ML18260A007
ML18260A007 | |
Person / Time | |
---|---|
Issue date: | 09/17/2018 |
From: | Bridget Curran Division of Inspection and Regional Support |
To: | |
Curran B | |
Shared Package | |
ML18260A002 | List: |
References | |
CN 18-032 | |
Download: ML18260A007 (1) | |
Text
NRC INSPECTION MANUAL DIRS Change Notice 18-032 DELETED: TRANSMITTED:
Number Date Number Date
- 2. IP 82002.08 04/10/18 IP 82002.08 09/17/18 TRAINING: No special training is required for any documents issued with this Change Notice.
REMARKS: IMC 0609 Appendix E Part I, Baseline Security Significance Determination Process for Power Reactors, has been revised in response to SECY 16-0073 and the March 2017 Assessment Team Review for redundancy and efficiencies of the 71130 series of IPs for power reactors.
IP 82002.08, Inspection of Site Specific Implementation of 10 CFR 50.54 (hh)(2)
Mitigating Strategies for Nuclear Power Plants Referencing the AP1000 Certified Design, has been revised to reflect specific AP1000 target areas and alternative water supply availability consistent with NEI 06-12 Revision 3.
DISTRIBUTION:
Standard Official Use Only (OUO)-Security Related Information.
Please contact: _______________ Phone: ________
END Issue Date: 09/17/18 1 18-032