NL-12-149, Official Exhibit - ENT000596-00-BD01 - NL-12-149, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, Clarification of Underground Piping Information Provided in Letter NL-11-032 Regarding the License Renewal Application .: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Fred Dacimo Vice President Operations License Renewal Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055     NL-12-149 October 18, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001  
{{#Wiki_filter:United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.
In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: ENT000596-00-BD01                  Identified: 12/10/2012 Admitted: 1/15/2013                          Withdrawn:
Rejected:                                      Stricken:
Other:                                                                  ENT000596 Submitted: December 6, 2012 Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 Fred Dacimo Vice President Operations License Renewal NL-12-149 October 18, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Clarification of Underground Piping Information   Provided in Letter NL-11-032 Regarding the License Renewal Application Indian Point Nuclear Generating Unit Nos. 2 & 3 Docket Nos. 50-247 and 50-286   License Nos. DPR-26 and DPR-64  
Clarification of Underground Piping Information Provided in Letter NL-11-032 Regarding the License Renewal Application Indian Point Nuclear Generating Unit Nos. 2 & 3 Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64


==REFERENCE:==
==REFERENCE:==
(1) Entergy letter (NL-11-032),Response to Request for Additional Information (RAI) Aging Management Programs, dated March 28, 2011  
(1) Entergy letter (NL-11-032), Response to Request for Additional Information (RAI) Aging Management Programs, dated March 28, 2011


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Reference (1) stated in the response to RAI 3.0.3.1.2-1 Part 5a that Underground piping and tanks are below grade, but are contained within a tunnel or vault such that they are in contact with air and are located where access for inspection is restricted. In-scope SSCs that are subject to aging management review at IPEC include no underground piping or tanks. Indian Point made this statement because piping located in underground vaults is periodically accessed for visual inspections during pressure tests. However, during a recent review of the NRC Interim Staff Guidance (ISG) for Buried Piping, LR-ISG-2011-03, a question was raised relative to the definition of restricted and whether the Indian Point definition was consistent with the intent of the ISG. As a result of this question, Entergy Nuclear Operations, Inc held a conference call with the NRC staff to clarify the definition of restricted as used in the ISG.
Reference (1) stated in the response to RAI 3.0.3.1.2-1 Part 5a that Underground piping and tanks are below grade, but are contained within a tunnel or vault such that they are in contact with air and are located where access for inspection is restricted. In-scope SSCs that are subject to aging management review at IPEC include no underground piping or tanks. Indian Point made this statement because piping located in underground vaults is periodically accessed for visual inspections during pressure tests. However, during a recent review of the NRC Interim Staff Guidance (ISG) for Buried Piping, LR-ISG-2011-03, a question was raised relative to the definition of restricted and whether the Indian Point definition was consistent with the intent of the ISG. As a result of this question, Entergy Nuclear Operations, Inc held a conference call with the NRC staff to clarify the definition of restricted as used in the ISG.
Although definition of the term restricted as related to underground piping was not found in NRC guidance documents related to license renewal, during the conference call on October 11, 2012, the NRC Staff indicated that it was intended that piping located in vaults for which access requires more than simply opening a locked access cover should be classified as underground piping. As a result of this change in understanding of the definition of underground piping, Indian Point has identified portions of the service water, city water and fuel oil systems that are located in vaults that require more than unlocking a hatch or cover for access. This piping will now be considered underground piping as defined in LR-ISG-2011-03. Specifically, this includes ENT000596 Submitted: December 6 , 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of
Although definition of the term restricted as related to underground piping was not found in NRC guidance documents related to license renewal, during the conference call on October 11, 2012, the NRC Staff indicated that it was intended that piping located in vaults for which access requires more than simply opening a locked access cover should be classified as underground piping.
: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)
As a result of this change in understanding of the definition of underground piping, Indian Point has identified portions of the service water, city water and fuel oil systems that are located in vaults that require more than unlocking a hatch or cover for access. This piping will now be considered underground piping as defined in LR-ISG-2011-03. Specifically, this includes
ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:
 
Identified:
ATTACHMENT 1 TO NL-12-149 CHANGES TO THE INDIAN POINT LRA SERVICE WATER, CITY WATER, AND FUEL OIL SYSTEMS AGING MANAGEMENT REVIEW TABLES ENTERGY NUCLEAR OPERATIONS, INC.
Admitted: Withdrawn:
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286
Rejected: Stricken: Other: ENT000596-00-BD0112/10/2012 1/15/2013
 
Attachment 1 NL-12-149 Page 1 of 2 The following identifies changes to the service water system and fuel oil system aging management review tables as a result of the clarification identified in this letter.
Changes are shown with underlines for additions.
Table 3.3.2-2-IP3: Service Water System Aging Effect                        NUREG-Component          Intended                                                    Aging Management                Table 1 Material    Environment    Requiring                        1801 Vol. 2             Notes Type          Function                                                        Programs                    Item Management                            Item Piping            Pressure        Carbon steel Condensation  Loss of material Buried Piping and VII.I-11    3.3.1-58    E boundary                      (ext)                          Tanks Inspection  (A-81)
Table 3.3.2-13-IP2: Fuel Oil Systems Aging Effect                        NUREG-Component          Intended                                                    Aging Management                Table 1 Material    Environment    Requiring                        1801 Vol. 2              Notes Type          Function                                                        Programs                    Item Management                            Item Piping            Pressure        Carbon steel Air - outdoor Loss of material Buried Piping and  VII.H1-8    3.3.1-60    E boundary                      (ext)                          Tanks Inspection  (A-24)
Table 3.3.2-13-IP3: Fuel Oil Systems Aging Effect                        NUREG-Component          Intended                                                    Aging Management                Table 1 Material    Environment    Requiring                        1801 Vol. 2              Notes Type          Function                                                        Programs                    Item Management                            Item Piping            Pressure        Carbon steel Air - outdoor Loss of material Buried Piping and  VII.H1-8    3.3.1-60    E boundary                      (ext)                          Tanks Inspection  (A-24)


ATTACHMENT 1 TO NL-12-149 CHANGES TO THE INDIAN POINT LRA SERVICE WATER,  CITY WATER, AND FUEL OIL SYSTEMS AGING MANAGEMENT REVIEW TABLES  ENTERGY NUCLEAR OPERATIONS, INC. INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286    NL-12-149Page 1 of 2 The following identifies changes to the service water system and fuel oil system aging management review tables as a result of the clarification identified in this letter. Changes are shown with underlines for additions.Table 3.3.2-2-IP3: Service Water System Component Type Intended Function Material Environment Aging Effect Requiring Management Aging Management Programs NUREG-1801 Vol. 2 Item Table 1 Item Notes Piping Pressure boundary Carbon steel Condensation (ext)Loss of material Buried Piping and Tanks Inspection VII.I-11 (A-81)  3.3.1-58  E Table 3.3.2-13-IP2:  Fuel Oil Systems  Component Type Intended Function Material Environment Aging Effect Requiring Management Aging Management Programs NUREG-1801 Vol. 2 Item Table 1 Item Notes Piping Pressure boundary Carbon steel Air - outdoor (ext)Loss of material Buried Piping and Tanks Inspection VII.H1-8 (A-24)  3.3.1-60  E Table 3.3.2-13-IP3:  Fuel Oil Systems  Component Type Intended Function Material Environment Aging Effect Requiring Management Aging Management Programs NUREG-1801 Vol. 2 Item Table 1 Item Notes Piping Pressure boundary Carbon steel Air - outdoor (ext)Loss of material Buried Piping and Tanks Inspection VII.H1-8 (A-24)  3.3.1-60  E    NL-12-149Page 2 of 2 Table 3.3.2-17-IP3:  City Water Component Type Intended Function Material Environment Aging Effect Requiring Management Aging Management Programs NUREG-1801 Vol. 2 Item Table 1 Item Notes Piping Pressure boundaryCopper AlloyAir - outdoor (ext)Loss of material Buried Piping and Tanks Inspection
Attachment 1 NL-12-149 Page 2 of 2 Table 3.3.2-17-IP3: City Water Aging Effect                         NUREG-Component         Intended                                                     Aging Management               Table 1 Material     Environment         Requiring                       1801 Vol. 2             Notes Type         Function                                                           Programs                   Item Management                            Item Piping           Pressure     Copper Alloy Air - outdoor (ext) Loss of material Buried Piping and --         --           G boundary                                                        Tanks Inspection}}
---- G}}

Latest revision as of 23:21, 4 November 2019

Official Exhibit - ENT000596-00-BD01 - NL-12-149, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, Clarification of Underground Piping Information Provided in Letter NL-11-032 Regarding the License Renewal Application .
ML13039A448
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/18/2012
From: Dacimo F
Entergy Nuclear Northeast
To:
Atomic Safety and Licensing Board Panel, Document Control Desk
SECY RAS
References
RAS 23852, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, NL-12-149
Download: ML13039A448 (5)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.

In the Matter of:

(Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: ENT000596-00-BD01 Identified: 12/10/2012 Admitted: 1/15/2013 Withdrawn:

Rejected: Stricken:

Other: ENT000596 Submitted: December 6, 2012 Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 Fred Dacimo Vice President Operations License Renewal NL-12-149 October 18, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Clarification of Underground Piping Information Provided in Letter NL-11-032 Regarding the License Renewal Application Indian Point Nuclear Generating Unit Nos. 2 & 3 Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64

REFERENCE:

(1) Entergy letter (NL-11-032), Response to Request for Additional Information (RAI) Aging Management Programs, dated March 28, 2011

Dear Sir or Madam:

Reference (1) stated in the response to RAI 3.0.3.1.2-1 Part 5a that Underground piping and tanks are below grade, but are contained within a tunnel or vault such that they are in contact with air and are located where access for inspection is restricted. In-scope SSCs that are subject to aging management review at IPEC include no underground piping or tanks. Indian Point made this statement because piping located in underground vaults is periodically accessed for visual inspections during pressure tests. However, during a recent review of the NRC Interim Staff Guidance (ISG) for Buried Piping, LR-ISG-2011-03, a question was raised relative to the definition of restricted and whether the Indian Point definition was consistent with the intent of the ISG. As a result of this question, Entergy Nuclear Operations, Inc held a conference call with the NRC staff to clarify the definition of restricted as used in the ISG.

Although definition of the term restricted as related to underground piping was not found in NRC guidance documents related to license renewal, during the conference call on October 11, 2012, the NRC Staff indicated that it was intended that piping located in vaults for which access requires more than simply opening a locked access cover should be classified as underground piping.

As a result of this change in understanding of the definition of underground piping, Indian Point has identified portions of the service water, city water and fuel oil systems that are located in vaults that require more than unlocking a hatch or cover for access. This piping will now be considered underground piping as defined in LR-ISG-2011-03. Specifically, this includes

ATTACHMENT 1 TO NL-12-149 CHANGES TO THE INDIAN POINT LRA SERVICE WATER, CITY WATER, AND FUEL OIL SYSTEMS AGING MANAGEMENT REVIEW TABLES ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286

Attachment 1 NL-12-149 Page 1 of 2 The following identifies changes to the service water system and fuel oil system aging management review tables as a result of the clarification identified in this letter.

Changes are shown with underlines for additions.

Table 3.3.2-2-IP3: Service Water System Aging Effect NUREG-Component Intended Aging Management Table 1 Material Environment Requiring 1801 Vol. 2 Notes Type Function Programs Item Management Item Piping Pressure Carbon steel Condensation Loss of material Buried Piping and VII.I-11 3.3.1-58 E boundary (ext) Tanks Inspection (A-81)

Table 3.3.2-13-IP2: Fuel Oil Systems Aging Effect NUREG-Component Intended Aging Management Table 1 Material Environment Requiring 1801 Vol. 2 Notes Type Function Programs Item Management Item Piping Pressure Carbon steel Air - outdoor Loss of material Buried Piping and VII.H1-8 3.3.1-60 E boundary (ext) Tanks Inspection (A-24)

Table 3.3.2-13-IP3: Fuel Oil Systems Aging Effect NUREG-Component Intended Aging Management Table 1 Material Environment Requiring 1801 Vol. 2 Notes Type Function Programs Item Management Item Piping Pressure Carbon steel Air - outdoor Loss of material Buried Piping and VII.H1-8 3.3.1-60 E boundary (ext) Tanks Inspection (A-24)

Attachment 1 NL-12-149 Page 2 of 2 Table 3.3.2-17-IP3: City Water Aging Effect NUREG-Component Intended Aging Management Table 1 Material Environment Requiring 1801 Vol. 2 Notes Type Function Programs Item Management Item Piping Pressure Copper Alloy Air - outdoor (ext) Loss of material Buried Piping and -- -- G boundary Tanks Inspection