ 17. Verifies trip of 2B RX BLDG VENT FAN. GREEN and AMBER lights illuminated.
: 18. Verifies trip of 2C RX BLDG VENT           GREEN light illuminated.
___ ___ ___ 18. Verifies trip of 2C RX BLDG VENT FAN. GREEN light illuminated.
FAN.                                                                            ___   ___     ___
___ ___ ___ 19. Verifies trip of 2A RX BLDG EXH FAN. GREEN and AMBER lights illuminated.
: 19. Verifies trip of 2A RX BLDG EXH           GREEN and AMBER lights FAN.                                      illuminated.                         ___   ___     ___
___ ___ ___ 20. Verifies trip of 2B RX BLDG EXH FAN. GREEN and AMBER lights illuminated.
: 20. Verifies trip of 2B RX BLDG EXH           GREEN and AMBER lights FAN.                                      illuminated.                         ___   ___     ___
___ ___ ___ 21. Verifies trip of 2C RX BLDG EXH FAN. GREEN light illuminated.
: 21. Verifies trip of 2C RX BLDG EXH           GREEN light illuminated.
___ ___  ___ *22. Verifies 3A INLET DAMPER AO 3-5741A closed.
FAN.                                                                            ___   ___      ___
Verifies 3B INLET DAMPER AO 3-5741B closed.
  *22. Verifies 3A INLET DAMPER AO 3-             Determines 3A & 3B INLET 5741A closed.                              DAMPERs AO 3-5741A & B are Verifies 3B INLET DAMPER AO 3-            NOT closed (GREEN lights 5741B closed.                              illuminated).
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B are NOT closed (GREEN lights illuminated).
Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3-5741A & 3-5741B to the CLOSE position.
Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated).
-5741A & 3-5741B to the CLOSE position. Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated).
___    ___      ___
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-h Rev 03


___   
TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ-JA-150-02 Comment SAT    UNSAT STEP                  ELEMENT                                  STANDARD Number
*23. Verifies 3A OUTLET DAMPER AO              Determines 3A & 2B OUTLET 3-5742A closed.                            DAMPERs AO 3-5742A & B are Verifies 3B OUTLET DAMPER AO              NOT closed (GREEN lights 3-5742B closed.                            illuminated).
Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position.
Determines 3A & 3B OUTLET DAMPERs AO 3-5742A & B did not close (GREEN lights illuminated).
___    ___      ___
  *24. Verifies 2A INLET DAMPER AO 2-            Determines 3A & 3B INLET 5741A closed.                              DAMPERs AO 2-5741A & B are Verifies 2B INLET DAMPER AO 2-            NOT closed (GREEN lights 5741B closed.                              illuminated).
Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2-5741A & 2-5741B to the CLOSE position.
Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated).
___    ___      ___
SRRS: 3D.105 (when utilized for operator initial or continuing training)                      S-N-h Rev 03


___
TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ-JA-150-02 Comment SAT    UNSAT STEP                  ELEMENT                                  STANDARD Number
*25. Verifies 2A OUTLET DAMPER AO              Determines 2A & 2B OUTLET 2-5742A closed.                            DAMPERs AO 2-5742A & B are Verifies 2B OUTLET DAMPER AO              NOT closed (GREEN lights 2-5742B closed.                            illuminated).
Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position.
Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not close (GREEN lights illuminated).
___    ___      ___
: 26. Verifies trip of 2A D/W & Torus            Condition met from previous steps Purge Fan.                                in the procedure.                  ___    ___      ___
: 27. Verifies trip of 2B D/W & Torus            Condition met from previous steps Purge Fan.                                in the procedure.                  ___    ___      ___
: 28. Verifies trip of 3A D/W & Torus            Condition met from previous steps Purge Fan.                                in the procedure.                  ___    ___      ___
: 29. Verifies trip of 3B D/W & Torus            Condition met from previous steps Purge Fan.                                in the procedure.                  ___    ___      ___
: 30. Notifies US of Secondary                  Examinee notifies the Unit Containment Isolation Failure and          Supervisor.
successful manual completion of the isolation.
___    ___      ___
Cue Acknowledge report.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-h Rev 03


___
TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ-JA-150-02 JPM  
TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number *23. Verifies 3A OUTLET DAMPER AO 3-5742A closed.
Verifies 3B OUTLET DAMPER AO 3-5742B closed.
Determines 3A & 2B OUTLET DAMPERs AO 3-5742A & B are NOT closed (GREEN lights illuminated).
Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position. Determines 3A & 3B OUTLET DAMPERs AO 3
-5742A & B did not clos e (GREEN lights illuminated).
 
___   
 
___   
 
___ *24. Verifies 2A INLET DAMPER AO 2-5741A closed.
Verifies 2B INLET DAMPER AO 2-5741B closed.
Determines 3A & 3B INLET DAMPERs AO 2-5741A & B are NOT closed (GREEN lights illuminated).
Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2
-5741A & 2-5741B to the CLOSE position. Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated).
 
___ 
 
___ 
 
___
TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number *25. Verifies 2A OUTLET DAMPER AO 2-5742A closed.
Verifies 2B OUTLET DAMPER AO 2-5742B closed.
Determines 2A & 2B OUTLET DAMPERs AO 2-5742A & B are NOT closed (GREEN lights illuminated).
Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position. Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not clos e (GREEN lights illuminated).
 
___   
 
___   
 
___ 26. Verifies trip of 2A D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
___  ___  ___ 27. Verifies trip of 2B D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
___  ___  ___ 28. Verifies trip of 3A D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
___  ___  ___ 29. Verifies trip of 3B D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
___  ___  ___ 30. Notifies US of Secondary Containment Isolation Failure and successful manual completion of the isolation.
Examinee notifies the Unit Supervisor.
 
___ 
 
___ 
 
___ Cue Acknowledge report.
END  JPM Stop Time:
 
TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:           RO         SRO             SRO Cert JPM Title: SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP)
Job Title:   RO     SRO     SRO Cert JPM Title:   SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP) JPM Number
JPM Number: S-N-h                                   Revision Number: 03 Task Number and Title: 261L002, Start the SBGT system.
: S-N-h Revision Number
K/A Number and Importance:               261000.A4.09         2.7 / 2.7 Suggested Testing Environment: Simulator Alternate Path:     Yes       No     SRO Only:         Yes         No   Time Critical:   Yes     No Reference(s): DOP 7500-01, Rev 36 Actual Testing Environment:             Simulator           Control Room         In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:           minutes EVALUATION  
: 0 3 Task Number and Title
: 261L002, Start the SBGT system.
K/A Number and Importance
:   261000.A4.09     2.7
/ 2.7 Suggested Testing Environment
:   Simulator Alternate Path
: Yes No SRO Only: Yes No Time Critical
: Yes No Reference(s)
: DOP 7500-01, Rev 36 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        S-N-h Rev 03
TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03  INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train.
. 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
: 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
: 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded
: 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
. 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours.
: 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01.
-01. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section                  S-N-h Rev 03


Page 1 of 10  Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number:
Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 00 Date: 02/16 Developed By:
S-N-i Revision Number:
Exam Author                       Date Approved By:
00 Date: 0 2/1 6          Developed By:
Facility Representative             Date Page 1 of 10
Exam Author Date   Approved By:
 
Facility Representative Date Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 2 of 10  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified. ________ 2. Knowledge and Abilities (K/A) references are included.
________     1. Task description and number, JPM description and number are identified.
________ 3. Performance location specified. (in
________     2. Knowledge and Abilities (K/A) references are included.
-plant, control room, simulator, or other)
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________     4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________     6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
Procedure DOP 4700-03 Rev: 22 Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
(*).
________ 10. Verify performance time is accurate
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure DOP 4700-03               Rev: 22 Procedure                           Rev:
Procedure                           Rev:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 10


SME / Instructor Date SME / Instructor Date SME / Instructor Date Job Performance Measure (JPM)
Page 3 of 10 Revision Record (Summary)
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM. DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross
Revision Record (Summary)
-Connect Operation to examinee
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.
.
Page 3 of 10
 
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.
DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation to examinee.
Page 4 of 10
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 5 of 10 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. Unit 3 is shutdown for a refuel outage.
: 1. Unit 3 is shutdown for a refuel outage.
: 2. 2A IAC is unavailable due to an oil leak.
: 2. 2A IAC is unavailable due to an oil leak.
: 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit
: 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
. 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
: 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
: 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2
: 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
. 6. Unit 2 SAC is running.
: 6. Unit 2 SAC is running.
: 7. Main Control Room is monitoring IA parameters.
: 7. Main Control Room is monitoring IA parameters.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY
: 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY .
. 2. All applicable prerequisites of DOP 4700
: 2. All applicable prerequisites of DOP 4700-03 have been met.
-03 have been met.
: 3. Your Pre Job Brief has been completed.
: 3. Your Pre Job Brief has been completed.
: 4. Notify the Unit Supervisor when you are complete with the task.
: 4. Notify the Unit Supervisor when you are complete with the task.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Page 5 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 6 of 10 The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
Page 6 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 7 of 10 JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #  Provide examinee a current copy of DOP 4700-03. 1. Identifies Step G.
Comment #
9 as the correct step in DOP 4700
SAT            UNSAT PERFORMANCE CHECKLIST                   STANDARDS Provide examinee a current copy of DOP 4700-03.
-03. Proceeds to Step G.
: 1. Identifies Step G.9 as the   Proceeds to Step G.9.
: 9. _____        _____
correct step in DOP 4700-03.
_____ 2. Verify closed 3
_____        _____      _____
-4799-501A, 3C IAC DISCH TO U
: 2. Verify closed 3-4799-501A,   Verifies 3-4799-501A, 3C IAC 3C IAC DISCH TO U-3          DISCH TO U-3 INST AIR INST AIR HEADER ISOL        HEADER ISOL VLV stem is in.
-3 INST AIR HEADER ISOL VLV. Verifies 3
VLV.
-4799-501A, 3C IAC DISCH TO U
(Valve is located above 3B IAC)                          _____        _____      _____
-3 INST AIR HEADER ISOL VLV stem is in.
CUE The component is in the position you described.
(Valve is located above  
*3. Close 2/3-4799-424, U2/U3    Rotates 2/3-4799-424, U2/U3 X-TIE SV.                    X-TIE SV clockwise until stem is in.
 
(Valve is located North of 3A IAC)                           _____        _____     _____
3B IAC)
_____        _____         _____
CUE The component is in the position you described.
CUE The component is in the position you described.
  *3. Close 2/3-4799-424, U2/U3 X-TIE SV. Rotates 2/3-4799-424, U2/U3 X-TIE SV clockwise until stem is in. (Valve is located North of 3A IAC) 
  *4. Open 2/3-4799-425, 3C IAC    Rotates 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV.     TO U2 AIR SYS X-TIE SV counter clockwise until stem is out.
 
_____        _____      _____
_____        _____        _____
(Valve is located North of 3A IAC)
CUE The component is in the position you described. *4. Open 2/3-4799-425, 3C IAC TO U2 AIR SYS X
-TIE SV. Rotates 2/3
-4799-425, 3C IAC TO U2 AIR SYS X
-TIE SV counter clockwise until stem is out. (Valve is located North of 3A IAC)
_____        _____        _____
CUE The component is in the position you described.
CUE The component is in the position you described.
Page 7 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # *5. Open 2-47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS
Comment #
. Rotates 47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS counter clockwise until stem is out. (Valve is located North of Cardox tank
SAT          UNSAT PERFORMANCE CHECKLIST                     STANDARDS
)    _____        _____        _____ CUE The component is in the position you described.
*5. Open 2-47350-500, U2           Rotates 47350-500, U2 INST INST AIR SYS XTIE FROM         AIR SYS XTIE FROM THE U3 THE U3 INST AIR SYS.          INST AIR SYS counter clockwise until stem is out.
  *6. Open 2-47350-329, U2 INST AIR HDR ISOL VLV
_____      _____      _____
. Rotates 2-47350-329, U2 INST AIR HDR ISOL VLV  
(Valve is located North of Cardox tank)
CUE The component is in the position you described.
  *6. Open 2-47350-329, U2           Rotates 2-47350-329, U2 INST AIR HDR ISOL VLV.        INST AIR HDR ISOL VLV counter clockwise until stem is out.
_____      _____      _____
(Valve is located North of 2B IAC)
CUE The component is in the position you described.
: 7. Report completion of task to  Reports completion of task to Unit Supervisor.              Unit Supervisor.
_____      _____      _____
END JPM Stop Time:_________
Page 8 of 10


counter clockwise until stem is out. (Valve is located North of 2B IAC)    _____        _____        _____
CUE The component is in the position you described.
: 7. Report completion of task to Unit Supervisor.
Reports completion of task to Unit Supervisor.
_____        _____        _____
END  JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 9 of 10  Operator's Name:
Operators Name:
Job Title:
Job Title:     q RO       q SRO JPM Title: Align IACs to Unit 2 Instrument Air header Revision Number: 00 JPM Number: S-N-i Task Number and Title: 278N013 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02           3.3 / 3.1 Suggested Testing Environme nt: In-Plant Suggested Testing Environment:       q Simulator         Plant     q Control Room Testing Method:         Simulate           Alternate Path:       Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete:_ 20__minutes                    Actual Time Used: _______ minutes
q RO q SRO JPM Title:
Align IACs to Unit 2 Instrument Air header Revision Number: 00 JPM Number:
S-N-i Task Number and Title: 278N 01 3 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02     3.3 / 3.1 Suggested Testing Environment:
In-Plant Suggested Testing Environment:
q Simulator     Plant q Control Room Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
_ 2 0__minutes  Actual Time Used:
_______ minutes


==References:==
==References:==
DOP 4700-03, Rev. 22 EVALUATION  
DOP 4700-03, Rev. 22 EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?             Yes           No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name: ____________________________
Satisfactory Unsatisfactory Comments:               Evaluator's Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________
Page 9 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 10 of 10 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. Unit 3 is shutdown for a refuel outage.
: 1. Unit 3 is shutdown for a refuel outage.
: 2. 2A IAC is unavailable due to an oil leak. 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
: 2. 2A IAC is unavailable due to an oil leak.
: 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
: 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
: 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
: 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
: 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
Line 2,372: Line 2,050:
: 7. Main Control Room is monitoring IA parameters.
: 7. Main Control Room is monitoring IA parameters.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Unit Supervisor has directed you to Cross
: 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY .
-connect 3C Instrument Air Compressor to Unit 2 ONLY .
: 2. All applicable prerequisites of DOP 4700-03 have been met.
: 2. All applicable prerequisites of DOP 4700
-03 have been met.
: 3. Your Pre Job Brief has been completed.
: 3. Your Pre Job Brief has been completed.
: 4. Notify the Unit Supervisor when you are complete with the task.
: 4. Notify the Unit Supervisor when you are complete with the task.
Page 10 of 10
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number: S-N-j Revision Number: 10 Date: 02/16 Developed By:
Exam Author                      Date Approved By:
Facility Representative            Date


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number:
S-N-j  Revision Number:
10  Date: 02/16        Developed By:
Exam Author Date  Approved By:
Facility Representative Date Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure DEOP 500-02 Rev: 16 Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure DEOP 500-02               Rev: 16 Procedure                           Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                           Rev:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date


SME / Instructor Date SME / Instructor Date        SME / Instructor Date Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
Revision Record (Summary)
Rev 08: Updated for the 2007 LORT exam Rev 09: Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam.
Rev 08:     Updated for the 2007 LORT exam Rev 09:     Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM. DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.
-02, Bypassing Interlocks and Isolations to provide to examinee.
DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations to provide to examinee.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
-1 AND 34-1 from Busses 33 AND 34. 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33
: 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
-1 and 34-1. 3. The loss of Busses 33
: 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
: 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
: 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
: 5. Drywell temperature and pressure are rising.
: 5. Drywell temperature and pressure are rising.
INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to perform the in
: 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500
: 2. Your Pre Job Brief has been completed.
-02. 2. Your Pre Job Brief has been completed.
: 3. Notify the Unit Supervisor when the in-plant actions are complete.
: 3. Notify the Unit Supervisor when the in
-plant actions are complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # Provide examinee a current copy of DEOP 500
Comment #
-02. 1 Proceed to Step G.3 of procedure.
SAT    UNSAT PERFORMANCE CHECKLIST                       STANDARDS Provide examinee a current copy of DEOP 500-02.
Locates Step G.3
1 Proceed to Step G.3 of       Locates Step G.3 procedure.
_____         _____         _____
_____   _____       _____
NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.
NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.
NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are:
NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are:
Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.
Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.
2 Obtain appropriate Equipment Box from the Control Room DEOP Equipment Storage Cabinet. OBTAINS appropriate EQUIPMENT BOX from the Control Room DEOP Equipment Storage Cabinet.
2 Obtain appropriate            OBTAINS appropriate Equipment Box from the       EQUIPMENT BOX from the
_____        _____        _____
_____  _____      _____
Control Room DEOP            Control Room DEOP Equipment Equipment Storage            Storage Cabinet.
Cabinet.
CUE DEOP Equipment Box you have identified is in your hand.
CUE DEOP Equipment Box you have identified is in your hand.
NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and panel 903-32. Locates Panel 903
NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and       Locates Panel 903-32.
-32. _____         _____         _____
panel 903-32.
NOTE Simulated JPM  
_____   _____       _____
- Examinee must explain the task.
NOTE Simulated JPM - Examinee must explain the task.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # *4 Lift AND tape lead on 903-32 panel terminal block AA terminal point 6 OR terminal point 7.
Comment #
On 903-32 panel terminal block AA terminal point 6 OR terminal point 7
SAT      UNSAT PERFORMANCE CHECKLIST                         STANDARDS
  *4 Lift AND tape lead on           On 903-32 panel terminal block 903-32 panel terminal          AA terminal point 6 OR terminal block AA terminal point 6       point 7 OR terminal point 7.
* Puts on insulated gloves.
* Puts on insulated gloves.
* Loosens screw with standard screwdriver
* Loosens screw with standard screwdriver.
.
* Uses split blade screwdriver     _____  _____      _____
* Uses split blade screwdriver to grasp screw and remove it
to grasp screw and remove it.
.
* Tapes the loose wire with electricians tape.
* Tapes the loose wire with electricians tape
.
_____        _____        _____
CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.
CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.
*5 Lift AND tape lead on 903-33 panel terminal block AA terminal point 6 OR terminal point 7.
  *5 Lift AND tape lead on           On 903-33 panel terminal block 903-33 panel terminal          AA terminal point 6 OR terminal block AA terminal point 6       point 7 OR terminal point 7.
On 903-33 panel terminal block AA terminal point 6 OR terminal point 7
* Puts on insulated gloves.
* Puts on insulated gloves.
* Loosens screw with standard screwdriver
* Loosens screw with standard screwdriver.
.
* Uses split blade screwdriver     _____  _____      _____
* Uses split blade screwdriver to grasp screw and remove it
to grasp screw and remove it.
.
* Tapes the loose wire with electricians tape.
* Tapes the loose wire with electricians tape
CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.
.
6 Notify Unit Supervisor          Notifies Unit Supervisor upon upon completion of task.         completion of task.
_____        _____        _____
_____   _____       _____
CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped. 6 Notify Unit Supervisor upon completion of task.
Notifies Unit Supervisor upon completion of task.
_____         _____         _____
CUE Acknowledge report of task completion.
CUE Acknowledge report of task completion.
END   JPM Stop Time
END JPM Stop Time:_________
:_________
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operator's Name:
Operators Name: ___________________________________
________________
Job Title:   q RO q SRO JPM Title: Bypass the Trip of Drywell Coolers Revision Number: 10 JPM Number: S-N-j Task Number and Title: 295L074, Bypass the Trip of Drywell Coolers.
___________________
K/A Number and Importance: 295028.A1.03           3.9 / 3.9 Suggested Testing Environment:         q Simulator         Plant   q Control Room Testing Method:         Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:               Yes                               No Estimated Time to Complete:           15     minutes     Actual Time Used: _______ minutes
Job Title:
q RO q SRO JPM Title:
Bypass the Trip of Drywell Coolers Revision Number:
10 JPM Number:
S-N-j   Task Number and Title: 295L074, Bypass the Trip of Drywell Coolers.
K/A Number and Importance: 295028
.A1.03     3.9 / 3.9 Suggested Testing Environment:
q Simulator     Plant q Control Room
 
Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
15       minutes   Actual Time Used: _______
minutes


==References:==
==References:==
 
DEOP 500-02, Rev 16 EVALUATION  
DEOP 500-02, Rev 16
 
EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily? Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Were all the Critical Elements performed satisfactorily?             Yes           No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
Evaluator's Name: ____________________________
(Print)
(Print) Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 9 of 9 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
-1 AND 34-1 from Busses 33 AND 34. 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33
: 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
-1 and 34-1. 3. The loss of Busses 33
: 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers. 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
: 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
: 5. Drywell temperature and pressure are rising.
: 5. Drywell temperature and pressure are rising.
INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to perform the in
: 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500
: 2. Your Pre-Job Brief has been completed.
-02. 2. Your Pre-Job Brief has been completed.
: 3. Notify the Unit Supervisor when the in-plant actions are complete Page 9 of 9
: 3. Notify the Unit Supervisor when the in
 
-plant actions are complete
Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number: S-N-k Revision Number: 15 Date: 02/16 Developed By:
Exam Author                  Date Approved By:
Facility Representative      Date Page 1 of 11


Page 1 of 11  Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number:
Job Performance Measure (JPM)
S-N-k  Revision Number: 15 Date: 02/16          Developed By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Exam Author Date  Approved By:
Facility Representative Date Job Performance Measure (JPM)
Page 2 of 11  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure DOP 0300-03 Rev: 25 Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure DOP 0300-03               Rev: 25 Procedure                           Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                           Rev:
________     9. Verify cues both verbal and visual are free of conflict.
________     10. Verify performance time is accurate
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                    Date SME / Instructor                                    Date SME / Instructor                                    Date Page 2 of 11


SME / Instructor Date SME / Instructor Date SME / Instructor Date Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 3 of 11  Revision Record (Summary)
Revision Record (Summary)
Revision 14 Updated for the 2007 LORT exam.
Revision 14     Updated for the 2007 LORT exam.
Revision 15 Revised for ILT 15
Revision 15     Revised for ILT 15-1 (2016-301) NRC Exam.
-1 (2016-301) NRC Exam.
Page 3 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS:
SIMULATOR SETUP INSTRUCTIONS:
N/A: In-Plant JPM. DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee.
N/A: In-Plant JPM.
DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee.
Page 4 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 5 of 11 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
: 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
: 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
: 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
: 3. The Unit Supervisor has reviewed the TRM and has taken required actions.
: 3. The Unit Supervisor has reviewed the TRM and has taken required actions.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to perform the in
: 1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300
: 2. Prerequisites have been met.
-03. 2. Prerequisites have been met.
: 3. Your Pre-Job Brief is complete.
: 3. Your Pre-Job Brief is complete.
: 4. Notify the Unit Supervisor upon completion of in
: 4. Notify the Unit Supervisor upon completion of in-plant actions.
-plant actions.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluator's Use:
Information for Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
The time clock starts when the candidate acknowledges the initiating cue.
Page 5 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 6 of 11 JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # 1. Proceed to Unit 2 CRD Flow Control Valves (FCVs) and establish communications with the control room.
Comment #
CRD FCVs located and communications established with control room.
SAT        UNSAT PERFORMANCE CHECKLIST                       STANDARDS
_______        ______      _____
: 1. Proceed to Unit 2 CRD         CRD FCVs located and Flow Control Valves           communications established (FCVs) and establish           with control room.
communications with the                                        _______    ______    _____
control room.
NOTE Step G.2 is N/A.
NOTE Step G.2 is N/A.
: 2. Verify OPEN 2
: 2. Verify OPEN 2-0301-30,         Verifies 2-0301-30 U2 CRD SYS FCV CONT            stem/handwheel backed out.
-0301-30, U2 CRD SYS FCV CON T AIR PRV ISOL VLV.
_______     ______   _____
Verifies 2
AIR PRV ISOL VLV.
-0301-30 stem/handwheel backed out.
_______       ______     _____
CUE Valve 2-0301-30 stem/ handwheel is backed out.
CUE Valve 2-0301-30 stem/ handwheel is backed out.
: 3. Verify OPEN 2
: 3. Verify OPEN 2-0301-144B,       Verifies 2-0301-144B valve U2 CRD SYS FCV 2-0302-         stem/handwheel backed out.
-0301-144B, U2 CRD SYS FCV 2
_______     ______   _____
-0302-6B AIR ISOL VLV.
6B AIR ISOL VLV.
Verifies 2
-0301-144B valve stem/handwheel backed out.
_______       ______     _____
CUE Valve 2-0301-144B stem/handwheel is backed out.
CUE Valve 2-0301-144B stem/handwheel is backed out.
: 4. Verify OPEN 2
: 4. Verify OPEN 2-0301-40B,       Verifies 2-0301-40B valve U2 CRD SYS B FCV              stem/handwheel backed out.
-0301-40B, U2 CRD SYS B FCV INLET VLV.
_______     ______   _____
Verifies 2
INLET VLV.
-0301-40B valve stem/handwheel backed out.
_______       ______     _____
CUE Valve 2-0301-40B stem/handwheel is backed out.
CUE Valve 2-0301-40B stem/handwheel is backed out.
: 5. Cycle the 2B FCV full open and full closed by adjusting PRV 2-0301-34 locally.
: 5. Cycle the 2B FCV full open     Adjusts PRV 2-0301-34 locally and full closed by adjusting  to cycle 2B FCV.
Adjusts PRV 2
PRV 2-0301-34 locally.
-0301-34 locally to cycle 2B FCV.
Verifies cycling by observing stem position and/or light indication on the CRD FCV       _______    ______    _____
Verifies cycling by observing stem position and/or light indication on the CRD FCV electrical transfer station.
electrical transfer station.
 
_______        ______      _____
CUE 2B FCV cycles full open and then full closed.
CUE 2B FCV cycles full open and then full closed.
Page 6 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 7 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # NOTE The Unit Supervisor has addressed the TRM per the Initial Conditions (addresses note preceding G.5 of DOP).
Comment #
: 6. Verify PRV 2
SAT        UNSAT PERFORMANCE CHECKLIST                     STANDARDS NOTE The Unit Supervisor has addressed the TRM per the Initial Conditions (addresses note preceding G.5 of DOP).
-0301-34 closed. Verifies PRV 2
: 6. Verify PRV 2-0301-34           Verifies PRV 2-0301-34 valve closed.                        stem backed out and turning
-0301-34 valve stem backed out and turning freely. _______       ______     _____
_______       ______   _____
freely.
CUE PRV 2-0301-34 valve stem is backed out and turning freely.
CUE PRV 2-0301-34 valve stem is backed out and turning freely.
: 7. Verify Pressure gauge PI 2-0302-60 indicates 0 psig.
: 7. Verify Pressure gauge PI       Verifies pressure gauge PI 2-2-0302-60 indicates 0 psig. 0302-60 reading 0 psig.
Verifies pressure gauge PI 2
_______       ______   _____
-
0302-60 reading 0 psig.
_______       ______     _____
CUE After examinee locates and observes the indicator, then cue:
CUE After examinee locates and observes the indicator, then cue:
PI 2-0302-60 is reading 0 psig.
PI 2-0302-60 is reading 0 psig.
: 8. Verify via U2 NSO that CRD FCV Controller in MANUAL and demand is set to minimum.
: 8. Verify via U2 NSO that         Calls U2 NSO to verify CRD CRD FCV Controller in         FCV Controller configuration MANUAL and demand is set to minimum.                                               _______       ______   _____
Calls U2 NSO to verify CRD FCV Controller configuration
_______       ______     _____
CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum.
CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum.
  *9. At CRD Electrical Transfer, place the transfer switch TS160 to the "Valve B" position to place FCV 2-0302-6B in service.
  *9. At CRD Electrical Transfer,   At CRD Electrical Transfer place the transfer switch     Station, places the transfer TS160 to the "Valve B"       switch to the "Valve B" position position to place FCV 2-     to place FCV 2-0302-6B in 0302-6B in service.          service                          _______     ______   _____
At CRD Electrical Transfer Station, places the transfer switch to the "Valve B" position to place FCV 2
-0302-6B in service
_______       ______     _____
CUE The transfer switch is in the "Valve B" position.
CUE The transfer switch is in the "Valve B" position.
*10. Select the 2B E/P converter by placing U2 CRD SYS FCV A/B SELECTOR VLV 2
*10. Select the 2B E/P            Selects the 2B E/P converter converter by placing U2       by placing 2-0301-29 to B.
-0301-29 to 'B".
CRD SYS FCV A/B SELECTOR VLV 2-0301-                                         _______      ______  _____
Selects the 2B E/P converter by placing 2
29 to B.
-0301-29 to "B".
Page 7 of 11
 
_______        ______      _____


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 8 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # CUE The 2-0301-29 Unit 2 CRD MANUAL E/P SELECTOR VALVE is in the 'B' position.
Comment #
SAT        UNSAT PERFORMANCE CHECKLIST                     STANDARDS CUE The 2-0301-29 Unit 2 CRD MANUAL E/P SELECTOR VALVE is in the B position.
Examiner Note:
Examiner Note:
On valves 2
On valves 2-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve.
-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve.
*11. Place U2 CRD SYS FCV         Places 2-0302-6B selector 2-0302-6B MAN/AUTO           switch to the automatic SELECTOR VLV, 2-0301-         position.
*11. Place U2 CRD SYS FCV 2-0302-6B MAN/AUTO SELECTOR VLV, 2
38, switch to the automatic                                   _______     ______   _____
-0301-38, switch to the automatic position. Places 2-0302-6B selector switch to the automatic position. _______       ______     _____
position.
CUE 2-0302-6B selector switch is in automatic.
CUE 2-0302-6B selector switch is in automatic.
*12. Place the U2 CRD SYS FCV 2-0302-6A MAN/AUTO SELECTOR VLV, 2-0301-37, to the manual position. Places the 2
*12. Place the U2 CRD SYS         Places the 2-0302-6A selector FCV 2-0302-6A                 switch to the manual position.
-0302-6A selector switch to the manual position.
MAN/AUTO SELECTOR VLV, 2-0301-37, to the                                         _______    ______    _____
 
manual position.
_______        ______      _____
CUE The 2-0302-6A selector switch is in manual.
CUE The 2-0302-6A selector switch is in manual.
*13. Open 2-0301-41B, U2 CRD SYS A/B FCV OUTLET VLV.
*13. Open 2-0301-41B, U2           Opens 2-0301-41B valve.
Opens 2-0301-41B valve.
CRD SYS A/B FCV Full CCW, stem/handwheel        _______    ______    _____
Full CCW, stem/handwhee l
OUTLET VLV.
backed out.
backed out.
_______        ______      _____
CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out.
CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out.
: 14. Notify Unit NSO that the 2B CRD FCV can now be controlled from the 902
: 14. Notify Unit NSO that the       Notifies Unit NSO of 2B CRD 2B CRD FCV can now be         FCV status and directs Unit controlled from the 902-5     NSO to adjust system flow rate Panel AND that system         to maintain stable flow.
-5 Panel AND that system flow should be adjusted to maintain stable flow rate.
flow should be adjusted to                                     _______    ______    _____
Notifies Unit NSO of 2B CRD FCV status and directs Unit NSO to adjust system flow rate to maintain stable flow.
maintain stable flow rate.
_______        ______      _____
CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate.
CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate.
Page 8 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 9 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # *15. Slowly close 2
Comment #
-0301-41A, U2 CRD SYS A/B FCV OUTLET VLV.
SAT        UNSAT PERFORMANCE CHECKLIST                     STANDARDS
Closes 2-0301-41A valve slowly (full CW or stem/
*15. Slowly close 2-0301-41A,     Closes 2-0301-41A valve U2 CRD SYS A/B FCV           slowly (full CW or stem/
handwheel in).
_______    ______    _____
_______        ______      _____
OUTLET VLV.                  handwheel in).
CUE The 2-0301-41A valve stem/handwheel is full CW or in.
CUE The 2-0301-41A valve stem/handwheel is full CW or in.
: 16. Notifies Unit Supervisor of completion of in
: 16. Notifies Unit Supervisor of   Unit Supervisor notified of completion of in-plant        completion of in-plant actions.
-plant actions per DOP and that the remaining steps are from the 902
actions per DOP and that the remaining steps are                                         _______    ______    _____
-5 panel. Unit Supervisor notified of completion of in
from the 902-5 panel.
-plant actions.
CUE Acknowledge report of task completion.
END JPM Stop Time:_________
Page 9 of 11


_______        ______      _____
CUE Acknowledge report of task completion.
EN D  JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 10 of 11  Operator's Name:
Operators Name: ___________________________________
___________________________________
Job Title:     rRO          rSRO JPM Title: Swap CRD Flow Control Valves Revision Number: 15 JPM Number: S-N-k Task Number and Title: 201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001.A4.03           2.9/2.8 Suggested Testing Environme nt: In-Plant Suggested Testing Environment:       q Simulator         Plant   q Control Room Testing Method:         Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete:       _ 23__ minutes     Actual Time Used: _______ minutes
Job Title:
r RO  rSRO JPM Title:
Swap CRD Flow Control Valves Revision Number: 15 JPM Number:
S-N-k Task Number and Title: 201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001
.A4.03     2.9/2.8 Suggested Testing Environment:
In-Plant Suggested Testing Environment:
q Simulator     Plant q Control Room Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
_ 2 3__ minutes   Actual Time Used: _______
minutes


==References:==
==References:==
DOP 0300-03, Rev. 25 EVALUATION  
DOP 0300-03, Rev. 25 EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?           Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory
Evaluators Name: ____________________________
 
Comments:                 Evaluator's Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________
Page 10 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 11 of 11 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
: 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
: 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
: 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
: 4. The Unit Supervisor has reviewed the TRM and has taken required actions.
: 4. The Unit Supervisor has reviewed the TRM and has taken required actions.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to perform the in
: 1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300
: 2. Prerequisites have been met.
-03. 2. Prerequisites have been met.
: 3. Your Pre-Job Brief is complete.
: 3. Your Pre-Job Brief is complete.
: 4. Notify the Unit Supervisor upon completion of in
: 4. Notify the Unit Supervisor upon completion of in-plant actions.
-plant actions.}}
Page 11 of 11}}

Revision as of 03:52, 30 October 2019

2016 Dresden Nuclear Station Initial License Examination As-Administered JPMs
ML17128A181
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/01/2016
From: Chuck Zoia
Exelon Generation Co
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML16257A680 List:
References
Download: ML17128A181 (170)


Text

Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE JPM Number: A-N-1-R Revision Number: 01 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for 2009 NRC Exam.

Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.

A-N-1-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Markup a copy of DOS 1100-02.

A-N-1-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. DOS 1100-02 was performed last shift.
3. The EO reported all surveillance requirements were within specifications.

INITIATING CUE

1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-1-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of DOS 1100-02.

  • 1. Student should identify step Identifies that step should I.4 should NOT have been NOT have been initialed.

initialed. _____ _____ _____

  • 2. Student should identify step Identifies that step should I.9.g should NOT have been NOT have been N/Ad.

N/Ad. _____ _____ _____

3. Notify Unit Supervisor of Notifies Unit Supervisor, to discrepancies. verify/correct issues.

_____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-1-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job Title: RO JPM Title: VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE Revision Number: 01 JPM Number: A-N-1-R Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.

K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 Actual Time Used: minutes

References:

DOS 1100-02, rev 17 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-1-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. DOS 1100-02 was performed last shift.
3. The EO reported all surveillance requirements were within specifications.

INITIATING CUE

1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
2. Inform the Unit Supervisor when the task is complete.

A-N-1-R Page 7 of 7

Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER JPM Number: A-N-2-R Revision Number: 00 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.

A-N-2-R Page 2 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. Pull up prints M-15 Sheet 1, M-16, and M-3658 Sheet 1 on Large TV in simulator.
3. Turn TV screen off.

DOCUMENT PREPARATION

1. Copy of M-15 Sheet 1.
2. Copy of M-16.
3. Copy of OP-AA-109-101.
4. Copy of OP-DR-109-1001.

A-N-2-R Page 3 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an Extra NSO.
2. Unit 2 is at 500 MWe.
3. 2C Condensate/Condensate Booster pump requires removal from service due to a leak.
4. Vent and Drain paths do NOT require manipulation.
5. Condensate/Condensate Booster Pump seal isolation is not required.
6. Hydrogen Addition injection isolation is not required.
7. Passport is not available, but is expected to return this shift.
8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
10. Other NSOs are tasked with determining electrical and air isolations.

INITIATING CUE

1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
2. Record recommended Isolation Points and Required Positions on the sheet provided.
3. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

A-N-2-R Page 4 of 10

Job Performance Measure (JPM)

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-R Page 5 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of M-15 Sheet 1 and M-16.

If the examinee requests Clearance and Tagging procedures, they may be provided.

The following steps may be performed in any order

1. Candidate identifies 2C Candidate correctly locates Condensate/Condensate and identifies 2C Booster pump on M-15 Sheet Condensate/Condensate _____ _____ _____
1. Booster pump on M-15 Sheet 1.
  • 2. Candidate determines Candidate identifies the isolation points and required following valves are positions for 2C condensate necessary isolation points _____ _____ _____

pump for 2C Condensate pump:

(Located on M-15 Sht. 1)

  • 2-3301-C-500 (Closed)
  • 2-3302-C-500 (Closed)
  • 3. Candidate determines Candidate identifies the isolation points and required following valves are positions for 2C condensate necessary isolation points _____ _____ _____

booster pump for 2C Condensate pump:

  • 2-3305-C-500 (Closed)

(Located on M-15 Sht. 1)

  • 2-3401-C-500 (Closed)

(Located on M-16)

A-N-2-R Page 6 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 4. Completes worksheet with Notifies Unit Supervisor, to EPN and required hang verify/correct issues.

position. _____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-2-R Page 7 of 10

Job Performance Measure (JPM)

Operators Name:

Job Title: RO JPM Title: DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER Revision Number: 00 JPM Number: A-N-2-R Task Number and Title: 299L012 Determine points of isolation in order to remove a piece of equipment from service.

K/A Number and Importance: Generic.2.2.41 3.5/3.9 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes

References:

OP-AA-109-101 Rev. 10, OP-DR-109-101-1001 Rev. 10, M-15 Sheet 1 Rev. M, M-16 Rev. AP EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-2-R Page 8 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an Extra NSO.
2. Unit 2 is at 500 MWe.
3. 2C Condensate/Condensate Booster pump requires removal from service due to a leak.
4. Vent and Drain paths do NOT require manipulation.
5. Condensate/Condensate Booster Pump seal isolation is not required.
6. Hydrogen Addition injection isolation is not required.
7. Passport is not available, but is expected to return this shift.
8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
10. Other NSOs are tasked with determining electrical and air isolations.

INITIATING CUE

1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
2. Record recommended Isolation Points and Required Positions on the sheet provided.
3. Inform the Unit Supervisor when the task is complete.

A-N-2-R Page 9 of 10

Job Performance Measure (JPM)

EPN Hang Position A-N-2-R Page 10 of 10

Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-3-R Revision Number: 02 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam.

Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam.

A-N-3-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.
3. Ensure a calculator is available and the memory/display has been cleared.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 1500-08.

A-N-3-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI)

HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.

3. Only the A CCSW Heat Exchanger is going to be placed in service.

INITIATING CUE

1. Complete the performance of DOS 1500-08.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of DOS 1500-08.

The following steps can be performed in any order.

If examinee states to stop, due to errors, inform him/her to continue calculations.

  • 1. Examinee calculates Dilution See attached key.

flow (1,017,000 gpm).

_____ _____ _____

2. Examinee enters dilution flow See attached key.

(from above) to calculate CCSW Activity Limit. _____ _____ _____

  • 3. Examinee calculates CCSW See attached key.

Activity Limit (2.91 x 10-5).

_____ _____ _____

  • 4. Examinee verifies CCSW Examinee determines Heat Exchanger A sample CCSW Heat Exchanger A activity is less than or equal sample activity is greater _____ _____ _____

to the calculated CCSW than or equal to the activity limit calculated CCSW activity limit

5. Recommends to the Unit Makes recommendation to Supervisor that the calculated Unit Supervisor.

sample limit exceeds the allowable discharge. _____ _____ _____

6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

_____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job Title: RO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-3-R Task Number and Title: 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.

K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes

References:

DOS 1500-08, rev 17 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-3-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
3. Only the A CCSW Heat Exchanger is going to be placed in service.

INITIATING CUE

1. Complete the performance of DOS 1500-08.
2. Inform the Unit Supervisor when the task is complete.

A-N-3-R Page 7 of 7

Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 01 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.

Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.

A-N-4-R Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a copy of DOA 0010-10 and DOA 0010-S1.

A-N-4-R Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A fire is burning at the Lift Station, no explosion has occurred.
3. The fire has been classified as a major fire.
4. Hazmat and rescue response are not required.
5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
6. A dedicated outside line is not available.

INITIATING CUE

1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-R Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOA 0010-10.

Provide the examinee with the supplied copy of DOA 0010-S1 when requested.

  • 1. Notify Coal City Fire From DOA 0010-S1 Protection District. (Refer to determines that 815-942-DOA 0010-S1, Key Phone 0336 is the number Numbers for DOA 0010 Block needed to contact the _____ _____ _____

Procedures.) CCFPD.

  • 2. Dial 815-942-0336 and Dials 815-942-0336 and communicate the details of communicates the details the fire. of the fire: _____ _____ _____
  • Location of fire
  • Assistance is required CUE:

If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities.

3. Notifies TSO via direct line for Notifies the TSO from a major fire. control room phone using the TSO direct line button and provides call back _____ _____ _____

phone number.

4. Notify Security Shift Notifies the Security Shift Supervisor that outside fire Supervisor that the department will be CCFPD will be responding responding AND request to the Lift Station.

assistance in providing access to affected area if _____ _____ _____

necessary.

5. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

_____ _____ _____

CUE:

Acknowledge report of task completion.

END A-N-4-R Page 5 of 8

Job Performance Measure (JPM)

JPM Stop Time:_________

A-N-4-R Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job Title: RO JPM Title: DETERMINE ACTIONS FOR A FIRE Revision Number: 01 JPM Number: A-N-4-R Task Number and Title: 295L009, Respond to a fire/explosion K/A Number and Importance: Generic.2.4.27 3.4 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

DOA 0010-10, rev 20; DOA 0010-S1, rev 14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-4-R Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A fire is burning at the Lift Station, no explosion has occurred.
3. The fire has been classified as a major fire.
4. Hazmat and rescue response are not required.
5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
6. A dedicated outside line is not available.

INITIATING CUE

1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
2. Inform the Unit Supervisor when the task is complete.

A-N-4-R Page 8 of 8

Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed ILT 15-1 (2016-301) NRC Exam.

A-N-1-S Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. None.

A-N-1-S Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. Unit 2 and Unit 3 are operating at rated power.
3. The following timeline occurred:
  • 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
  • 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.

INITIATING CUE

1. Utilizing the Reportability Manual, determine the earliest reportability requirement.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-1-S Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Candidate locates a copy of Reportability Manual.

EXAMINER NOTE:

The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4.

  • 1. Determines the event is Determines the event is reportable per SAF 1.8. reportable per SAF 1.8, Event or Condition that could have prevented _____ _____ _____

fulfillment of a Safety Function.

  • 2. Determines the time limit to Determines the time limit Notify the NRC Operations to Notify the NRC Center via the ENS as soon Operations Center via the as practical and in all cases, ENS as soon as practical within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and in all cases within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of the occurrence (Time 0542).

_____ _____ _____

END JPM Stop Time:_________

A-N-1-S Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job Title: SRO JPM Title: REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and Title: 299L001, Determine Reportability requirements as outlined in station Reportability manual.

K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 Actual Time Used: minutes

References:

Reportability Tables and Decision Trees LS-AA-1020 Rev 23, Safety (SAF) LS-AA-1110 Rev. 22 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-1-S Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. Unit 2 and Unit 3 are operating at rated power.
3. The following timeline occurred:
  • 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
  • 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.

INITIATING CUE

1. Utilizing the Reportability Manual, determine the earliest reportability requirement.

A-N-1-S Page 7 of 7

Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number: A-N-2-S Revision Number: 01 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified for 2010 Cert Exam.

Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam.

A-N-2-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Marked up copy of OP-AA-105-102.

A-N-2-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Shift Manager.
2. An SRO is in the process of license reactivation.
3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.

INITIATING CUE

1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-S Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comm PERFORMANCE CHECKLIST STANDARDS SAT ent NOTE:

Provide the Examinee the provided marked up copy of OP-AA-105-102.

1. Review OP-AA-105-102, Reviews OP-AA-105-102, Attachment 2. Attachment 2.

_____ _____ _____

2. Check that Hours on Shift are in Notes 12.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> listed on the same calendar quarter. 6/26/16 are performed during the 2nd calendar _____ _____ _____

quarter and cannot be counted towards license re-activation.

3. Check that Hours on Shift are Determines 12.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> as applicable for license WEC listed on 07/3/16 reactivation. cannot be credited towards license re-activation.

_____ _____ _____

EXAMINER NOTE:

Steps 2 and 3 lead to the determination in step 4

  • 4. Check that licensee has the Determines that licensee required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />. does NOT have adequate hours to meet the 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> _____ _____ _____

requirement.

  • 5. Verifies Plant Tour completed Determines that Plant Tour per step 4.b date and signature are not completed. _____ _____ _____
6. Report the results of the review Returns without signing OP-to the Shift Operations AA-105-102, Attachment 2 Superintendent (SOS). to the SOS.

Informs the SOS that the licensees license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete. _____ _____ _____

CUE:

As the SOS, acknowledge the report.

END A-N-2-S Page 5 of 8

Job Performance Measure (JPM)

JPM Stop Time:_________

A-N-2-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job Title: SRO JPM Title: REACTIVATION OF AN SRO LICENSE Revision Number: 01 JPM Number: A-N-2-S Task Number and Title: Title: 299L024, Maintain an Active License K/A Number and Importance: Generic.2.1.4 3.3 / 3.8 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 Actual Time Used: minutes

References:

OP-AA-105-102, Rev. 11 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-2-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Shift Manager.
2. An SRO is in the process of license reactivation.
3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.

INITIATING CUE

1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions A-N-2-S Page 8 of 8

Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-S Revision Number: 04 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for 2010 NRC exam.

Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam.

A-N-3-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 6600-02.

A-N-3-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
4. The Equipment Operator reported all surveillance requirements were within specifications.

INITIATING CUE

1. Perform calculation verification and ensure paperwork is correct.
2. Inform me when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of DOS 6600-02.

  • 1. Candidate should identify Identifies differential step I.1.e has a mathematical pressure should read 4.

error. _____ _____ _____

  • 2. Candidate should identify Identifies incorrect step I.1.w OR step I.1.v is verification of dP <6.

signed off as verified dP of <6 _____ _____ _____

(actual is 7).

  • 3. Candidate should identify that Identifies step NOT steps I.1.ab have been independently verified.

initialed by the same person _____ _____ _____

performing the surveillance and were NOT independently verified.

4. Notify Unit Supervisor of Notifies Unit Supervisor, discrepancies. may dispatch Operators to verify/correct issues, also _____ _____ _____

may initiate IR.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job Title: SRO JPM Title: VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 04 JPM Number: A-N-3-S Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 Actual Time Used: minutes

References:

DOS 6600-02, rev 20 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-3-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
4. The Equipment Operator reported all surveillance requirements were within specifications.

INITIATING CUE

1. Perform calculation verification and ensure paperwork is correct.
2. Inform me when the task is complete.

A-N-3-R Page 7 of 7

Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 02 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam.

Revision 02 Modified for ILT 15-1 (2016-301) NRC Exam.

A-N-4-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.
3. Ensure a calculator is available and the memory/display has been cleared.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 1500-08.

A-N-4-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the U2 US.
2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
3. Only the A CCSW Heat Exchanger is going to be placed in service.

INITIATING CUE

1. Review and Verify DOS 1500-08.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-S Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of DOS 1500-08.

The following steps can be performed in any order.

  • 1. Verifies Dilution flow Determines Dilution flow calculation (1,017,000 gpm). was incorrectly determined. Correct Dilution flow is 1,017,000 _____ _____ _____

gpm.

  • 2. Enters dilution flow Determines 2.91 x 10-5 is (1,017,000 gpm) to calculate the correct CCSW sample CCSW Activity Limit. activity limit.

_____ _____ _____

NOTE:

If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated:

Direct the candidate to complete the review and make any necessary adjustments as necessary and another SRO will review.

3. Verifies CCSW Heat Determines 2.01 x 10-5 is Exchanger A sample activity less than 2.91 x 10-5.

is less than or equal to the calculated CCSW activity limit _____ _____ _____

  • 4. Re-Performs Canal Activity Uses 1,017,000 gpm as Calculation. Dilution Flow. Determines incorrect activity level used for A Activity level of CCSW Heat Exchanger.

Correct value is 2.01 x10-5. _____ _____ _____

  • 5. Determines Canal Activity Determines Canal Activity Concentration. Concentration is 6.9 x10-8

_____ _____ _____

A-N-4-S Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

6. Determines need for NSO to Examinee directs NSO to re-perform calculations. re-perform calculations

_____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-4-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job Title: SRO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-4-S Task Number and Title: 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.

K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environme nt: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes

References:

DOS 1500-08, rev 17 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-4-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the U2 US.
2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
3. Only the A CCSW Heat Exchanger is going to be placed in service.

INITIATING CUE

1. Review and Verify DOS 1500-08.
2. Inform the Unit 2 Supervisor when the task is complete.

A-N-4-S Page 8 of 8

Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number: A-N-5-S Revision Number: 00 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator init ial or continuing train ing)

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.

A-N-5-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. For exam purposes/exam security provide a colored copy of a blank NARS form.

A-N-5-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. This is a time critical JPM.
2. You are the Shift Emergency Director.
3. Unit 2 was operating at near rated conditions.
4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
6. Visible damage to spent fuel has occurred.
7. Fuel pool level is lowering at 1 foot per minute.
8. Refuel floor CAM is alarming due to high airborne particulate contamination.
9. A large hole is present in the Reactor Building wall.
10. There is NO verifier available.

INITIATING CUES

1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

A-N-5-S Page 4 of 8

Job Performance Measure (JPM)

Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-5-S Page 5 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts.

Provide the supplied NARS Form.

Provide the supplied screen shot of the meteorological data.

  • 1. Determines a classification of Determines highest GENERAL EMERGENCY, classification is a due to notification from the GENERAL EMERGENCY _____ _____ _____

Security Force that a per EAL HG1 (15 minute HOSTILE ACTION is requirement).

occurring within the protected area AND Damage to spent fuel pool has occurred.

NOTE:

Determines classification start time _______ and stop time _______ .

(15 minute limit)

  • 2. Properly fills out NARS form. See attached key for the areas that must be filled out correctly (12 minute requirement) _____ _____ _____

NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used.

NOTE:

Fill out NARS form start time (when declaration completed) _______ and stop time _______ .

(12 minute limit)

END JPM Stop Time:_________

A-N-5-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job Title: SRO JPM Title: DETERMINE EP PROTECTIVE ACTION RECOMMENDATION Revision Number: 00 JPM Number: A-N-5-S Task Number and Title: 295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 Actual Time Used: minutes

References:

EP-AA-1004 Addendum 3 Rev. 002 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-5-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. This is a time critical JPM.
2. You are the Shift Emergency Director.
3. Unit 2 was operating at near rated conditions.
4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
6. Visible damage to spent fuel has occurred.
7. Fuel pool level is lowering at 1 foot per minute.
8. Refuel floor CAM is alarming due to high airborne particulate contamination.
9. A large hole is present in the Reactor Building wall.
10. There is NO verifier available.

INITIATING CUES

1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form.

Give the NARS form to the WEC Supervisor, who will make the state notification.

A-N-5-S Page 8 of 8

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S-N-a Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date JOB PERFORMANCE MEASURE VALIDATION CHECKLIST SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 1100-02 Rev: 19 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 02 Revised for 2013 NRC exam.

Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC _51_.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Run CAEP file S-N-a.cae.
3. If the CAEP file cannot be run then insert the following Expert Commands:
a. Insert following Malfunctions and/or Remotes:
  • IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
  • IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
  • IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #

whichever pump is started first will not develop flow)

  • IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #

whichever pump is started first will not develop flow)

  • IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF)
b. Setup the following Triggers:
  • TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position)
  • TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction)
  • TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position)
  • TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction)

DOCUMENT PREPARATION Clean copy of DOP 1100-02 hardcard.

SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. A transient has occurred, resulting in an ATWS.
3. The Unit Supervisor has authorized the use of Hard Cards.

INITIATING CUE

1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Examinee should locate the hard card, then provide the included copy.

1. Selects the correct procedure step. Determines correct procedure step is per DOP 1100-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS)

___ ___ ___

2. Place the SBLC INJECTION Turns the SBLC INJECTION CONTROL keylock switch to the CONTROL keylock switch to either SYS 1 OR SYS 2 position. the intermediate right OR intermediate left position.

___ ___ ___

3. Verifies applicable SQUIB pilot SQUIB A or B light off.

light NOT lit. ___ ___ ___

Note The selected pump starts but does not develop flow (relief valve failure in the JPM setup).

4. Verifies applicable PUMP pilot PUMP light on.

light lit. ___ ___ ___

BEGIN ALTERNATE PATH

5. Verifies FLOW pilot light lit. FLOW light off (SBLC is NOT injecting). ___ ___ ___
6. SBLC SQUIB VLV CKT FAILURE Annunciator 902-5 H-6 illuminated.

annunciator alarms (902-5 H-6). ___ ___ ___

  • 7. Places SBLC INJECTION Turns the SBLC INJECTION CONTROL keylock switch to CONTROL keylock switch to the opposite position taken to in step opposite direction turned in step 1.

1.

___ ___ ___

8. Verifies opposite PUMP pilot light Opposite PUMP light on.

lit. ___ ___ ___

Note Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re-positioned.

9. Verifies RWCU valve 2-1201-1 Examinee recognizes that valve 2-closed. 1201-1 valve did NOT close. ___ ___ ___

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-a Rev 03

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 10. Closes RWCU valve 2-1201-1. Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position.

___ ___ ___

11. Verifies RWCU valve 2-1201-1A GREEN light illuminated.

closed. ___ ___ ___

12. Verifies RWCU valve 2-1201-2 Examinee recognizes that valve 2-closed. 1201-2 valve did NOT close. ___ ___ ___
  • 13. Closes RWCU valve 2-1201-2. Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position.

___ ___ ___

14. Verifies RWCU valve 2-1201-3 GREEN light illuminated.

closed. ___ ___ ___

15. Verifies RWCU valve 2-1201-7 RED light illuminated.

closed. ___ ___ ___

16. Informs Unit Supervisor task is Reports SBLC is injecting but the complete. first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to close automatically.

___ ___ ___

Cue Acknowledge report of task completion.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-a Rev 03

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: RO SRO SRO Cert JPM Title: SBLC - Injection with Pump and RWCU Failures JPM Number: S-N-a Revision Number: 03 Task Number and Title: 211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 1100-02, Rev 19 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-a Rev 03

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. A transient has occurred, resulting in an ATWS.
3. The Unit Supervisor has authorized the use of Hard Cards.

INITIATING CUE

1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S-N-b Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 0600-06 Rev: 44 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 02 Bank JPM.

Revision 03 Revised for 2009 NRC Exam.

Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC _52_.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify BOTH FW REG ISOL VALVES are OPEN:
  • MO 2-3206A
  • MO 2-3206B
3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED.
4. Verify MASTER CONTROL STATION is in MAN.
5. Low Flow Reg Valve is controlling level at 30 in AUTO.
6. Insert following Malfunctions and/or Remotes:
  • None.
7. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION

1. Copy of DOP 0600-06 marked up through limitations and actions.

SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit Startup is in progress.
3. The FWLCS is controlling level with the Low Flow Reg Valve.
4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
5. 2A & 2B FRVs have been pre-operationally tested.
6. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide the examinee with the provided copy of DOP 0600-06.

1. Verify 2A and 2B FWRVs have Condition met in initial conditions.

been pre-operationally tested per Step G.1.

___ ___ ___

2. Verify the following valves are GREEN lights illuminated on the open: following:
  • MO 2-3205A, FW LINE STOP.
  • MO 2-3205A
  • MO 2-3205B, FW LINE STOP.
  • MO 2-3205B
  • MO 2-3206A, 2A FW REG
  • MO 2-3206A ISOL.
  • MO 2-3206B, 2B FW REG
  • MO 2-3206B ISOL.

___ ___ ___

3. Adjust MASTER CONTROL Depresses appropriate pushbutton STATION OR RX LO FLOW to verify setpoint to match actual CONTROL STATION, setpoint to RPV level on MASTER match actual RPV level. CONTROL STATION OR RX LO FLOW CONTROL STATION. ___ ___ ___
4. Select appropriate FWLCS RPV Depresses appropriate FWLCS level signal per Section G.17. RPV level signal pushbutton. ___ ___ ___
5. Place RX LO FLOW CONTROL Verifies AUTO light illuminated on STATION to AUTO. RX LO FLOW CONTROL ___ ___ ___

STATION.

  • 6. Place one REG VLV CONTROL Depresses AUTO pushbutton on STATION in AUTO. 2B REG VLV CONTROL STATION.

___ ___ ___

7. Verify other REG VLV CONTROL Verifies MAN light illuminated on STATION in MAN. 2A REG VLV CONTROL STATION.

___ ___ ___

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-b Rev 04

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 8. Place MASTER CONTROL Depresses AUTO pushbutton on STATION in AUTO. FWLC MASTER CONTROL STATION.

___ ___ ___

Note The LOW FLOW FWRV will automatically transfer to the 2B FWRV when the LOW FLOW FWRV position is 85% feedwater flow.

9. Informs Unit Supervisor task is Examinee notifies the Unit complete. Supervisor. ___ ___ ___

Cue Acknowledge report of task completion.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-b Rev 04

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: RO SRO SRO Cert JPM Title: Place a FRV in Service in Auto During Unit Startup JPM Number: S-N-b Revision Number: 04 Task Number and Title: 259L021, Place FRV in service in AUTO (unit startup).

K/A Number and Importance: 259002.A4.03 3.8 / 3.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 0600-06, Rev 44 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-b Rev 04

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit Startup is in progress.
3. The FWLCS is controlling level with the Low Flow Reg Valve.
4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
5. 2A & 2B FRVs have been pre-operationally tested.
6. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04

TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ-JA-150-02 Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DEOP 0500-03 Rev: 23 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 06 Bank JPM.

Revision 07 Revised for ILT 12-1 Cert Exam.

Revision 08 Revised for ILT 14-1 NRC Exam.

Revision 09 Revised for ILT 15-1 (2016-301) NRC Exam.

SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC (IC _53__ used for validation).

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify ALL LP ECCS Pumps are in PTL.
3. Run the following CAEP file: S-N-d.cae
4. If the CAEP cannot be ran, insert the following Expert Commands:
  • Insert the following Malfunctions, Remotes, and/or Overrides:

o imf ser0016 on o imf ser0155 on o ior lpdvlvcl25 close o ior lpdvlvop16 open o ior rrd5bcls close

  • Assign the following trigger assignment:

o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems.

SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.

Examiner Note: The following parameters do not match the simulator indications.

3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 140 psig and slowly dropping.
5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
6. B Loop is selected for injection.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ-JA-150-02 JPM Start Time:

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the provided copy of DEOP 0500-03.

1. Verifies 2A LPCI PP control ALL lights extinguished.

switch in Pull-to-Lock.

_____ _____ _____

2. Place PP SUCT VLV MO 2- RED light illuminated.

1501-5A control switch in

_____ _____ _____

Manual Bypass and verify closed.

3. Verify MIN FLOW VLV 2- RED light illuminated.

1501-13A closed if not

_____ _____ _____

needed.

CUE:

2-1501-13A is not required for 2B LPCI pump.

NOTE:

The following valves may be verified in any order

4. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20A and

_____ _____ _____

2-1501-38A closed.

5. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19A and 2-1501-18A

_____ _____ _____

closed.

6. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28A and 2-1501-27A

_____ _____ _____

closed.

7. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20B and

_____ _____ _____

2-1501-38B closed.

8. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19B and 2-1501-18B

_____ _____ _____

closed.

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

9. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28B and 2-1501-27B

_____ _____ _____

closed.

NOTE:

For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).

CUE:

When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed.

10. Unlock AND open 2-1501- Instructs EO to complete 74A, U2 LPCI A PMP step G.12.c.(5).(a).

_____ _____ _____

VENT VLV.

11. Crack open 2-1501-15A, U2 Instructs EO to complete LPCI A PMP VENT VLV until step G.12.c.(5).(b).

_____ _____ _____

flow is observed from pipe.

12. Close 2(3)-1501-15A, U2 Instructs EO to complete LPCI A PMP VENT VLV. step G.12.c.(5).(c).

_____ _____ _____

13. Close AND lock 2-1501-74A, Instructs EO to complete U2(3) LPCI A PMP step G.12.c.(5).(d).

_____ _____ _____

VENT VLV.

14. Open 2-1501-47A-R, U2 Instructs EO to obtain PI 2-LPCI A PUMP SUCT PI 1501-47A reading per step

_____ _____ _____

2-1501-47A ROOT VLV (at G.12.c.(6). & G.12.c.(7).

pump) and verify PI 2-1501-47A indicates less than 15 psig.

CUE:

PI 2-1501-47A indicates 15.5 psig.

15. Recognizes reading is NOT Determines reading is less than 15 psig. greater than 15 psig.

_____ _____ _____

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

16. Close 2-1501-47A-R, U2 Instructs EO to close 2-LPCI A PUMP SUCT PI 1501-47A per step

_____ _____ _____

2-1501-47A ROOT VLV. G.12.c.(8).

CUE:

2-1501-47A-R is Closed.

17. Open PP SUCT VLV MO 2- GREEN light illuminated.

1501-5A.

_____ _____ _____

18. Notify Unit Supervisor that 2A Examinee notifies Unit LPCI pump cannot be used Supervisor of 2A LPCI

_____ _____ _____

with suction from the CST. pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.

CUE:

Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.

Maintain the 2A LPCI pump in PTL.

BEGIN ALTERNATE PATH

19. Verifies 2C LPCI PP control ALL lights extinguished.

switch in Pull-to-Lock.

_____ _____ _____

  • 20. Place PP SUCT VLV MO 2- RED light illuminated.

1501-5C control switch in

_____ _____ _____

Manual Bypass and verify closed.

21. Verify MIN FLOW VLV 2- RED light illuminated.

1501-13B closed if not

_____ _____ _____

needed.

CUE:

2-1501-13B is not required for 2D LPCI pump.

22. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20A and

_____ _____ _____

2-1501-38A closed.

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

23. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19A and 2-1501-18A

_____ _____ _____

closed.

24. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28A and 2-1501-27A

_____ _____ _____

closed.

25. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20B and

_____ _____ _____

2-1501-38B closed.

26. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19B and 2-1501-18B

_____ _____ _____

closed.

27. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28B and 2-1501-27B

_____ _____ _____

closed.

28. Unlock AND open 2-1501- Instructs EO to complete 74C, U2 LPCI C PMP step G.12.e.(5).(a).

_____ _____ _____

VENT VLV.

29. Crack open 2-1501-15C, U2 Instructs EO to complete LPCI C PMP VENT VLV until step G.12.e.(5).(b).

_____ _____ _____

flow is observed from pipe.

30. Close 2(3)-1501-15C, U2 Instructs EO to complete LPCI C PMP VENT VLV. step G.12.e.(5).(c).

_____ _____ _____

31. Close AND lock 2-1501-74C, Instructs EO to complete U2 LPCI C PMP step G.12.e.(5).(d).

_____ _____ _____

VENT VLV.

32. Open 2-1501-47C-R, U2 LPCI Instructs EO to obtain PI 2-C PUMP SUCT PI 2- 1501-47C reading per step

_____ _____ _____

1501-47C ROOT VLV (at G.12.e.(6).

pump) and verify PI 2-1501-47C indicates less than 15 psig.

CUE:

Pressure is 10 psig. .

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

33. Recognizes reading is less Determines reading is than 15 psig. LESS than 15 psig.

_____ _____ _____

34. Close 2-1501-47C-R, U2 LPCI Instructs EO to close 2-C PUMP SUCT PI 1501-47C per step

_____ _____ _____

2-1501-47C ROOT VLV. G.12.e.(8).

  • 35. Unlock AND open 2-1501- Directs EO to perform 31C, U2 LPCI C PMP step G.12.e.(10)(a) _____ _____ _____

SUCT VLV FROM CST [at 2 C LPCI Pump]

CUE:

2-1501-31C is open.

  • 36. Unlock AND open 2-1501- Directs EO to perform 37, U2 LPCI & CS SUCT step G.12.e.(10)(b) _____ _____ _____

FROM 2/3A CST SV (located at 2/3A CST)

Simulator Operator / Evaluator:

Activate Trigger 15 to lineup 2C LPCI pump suction to the CST.

CUE:

2-1501-37 is open.

Examiner Note:

If a RPV level band is requested: Direct the candidate to maintain RPV level between +8 and +48 (NOTE: RPV level is -65 and dropping per the cue)

  • 37. Start 2C LPCI PP Places control switch to start. RED light _____ _____ _____

illuminated.

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ-JA-150-02 UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

38. Inform Unit Supervisor that Informs Unit Supervisor 2C LPCI pump is lined up that 2C LPCI pump is _____ _____ _____

to the CST and the task is lined up to the CST and complete. injecting; the task is complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: RO SRO SRO Cert JPM Title: LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number: S-N-d Revision Number: 09 Task Number and Title: 29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A1.04 3.6 / 3.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DEOP 0500-03, Rev 23 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 38 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.
3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 140 psig and slowly dropping.
5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
6. B Loop is selected for injection.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09

TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure CONTAINMENT - VENT CONTAINMENT WITH APCV - (A)

JPM Number: S-N-e Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00

TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DEOP 0500-04 Rev: 16 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00

TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.

SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00

TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. (IC _51__ used for validation).

NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Ensure Torus water level is <30 feet.
3. Run the following CAEP file: S-N-e.cae
4. If the CAEP file cannot be ran insert the following Expert Commands:
a. Insert following Malfunctions, Remotes, and/or Overrides:
  • IMF CIGP2I (Spurious Group II Isolation)
  • Adjusts Torus Level indications to ~20 feet.

v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20

  • Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0
  • Prevents the 2-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off
  • Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.

v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled

  • Adjusts Drywell & Torus pressures to 50.0 psig.

v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0

5. Verify the SBGT system operating and verify flow ~4000 scfm.
6. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04.
7. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.

SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00

TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Aux 2 NSO.
2. A break inside the Unit 2 Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
4. Torus water level is 20 feet.
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.
9. The N2 System is in its normal lineup.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00

TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide examinee the marked up copy of DEOP 0500-04.

Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.

1. Verify SBGT is operating and flow Verifies 2/3A SBGT train is ~ 4000 scfm. FI 7540-13 is reading ~4000 scfm. ___ ___ ___
2. Verify Reactor Mode switch NOT Verifies Reactor Mode switch NOT in RUN. in RUN. ___ ___ ___
3. Place VENT ISOL SIGNAL Momentarily places Bypass switch BYPASS switch on 902-5 panel to to Torus Position.

TORUS.

___ ___ ___

4. Open AO 2-1601-61, TORUS 2- Places AO 2-1601-61 control INCH VENT VLV. switch to OPEN position and determines that the valve will not open.

___ ___ ___

  • 5. Place the VENT ISOL SIGNAL Places the VENT ISOL SIGNAL BYPASS Switch on 902-5 to BYPASS Switch on 902-5 to DRYWELL. DRYWELL

___ ___ ___

  • 6. Open AO 2-1601-62, DW 2-INCH Places AO 2-1601-62 control VENT VLV. switch to OPEN.

Green light extinguishes and Red light illuminates. ___ ___ ___

  • 7. Open AO 2-1601-63, VENT TO Places AO 2-1601-63 control SBGT. switch to OPEN.

Green light extinguishes and Red light illuminates. ___ ___ ___

8. Determine if SBGT flow is Determines Containment pressure adequate to control and maintain trend.

Torus Bottom pressure below the Primary Containment Pressure Limit. ___ ___ ___

Examiner Note:

DW pressure as indicated on PR/FR 2-8540-2/4 is as read and no change is expected with the small diameter vent path in service.

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00

TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number Cue If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.

BEGIN ALTERNATE PATH

9. Determines use of AUGMENTED Proceeds to Attachment 1 step 6.

PRI CNMT VENT (APCV) System is required.

___ ___ ___

  • 10. Place AUGMENTED PRI CNMT Rotates control switch clockwise to VENT MODE SWITCH to APCV APCV position on Panel 902-3

___ ___ ___

11. Verify closed AO 2-1601-63, VENT Verifies AO-2-1601-63 in closed.

TO SBGT GREEN light lit, RED light extinguished.

___ ___ ___

12. Verify closed AO 2-1601-91, VENT Verifies AO-2-1601-91 in closed.

TO RX BLDG EXH SYS RED light lit, GREEN light extinguished.

___ ___ ___

  • 13. Place TORUS ISOLATION Rotates TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 GROUP 2 OVERRIDE 2-1601-60 switch to OVERRIDE and hold on keylock switch clockwise and holds 902-3 Panel

___ ___ ___

  • 14. Place DRYWELL ISOLATION Rotates DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 GROUP 2 OVERRIDE 2-1601-23 switch to OVERRIDE and release keylock switch clockwise and on 902-3 Panel releases

___ ___ ___

  • 15. Release TORUS ISOLATION Releases TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 GROUP 2 OVERRIDE 2-1601-60 on 902-3 Panel keylock switch

___ ___ ___

  • 16. Place CMNT ISOLATION GROUP Rotates CMNT ISOLATION 2 OVERRIDE 2-1601-24 switch to GROUP 2 OVERRIDE 2-1601-24 OVERRIDE and release on 902-3 keylock switch clockwise and Panel releases

___ ___ ___

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00

TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 17. Open AO 2-1601-60, TORUS Determines Torus Water Level is VENT VLV. less than 30 feet and opens AO 2-1601-60, TORUS VENT VLV.

___ ___ ___

  • 18. Open AO 2-1601-24, VENT TO RX Rotates AO 2-1601-24, VENT TO BLDG EXH SYS. RX BLDG EXH SYS control switch clockwise and verifies GREEN light extinguishes and RED light illuminates ___ ___ ___
  • 19. Open AO 2-1601-92 VENT TO Rotates AO 2-1601-92 VENT TO MAIN CHIMNEY to control and MAIN CHIMNEY control switch maintain Primary Containment clockwise and verifies GREEN pressure below limit. light extinguishes and RED light illuminates ___ ___ ___

Cue:

DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.

If examinee asks, DW pressure recorder PR/FR 2-8540-2/4 is slowly lowering.

If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).

20. Informs Unit Supervisor task is Examinee notifies the Unit complete. Supervisor. ___ ___ ___

Cue Acknowledge report of task completion.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00

TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: RO SRO SRO Cert JPM Title: Containment - Vent Containment with APCV - (A)

JPM Number: S-N-e Revision Number: 00 Task Number and Title: 295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit.

K/A Number and Importance: 223001.A4.07 4.2*/4.1 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DEOP 0500-04, Rev 16 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-e Rev 00

TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Aux 2 NSO.
2. A break inside the Unit 2 Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
4. Torus water level is 20 feet.
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.
9. The N2 System is in its normal lineup.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00

TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03

TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 6700-18 Rev: 13 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03

TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 02 Updated to comply with rev 4 of DOP 6500-10 Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03

TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC (IC _51__ used for validation).

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Hold MCC 29-7/28-7 Feed from Bus 29 in TRIP until MCC 29-7/28-7 Feed from Bus 28 CLOSES.
3. This completes the setup for this JPM.

DOCUMENT PREPARATION Mark up copy of DOP 6700-18, Bus 28 Outage.

SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03

TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. MCC 28-7/29-7 is powered from Bus 28.
2. Power has been restored to Bus 29.
3. You are the Unit 2 Assistant NSO.
4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.

INITIATING CUE

1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
2. Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03

TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number

1. Declare BOTH LPCI subsystems Informs the Unit Supervisor BOTH inoperable LPCI subsystems must be declared inoperable.

Reference TS 3.5.2

___ ___ ___

Cue Respond: Division 1 and 2 LPCI subsystems are inoperable.

  • 2. Open the feed breaker from Bus Opens the feed breaker AND 28, MCC 29-7/28-7 FEED FROM maintains the switch in TRIP.

BUS 28, by placing control switch in TRIP AND maintain switch in TRIP.

___ ___ ___

  • 3. Close feed breaker from Bus 29, Closes the feed breaker MCC 29-7/28-7 FEED FROM BUS 29.

___ ___ ___

  • 4. Release feed breaker from Bus 28, Releases feed breaker control MCC 29-7/28-7 FEED FROM BUS switch 28, control switch.

___ ___ ___

5. Notify the Unit 2 Supervisor that Unit 2 Supervisor notified.

normal feed has been restored to MCC 28-7/29-7.

___ ___ ___

Cue Acknowledge report of task completion.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-f Rev 03

TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: RO SRO SRO Cert JPM Title: Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Task Number and Title: 262L026, Restore Normal Feed to 28-7/29-7 from Bus 29 K/A Number and Importance: 262001.A4.01 3.4 / 3.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 6700-18, Rev 13 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-f Rev 03

TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. MCC 28-7/29-7 is powered from Bus 28.
2. Power has been restored to Bus 29.
3. You are the Unit 2 Assistant NSO.
4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.

INITIATING CUE

1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
2. Notify the Unit 2 Supervisor when the task is complete SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP)

S-N-g Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 0700-01 Rev: 15 Procedure DOA 0700-02 Rev: 13 Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 00 New JPM for the 2010 LORT exam.

Revision 01 Updated for the 2012 LORT exam.

Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to a 2-3% power IC (IC _53__ used for validation).

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Position SRM detectors for a 104 to 105 count rate. (Should not be in the fully withdrawn position)
3. Run CAEP file: S-N-f.cae
4. If CAEP file cannot be ran, insert the following Expert Commands:
a. Malfunctions required:
1) imf nis22det (Inserts SRM 22 stuck malfunction)
b. Triggers required:
1) trgset 1 nilsdet(2) .and. nil104do
2) trgset 2 et_array(1) .and. nilsdet(2) .and. nil101di
3) trg 2 dmf nis22det DOCUMENT PREPARATION Clean copies of the following procedures:
  • DOP 0700-01, Source Range monitor Operation (SRM)
  • DOA 0700-02, SRM or IRM Detector Stuck SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. Unit 2 startup is in progress.
2. You are an extra NSO assisting the startup.
3. Primary Containment has been established.

INITIATING CUE

1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
2. Your Pre-Job Brief has been completed.
3. Notify the Unit supervisor upon completion of the task.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide the Examinee a copy of DOP 0700-01.

1. WHEN IRM down scale alarms IRM down scales are cleared by have cleared, THEN start SRM initial conditions.

withdrawal and maintain SRM Monitors count rate when count rate 290 cps to 8.85x104 withdrawing SRMs.

cps. ___ ___ ___

  • 2. Depress the applicable Depresses each SRMs SELECT SELECT switch (LIT when switch.

selected).

Verifies SELECT light lit. ___ ___ ___

  • 3. Depress and hold the DRIVE Depress and hold the DRIVE OUT OUT switch to withdraw SRMs switch to withdraw SRMs to maintain SRM count rate of 290 cps to 8.85x104 cps. ___ ___ ___

BEGIN ALTERNATE PATH

4. Verify that SRMs indication is For SRMs 21, 23 & 24:

changing as expected.

  • Count rate drops.
  • Period indicates negative.

For SRM 22 indications remain unchanged. ___ ___ ___

5. Report SRM 22 detector did not Reports SRM 22 detector did not move and/or appears to be stuck. move and/or appears to be stuck. ___ ___ ___

Note The Examinee should allow SRMs 21, 23, 24 to fully withdraw.

Cue Acknowledge report. Announce entering DOA 0700-02, SRM or IRM Detector Stuck. Direct the Examinee to perform DOA 0700-02. When the Examinee locates DOA 0700-02, give him the provided copy of DOA 0700-02.

Note The Examinee may have already deselected SRMs earlier.

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-g Rev 02

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 6. Depress SRM SELECT Depresses SRM SELECT switches to establish ONLY switches to establish ONLY SRM 22 selected SRM 22 SELECT light lit. ___ ___ ___

Note An automatic Trigger is setup to delete the SRM stuck detector malfunction when it is inserted.

  • 7. Use DRIVE IN AND DRIVE OUT Depresses DRIVE IN switch to switches to move stuck SRM move SRM 22.

detector in both directions to free it.

___ ___ ___

8. Verify indication that SRM 22 is Observes SRM 22:

moving.

  • Count rate rises.
  • Period indicates positive.

___ ___ ___

  • 9. Depress DRIVE IN switch to stop Depresses DRIVE IN switch to SRM 22. stop SRM 22.

___ ___ ___

  • 10. Use DRIVE IN AND DRIVE OUT Depresses and holds DRIVE OUT switches to move stuck SRM switch to move SRM 22.

detector in both directions to free Drives SRM 22 fully out.

it.

___ ___ ___

11. Verify that SRM 22 indication is Observes SRMs 22:

changing as expected.

  • Count rate drops.
  • Period indicates negative.
12. Report SRM 22 detector is fully Reports SRM 22 detector is fully withdrawn. withdrawn. ___ ___ ___

Cue Acknowledge report.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-g Rev 02

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: RO SRO SRO Cert JPM Title: Withdraw SRM Detectors with a Stuck SRM Detector (AP)

JPM Number: S-N-g Revision Number: 02 Task Number and Title: 215L022 Respond to an SRM or IRM stuck detector.

K/A Number and Importance: 215004A4.04 3.2 / 3.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 18 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-g Rev 02

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. Unit 2 startup is in progress.
2. You are an extra NSO assisting the startup.
3. Primary Containment has been established.

INITIATING CUE

1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
2. Your Pre-Job Brief has been completed.
3. Notify the Unit supervisor upon completion of the task.

SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02

TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ-JA-150-02 Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 7500-01 Rev: 36 Procedure DAN 902(3)-3 F-14 Rev: 20 Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for 2010 Cert Exam.

Revision 03 Modified for ILT 15-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation).

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Place the 2/3A SBGT train control switch in STBY.
3. Place the 2/3B SBGT train control switch in PRI.
4. Verify the following fans operating:
  • 2A RX BLDG VENT FAN
  • 2B RX BLDG VENT FAN
  • 2A RX BLDG EXH FAN
  • 2B RX BLDG EXH FAN
  • 3A RX BLDG VENT FAN
  • 3B RX BLDG VENT FAN
  • 3A RX BLDG EXH FAN
  • 3B RX BLDG EXH FAN
5. Run CAEP file S-N-h.cae
6. If the CAEP file cannot be ran, insert the following Expert Commands:
a. ior vrdtp3c trip (Prevents autostart of 2C RB vent fan)
b. ior vrdtp4c trip (Prevents autostart of 2C RB exhaust fan)
c. irf cirbvall lifted (Prevents Secondary Containment Isolation on U2)
d. trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START)
e. imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal)
f. imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan).
g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan).
h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan).
i. imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan).

DOCUMENT PREPARATION Clean copy of DOP 7500-01.

Clean copy of DAN 902(3)-3 F-14 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train.
3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

INITIATING CUE

1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ-JA-150-02 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number Note Provide the Examinee a copy of DOP 7500-01.

  • 1. Place the 2/3A SBGT SELECT Places the 2/3A SBGT SELECT switch to A PRI position. switch to the A PRI position. ___ ___ ___
  • 2. Place the 2/3B SBGT SELECT Places the 2/3B SBGT SELECT switch to B STBY position. switch to the B STBY position. ___ ___ ___
3. Verify the 2/3A and B AIR Both GREEN lights illuminated.

HEATERs are OFF. ___ ___ ___

4. Verify the 2/3A and B Fans are Both GREEN lights illuminated.

OFF. ___ ___ ___

5. Verify annunciators 923-5 A-6 and Both annunciator tiles 923-5 B-6 are NOT in alarm. extinguished. ___ ___ ___
6. Verify 2/3B SBGT SELECT Verifies 2/3 B SBGT Select switch SWITCH in B STBY position. in B STBY. ___ ___ ___

Note When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds. The resulting Secondary Containment Isolation fails and the operator should complete the isolation.

  • 7. Starts 2/3A SBGT train. Places 2/3 A SBGT Select switch to START A position. ___ ___ ___
8. Verifies the 2/3A SBGT train Begins verifying the 2/3A SBGT initiated properly. train operating properly. ___ ___ ___
9. Records the Start Time on Records the Start Time on Operator Aid. Operator Aid ___ ___ ___

BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur, and perform the Limitations and Actions.

Cue If examinee does not react to the alarm on the 902-3 panel, make the following update:

Attention for an Update. RX BLDG VENT CH A RAD HI-HI is in. End of Update.

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number Note If the examinee starts to head to the 902-3 panel to respond to the 902-3 F-14 annunciator stop them and hand them the provided copy of the DAN.

  • 10. Verifies trip of 3A RX BLDG VENT Determines 3A RX BLDG VENT FAN. FAN is NOT tripped. (BLUE lights illuminated).

Places control switch 3A RX BLDG VENT FAN to the Trip position.

Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated).

___ ___ ___

  • 11. Verifies trip of 3B RX BLDG VENT Determines 3B RX BLDG VENT FAN. FAN is NOT tripped. (BLUE lights illuminated).

Places control switch 3B RX BLDG VENT FAN to the Trip position.

Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated). ___ ___ ___

12. Verifies trip of 3C RX BLDG VENT GREEN light illuminated.

FAN. ___ ___ ___

  • 13. Verifies trip of 3A RX BLDG EXH Determines 3A RX EXH VENT FAN. FAN is NOT tripped. (BLUE lights illuminated).

Places control switch 3A RX BLDG EXH FAN to the Trip position.

Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated). ___ ___ ___

  • 14. Verifies trip of 3B RX BLDG EXH Determines 3B RX EXH VENT FAN. FAN is NOT tripped. (BLUE lights illuminated).

Places control switch 3B RX BLDG EXH FAN to the Trip position.

Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated). ___ ___ ___

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number

15. Verifies trip of 3C RX BLDG EXH GREEN light illuminated.

FAN. ___ ___ ___

16. Verifies trip of 2A RX BLDG VENT GREEN and AMBER lights FAN. illuminated. ___ ___ ___
17. Verifies trip of 2B RX BLDG VENT GREEN and AMBER lights FAN. illuminated. ___ ___ ___
18. Verifies trip of 2C RX BLDG VENT GREEN light illuminated.

FAN. ___ ___ ___

19. Verifies trip of 2A RX BLDG EXH GREEN and AMBER lights FAN. illuminated. ___ ___ ___
20. Verifies trip of 2B RX BLDG EXH GREEN and AMBER lights FAN. illuminated. ___ ___ ___
21. Verifies trip of 2C RX BLDG EXH GREEN light illuminated.

FAN. ___ ___ ___

  • 22. Verifies 3A INLET DAMPER AO 3- Determines 3A & 3B INLET 5741A closed. DAMPERs AO 3-5741A & B are Verifies 3B INLET DAMPER AO 3- NOT closed (GREEN lights 5741B closed. illuminated).

Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3-5741A & 3-5741B to the CLOSE position.

Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated).

___ ___ ___

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 23. Verifies 3A OUTLET DAMPER AO Determines 3A & 2B OUTLET 3-5742A closed. DAMPERs AO 3-5742A & B are Verifies 3B OUTLET DAMPER AO NOT closed (GREEN lights 3-5742B closed. illuminated).

Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position.

Determines 3A & 3B OUTLET DAMPERs AO 3-5742A & B did not close (GREEN lights illuminated).

___ ___ ___

  • 24. Verifies 2A INLET DAMPER AO 2- Determines 3A & 3B INLET 5741A closed. DAMPERs AO 2-5741A & B are Verifies 2B INLET DAMPER AO 2- NOT closed (GREEN lights 5741B closed. illuminated).

Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2-5741A & 2-5741B to the CLOSE position.

Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated).

___ ___ ___

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ-JA-150-02 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 25. Verifies 2A OUTLET DAMPER AO Determines 2A & 2B OUTLET 2-5742A closed. DAMPERs AO 2-5742A & B are Verifies 2B OUTLET DAMPER AO NOT closed (GREEN lights 2-5742B closed. illuminated).

Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position.

Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not close (GREEN lights illuminated).

___ ___ ___

26. Verifies trip of 2A D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___
27. Verifies trip of 2B D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___
28. Verifies trip of 3A D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___
29. Verifies trip of 3B D/W & Torus Condition met from previous steps Purge Fan. in the procedure. ___ ___ ___
30. Notifies US of Secondary Examinee notifies the Unit Containment Isolation Failure and Supervisor.

successful manual completion of the isolation.

___ ___ ___

Cue Acknowledge report.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: RO SRO SRO Cert JPM Title: SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP)

JPM Number: S-N-h Revision Number: 03 Task Number and Title: 261L002, Start the SBGT system.

K/A Number and Importance: 261000.A4.09 2.7 / 2.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 7500-01, Rev 36 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) S-N-h Rev 03

TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train.
3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

INITIATING CUE

1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03

Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 00 Date: 02/16 Developed By:

Exam Author Date Approved By:

Facility Representative Date Page 1 of 10

Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 4700-03 Rev: 22 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.

Page 3 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.

DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation to examinee.

Page 4 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. Unit 3 is shutdown for a refuel outage.
2. 2A IAC is unavailable due to an oil leak.
3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
6. Unit 2 SAC is running.
7. Main Control Room is monitoring IA parameters.

INITIATING CUE

1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY .
2. All applicable prerequisites of DOP 4700-03 have been met.
3. Your Pre Job Brief has been completed.
4. Notify the Unit Supervisor when you are complete with the task.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

Page 5 of 10

Job Performance Measure (JPM)

The timeclock starts when the candidate acknowledges the initiating cue.

Page 6 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

Comment #

SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Provide examinee a current copy of DOP 4700-03.

1. Identifies Step G.9 as the Proceeds to Step G.9.

correct step in DOP 4700-03.

_____ _____ _____

2. Verify closed 3-4799-501A, Verifies 3-4799-501A, 3C IAC 3C IAC DISCH TO U-3 DISCH TO U-3 INST AIR INST AIR HEADER ISOL HEADER ISOL VLV stem is in.

VLV.

(Valve is located above 3B IAC) _____ _____ _____

CUE The component is in the position you described.

  • 3. Close 2/3-4799-424, U2/U3 Rotates 2/3-4799-424, U2/U3 X-TIE SV. X-TIE SV clockwise until stem is in.

(Valve is located North of 3A IAC) _____ _____ _____

CUE The component is in the position you described.

  • 4. Open 2/3-4799-425, 3C IAC Rotates 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV. TO U2 AIR SYS X-TIE SV counter clockwise until stem is out.

_____ _____ _____

(Valve is located North of 3A IAC)

CUE The component is in the position you described.

Page 7 of 10

Job Performance Measure (JPM)

Comment #

SAT UNSAT PERFORMANCE CHECKLIST STANDARDS

  • 5. Open 2-47350-500, U2 Rotates 47350-500, U2 INST INST AIR SYS XTIE FROM AIR SYS XTIE FROM THE U3 THE U3 INST AIR SYS. INST AIR SYS counter clockwise until stem is out.

_____ _____ _____

(Valve is located North of Cardox tank)

CUE The component is in the position you described.

  • 6. Open 2-47350-329, U2 Rotates 2-47350-329, U2 INST AIR HDR ISOL VLV. INST AIR HDR ISOL VLV counter clockwise until stem is out.

_____ _____ _____

(Valve is located North of 2B IAC)

CUE The component is in the position you described.

7. Report completion of task to Reports completion of task to Unit Supervisor. Unit Supervisor.

_____ _____ _____

END JPM Stop Time:_________

Page 8 of 10

Job Performance Measure (JPM)

Operators Name:

Job Title: q RO q SRO JPM Title: Align IACs to Unit 2 Instrument Air header Revision Number: 00 JPM Number: S-N-i Task Number and Title: 278N013 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02 3.3 / 3.1 Suggested Testing Environme nt: In-Plant Suggested Testing Environment: q Simulator Plant q Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete:_ 20__minutes Actual Time Used: _______ minutes

References:

DOP 4700-03, Rev. 22 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Page 9 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. Unit 3 is shutdown for a refuel outage.
2. 2A IAC is unavailable due to an oil leak.
3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
6. Unit 2 SAC is running.
7. Main Control Room is monitoring IA parameters.

INITIATING CUE

1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY .
2. All applicable prerequisites of DOP 4700-03 have been met.
3. Your Pre Job Brief has been completed.
4. Notify the Unit Supervisor when you are complete with the task.

Page 10 of 10

Job Performance Measure (JPM)

Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number: S-N-j Revision Number: 10 Date: 02/16 Developed By:

Exam Author Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DEOP 500-02 Rev: 16 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

Job Performance Measure (JPM)

Revision Record (Summary)

Rev 08: Updated for the 2007 LORT exam Rev 09: Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.

DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations to provide to examinee.

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
5. Drywell temperature and pressure are rising.

INITIATING CUE

1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
2. Your Pre Job Brief has been completed.
3. Notify the Unit Supervisor when the in-plant actions are complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

JPM Start Time: _________

Comment #

SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Provide examinee a current copy of DEOP 500-02.

1 Proceed to Step G.3 of Locates Step G.3 procedure.

_____ _____ _____

NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.

NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are:

Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.

Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.

2 Obtain appropriate OBTAINS appropriate Equipment Box from the EQUIPMENT BOX from the

_____ _____ _____

Control Room DEOP Control Room DEOP Equipment Equipment Storage Storage Cabinet.

Cabinet.

CUE DEOP Equipment Box you have identified is in your hand.

NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and Locates Panel 903-32.

panel 903-32.

_____ _____ _____

NOTE Simulated JPM - Examinee must explain the task.

Job Performance Measure (JPM)

Comment #

SAT UNSAT PERFORMANCE CHECKLIST STANDARDS

  • 4 Lift AND tape lead on On 903-32 panel terminal block 903-32 panel terminal AA terminal point 6 OR terminal block AA terminal point 6 point 7 OR terminal point 7.
  • Puts on insulated gloves.
  • Loosens screw with standard screwdriver.
  • Uses split blade screwdriver _____ _____ _____

to grasp screw and remove it.

  • Tapes the loose wire with electricians tape.

CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.

  • 5 Lift AND tape lead on On 903-33 panel terminal block 903-33 panel terminal AA terminal point 6 OR terminal block AA terminal point 6 point 7 OR terminal point 7.
  • Puts on insulated gloves.
  • Loosens screw with standard screwdriver.
  • Uses split blade screwdriver _____ _____ _____

to grasp screw and remove it.

  • Tapes the loose wire with electricians tape.

CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.

6 Notify Unit Supervisor Notifies Unit Supervisor upon upon completion of task. completion of task.

_____ _____ _____

CUE Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

Operators Name: ___________________________________

Job Title: q RO q SRO JPM Title: Bypass the Trip of Drywell Coolers Revision Number: 10 JPM Number: S-N-j Task Number and Title: 295L074, Bypass the Trip of Drywell Coolers.

K/A Number and Importance: 295028.A1.03 3.9 / 3.9 Suggested Testing Environment: q Simulator Plant q Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: _______ minutes

References:

DEOP 500-02, Rev 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
5. Drywell temperature and pressure are rising.

INITIATING CUE

1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
2. Your Pre-Job Brief has been completed.
3. Notify the Unit Supervisor when the in-plant actions are complete Page 9 of 9

Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number: S-N-k Revision Number: 15 Date: 02/16 Developed By:

Exam Author Date Approved By:

Facility Representative Date Page 1 of 11

Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 0300-03 Rev: 25 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 14 Updated for the 2007 LORT exam.

Revision 15 Revised for ILT 15-1 (2016-301) NRC Exam.

Page 3 of 11

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS:

N/A: In-Plant JPM.

DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee.

Page 4 of 11

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
3. The Unit Supervisor has reviewed the TRM and has taken required actions.

INITIATING CUE

1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
2. Prerequisites have been met.
3. Your Pre-Job Brief is complete.
4. Notify the Unit Supervisor upon completion of in-plant actions.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The time clock starts when the candidate acknowledges the initiating cue.

Page 5 of 11

Job Performance Measure (JPM)

JPM Start Time: _________

Comment #

SAT UNSAT PERFORMANCE CHECKLIST STANDARDS

1. Proceed to Unit 2 CRD CRD FCVs located and Flow Control Valves communications established (FCVs) and establish with control room.

communications with the _______ ______ _____

control room.

NOTE Step G.2 is N/A.

2. Verify OPEN 2-0301-30, Verifies 2-0301-30 U2 CRD SYS FCV CONT stem/handwheel backed out.

_______ ______ _____

AIR PRV ISOL VLV.

CUE Valve 2-0301-30 stem/ handwheel is backed out.

3. Verify OPEN 2-0301-144B, Verifies 2-0301-144B valve U2 CRD SYS FCV 2-0302- stem/handwheel backed out.

_______ ______ _____

6B AIR ISOL VLV.

CUE Valve 2-0301-144B stem/handwheel is backed out.

4. Verify OPEN 2-0301-40B, Verifies 2-0301-40B valve U2 CRD SYS B FCV stem/handwheel backed out.

_______ ______ _____

INLET VLV.

CUE Valve 2-0301-40B stem/handwheel is backed out.

5. Cycle the 2B FCV full open Adjusts PRV 2-0301-34 locally and full closed by adjusting to cycle 2B FCV.

PRV 2-0301-34 locally.

Verifies cycling by observing stem position and/or light indication on the CRD FCV _______ ______ _____

electrical transfer station.

CUE 2B FCV cycles full open and then full closed.

Page 6 of 11

Job Performance Measure (JPM)

Comment #

SAT UNSAT PERFORMANCE CHECKLIST STANDARDS NOTE The Unit Supervisor has addressed the TRM per the Initial Conditions (addresses note preceding G.5 of DOP).

6. Verify PRV 2-0301-34 Verifies PRV 2-0301-34 valve closed. stem backed out and turning

_______ ______ _____

freely.

CUE PRV 2-0301-34 valve stem is backed out and turning freely.

7. Verify Pressure gauge PI Verifies pressure gauge PI 2-2-0302-60 indicates 0 psig. 0302-60 reading 0 psig.

_______ ______ _____

CUE After examinee locates and observes the indicator, then cue:

PI 2-0302-60 is reading 0 psig.

8. Verify via U2 NSO that Calls U2 NSO to verify CRD CRD FCV Controller in FCV Controller configuration MANUAL and demand is set to minimum. _______ ______ _____

CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum.

  • 9. At CRD Electrical Transfer, At CRD Electrical Transfer place the transfer switch Station, places the transfer TS160 to the "Valve B" switch to the "Valve B" position position to place FCV 2- to place FCV 2-0302-6B in 0302-6B in service. service _______ ______ _____

CUE The transfer switch is in the "Valve B" position.

  • 10. Select the 2B E/P Selects the 2B E/P converter converter by placing U2 by placing 2-0301-29 to B.

CRD SYS FCV A/B SELECTOR VLV 2-0301- _______ ______ _____

29 to B.

Page 7 of 11

Job Performance Measure (JPM)

Comment #

SAT UNSAT PERFORMANCE CHECKLIST STANDARDS CUE The 2-0301-29 Unit 2 CRD MANUAL E/P SELECTOR VALVE is in the B position.

Examiner Note:

On valves 2-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve.

  • 11. Place U2 CRD SYS FCV Places 2-0302-6B selector 2-0302-6B MAN/AUTO switch to the automatic SELECTOR VLV, 2-0301- position.

38, switch to the automatic _______ ______ _____

position.

CUE 2-0302-6B selector switch is in automatic.

  • 12. Place the U2 CRD SYS Places the 2-0302-6A selector FCV 2-0302-6A switch to the manual position.

MAN/AUTO SELECTOR VLV, 2-0301-37, to the _______ ______ _____

manual position.

CUE The 2-0302-6A selector switch is in manual.

  • 13. Open 2-0301-41B, U2 Opens 2-0301-41B valve.

CRD SYS A/B FCV Full CCW, stem/handwheel _______ ______ _____

OUTLET VLV.

backed out.

CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out.

14. Notify Unit NSO that the Notifies Unit NSO of 2B CRD 2B CRD FCV can now be FCV status and directs Unit controlled from the 902-5 NSO to adjust system flow rate Panel AND that system to maintain stable flow.

flow should be adjusted to _______ ______ _____

maintain stable flow rate.

CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate.

Page 8 of 11

Job Performance Measure (JPM)

Comment #

SAT UNSAT PERFORMANCE CHECKLIST STANDARDS

  • 15. Slowly close 2-0301-41A, Closes 2-0301-41A valve U2 CRD SYS A/B FCV slowly (full CW or stem/

_______ ______ _____

OUTLET VLV. handwheel in).

CUE The 2-0301-41A valve stem/handwheel is full CW or in.

16. Notifies Unit Supervisor of Unit Supervisor notified of completion of in-plant completion of in-plant actions.

actions per DOP and that the remaining steps are _______ ______ _____

from the 902-5 panel.

CUE Acknowledge report of task completion.

END JPM Stop Time:_________

Page 9 of 11

Job Performance Measure (JPM)

Operators Name: ___________________________________

Job Title: rRO rSRO JPM Title: Swap CRD Flow Control Valves Revision Number: 15 JPM Number: S-N-k Task Number and Title: 201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001.A4.03 2.9/2.8 Suggested Testing Environme nt: In-Plant Suggested Testing Environment: q Simulator Plant q Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: _ 23__ minutes Actual Time Used: _______ minutes

References:

DOP 0300-03, Rev. 25 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Page 10 of 11

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
4. The Unit Supervisor has reviewed the TRM and has taken required actions.

INITIATING CUE

1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
2. Prerequisites have been met.
3. Your Pre-Job Brief is complete.
4. Notify the Unit Supervisor upon completion of in-plant actions.

Page 11 of 11