| | issue date = 08/29/2013 | | | issue date = 08/29/2013 |
| | title = License Amendment Request Marked-up Page Corrections | | | title = License Amendment Request Marked-up Page Corrections |
| | author name = Shea J W | | | author name = Shea J |
| | author affiliation = Tennessee Valley Authority | | | author affiliation = Tennessee Valley Authority |
| | addressee name = | | | addressee name = |
Revision as of 19:56, 21 June 2019
Letter Sequence Request |
|---|
|
Results
Other: CNL-14-032, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), CNL-14-132, Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Bro, CNL-15-035, Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), CNL-15-159, Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), CNL-16-036, Sixth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), CNL-16-132, Seventh Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), CNL-17-107, Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049), CNL-18-017, Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, CNL-18-056, Completion of Required Action for NRC Order Number EA-12-049, Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ML13064A465, ML13225A541, ML13247A284, ML13338A634, ML14323A295, ML15069A358
|
MONTHYEARML13064A4652013-02-28028 February 2013 Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) Project stage: Other ML13182A3962013-07-0505 July 2013 And Watts Bar Nuclear Plant - Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 Project stage: Approval ML13247A2842013-08-28028 August 2013 First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) Project stage: Other ML13309B0592013-08-29029 August 2013 License Amendment Request Marked-up Page Corrections Project stage: Request ML13338A6342013-12-18018 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Browns Ferry Nuclear Plant, Units 1, 2, and 3, TAC Nos.: MF0902, MF0903, and MF0904 Project stage: Other ML13225A5412013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Other CNL-14-032, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-02-28028 February 2014 Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other CNL-14-132, Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Bro2014-08-28028 August 2014 Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Brown Project stage: Other CNL-14-138, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-28028 August 2014 Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML14323A2952014-11-26026 November 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other ML14281A1982014-12-23023 December 2014 Relaxation of the Schedule Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events Project stage: Approval CNL-15-035, Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-27027 February 2015 Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML15069A3582015-04-0606 April 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other CNL-15-159, Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other CNL-16-036, Sixth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other CNL-16-132, Seventh Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-08-26026 August 2016 Seventh Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2017-02-28028 February 2017 Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other CNL-17-107, Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049)2017-08-31031 August 2017 Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049) Project stage: Other CNL-18-017, Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2018-02-23023 February 2018 Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other CNL-18-056, Completion of Required Action for NRC Order Number EA-12-049, Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2018-05-31031 May 2018 Completion of Required Action for NRC Order Number EA-12-049, Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other 2014-08-28
[Table View] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 August 29, 2013 10 CFR 50.4 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
License Amendment Request Marked-up Page Corrections
References:
- 1. Letter from TVA to NRC, "License Amendment Request to Change Technical Specifications to Delete References to Section Xl of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25 Percent Extension of Surveillance Intervals to Accelerated Frequencies Utilized in the IST Program -TS-475," dated August 28, 2012 [ML12242A477]
- 2. Technical Specifications Task Force (TSTF)-479-A, Revision 0, "Changes to Reflect Revision to 10 CFR 50.55a," dated December 19, 2005 3. TSTF-497-A, Revision 0, "Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less," dated August 28, 2008 In Reference 1, Tennessee Valley Authority (TVA) submitted a License Amendment Request (LAR) to modify Facility Operating Licenses DPR-33 for Browns Ferry Nuclear Plant (BFN), Unit 1; DPR-52 for BFN, Unit 2; and DPR-68 for BFN, Unit 3.During review of the LAR, the NRC identified a minor typographical error on Technical Specification Page 5.0-12 for each of the three mark-ups provided for BFN, Units 1, 2, and 3, i.e., in the last line of 5.5.6.a, the word "are" is to be deleted. In a subsequent telephone conversation with the BFN NRC Project Manager, Ms. Farideh Saba, TVA agreed to submit the corrected pages to replace the previous pages (Page 5.0-12 for BFN, Units 1, 2, and 3)in Reference
- 1. The enclosures to this letter provide the three corrected pages.DP y Prin~ted on recycled paper t U.S. Nuclear Regulatory Commission Page 2 August 29, 2013 TVA has determined that correcting the typographical error does not affect the previous conclusions regarding the no significant hazards considerations and the categorical exclusion from environmental review pursuant to the provision of 10 CFR 51.22(c)(9) for the LAR submitted in Reference 1.There are no new regulatory commitments in this letter. If you have any questions regarding these corrections, please contact Edward D. Schrull at (423) 751-3850.I declare under penalty of perjury that the foregoing is true and correct. Executed on this 29th day of August 2013.Ily, Shea President, Nuclear Licensing
Enclosures:
- 1. Corrected Marked-up Browns Ferry Nuclear Plant Technical Specification Pages 5.0-12 for Units 1, 2, and 3 2. Corrected Retyped Browns Ferry Nuclear Plant Technical Specification Pages 5.0-12 for Units 1, 2, and 3.cc (Enclosures):
NRC Regional Administrator
-Region II NRC Senior Resident Inspector
-Browns Ferry Nuclear Plant
Enclosure 2 Corrected Retyped Browns Fe"y Nuclear Plant Technical Specification Pages .5-t2 for Units 1, 2, and 3 Programs and Manuals Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.4 Radioacthm Effluent Controls Proarnm (continued)
- h. Umitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I;i. Limitations on the annual and quarterly doses to a member of the public from iodine-131, Iodine-133, tritium, and all radlonuclides In particulate form with half lives > 8 days in gaseous effluents released from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; and j. Limitations on the annual dose or dose commitment to any member of the public beyond the site boundary due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.k. The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Radioactive Effluent Controls Program surveillance frequency.
5.5.5 Component Cyclic-or Trnan.Qnt1Umit This program provides controls to track the FSAR Section 4.2.5, cyclic and transient occurrences to ensure that components are maintained within the design limits.5.5.6 Inservie Tastina Promm This program provides controls for inservice testing of ASME Code Class 1, 2 and 3 components.
The program shall Include the following:
- a. Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda as follows: (contlnugal
.BFN-UNIT I 5.0-t2 Amendment No. 234,23W, Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.4 lef-71 7FF];JLs71Fum (continued)
- h. Umitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I;I. Limilations on the annual and quarterly doses to a member of the public from iodine-131, iodine-133, tritium, and all radionuclides in particulate form with haff lives 8 B days In gaseous effluents released from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I; and j. Umitations on the annual dose or dose commitment to any member of the public beyond the site boundary due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.k. The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Radioactive Effluent Controls Program surveillance frequency.
5.5.5 Comoonent Cyclic or Transient Limit This program provides controls to track the FSAR Section 4.2.5, cydic and transient occurrences to ensure that components are maintained within the design limits.5.5.6 Inservios Testina Proaram This program provides controls for Inservice testing of ASME Code Class 1, 2, and 3 components.
The program shall Include the following:
- a. Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda as follows: (continued)
BFN-UNIT 2 5&0-12 Amendment No. 263,266, Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.4 R81active Eficent Contols Progmm (continued)
- h. Lirnitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I;I. I-mitations on the annual and quarterly doses to a member of the public from lodine-I 31, lodlne-133, tritlum, and all radlonucldes In particulate form with half lives > 8 days In gaseous effluents released from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix 1; and j. Limitations on the annual dose or does commitment to any member of the public beyond the site boundary due to releases of radloaclivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190.k. The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Radioactive Effluent Controls Program surveillance frequency.
5.5.5 Component Cyclic or Transient Limit This program provides controls to track the FSAR Section 4.2.5, cyclic and transient occurrences to ensure that components are maintained within the design limits.5.5.6 Inseni"ce Testina Proaram This program provides controls for Inservice testing of ASME Code Class 1, 2, and 3 components.
The program shall Include the following:
- a. Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda as follows: (continued)
BIFN-UNIT 3 5.0-12 Amendment No. 242,226,