{{#Wiki_filter:NRC INSPECTION MANUAL                                              DIRS Change Notice 18-032 DELETED:                                          TRANSMITTED:
Number                        Date                Number                        Date
: 1. IMC 0609 App E Part I        09/30/16            IMC 0609 App E Part I        09/17/18
: 2. IP 82002.08                  04/10/18            IP 82002.08                  09/17/18 TRAINING:      No special training is required for any documents issued with this Change Notice.
REMARKS:        IMC 0609 Appendix E Part I, Baseline Security Significance Determination Process for Power Reactors, has been revised in response to SECY 16-0073 and the March 2017 Assessment Team Review for redundancy and efficiencies of the 71130 series of IPs for power reactors.
IP 82002.08, Inspection of Site Specific Implementation of 10 CFR 50.54 (hh)(2)
Mitigating Strategies for Nuclear Power Plants Referencing the AP1000 Certified Design, has been revised to reflect specific AP1000 target areas and alternative water supply availability consistent with NEI 06-12 Revision 3.
DISTRIBUTION:
Standard Official Use Only (OUO)-Security Related Information.
Please contact: _______________ Phone: ________
END Issue Date: 09/17/18                              1                                        18-032}}

Latest revision as of 14:41, 20 October 2019

Inspection Manual Change Notice 18-032
ML18260A007
Person / Time
Issue date: 09/17/2018
From: Bridget Curran
Division of Inspection and Regional Support
To:
Curran B
Shared Package
ML18260A002 List:
References
CN 18-032
Download: ML18260A007 (1)


Text

NRC INSPECTION MANUAL DIRS Change Notice 18-032 DELETED: TRANSMITTED:

Number Date Number Date

1. IMC 0609 App E Part I 09/30/16 IMC 0609 App E Part I 09/17/18
2. IP 82002.08 04/10/18 IP 82002.08 09/17/18 TRAINING: No special training is required for any documents issued with this Change Notice.

REMARKS: IMC 0609 Appendix E Part I, Baseline Security Significance Determination Process for Power Reactors, has been revised in response to SECY 16-0073 and the March 2017 Assessment Team Review for redundancy and efficiencies of the 71130 series of IPs for power reactors.

IP 82002.08, Inspection of Site Specific Implementation of 10 CFR 50.54 (hh)(2)

Mitigating Strategies for Nuclear Power Plants Referencing the AP1000 Certified Design, has been revised to reflect specific AP1000 target areas and alternative water supply availability consistent with NEI 06-12 Revision 3.